This document summarizes an asbestos survey report and related federal contract opportunity. The asbestos survey report identifies asbestos-containing materials found during an inspection of the Cincinnati VA Medical Center in preparation for a planned renovation project to replace various hospital steam heating systems. Asbestos was detected in hard white pipe fitting insulation and brown caulking in various building locations.
The related federal contract opportunity is a solicitation by the Veterans Administration Indianapolis to release an invitation for bid for project number 539-19-202 entitled "Loading Dock and Warehouse Improvements" at their facility. The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses and offers a project magnitude between $100,000 to $200,000. Interested parties should register on the Federal Business Opportunities website to receive any updates or amendments regarding requirements, response date, and pre-bid site visit details which will be included in the solicitation package.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25020B0027 0003.docx | DOCX document | |
| 36C25020B0027 0002.docx | DOCX document | |
| N1187304 Cinci VA Replace Hospital Steam Heating Systems Phase 2 Ltd LP Sampling Analysis Report 040419.pdf | ||
| 36C25020B0027 0001.docx | DOCX document | |
| 36C25020B0027 0001.docx | DOCX document | |
| 36C25020B0027-004.pdf | ||
| 36C25020B0027-005.pdf | ||
| 36C25020B0027-003.pdf | ||
| 36C25020B0027-002.docx | DOCX document | |
| 36C25020B0027-006.docx | DOCX document | |
| 36C25020B0027-007.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asbestos Survey VA Project: Replace Hospital Steam Heating Systems Phase 2
VA Project Number: 539-18-102 Cincinnati VA Medical Center
3200 Vine Street Cincinnati, Ohio 45220
April 4, 2019
Terracon Project No. N1187304
Prepared for:
Levin Porter Associates Inc.
Miamisburg, Ohio 45342
Prepared by:
Terracon Consultants, Inc.
Cincinnati, Ohio 45226
Terracon Consul tants, Inc., 611 Lunken Park Dr ive, Cincinnat i , OH 45226 P (513) 321-5816 terracon.com
April 4, 2019
Levin Porter Associates Inc.
3011 Newmark Drive Miamisburg, Ohio 45342
Attn: Mr. J. William Williams, AIA President T: (937) 224-1931 E: bwilliams@levin-portar.com
Re: Asbestos Survey VA Project: Replace Hospital Steam Heating Systems Phase 2 VA Project No. 539-18-102 Cincinnati VA Medical Center 3200 Vine Street Cincinnati, Ohio 45220 Terracon Project No. N1187304
Dear Mr. Williams:
Terracon Consultants, Inc. (Terracon) is pleased to submit the attached report for the above-referenced renovation project to Levin Porter Associates Inc. (Client). The purpose of this report is to present the results of an asbestos survey which was performed on March 13 and 14, 2019, and in general accordance with our proposal number PN1187304, dated August 13, 2018. We understand that this survey was requested for the purpose of a planned renovation pertaining to various hospital steam systems at various locations throughout the Cincinnati VA Medical Center (CVAMC) (as shown on Client-provided drawings).
Asbestos-containing materials (ACM) were identified as a result of the survey. Please refer to the attached report for detail.
Terracon appreciates the opportunity to provide this service to John Poe Architects. If you have any questions regarding this report, please contact the undersigned at 513-321-5816.
Sincerely, Terracon Consultants, Inc.
Joshua Vogel Joseph A. Tussey, CHMM Project Manager Sr. Associate / Group Manager
OH AHES #35291 OH AHES #32388
Replace Hospital Steam Heating Systems Phase 2 ■ CVAMC April 4, 2019 ■ Terracon Project No. N1187304
TABLE OF CONTENTS
EXECUTIVE SUMMARY .......................................................................................................................... i
1.0 INTRODUCTION
1.1 Project Objective
1.2 Reliance
2.0 BUILDING DESCRIPTION
3.0 FIELD ACTIVITIES
3.1 Visual Assessment
3.2 Physical Assessment
3.3 Sample Collection
3.4 Sample Analysis
4.0 REGULATORY OVERVIEW
5.0 FINDINGS AND RECOMMENDATIONS
6.0 LIMITATIONS/GENERAL COMMENTS
APPENDIX A IDENTIFIED ASBESTOS-CONTAINING MATERIALS BY HOMOGENEOUS AREA (HA)
APPENDIX B ASBESTOS SURVEY SAMPLE & RESULTS SUMMARY
APPENDIX C ASBESTOS ANALYTICAL LABORATORY DATA
APPENDIX D LICENSES AND CERTIFICATIONS
APPENDIX E SAMPLE LOCATION DRAWINGS
April 4, 2019 ■ Terracon Project No. N1187304
Responsive ■ Resourceful ■ Reliable i
EXECUTIVE SUMMARY
Terracon Consultants, Inc. (Terracon) conducted an asbestos survey which was specifically limited to within the boundaries and intent of the planned renovation project entitled “Replace Hospital Steam Heating Systems Phase 2” at the Cincinnati VA Medical Center (CVAMC). We understand that this survey was requested prior to renovation for the purpose of compliance with the EPA National Emission Standards for Hazardous Air Pollutants (NESHAP) regulation (40 CFR Part 61, Subpart M). The survey included identifying and sampling suspect asbestos-containing materials (ACM), and providing information regarding the identity, location, condition, and approximate quantities of ACM (if any) pertaining to specific building components which are intended to be impacted by planned renovation as indicated on Client-provided drawings. The survey was performed on March 13 and 14, 2018 by two (2) United States Environmental Protection Agency (USEPA)-accredited asbestos inspectors and Ohio Environmental Protection Agency (OEPA) certified Asbestos Hazard Evaluation Specialists (AHES). The survey was conducted in general accordance with our proposal number PN1187304, dated August 13, 2018, and the sampling protocols established in USEPA 40 Code of Federal Regulations (CFR) Part 763, Subpart E, known as the Asbestos Hazard Emergency Response Act (AHERA).
Specific to the subject renovation project areas and building systems indicated on Client-provided drawings and based on the analytical results of the collected samples, the materials listed below were identified to contain asbestos.
ACM Description Material Location % and Type Asbestos Condition Estimated
Quantity* Hard White Pipe Fitting Insulation with Fiberglass
Undercoat
Basement- B010 5” and 3” Condensate/Steam Lines
2.6% Amosite by Point Count (PC) Good ~5 Fittings or 5
Square Feet (SF)
Brown Caulking 1st Floor- B128- Base of 2” and 5” Steam Lines 4.8% Chrysotile PC Good ~1 SF Total
Brown Caulking 2nd Floor- B226- Base of 2” and 5” Steam Lines 3.2% Chrysotile PC Good ~1 SF Total
*Estimated quantities listed above are based on a cursory field evaluation, and actual quantities may vary significantly, especially if ACMs are present outside of the renovation areas, and in hidden and/or inaccessible areas not evaluated as part of this survey. This is not a bidding document and contractors would be responsible for drawing their own conclusions on quantities present
A sample summary is included in Appendix B; laboratory analytical reports are included as Appendix C.
If the identified ACMs will be impacted by the renovation, such materials would need to be properly removed, handled, and disposed in accordance with applicable federal and state EPA regulations, Occupational Safety and Health Administration (OSHA) regulations, and per VA project specifications.
Responsive ■ Resourceful ■ Reliable 1
ASBESTOS SURVEY
VA Project: Replace Hospital Steam Heating Systems Phase 2
VA Project No.: 539-18-102 Cincinnati VA Medical Center
3200 Vine Street Cincinnati, Ohio 45220
Terracon Project No. N1187302 April 4, 2019
1.0 INTRODUCTION
Terracon Consultants, Inc. (Terracon) conducted an asbestos survey specifically limited to within the boundaries and intent of the planned renovation project entitled “Replace Hospital Steam Heating Systems Phase 2” at the Cincinnati VA Medical Center (CVAMC). The survey was performed on March 13 and 14, 2019 by two (2) United States Environmental Protection Agency (USEPA)-accredited asbestos inspectors and Ohio Environmental Protection Agency (OEPA) certified Asbestos Hazard Evaluation Specialists (AHES). Accessible building components and areas intended to be impacted by the renovation project were surveyed based upon Client-provided renovation plans. Homogeneous areas of suspect asbestos-containing materials (ACM) were visually identified and documented. Although reasonable effort was made to survey accessible suspect materials, additional suspect but un-sampled materials could be located in walls, in voids, or in other concealed areas. Suspect ACM samples were collected in general accordance with the sampling protocols outlined in USEPA 40 Code of Federal Regulations (CFR) Part 763, Subpart E, known as the Asbestos Hazard Emergency Response Act (AHERA).
Samples were delivered to an accredited laboratory for analysis by Polarized Light Microscopy
(PLM).
1.1 Project Objective
We understand that this survey was requested for the purposes of a future planned renovation project pertaining to replacement of various steam heating components at various locations. Please note that asbestos surveys are required prior to renovation or demolition to satisfy requirements of the USEPA 40 CFR Part 61, Subpart M, the National Emission Standards for Hazardous Air Pollutants (NESHAP) regulation (as well as the state NESHAP equivalent).
1.2 Reliance
This report is for the exclusive use of Levin Porter Associates Inc. (Client) for the project being discussed. Reliance by any other party on this report is prohibited without written authorization of Terracon and Levin Porter Associates Inc. Reliance on this report by Levin Porter Associates Inc.
April 4, 2019 ■ Terracon Project No. N1187304
Responsive ■ Resourceful ■ Reliable 2 and all authorized parties will be subject to the terms, conditions, and limitations stated in the proposal and the agreement between Terracon and Levin Porter Associates Inc.
2.0 BUILDING DESCRIPTION
The renovation project includes impacts to various hospital steam systems at various locations throughout the hospital. Client-provided drawings which indicate the areas and systems being impacted are are shown on the sample location drawings included in Appendix E.
3.0 FIELD ACTIVITIES
The survey was conducted by Mr. Joshua Vogel and Mr. Lemuel Weyer, USEPA-accredited asbestos inspectors and OEPA certified AHES. A copy of their Ohio AHES credential is attached as Appendix D. The survey was conducted in general accordance with the sample collection protocols established in USEPA 40 CFR Part 763, Subpart E, Section 763.86, AHERA. A summary of survey activities is provided below.
3.1 Visual Assessment
Survey activities were initiated with visual observation of accessible areas and accessible building components to identify homogeneous areas of suspect ACM. A homogeneous area (HA) consists of building materials that appear similar throughout in terms of color and texture with consideration given to the date of application.
3.2 Physical Assessment
A physical assessment of each HA of suspect ACM was conducted to assess the friability and condition of the materials. A friable material is defined by the USEPA as a material which can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friability was assessed by physically touching suspect materials.
3.3 Sample Collection
Based on results of the visual observation, bulk samples of suspect ACM were collected in general accordance with USEPA AHERA sampling protocols. Samples of suspect materials were collected from randomly selected locations in each homogeneous area. Bulk samples were collected using wet methods as applicable to reduce the potential for fiber release. Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker.
The selection of sample locations and frequency of sampling were based on Terracon’s observations and the assumption that like materials in the same area are homogeneous in content.
April 4, 2019 ■ Terracon Project No. N1187304
Responsive ■ Resourceful ■ Reliable 3
Terracon collected a total of 144 bulk samples from 48 homogeneous areas of suspect ACM. A summary of suspect ACM samples collected during the survey is included as Appendix B.
3.4 Sample Analysis
Bulk samples were submitted under chain of custody to International Asbestos Testing Laboratories (IATL) of Mount Laurel, New Jersey for analysis PLM with dispersion staining techniques per USEPA methodology 600/R-93/116. The percentage of asbestos, where applicable, was determined by microscopic visual estimation. When applicable for samples determined by PLM to have a low asbestos content (<10%), the additional point count (PC) method was utilized. IATL is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP), accreditation number 101165-0.
4.0 REGULATORY OVERVIEW
The asbestos NESHAP (40 CFR Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices. The asbestos NESHAP regulation also requires the identification and classification of existing ACM according to friability prior to demolition or renovation activity. Friable ACM is a material containing more than 1% asbestos that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure. All friable ACM is considered regulated asbestos containing material (RACM).
The asbestos NESHAP regulation classifies material subject to demolition or renovation as either RACM, Category I non-friable ACM, or Category II non-friable ACM. RACM includes all friable ACM (pre-disturbance), along with Category I non-friable ACM that becomes friable (during disturbance), and Category I non-friable ACM subject to sanding, grinding, cutting, or abrading, or Category II non-friable ACM with a high probability of becoming crumbled, pulverized, or reduced to powder by forces expected to act on the material during disturbance. Category I non-friable ACM are exclusively asbestos-containing packings, gaskets, resilient floor coverings, and asphalt roofing products that contain more than 1% asbestos. Category II non-friable ACM are all other non-friable materials (other than Category I non-friable ACM) that contain more than 1% asbestos. Category II non-friable ACM generally includes (but is not limited to) cementitious material such as: cement pipes, cement siding (Transite™), cement panels, glazing, mortar, and grouts.
The Ohio Environmental Protection Agency (OEPA) adopted Chapter 3745-20 of the Ohio Administrative Code and implements the Asbestos NESHAP. The owner or operator must provide the OEPA district office or local air agency with written notification at least 10 business days prior to the commencement demolition projects and prior to removal of friable ACMs in quantities greater than 50 linear or 50 square feet. The OEPA also regulates friable asbestos abatement activities, asbestos personnel training, and issuance of asbestos professional certifications under OAC 3745-22. OEPA audits asbestos abatement projects and responds to public health
April 4, 2019 ■ Terracon Project No. N1187304
Responsive ■ Resourceful ■ Reliable 4 emergencies where friable ACMs has been released. Please note that per OEPA regulations, non-friable floor tile if broken into pieces four (4) square inches or smaller are considered friable, and thus as a RACM.
The United States Occupational Safety and Health Administration (USOSHA) asbestos standard for construction (29 CFR 1926.1101) regulates workplace exposure to asbestos. The USOSHA standard requires that employee exposure to airborne asbestos must not exceed 0.1 fibers per cubic centimeter of air (0.1 f/cc) as an eight-hour time weighted average (TWA) and not exceed
1.0 fibers per cubic centimeter of air (1.0 f/cc) over a 30-minute time period known as an excursion limit (EL). The TWA and EL are known as USOSHA’s asbestos permissible exposure limits (PELs). The USOSHA standard classifies construction and maintenance activities which could disturb ACM, and specifies work practices and precautions which employers must follow when engaging in each class of regulated work.
5.0 FINDINGS AND RECOMMENDATIONS
Specific to the subject renovation project areas and building systems indicated on Client-provided drawings and based on the analytical results of the collected samples, the materials listed below were identified to contain asbestos.
ACM Description Material Location % and Type Asbestos Condition Estimated
Quantity* Hard White Pipe Fitting Insulation with Fiberglass
Undercoat
Basement- B010 5” and 3” Condensate/Steam Lines
2.6% Amosite by Point Count (PC) Good ~5 Fittings or 5
Square Feet (SF)
Brown Caulking 1st Floor- B128- Base of 2” and 5” Steam Lines 4.8% Chrysotile PC Good ~1 SF Total
Brown Caulking 2nd Floor- B226- Base of 2” and 5” Steam Lines 3.2% Chrysotile PC Good ~1 SF Total
*Estimated quantities listed above are based on a cursory field evaluation, and actual quantities may vary significantly, especially if ACMs are present outside of the renovation areas, and in hidden and/or inaccessible areas not evaluated as part of this survey. This is not a bidding document and contractors would be responsible for drawing their own conclusions on quantities present
A sample summary is included in Appendix B; laboratory analytical reports are included as Appendix C.
If the identified ACMs will be impacted by the renovation, such materials would need to be properly removed, handled, and disposed in accordance with applicable federal and state EPA regulations, Occupational Safety and Health Administration (OSHA) regulations, and per VA project specifications.
April 4, 2019 ■ Terracon Project No. N1187304
Responsive ■ Resourceful ■ Reliable 5
6.0 LIMITATIONS/GENERAL COMMENTS
The survey was project specific and limited to our understanding of the Client’s intended renovation project scope; this survey is not meant to be a comprehensive survey of the entire building/facility. In addition, Terracon did not perform sampling which required demolition or destructive activities such as knocking large holes in walls, dismantling of equipment or removal of protective coverings. Reasonable efforts to access suspect materials within known areas of restricted access (e.g., crawl spaces) were made; however, confined spaces or areas which may pose a health or safety risk to Terracon personnel were not sampled. Sampling did not include suspect materials which could not be safely reached with available ladders/man-lifts.
This asbestos survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions, and recommendations expressed in this report are based on conditions observed during our survey of the building. The information contained in this report is relevant to the date on which this survey was performed and should not be relied upon to represent conditions at a later date. This report has been prepared on behalf of and exclusively for use by Levin Porter Associates Inc. for specific application to their project as discussed. This report is not a bidding document. Contractors or consultants reviewing this report must draw their own conclusions regarding quantities, further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories, or other third-parties supplying information which may have been used in the preparation of this report. No warranty, express or implied is made.
R es po ns iv e
R es ou rc ef ul
Re lia bl e
AP
PE
N D
IX
A
VA
P ro je ct : R ep la ce H os pi ta l S te am
H ea tin g
Sy st em s
Ph as e
VA
P ro je ct N o.
: 5
-1
8-
C in ci nn at i V A
M ed ic al
C en te r
V in e St re et
C in ci nn at i, O hi o
Te rra co n
Pr oj ec t N o.
N
ID
EN
TI
FI
ED
A
SB
ES
TO
S-
CO
NT
AI
N
IN
G
M
AT
ER
IA
LS
B
Y
HO
M O
G
EN
EO
US
A R
EA
(H
A) HA No
’s
AC
M
D es cr ip tio n
M at er ia l L oc at io n a nd
T yp e As be st os
EP
A
NE
SH
AP
Cl as si fic at io n Co nd iti on Es tim at ed Q ua nt ity
H ar d
W hi te F itt in g In su la tio n w ith
F ib er gl as s
U nd er co at Ba se m en t-
B0
” a nd
” C on de ns at e/
St ea m Li ne s
2.
6%
A m os ite by P oi nt
C ou nt (P
C
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l (R
AC
M
G oo d
~5 F itt in gs o r 5 Sq ua re
F ee t (
SF
Br ow n
C au lk in g 1s t F lo or
- B
8-
B as e of
” a nd
” S te am L in es
4.
8%
C hr ys ot ile
PC
C at eg or y
II
N on
-F ria bl e
G oo d ~1
SF
T ot al
Br ow n
C au lk in g 2n d Fl oo r-
B2
- B as e of
” a nd
” S te am L in es
3.
2%
C hr ys ot ile
PC
C at eg or y
II
N on
-F ria bl e
G oo d ~1
S F
To ta l
Se e
Ap pe nd ix
B fo r a s um m ar y of s am pl es c ol le ct ed
, A pp en di x C fo r d et ai le d an al yt ica l r es ul ts
, a nd
A pp en di x E fo r a s am pl e lo ca tio n dr aw in gs
*E st im at ed q ua nt iti es li st ed a bo ve a re b as ed o n a cu rs or y fie ld e va lu at io n, a nd a ct ua l q ua nt iti es m ay v ar y si gn ific an tly
, e sp ec ia lly if
A C
M s ar e pr es en t o ut si de o f t he pl an ne d re no va tio n ar ea s, a nd in h id de n an d/ or in ac ce ss ib le a re as n ot e va lu at ed a s pa rt of th is su rv ey
. T hi s is no t a b id di ng d oc um en t a nd c on tra ct or s w ou ld b e re sp on si bl e fo r d ra w in g th ei r o w n co nc lu si on s re ga rd in g qu an tit ie s pr es en t.
It sh ou ld b e no te d th at in ac ce ss ib le /c on ce al ed s us pe ct m at er ia ls , o th er th an th os e id en tif ie d du rin g th is s ur ve y, m ay e xi st
. S ho ul d ad di tio na l s us pe ct m at er ia ls be un co ve re d pr io r t o or d ur in g re no va tio n ac tiv iti es , t ho se m at er ia ls m us t b e as su m ed a sb es to s-co nt ai ni ng u nt il sa m pl ed b y an O hi o lic en se d as be st os in sp ec to r a nd an al ys is c an c on fir m o r d en y th ei r a sb es to s co nt en t.
If th e id en tif ie d
AC
M s w ill be im pa ct ed b y th e re no va tio n, s uc h m at er ia ls w ou ld n ee d to b e pr op er ly re m ov ed
, h an dl ed
, a nd d is po se d in a cc or da nc e w ith a pp lic ab le fe de ra l a nd s ta te E
PA
re gu la tio ns
, O cc up at io na l S af et y an d
H ea lth A dm in is tra tio n
(O
SH
A) re gu la tio ns
, a nd p er
V A pr oj ec t s pe ci fic at io ns
Responsive ■ Resourceful ■ Reliable
APPENDIX B
VA Project: Replace Hospital Steam Heating Systems Phase 2 VA Project No.: 539-18-102
Cincinnati VA Medical Center 3200 Vine Street
Cincinnati, Ohio 45220 Terracon Project No. N1187304
ASBESTOS SURVEY SAMPLE SUMMARY
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
White Mastic over Fiberglass Pipe
Insulation
West Side of Machinery- 2” Pipe
Sub-Basement-
None Detected (ND)
002 West Side of Machinery- 4” Pipe ND
003 East Side of Machinery- 2” Pipe ND
White Mastic over Fiberglass Pipe
Insulation
2” Condensate Pipe Sub- Basement- 2” Condensate and 4” Steam Lines- East
Crawl Space
ND
005 4” Steam Pipe ND
006 4” Steam Pipe ND
White Mastic over Fiberglass Pipe
Insulation
South Side of West Tank
Sub-Basement- Pipes Associated with Condensation Tanks
ND
008 North Side of West Tank ND
009 North Side of East Tank ND
White Mastic over Fiberglass Pipe
Insulation
Center of Room – 4” Condensation Line Sub-Basement-
Condensate and Steam Line- Main
Room
ND
Northwest Corner of Room – 4” High Pressure Steam
Line
ND
April 4, 2019 ■ Terracon Project No. N1187304
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
Northeast Corner of
Room- 1” Condensation Line
ND
White Mastic over Fiberglass Pipe
Insulation
4” Pipe
Basement- A-013 Closet
ND
014 4” Pipe ND
015 4” Pipe ND
White Mastic over Fiberglass Pipe
Insulation
4” Condensate Line
Basement- C003B Condensate Line
ND
017 4” Condensate Line ND
018 4” Condensate Line ND
White Mastic over Fiberglass Pipe
Insulation
1” Pipe
Basement- C003B Pipe Around Flow
Meter
ND
020 1” Pipe ND
021 1” Pipe ND
Hard White Fittings with Fiberglass
Undercoat
5” Pipe Basement- B010 5” and 3” Condensate/Steam
Lines
2.6% Amosite by Point Count
(PC)
023 5” Pipe 2.2% Amosite PC
024 3” 1.9% Amosite PC
Plaster Wall: Base Coat and Finished
Coat
Near Hatch
Basement- B010
Base Coat: ND, Finished Coat:
ND
026 Near Hatch Base Coat: ND, Finished Coat:
ND
027 Near Hatch Base Coat: ND, Finished Coat:
April 4, 2019 ■ Terracon Project No. N1187304
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
White Mastic over Fiberglass Pipe
Insulation
4” Pipe
1st Floor- A123 – 4” Steam Lines
ND
029 4” Pipe ND
030 4” Pipe ND
Brown Caulking
2” Pipe
1st Floor- B128- Base of 2” and 5”
Steam Lines
4.3% Chrysotile PC
032 5” Pipe 4.1% Chrysotile PC
033 5” Pipe 4.8% Chrysotile PC
White Mastic over Fiberglass Pipe
Insulation
4” Pipe
2nd Floor- A221- 4” Steam Lines
ND
035 4” Pipe ND
036 4” Pipe ND
Brown Caulking
4” Pipe
2nd Floor- A221- Base of 4”Steam
Lines
ND
038 4” Pipe ND
039 4” Pipe ND
Brown Caulking
2” Pipe
2nd Floor- B226- Base of 2” and 5”
Steam Lines
2.4% Chrysotile PC
041 5” Pipe 1.8% Chrysotile PC
042 5” Pipe 3.2% Chrysotile PC
15 043 4” Pipe 3rd Floor- A336- 4” Steam Lines ND
April 4, 2019 ■ Terracon Project No. N1187304
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
044 White Mastic over Fiberglass Pipe
Insulation
4” Pipe ND
045 4” Pipe ND
Red Fire-Stop Caulking
4” Pipe
3rd Floor- A336- 4” Steam Lines
ND
047 4” Pipe ND
048 4” Pipe ND
Red Fire-Stop Caulking
5” Pipe
3rd Floor- B317- Base of 5” and 3”
Steam Lines
ND
050 5” Pipe ND
051 3” Pipe ND
White Mastic over Fiberglass Pipe
Insulation
5” Pipe
3rd Floor- B317- 5” and 3” Steam Lines
ND
053 5” Pipe ND
054 3” Pipe ND
White Mastic over Fiberglass Pipe
Insulation
4” Pipe
5th Floor- A525- 4” Steam Lines
ND
056 4” Pipe ND
057 4” Pipe ND
Red Fire-Stop
Caulking
5” Pipe 5th Floor- B508- Base of 2” and 5”
Steam Lines
059 5” Pipe ND
April 4, 2019 ■ Terracon Project No. N1187304
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
060 3” Pipe ND
Red Fire-Stop Caulking
5” Pipe
7th Floor- B711- Base of 5” and 3”
Steam Lines
ND
062 5” Pipe ND
063 3” Pipe ND
White Mastic over Fiberglass Pipe
Insulation
5” Pipe
7th Floor- B711- 5” and 3” Steam Lines
ND
065 5” Pipe ND
066 3” Pipe ND
Red Fire-Stop Caulking
5” Pipe
7th Floor- A725- Base of 5” and 3”
Steam Lines
ND
068 5” Pipe ND
069 3” Pipe ND
White Mastic over Fiberglass Pipe
Insulation
5” Pipe
7th Floor- A725- 5” and 3” Steam Lines
ND
071 5” Pipe ND
072 3” Pipe ND
White 2’ x 2’ Fine Textured Ceiling Tile
South End of Hallway
Building 2- Throughout Basement
ND
074 Outside Room 0007 ND
075 Outside Room 0007 ND
April 4, 2019 ■ Terracon Project No. N1187304
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
White Mastic over Fiberglass Pipe
Insulation
South End of Hallway Building 2
Basement - Steam and Condensate Lines Throughout
Basement
ND
077 Outside Room 0007 ND
078 North End of Crawl Space ND
Red Fire-Stop Caulking
Outside Room 0007
Building 2 Basement- All Wall
Penetrations
ND
080 Outside Room 0007 ND
081 Outside Room 0007 ND
White Mastic over Fiberglass Pipe
Insulation
Northwest Corner of Mechanical Room
Building 8- Steam and Condensate
Lines in Northwest Corner
ND
083 Northwest Corner of Mechanical Room ND
084 Northwest Corner of Mechanical Room ND
White Mastic over Fiberglass Pipe
Insulation
Northwest of Entry to Ground’s Crew
Office- 1” Pipe Building 1- Steam Line in Ground’s Crew Basement
Area
ND
Northwest of Entry to Ground’s Crew
Office- 1” Pipe
ND
Northwest of Entry to Ground’s Crew
Office- 1” Pipe
ND
Brown Caulking
1” Pipe 3rd Floor- Operating Room- Steam Line
Near Northeast Corner of Clean
Room
ND
089 1” Pipe ND
090 1” Pipe ND
31 091 Red Fire-Stop Caulking Center West ND
April 4, 2019 ■ Terracon Project No. N1187304
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
092 Northwest Building 15 Roof- West Wall of AHU
ND
093 Southwest ND
White Mastic over Fiberglass Pipe
Insulation
Northwest Corner
Building 15 Roof- AHU 1 Steam
Lines
ND
095 Middle West ND
096 Southwest Corner ND
Tan Putty
Southwest Corner
Building 15 Roof- AHU 1 Southwest
Corner
ND
098 Southwest Corner ND
099 Southwest Corner ND
Transparent Mastic
Outside Room B412 4th Floor-
Throughout New Pharmacy on Duct
Work
ND
101 Outside Room B412 ND
102 Outside Room B412 ND
2’ x 2’ Small Fissure Ceiling Tiles
Outside Room B412 4th Floor-
Throughout New Pharmacy Hallways
ND
104 Outside Room B412 ND
105 Outside Room B433a ND
Brown Duct Mastic
Outside Room B412a 4th Floor- New
Pharmacy Duct Work
ND
107 Outside Room B412a ND
April 4, 2019 ■ Terracon Project No. N1187304
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
108 Outside Room B412a ND
2’ x 2’ White Bird Track Ceiling Tile
Doorway of Northwest Room (Electrophoresis
Core) 4th Floor- New
Pharmacy Rooms
ND
110 Doorway of Lac Produce ND
111 Doorway to West Lab ND
White Mastic over Fiberglass Pipe
Insulation
Large Area- East of South Column
4th Floor- South New Pharmacy
Area- Steam Lines
ND
Large Area
Northeast of South Column
ND
114 North Center of Large Room ND
Gray Duct Mastic
Center of Large Room
4th Floor- South New Pharmacy-
Duct Work
ND
116 Center of Large Room ND
117 Center of Large Room ND
White Mastic over Fiberglass Pipe
Insulation
2” Pipe- Middle East Wall
5th Floor Penthouse (B505E)- Steam
Lines on East Side of Room
ND
119 2” Pipe- Middle of Room ND
120 2” Pipe- Middle of Room ND
White Duct Tape
Southwest Corner of Room 5th Floor Penthouse
(B505E)- Duct Work
ND
122 Southwest Corner of Room ND
April 4, 2019 ■ Terracon Project No. N1187304
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
123 Southwest Corner of Room ND
White Mastic over Fiberglass Pipe
Insulation
4” Pipe- Southwest Corner of Room
5th Floor Penthouse (B505E)- Steam
Lines in Southwest Corner of Room
ND
125 4” Pipe- Southwest Corner of Room ND
126 4” Pipe- Southwest Corner of Room ND
White Duct Mastic
Southwest Corner of Room on
Uninsulated Duct Work
5th Floor Penthouse (B505E)- Duct
Work in southwest Corner of Room
ND
Southwest Corner of Room on
Uninsulated Duct Work
ND
Southwest Corner of Room on
Uninsulated Duct Work
ND
White Mastic over Fiberglass Pipe
Insulation
East Side of Area
AHU1- 4” Steam Lines
ND
131 Middle of Area ND
132 West Side of Area ND
Gray Caulking
Southwest Corner
AHU1 Roof
ND
134 Southwest Corner ND
135 Southwest Corner ND
136 White Mastic over Fiberglass Pipe
Insulation
Middle of North Wall 4th Floor- Throughout
Mechanical Room - 456A- Steam Lines
ND
137 Northeast Corner of Room ND
April 4, 2019 ■ Terracon Project No. N1187304
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
138 Middle of East Wall ND
White Mastic over Fiberglass Pipe
Insulation
South End
AHU 3 Steam Lines
ND
140 Middle ND
141 North End ND
Gray Caulking
Southeast Corner
AHU 3 Roof
ND
143 Southeast Corner ND
144 Southeast Corner ND
April 4, 2019 ■ Terracon Project No. N1187304
Responsive ■ Resourceful ■ Reliable
APPENDIX C
ASBESTOS ANALYTICAL LABORATORY DATA
Lab No.: 6743046 Client No.: 1-001
Analyst Observation: White Mastic Client Description: White Mastic Over Fiberglass Pipe Insulation
Location: West Side Of Machinery - 2" Pipe; Sub-Basement-South Facility:
Percent Asbestos:
None Detected
Percent Non-Asbestos Fibrous Material:
5 Wollastonite
Percent Non-Fibrous Material:
Lab No.: 6743047 Client No.: 1-002
Location: West Side Of Machinery - 4"
Facility:
Lab No.: 6743048 Client No.: 1-003
Location: East Side Of Machinery - 2"
Facility:
Lab No.: 6743049 Client No.: 2-004
Location: 2" Condensate Pipe; East Crawl Space Facility:
Lab No.: 6743050 Client No.: 2-005
Location: 4" Steam Pipe; East Crawl Space Facility:
Lab No.: 6743051 Client No.: 2-006
Location: 4" Steam Pipe; East Crawl Space
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Erik Swanson
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Client: TER940
Dated : 3/29/2019 7:02:58 Page 1 of 33
Lab No.: 6743052 Client No.: 3-007
Location: South Side Of West Tank; Sub- Basement Facility:
Lab No.: 6743053 Client No.: 3-008
Location: North Side Of West Tank; Sub-
Facility:
Lab No.: 6743054 Client No.: 3-009
Location: North Side Of East Tank; Sub-
Facility:
Lab No.: 6743055 Client No.: 4-010
Location: Center Of Room-4" Condensation Line; Sub-Basement Facility:
Lab No.: 6743056 Client No.: 4-011
Location: Northwest Corner Of Room-4" High Pressure Steam Line; Sub-Basement Facility:
Lab No.: 6743057 Client No.: 4-012
Location: Northeast Corner Of Room-1" Condensatiion Line; Sub-Basement Facility:
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Erik Swanson
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:58 Page 2 of 33
Lab No.: 6743058 Client No.: 5-013
Location: 4" Pipe; Basement - A-013 Closet
Lab No.: 6743059 Client No.: 5-014
Lab No.: 6743060 Client No.: 5-015
Lab No.: 6743061 Client No.: 6-016
Location: 4" Condensate Line; Basement - C003B Facility:
Lab No.: 6743062 Client No.: 6-017
Facility:
Lab No.: 6743063 Client No.: 6-018
Facility:
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Erik Swanson
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:58 Page 3 of 33
Lab No.: 6743064 Client No.: 7-019
Location: 1" Pipe; Basement - C003B Around Flow Meter Facility:
Lab No.: 6743065 Client No.: 7-020
Facility:
Lab No.: 6743066 Client No.: 7-021
Facility:
Lab No.: 6743067 Client No.: 8-022
Analyst Observation: White Fitting Client Description: Hard White Fittings With Fiberglass Pipe
Location: 5" Pipe; Basement - B010 Condensate/Steam Line Facility:
PC 2.6 Amosite
10 Fibrous Glass
87.4
Lab No.: 6743068 Client No.: 8-023
Location: 5" Pipe; Basement - B010
Facility:
PC 2.2 Amosite
87.8
Lab No.: 6743069 Client No.: 8-024
Location: 3" Pipe; Basement - B010
Facility:
PC 1.9 Amosite
88.1
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Erik Swanson
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:58 Page 4 of 33
Lab No.: 6743070 Client No.: 9-025
Analyst Observation: White Plaster Client Description: Plaster Wall
Location: Near Hatch; Basement - B010
Lab No.: 6743070(L2) Client No.: 9-025
Analyst Observation: Beige Plaster
Lab No.: 6743071 Client No.: 9-026
Lab No.: 6743071(L2) Client No.: 9-026
Lab No.: 6743072 Client No.: 9-027
Lab No.: 6743072(L2) Client No.: 9-027
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Erik Swanson
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:58 Page 5 of 33
Lab No.: 6743073 Client No.: 10-028
Location: 4" Pipe; 1st Floor-A123 Steam Lines Facility:
Lab No.: 6743074 Client No.: 10-029
Facility:
Lab No.: 6743075 Client No.: 10-030
Facility:
Lab No.: 6743076 Client No.: 11-031
Analyst Observation: Brown Mastic Client Description: Brown Caulking
Location: 2" Pipe; 1st Floor-B128-Steam
Facility:
PC 4.3 Chrysotile
95.7
Lab No.: 6743077 Client No.: 11-032
Location: 5" Pipe; 1st Floor-B128-Steam
Facility:
PC 4.1 Chrysotile
95.9
Lab No.: 6743078 Client No.: 11-033
Location: 5" Pipe; 1st Floor-B128-Steam
Facility:
PC 4.8 Chrysotile
95.2
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Erik Swanson
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:58 Page 6 of 33
Lab No.: 6743079 Client No.: 12-034
Analyst Observation: White Coating
Location: 4" Pipe; 2nd Floor-A221-Steam
Facility:
3 Cellulose
Lab No.: 6743080 Client No.: 12-035
Facility:
1 Cellulose
Lab No.: 6743080(L2) Client No.: 12-035
Analyst Observation: Grey Insulation
Facility:
95 Fibrous Glass
Lab No.: 6743081 Client No.: 12-036
Facility:
Lab No.: 6743082 Client No.: 13-037
Analyst Observation: Brown Non-Fibrous
Facility:
1 Fibrous Glass
Lab No.: 6743083 Client No.: 13-038
Facility:
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Zach Schwartz
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:58 Page 7 of 33
Lab No.: 6743083(L2) Client No.: 13-038
Analyst Observation: Grey Fibrous
Facility:
95 Fibrous Glass
Lab No.: 6743084 Client No.: 13-039
Facility:
5 Fibrous Glass
Lab No.: 6743085 Client No.: 14-040
Analyst Observation: Brown Caulk
Location: 2" Pipe; 2nd Floor-B226-Steam
Facility:
PC 2.4 Chrysotile
3 Fibrous Glass
94.6
Lab No.: 6743086 Client No.: 14-041
Analyst Observation: Tan Caulk
Location: 5" Pipe; 2nd Floor-B226-Steam
Facility:
PC 1.8 Chrysotile
2 Fibrous Glass
96.2
Lab No.: 6743087 Client No.: 14-042
Location: 5" Pipe; 2nd Floor-B226-Steam
Facility:
PC 3.2 Chrysotile
96.8
Lab No.: 6743088 Client No.: 15-043
Analyst Observation: Off-White Wrap
Location: 4" Pipe; 3rd Floor-A336-Steam
Facility:
15 Cellulose
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Zach Schwartz
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:58 Page 8 of 33
Lab No.: 6743088(L2) Client No.: 15-043
Analyst Observation: Yellow Insulation
Facility:
99 Fibrous Glass
Lab No.: 6743089 Client No.: 15-044
Analyst Observation: Off-White Coating
Facility:
20 Cellulose
Lab No.: 6743089(L2) Client No.: 15-044
Facility:
Lab No.: 6743090 Client No.: 15-045
Analyst Observation: Grey Coating
Facility:
Lab No.: 6743090(L2) Client No.: 15-045
Facility:
Lab No.: 6743091 Client No.: 16-046
Analyst Observation: Red Caulk Client Description: Red Fire-Stop Caulking
Facility:
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Zach Schwartz
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:58 Page 9 of 33
Lab No.: 6743092 Client No.: 16-047
Facility:
Lab No.: 6743093 Client No.: 16-048
Facility:
Lab No.: 6743094 Client No.: 17-049
Analyst Observation: Red Firestop
Location: 5" Pipe; 3rd Floor-A317-Steam
Facility:
Lab No.: 6743095 Client No.: 17-050
Location: 5" Pipe; 3rd Floor-A317-Steam
Facility:
Lab No.: 6743096 Client No.: 17-051
Location: 3" Pipe; 3rd Floor-A317-Steam
Facility:
Lab No.: 6743097 Client No.: 18-052
Location: 5" Pipe; 3rd Floor-B317-Steam
Facility:
50 Cellulose
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Zach Schwartz
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:58 Page 10 of 33
Lab No.: 6743098 Client No.: 18-053
Location: 5" Pipe; 3rd Floor-B317-Steam
Facility:
30 Cellulose
Lab No.: 6743099 Client No.: 18-054
Location: 3" Pipe; 3rd Floor-B317-Steam
Facility:
Lab No.: 6743099(L2) Client No.: 18-054
Analyst Observation: Brown Insulation
Location: 3" Pipe; 3rd Floor-B317-Steam
Facility:
Lab No.: 6743100 Client No.: 19-055
Location: 4" Pipe; 5th Floor-A525-Steam
Facility:
Lab No.: 6743101 Client No.: 19-056
Facility:
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Zach Schwartz
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:58 Page 11 of 33
Lab No.: 6743102 Client No.: 19-057
Facility:
Lab No.: 6743102(L2) Client No.: 19-057
Facility:
Lab No.: 6743103 Client No.: 20-058
Client Description: Red Firestop Caulking
Location: 5" Pipe; 5th Floor-B508-Steam
Facility:
Lab No.: 6743104 Client No.: 20-059
Location: 5" Pipe; 5th Floor-B508-Steam
Facility:
Lab No.: 6743105 Client No.: 20-060
Location: 3" Pipe; 5th Floor-B508-Steam
Facility:
Lab No.: 6743106 Client No.: 21-061
Location: 5" Pipe; 7th Floor-B711-Steam
Facility:
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Zach Schwartz
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:59 Page 12 of 33
Lab No.: 6743107 Client No.: 21-062
Facility:
Lab No.: 6743108 Client No.: 21-063
Location: 3" Pipe; 7th Floor-B711-Steam
Facility:
Lab No.: 6743108(L2) Client No.: 21-063
Analyst Observation: Brown Foam
Facility:
Lab No.: 6743109 Client No.: 22-064
Facility:
Lab No.: 6743110 Client No.: 22-065
Analyst Observation: White Wrap
Facility:
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Zach Schwartz
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:59 Page 13 of 33
Lab No.: 6743111 Client No.: 22-066
Facility:
Lab No.: 6743112 Client No.: 23-067
Location: 5" Pipe; 7th Floor-A725-Steam
Facility:
Lab No.: 6743113 Client No.: 23-068
Facility:
Lab No.: 6743114 Client No.: 23-069
Location: 3" Pipe; 7th Floor-A725-Steam
Facility:
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Zach Schwartz
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:59 Page 14 of 33
Lab No.: 6743115 Client No.: 24-070
Facility:
Lab No.: 6743116 Client No.: 24-071
Facility:
Lab No.: 6743117 Client No.: 24-072
Location: 3" Pipe; 7th Floor-A725-Steam
Facility:
Lab No.: 6743118 Client No.: 25-073
Analyst Observation: White/Grey Ceiling Tile Client Description: White 2'x2' Fine Textured Ceiling Tile
Location: South End Of Hallway; Bldg 2- Throughout Basement Facility:
55 Mineral Wool
Lab No.: 6743119 Client No.: 25-074
Location: Outside Room 0007; Bldg 2-
Facility:
Lab No.: 6743120 Client No.: 25-075
Facility:
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Terrence Mulhern
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:59 Page 15 of 33
Lab No.: 6743121 Client No.: 26-076
Location: South End Of Hallway; Bldg 2-
Facility:
Lab No.: 6743122 Client No.: 26-077
Facility:
Lab No.: 6743123 Client No.: 26-078
Location: North End Of Crawl Space; Bldg 2-Basement Facility:
Lab No.: 6743124 Client No.: 27-079
Basement All Wall Penetrations Facility:
5 Mineral Wool
Lab No.: 6743125 Client No.: 27-080
Facility:
Lab No.: 6743126 Client No.: 27-081
Facility:
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Terrence Mulhern
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:59 Page 16 of 33
Lab No.: 6743127 Client No.: 28-082
Location: Northwest Corner Of Mechanical Room; Bldg 8 Facility:
Lab No.: 6743128 Client No.: 28-083
Facility:
Lab No.: 6743129 Client No.: 28-084
Facility:
Lab No.: 6743130 Client No.: 29-085
Location: Northwest Of Entry To Ground's Crew Office-1" Pipe; Bldg 1 Facility:
Lab No.: 6743131 Client No.: 29-086
Facility:
Lab No.: 6743132 Client No.: 29-087
Facility:
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Terrence Mulhern
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:59 Page 17 of 33
Lab No.: 6743133 Client No.: 30-088
Location: 1" Pipe; 3rd Fl Operating Rm- Steam Line Near NE Corner Of Clean Rm Facility:
Lab No.: 6743134 Client No.: 30-089
Facility:
Lab No.: 6743135 Client No.: 30-090
Facility:
Lab No.: 6743136 Client No.: 31-091
Location: Center West; Bldg 15 Roof-West Wall Of AHU 30 Facility:
Lab No.: 6743137 Client No.: 31-092
Location: Northwest; Bldg 15 Roof-West
Facility:
Lab No.: 6743138 Client No.: 31-093
Location: Southwest; Bldg 15 Roof-West
Facility:
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Terrence Mulhern
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:59 Page 18 of 33
Lab No.: 6743139 Client No.: 32-094
Location: Northwest Corner; Bldg 15 Roof- AHU 30 Steam Line Facility:
Lab No.: 6743140 Client No.: 32-095
Location: Middle West; Bldg 15 Roof-AHU 30 Steam Line Facility:
Lab No.: 6743141 Client No.: 32-096
Location: Southwest Corner; Bldg 15 Roof- AHU 30 Steam Line Facility:
Lab No.: 6743142 Client No.: 33-097
Analyst Observation: Grey Putty Client Description: Tan Putty
AHU 30
Facility:
5 Cellulose
Lab No.: 6743143 Client No.: 33-098
Facility:
Lab No.: 6743144 Client No.: 33-099
Facility:
Laboratory Director
Approved By:
Date Analyzed:
3/18/2019Date Received:
Analyst:
Please refer to the Appendix of this report for further information regarding your analysis.
Signature:
Terrence Mulhern
03/28/2019 Frank E. Ehrenfeld, III
9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054
Telephone: 856-231-9449 Email: customerservice@iatl.com
CERTIFICATE OF ANALYSIS
Client: Terracon
611 Lunken Park Drive Cincinnati OH 45226
3/29/2019Report Date:
Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304
PLM BULK SAMPLE ANALYSIS SUMMARY
Dated : 3/29/2019 7:02:59 Page 19 of 33
Lab No.: 6743145 Client No.: 34-100
Analyst Observation: Clear Mastic Client Description: Transparent Mastic
Location: Outside Room B412; 4th Fl Throughout New Pharmacy On Ductwork Facility: