36C25022Q0250 0002.pdf

PDF 133 KB Posted

Attached to
J061--539-22-204 - Electric Panel Study Commercial Services RFQ
Solicitation number
36C25022Q0250
Issued by

View the file

Other files

File Type Posted
36C25022Q0250 0003.pdf PDF
36C25022Q0250 0001.docx DOCX document
Attachment II - SCA WD.pdf PDF
Attachment I - SOW.pdf PDF
36C25022Q0250.pdf PDF
Attachment III - Electric Drawings.pdf PDF
Attachment IV - VHA Supplemental Contract Requirements for Combatting COVID-19.pdf PDF
36C25022Q0250.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

02-24-2022

539-22-2-6905-0016

539-22-204

36C250

Department of Veterans Affairs

Network Contracting Office (NCO) 10

260 E. University Avenue

Cincinnati OH 45219

36C250

Department of Veterans Affairs

Network Contracting Office (NCO) 10

260 E. University Avenue

Cincinnati OH 45219

To all Offerors/Bidders

36C25022Q0250

02-24-2022

X

X X

03/07/2022 at 10:00 A.M. EST.

539-3620162-6905-854200-3223 23NRNR000

X 0

This amendment is being posted to provide answers to questions that were received. See page 2-3.

Quotes are due on the date/time posted in box 11.

Luke A. Turner

Contracting Officer

VA-VHA-2020-D02DEFD3

Questions and Answers Below:

1. Is building 1 the only building to be included in this scope of work?

a. Correct, only building 1.

2. Is circuit tracing required for devices other than outlets and light switches? If so, is labeling required to be visible at the device?

a. Panels should be traced and labeled in their entirety – this can include more than outlets and light switches.

b. Labels at the device are required – these should include circuit and panel numbers

3. Is medium voltage equipment included in this SOW?

a. 120/208V, 277/480V will be included.

4. What are the specifications for the panel schedules? i.e. electronic copy? Physical copy? Siz e?

Does the schedule need to be able to adhere to a surface?

a. Per the SOW, there should be two hardcopies of the panel schedule in each panel, as well as a PDF of the schedule submitted to the COR.

i. All schedules should be typed and printed

b. Sizes depend on panel manufacturer – must fit inside the panel sleeve, inside the door.

i. If the contractor prefers one standard size, they can provide a new standard sleeve/size for all panels in the project, but it is not required. It must fit inside the panel door and the contractor will need to remove the existing sleeve entirely.

5. What information needs to be provided in the panel schedule?

a. Equipment Description

b. Room Number

i. Include specific location within room, direction based on magnetic North

6. Please clarify “The contractor should verify panel schedule after tracing with shutdowns of each breaker panel. In the case of a shutdown, the contractor should give three weeks’ notice to the COTR of which breaker will be turned off and red lines of the affected devices.” See SOW. What does red lines of affected devices mean?

a. Detailed description of what they expect will be affected in the shut down – can be included in the outage request email to the COR

b. Red lines/as-builts will be required at the conclusion of the project

i. AutoCAD and PDF Form

7. Will a HEPA cart be provided by others to All-Test in the event work above ceilings is required?

a. HEPA carts will not be provided by the VA – infection control should be included in the bids

8. Will onsite parking free of charge be provided to our crew?

a. Contractors will have to find their own parking, as no parking will be permitted onsite.

9. Is there a larger scope of work that this project falls into?

a. No, this is a stand-alone project.

***END OF AMENDMENT***

Is the intent of this project to perform circuit tracing at load centers/panel boards , for only lighting and receptacle branch circuits, with the real intention to label light switches and receptacles with panel name and circuit number and update panel schedule? Or should every branch circuit be included? I.e.

hvac equipment, elevator circuits, etc.

The intent of this project is to update the panel schedules for the electrical panels within the hospital by tracing and identifying all branched circuits. The panel should be labeled in its entirety, which can include more than light switches and outlets.

Or do all feeder circuits need to be traced as well? I.e. every piece of the electrical system, from utility service entrance to switchgear, to distribution panels, including motor control centers, to load centers and then every branch circuit?

This project will not trace the entire electrical system – only the panel branched circuits, and labeling associated devices with circuit and panel numbers.

File details come from the government source that posted it. Updated .