N1187304 Cinci VA Replace Hosiptal Steam Systems Phase 2 Asbestos Survey Report Final.pdf

PDF 4 MB Posted

Attached to
36C25020B0027 - Z1DA--Replace Steam Heating Systems Federal contract opportunity
Solicitation number
36C25020B0027
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document summarizes an asbestos survey report and related federal contract opportunity. The asbestos survey report identifies asbestos-containing materials found during an inspection of the Cincinnati VA Medical Center in preparation for a planned renovation project to replace various hospital steam heating systems. Asbestos was detected in hard white pipe fitting insulation and brown caulking in various building locations.

The related federal contract opportunity is a solicitation by the Veterans Administration Indianapolis to release an invitation for bid for project number 539-19-202 entitled "Loading Dock and Warehouse Improvements" at their facility. The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses and offers a project magnitude between $100,000 to $200,000. Interested parties should register on the Federal Business Opportunities website to receive any updates or amendments regarding requirements, response date, and pre-bid site visit details which will be included in the solicitation package.

View the file

Other files for this federal contract opportunity

Other files attached to 36C25020B0027 - Z1DA--Replace Steam Heating Systems, newest first.
File Type Posted
36C25020B0027 0003.docx DOCX document
36C25020B0027 0002.docx DOCX document
N1187304 Cinci VA Replace Hospital Steam Heating Systems Phase 2 Ltd LP Sampling Analysis Report 040419.pdf PDF
36C25020B0027 0001.docx DOCX document
36C25020B0027 0001.docx DOCX document
36C25020B0027-004.pdf PDF
36C25020B0027-005.pdf PDF
36C25020B0027-003.pdf PDF
36C25020B0027-002.docx DOCX document
36C25020B0027-006.docx DOCX document
36C25020B0027-007.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Asbestos Survey VA Project: Replace Hospital Steam Heating Systems Phase 2

VA Project Number: 539-18-102 Cincinnati VA Medical Center

3200 Vine Street Cincinnati, Ohio 45220

April 4, 2019

Terracon Project No. N1187304

Prepared for:

Levin Porter Associates Inc.

Miamisburg, Ohio 45342

Prepared by:

Terracon Consultants, Inc.

Cincinnati, Ohio 45226

Terracon Consul tants, Inc., 611 Lunken Park Dr ive, Cincinnat i , OH 45226 P (513) 321-5816 terracon.com

April 4, 2019

Levin Porter Associates Inc.

3011 Newmark Drive Miamisburg, Ohio 45342

Attn: Mr. J. William Williams, AIA President T: (937) 224-1931 E: bwilliams@levin-portar.com

Re: Asbestos Survey VA Project: Replace Hospital Steam Heating Systems Phase 2 VA Project No. 539-18-102 Cincinnati VA Medical Center 3200 Vine Street Cincinnati, Ohio 45220 Terracon Project No. N1187304

Dear Mr. Williams:

Terracon Consultants, Inc. (Terracon) is pleased to submit the attached report for the above-referenced renovation project to Levin Porter Associates Inc. (Client). The purpose of this report is to present the results of an asbestos survey which was performed on March 13 and 14, 2019, and in general accordance with our proposal number PN1187304, dated August 13, 2018. We understand that this survey was requested for the purpose of a planned renovation pertaining to various hospital steam systems at various locations throughout the Cincinnati VA Medical Center (CVAMC) (as shown on Client-provided drawings).

Asbestos-containing materials (ACM) were identified as a result of the survey. Please refer to the attached report for detail.

Terracon appreciates the opportunity to provide this service to John Poe Architects. If you have any questions regarding this report, please contact the undersigned at 513-321-5816.

Sincerely, Terracon Consultants, Inc.

Joshua Vogel Joseph A. Tussey, CHMM Project Manager Sr. Associate / Group Manager

OH AHES #35291 OH AHES #32388

Replace Hospital Steam Heating Systems Phase 2 ■ CVAMC April 4, 2019 ■ Terracon Project No. N1187304

TABLE OF CONTENTS

EXECUTIVE SUMMARY .......................................................................................................................... i

1.0 INTRODUCTION

1.1 Project Objective

1.2 Reliance

2.0 BUILDING DESCRIPTION

3.0 FIELD ACTIVITIES

3.1 Visual Assessment

3.2 Physical Assessment

3.3 Sample Collection

3.4 Sample Analysis

4.0 REGULATORY OVERVIEW

5.0 FINDINGS AND RECOMMENDATIONS

6.0 LIMITATIONS/GENERAL COMMENTS

APPENDIX A IDENTIFIED ASBESTOS-CONTAINING MATERIALS BY HOMOGENEOUS AREA (HA)

APPENDIX B ASBESTOS SURVEY SAMPLE & RESULTS SUMMARY

APPENDIX C ASBESTOS ANALYTICAL LABORATORY DATA

APPENDIX D LICENSES AND CERTIFICATIONS

APPENDIX E SAMPLE LOCATION DRAWINGS

April 4, 2019 ■ Terracon Project No. N1187304

Responsive ■ Resourceful ■ Reliable i

EXECUTIVE SUMMARY

Terracon Consultants, Inc. (Terracon) conducted an asbestos survey which was specifically limited to within the boundaries and intent of the planned renovation project entitled “Replace Hospital Steam Heating Systems Phase 2” at the Cincinnati VA Medical Center (CVAMC). We understand that this survey was requested prior to renovation for the purpose of compliance with the EPA National Emission Standards for Hazardous Air Pollutants (NESHAP) regulation (40 CFR Part 61, Subpart M). The survey included identifying and sampling suspect asbestos-containing materials (ACM), and providing information regarding the identity, location, condition, and approximate quantities of ACM (if any) pertaining to specific building components which are intended to be impacted by planned renovation as indicated on Client-provided drawings. The survey was performed on March 13 and 14, 2018 by two (2) United States Environmental Protection Agency (USEPA)-accredited asbestos inspectors and Ohio Environmental Protection Agency (OEPA) certified Asbestos Hazard Evaluation Specialists (AHES). The survey was conducted in general accordance with our proposal number PN1187304, dated August 13, 2018, and the sampling protocols established in USEPA 40 Code of Federal Regulations (CFR) Part 763, Subpart E, known as the Asbestos Hazard Emergency Response Act (AHERA).

Specific to the subject renovation project areas and building systems indicated on Client-provided drawings and based on the analytical results of the collected samples, the materials listed below were identified to contain asbestos.

ACM Description Material Location % and Type Asbestos Condition Estimated

Quantity* Hard White Pipe Fitting Insulation with Fiberglass

Undercoat

Basement- B010 5” and 3” Condensate/Steam Lines

2.6% Amosite by Point Count (PC) Good ~5 Fittings or 5

Square Feet (SF)

Brown Caulking 1st Floor- B128- Base of 2” and 5” Steam Lines 4.8% Chrysotile PC Good ~1 SF Total

Brown Caulking 2nd Floor- B226- Base of 2” and 5” Steam Lines 3.2% Chrysotile PC Good ~1 SF Total

*Estimated quantities listed above are based on a cursory field evaluation, and actual quantities may vary significantly, especially if ACMs are present outside of the renovation areas, and in hidden and/or inaccessible areas not evaluated as part of this survey. This is not a bidding document and contractors would be responsible for drawing their own conclusions on quantities present

A sample summary is included in Appendix B; laboratory analytical reports are included as Appendix C.

If the identified ACMs will be impacted by the renovation, such materials would need to be properly removed, handled, and disposed in accordance with applicable federal and state EPA regulations, Occupational Safety and Health Administration (OSHA) regulations, and per VA project specifications.

Responsive ■ Resourceful ■ Reliable 1

ASBESTOS SURVEY

VA Project: Replace Hospital Steam Heating Systems Phase 2

VA Project No.: 539-18-102 Cincinnati VA Medical Center

3200 Vine Street Cincinnati, Ohio 45220

Terracon Project No. N1187302 April 4, 2019

1.0 INTRODUCTION

Terracon Consultants, Inc. (Terracon) conducted an asbestos survey specifically limited to within the boundaries and intent of the planned renovation project entitled “Replace Hospital Steam Heating Systems Phase 2” at the Cincinnati VA Medical Center (CVAMC). The survey was performed on March 13 and 14, 2019 by two (2) United States Environmental Protection Agency (USEPA)-accredited asbestos inspectors and Ohio Environmental Protection Agency (OEPA) certified Asbestos Hazard Evaluation Specialists (AHES). Accessible building components and areas intended to be impacted by the renovation project were surveyed based upon Client-provided renovation plans. Homogeneous areas of suspect asbestos-containing materials (ACM) were visually identified and documented. Although reasonable effort was made to survey accessible suspect materials, additional suspect but un-sampled materials could be located in walls, in voids, or in other concealed areas. Suspect ACM samples were collected in general accordance with the sampling protocols outlined in USEPA 40 Code of Federal Regulations (CFR) Part 763, Subpart E, known as the Asbestos Hazard Emergency Response Act (AHERA).

Samples were delivered to an accredited laboratory for analysis by Polarized Light Microscopy

(PLM).

1.1 Project Objective

We understand that this survey was requested for the purposes of a future planned renovation project pertaining to replacement of various steam heating components at various locations. Please note that asbestos surveys are required prior to renovation or demolition to satisfy requirements of the USEPA 40 CFR Part 61, Subpart M, the National Emission Standards for Hazardous Air Pollutants (NESHAP) regulation (as well as the state NESHAP equivalent).

1.2 Reliance

This report is for the exclusive use of Levin Porter Associates Inc. (Client) for the project being discussed. Reliance by any other party on this report is prohibited without written authorization of Terracon and Levin Porter Associates Inc. Reliance on this report by Levin Porter Associates Inc.

April 4, 2019 ■ Terracon Project No. N1187304

Responsive ■ Resourceful ■ Reliable 2 and all authorized parties will be subject to the terms, conditions, and limitations stated in the proposal and the agreement between Terracon and Levin Porter Associates Inc.

2.0 BUILDING DESCRIPTION

The renovation project includes impacts to various hospital steam systems at various locations throughout the hospital. Client-provided drawings which indicate the areas and systems being impacted are are shown on the sample location drawings included in Appendix E.

3.0 FIELD ACTIVITIES

The survey was conducted by Mr. Joshua Vogel and Mr. Lemuel Weyer, USEPA-accredited asbestos inspectors and OEPA certified AHES. A copy of their Ohio AHES credential is attached as Appendix D. The survey was conducted in general accordance with the sample collection protocols established in USEPA 40 CFR Part 763, Subpart E, Section 763.86, AHERA. A summary of survey activities is provided below.

3.1 Visual Assessment

Survey activities were initiated with visual observation of accessible areas and accessible building components to identify homogeneous areas of suspect ACM. A homogeneous area (HA) consists of building materials that appear similar throughout in terms of color and texture with consideration given to the date of application.

3.2 Physical Assessment

A physical assessment of each HA of suspect ACM was conducted to assess the friability and condition of the materials. A friable material is defined by the USEPA as a material which can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friability was assessed by physically touching suspect materials.

3.3 Sample Collection

Based on results of the visual observation, bulk samples of suspect ACM were collected in general accordance with USEPA AHERA sampling protocols. Samples of suspect materials were collected from randomly selected locations in each homogeneous area. Bulk samples were collected using wet methods as applicable to reduce the potential for fiber release. Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker.

The selection of sample locations and frequency of sampling were based on Terracon’s observations and the assumption that like materials in the same area are homogeneous in content.

April 4, 2019 ■ Terracon Project No. N1187304

Responsive ■ Resourceful ■ Reliable 3

Terracon collected a total of 144 bulk samples from 48 homogeneous areas of suspect ACM. A summary of suspect ACM samples collected during the survey is included as Appendix B.

3.4 Sample Analysis

Bulk samples were submitted under chain of custody to International Asbestos Testing Laboratories (IATL) of Mount Laurel, New Jersey for analysis PLM with dispersion staining techniques per USEPA methodology 600/R-93/116. The percentage of asbestos, where applicable, was determined by microscopic visual estimation. When applicable for samples determined by PLM to have a low asbestos content (<10%), the additional point count (PC) method was utilized. IATL is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP), accreditation number 101165-0.

4.0 REGULATORY OVERVIEW

The asbestos NESHAP (40 CFR Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices. The asbestos NESHAP regulation also requires the identification and classification of existing ACM according to friability prior to demolition or renovation activity. Friable ACM is a material containing more than 1% asbestos that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure. All friable ACM is considered regulated asbestos containing material (RACM).

The asbestos NESHAP regulation classifies material subject to demolition or renovation as either RACM, Category I non-friable ACM, or Category II non-friable ACM. RACM includes all friable ACM (pre-disturbance), along with Category I non-friable ACM that becomes friable (during disturbance), and Category I non-friable ACM subject to sanding, grinding, cutting, or abrading, or Category II non-friable ACM with a high probability of becoming crumbled, pulverized, or reduced to powder by forces expected to act on the material during disturbance. Category I non-friable ACM are exclusively asbestos-containing packings, gaskets, resilient floor coverings, and asphalt roofing products that contain more than 1% asbestos. Category II non-friable ACM are all other non-friable materials (other than Category I non-friable ACM) that contain more than 1% asbestos. Category II non-friable ACM generally includes (but is not limited to) cementitious material such as: cement pipes, cement siding (Transite™), cement panels, glazing, mortar, and grouts.

The Ohio Environmental Protection Agency (OEPA) adopted Chapter 3745-20 of the Ohio Administrative Code and implements the Asbestos NESHAP. The owner or operator must provide the OEPA district office or local air agency with written notification at least 10 business days prior to the commencement demolition projects and prior to removal of friable ACMs in quantities greater than 50 linear or 50 square feet. The OEPA also regulates friable asbestos abatement activities, asbestos personnel training, and issuance of asbestos professional certifications under OAC 3745-22. OEPA audits asbestos abatement projects and responds to public health

April 4, 2019 ■ Terracon Project No. N1187304

Responsive ■ Resourceful ■ Reliable 4 emergencies where friable ACMs has been released. Please note that per OEPA regulations, non-friable floor tile if broken into pieces four (4) square inches or smaller are considered friable, and thus as a RACM.

The United States Occupational Safety and Health Administration (USOSHA) asbestos standard for construction (29 CFR 1926.1101) regulates workplace exposure to asbestos. The USOSHA standard requires that employee exposure to airborne asbestos must not exceed 0.1 fibers per cubic centimeter of air (0.1 f/cc) as an eight-hour time weighted average (TWA) and not exceed

1.0 fibers per cubic centimeter of air (1.0 f/cc) over a 30-minute time period known as an excursion limit (EL). The TWA and EL are known as USOSHA’s asbestos permissible exposure limits (PELs). The USOSHA standard classifies construction and maintenance activities which could disturb ACM, and specifies work practices and precautions which employers must follow when engaging in each class of regulated work.

5.0 FINDINGS AND RECOMMENDATIONS

Specific to the subject renovation project areas and building systems indicated on Client-provided drawings and based on the analytical results of the collected samples, the materials listed below were identified to contain asbestos.

ACM Description Material Location % and Type Asbestos Condition Estimated

Quantity* Hard White Pipe Fitting Insulation with Fiberglass

Undercoat

Basement- B010 5” and 3” Condensate/Steam Lines

2.6% Amosite by Point Count (PC) Good ~5 Fittings or 5

Square Feet (SF)

Brown Caulking 1st Floor- B128- Base of 2” and 5” Steam Lines 4.8% Chrysotile PC Good ~1 SF Total

Brown Caulking 2nd Floor- B226- Base of 2” and 5” Steam Lines 3.2% Chrysotile PC Good ~1 SF Total

*Estimated quantities listed above are based on a cursory field evaluation, and actual quantities may vary significantly, especially if ACMs are present outside of the renovation areas, and in hidden and/or inaccessible areas not evaluated as part of this survey. This is not a bidding document and contractors would be responsible for drawing their own conclusions on quantities present

A sample summary is included in Appendix B; laboratory analytical reports are included as Appendix C.

If the identified ACMs will be impacted by the renovation, such materials would need to be properly removed, handled, and disposed in accordance with applicable federal and state EPA regulations, Occupational Safety and Health Administration (OSHA) regulations, and per VA project specifications.

April 4, 2019 ■ Terracon Project No. N1187304

Responsive ■ Resourceful ■ Reliable 5

6.0 LIMITATIONS/GENERAL COMMENTS

The survey was project specific and limited to our understanding of the Client’s intended renovation project scope; this survey is not meant to be a comprehensive survey of the entire building/facility. In addition, Terracon did not perform sampling which required demolition or destructive activities such as knocking large holes in walls, dismantling of equipment or removal of protective coverings. Reasonable efforts to access suspect materials within known areas of restricted access (e.g., crawl spaces) were made; however, confined spaces or areas which may pose a health or safety risk to Terracon personnel were not sampled. Sampling did not include suspect materials which could not be safely reached with available ladders/man-lifts.

This asbestos survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions, and recommendations expressed in this report are based on conditions observed during our survey of the building. The information contained in this report is relevant to the date on which this survey was performed and should not be relied upon to represent conditions at a later date. This report has been prepared on behalf of and exclusively for use by Levin Porter Associates Inc. for specific application to their project as discussed. This report is not a bidding document. Contractors or consultants reviewing this report must draw their own conclusions regarding quantities, further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories, or other third-parties supplying information which may have been used in the preparation of this report. No warranty, express or implied is made.

R es po ns iv e

R es ou rc ef ul

Re lia bl e

AP

PE

N D

IX

A

VA

P ro je ct : R ep la ce H os pi ta l S te am

H ea tin g

Sy st em s

Ph as e

VA

P ro je ct N o.

: 5

-1

8-

C in ci nn at i V A

M ed ic al

C en te r

V in e St re et

C in ci nn at i, O hi o

Te rra co n

Pr oj ec t N o.

N

ID

EN

TI

FI

ED

A

SB

ES

TO

S-

CO

NT

AI

N

IN

G

M

AT

ER

IA

LS

B

Y

HO

M O

G

EN

EO

US

A R

EA

(H

A) HA No

’s

AC

M

D es cr ip tio n

M at er ia l L oc at io n a nd

T yp e As be st os

EP

A

NE

SH

AP

Cl as si fic at io n Co nd iti on Es tim at ed Q ua nt ity

H ar d

W hi te F itt in g In su la tio n w ith

F ib er gl as s

U nd er co at Ba se m en t-

B0

” a nd

” C on de ns at e/

St ea m Li ne s

2.

6%

A m os ite by P oi nt

C ou nt (P

C

R eg ul at ed A sb es to s

C on ta in in g

M at er ia l (R

AC

M

G oo d

~5 F itt in gs o r 5 Sq ua re

F ee t (

SF

Br ow n

C au lk in g 1s t F lo or

- B

8-

B as e of

” a nd

” S te am L in es

4.

8%

C hr ys ot ile

PC

C at eg or y

II

N on

-F ria bl e

G oo d ~1

SF

T ot al

Br ow n

C au lk in g 2n d Fl oo r-

B2

- B as e of

” a nd

” S te am L in es

3.

2%

C hr ys ot ile

PC

C at eg or y

II

N on

-F ria bl e

G oo d ~1

S F

To ta l

Se e

Ap pe nd ix

B fo r a s um m ar y of s am pl es c ol le ct ed

, A pp en di x C fo r d et ai le d an al yt ica l r es ul ts

, a nd

A pp en di x E fo r a s am pl e lo ca tio n dr aw in gs

*E st im at ed q ua nt iti es li st ed a bo ve a re b as ed o n a cu rs or y fie ld e va lu at io n, a nd a ct ua l q ua nt iti es m ay v ar y si gn ific an tly

, e sp ec ia lly if

A C

M s ar e pr es en t o ut si de o f t he pl an ne d re no va tio n ar ea s, a nd in h id de n an d/ or in ac ce ss ib le a re as n ot e va lu at ed a s pa rt of th is su rv ey

. T hi s is no t a b id di ng d oc um en t a nd c on tra ct or s w ou ld b e re sp on si bl e fo r d ra w in g th ei r o w n co nc lu si on s re ga rd in g qu an tit ie s pr es en t.

It sh ou ld b e no te d th at in ac ce ss ib le /c on ce al ed s us pe ct m at er ia ls , o th er th an th os e id en tif ie d du rin g th is s ur ve y, m ay e xi st

. S ho ul d ad di tio na l s us pe ct m at er ia ls be un co ve re d pr io r t o or d ur in g re no va tio n ac tiv iti es , t ho se m at er ia ls m us t b e as su m ed a sb es to s-co nt ai ni ng u nt il sa m pl ed b y an O hi o lic en se d as be st os in sp ec to r a nd an al ys is c an c on fir m o r d en y th ei r a sb es to s co nt en t.

If th e id en tif ie d

AC

M s w ill be im pa ct ed b y th e re no va tio n, s uc h m at er ia ls w ou ld n ee d to b e pr op er ly re m ov ed

, h an dl ed

, a nd d is po se d in a cc or da nc e w ith a pp lic ab le fe de ra l a nd s ta te E

PA

re gu la tio ns

, O cc up at io na l S af et y an d

H ea lth A dm in is tra tio n

(O

SH

A) re gu la tio ns

, a nd p er

V A pr oj ec t s pe ci fic at io ns

Responsive ■ Resourceful ■ Reliable

APPENDIX B

VA Project: Replace Hospital Steam Heating Systems Phase 2 VA Project No.: 539-18-102

Cincinnati VA Medical Center 3200 Vine Street

Cincinnati, Ohio 45220 Terracon Project No. N1187304

ASBESTOS SURVEY SAMPLE SUMMARY

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

White Mastic over Fiberglass Pipe

Insulation

West Side of Machinery- 2” Pipe

Sub-Basement-

None Detected (ND)

002 West Side of Machinery- 4” Pipe ND

003 East Side of Machinery- 2” Pipe ND

White Mastic over Fiberglass Pipe

Insulation

2” Condensate Pipe Sub- Basement- 2” Condensate and 4” Steam Lines- East

Crawl Space

ND

005 4” Steam Pipe ND

006 4” Steam Pipe ND

White Mastic over Fiberglass Pipe

Insulation

South Side of West Tank

Sub-Basement- Pipes Associated with Condensation Tanks

ND

008 North Side of West Tank ND

009 North Side of East Tank ND

White Mastic over Fiberglass Pipe

Insulation

Center of Room – 4” Condensation Line Sub-Basement-

Condensate and Steam Line- Main

Room

ND

Northwest Corner of Room – 4” High Pressure Steam

Line

ND

April 4, 2019 ■ Terracon Project No. N1187304

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

Northeast Corner of

Room- 1” Condensation Line

ND

White Mastic over Fiberglass Pipe

Insulation

4” Pipe

Basement- A-013 Closet

ND

014 4” Pipe ND

015 4” Pipe ND

White Mastic over Fiberglass Pipe

Insulation

4” Condensate Line

Basement- C003B Condensate Line

ND

017 4” Condensate Line ND

018 4” Condensate Line ND

White Mastic over Fiberglass Pipe

Insulation

1” Pipe

Basement- C003B Pipe Around Flow

Meter

ND

020 1” Pipe ND

021 1” Pipe ND

Hard White Fittings with Fiberglass

Undercoat

5” Pipe Basement- B010 5” and 3” Condensate/Steam

Lines

2.6% Amosite by Point Count

(PC)

023 5” Pipe 2.2% Amosite PC

024 3” 1.9% Amosite PC

Plaster Wall: Base Coat and Finished

Coat

Near Hatch

Basement- B010

Base Coat: ND, Finished Coat:

ND

026 Near Hatch Base Coat: ND, Finished Coat:

ND

027 Near Hatch Base Coat: ND, Finished Coat:

April 4, 2019 ■ Terracon Project No. N1187304

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

White Mastic over Fiberglass Pipe

Insulation

4” Pipe

1st Floor- A123 – 4” Steam Lines

ND

029 4” Pipe ND

030 4” Pipe ND

Brown Caulking

2” Pipe

1st Floor- B128- Base of 2” and 5”

Steam Lines

4.3% Chrysotile PC

032 5” Pipe 4.1% Chrysotile PC

033 5” Pipe 4.8% Chrysotile PC

White Mastic over Fiberglass Pipe

Insulation

4” Pipe

2nd Floor- A221- 4” Steam Lines

ND

035 4” Pipe ND

036 4” Pipe ND

Brown Caulking

4” Pipe

2nd Floor- A221- Base of 4”Steam

Lines

ND

038 4” Pipe ND

039 4” Pipe ND

Brown Caulking

2” Pipe

2nd Floor- B226- Base of 2” and 5”

Steam Lines

2.4% Chrysotile PC

041 5” Pipe 1.8% Chrysotile PC

042 5” Pipe 3.2% Chrysotile PC

15 043 4” Pipe 3rd Floor- A336- 4” Steam Lines ND

April 4, 2019 ■ Terracon Project No. N1187304

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

044 White Mastic over Fiberglass Pipe

Insulation

4” Pipe ND

045 4” Pipe ND

Red Fire-Stop Caulking

4” Pipe

3rd Floor- A336- 4” Steam Lines

ND

047 4” Pipe ND

048 4” Pipe ND

Red Fire-Stop Caulking

5” Pipe

3rd Floor- B317- Base of 5” and 3”

Steam Lines

ND

050 5” Pipe ND

051 3” Pipe ND

White Mastic over Fiberglass Pipe

Insulation

5” Pipe

3rd Floor- B317- 5” and 3” Steam Lines

ND

053 5” Pipe ND

054 3” Pipe ND

White Mastic over Fiberglass Pipe

Insulation

4” Pipe

5th Floor- A525- 4” Steam Lines

ND

056 4” Pipe ND

057 4” Pipe ND

Red Fire-Stop

Caulking

5” Pipe 5th Floor- B508- Base of 2” and 5”

Steam Lines

059 5” Pipe ND

April 4, 2019 ■ Terracon Project No. N1187304

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

060 3” Pipe ND

Red Fire-Stop Caulking

5” Pipe

7th Floor- B711- Base of 5” and 3”

Steam Lines

ND

062 5” Pipe ND

063 3” Pipe ND

White Mastic over Fiberglass Pipe

Insulation

5” Pipe

7th Floor- B711- 5” and 3” Steam Lines

ND

065 5” Pipe ND

066 3” Pipe ND

Red Fire-Stop Caulking

5” Pipe

7th Floor- A725- Base of 5” and 3”

Steam Lines

ND

068 5” Pipe ND

069 3” Pipe ND

White Mastic over Fiberglass Pipe

Insulation

5” Pipe

7th Floor- A725- 5” and 3” Steam Lines

ND

071 5” Pipe ND

072 3” Pipe ND

White 2’ x 2’ Fine Textured Ceiling Tile

South End of Hallway

Building 2- Throughout Basement

ND

074 Outside Room 0007 ND

075 Outside Room 0007 ND

April 4, 2019 ■ Terracon Project No. N1187304

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

White Mastic over Fiberglass Pipe

Insulation

South End of Hallway Building 2

Basement - Steam and Condensate Lines Throughout

Basement

ND

077 Outside Room 0007 ND

078 North End of Crawl Space ND

Red Fire-Stop Caulking

Outside Room 0007

Building 2 Basement- All Wall

Penetrations

ND

080 Outside Room 0007 ND

081 Outside Room 0007 ND

White Mastic over Fiberglass Pipe

Insulation

Northwest Corner of Mechanical Room

Building 8- Steam and Condensate

Lines in Northwest Corner

ND

083 Northwest Corner of Mechanical Room ND

084 Northwest Corner of Mechanical Room ND

White Mastic over Fiberglass Pipe

Insulation

Northwest of Entry to Ground’s Crew

Office- 1” Pipe Building 1- Steam Line in Ground’s Crew Basement

Area

ND

Northwest of Entry to Ground’s Crew

Office- 1” Pipe

ND

Northwest of Entry to Ground’s Crew

Office- 1” Pipe

ND

Brown Caulking

1” Pipe 3rd Floor- Operating Room- Steam Line

Near Northeast Corner of Clean

Room

ND

089 1” Pipe ND

090 1” Pipe ND

31 091 Red Fire-Stop Caulking Center West ND

April 4, 2019 ■ Terracon Project No. N1187304

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

092 Northwest Building 15 Roof- West Wall of AHU

ND

093 Southwest ND

White Mastic over Fiberglass Pipe

Insulation

Northwest Corner

Building 15 Roof- AHU 1 Steam

Lines

ND

095 Middle West ND

096 Southwest Corner ND

Tan Putty

Southwest Corner

Building 15 Roof- AHU 1 Southwest

Corner

ND

098 Southwest Corner ND

099 Southwest Corner ND

Transparent Mastic

Outside Room B412 4th Floor-

Throughout New Pharmacy on Duct

Work

ND

101 Outside Room B412 ND

102 Outside Room B412 ND

2’ x 2’ Small Fissure Ceiling Tiles

Outside Room B412 4th Floor-

Throughout New Pharmacy Hallways

ND

104 Outside Room B412 ND

105 Outside Room B433a ND

Brown Duct Mastic

Outside Room B412a 4th Floor- New

Pharmacy Duct Work

ND

107 Outside Room B412a ND

April 4, 2019 ■ Terracon Project No. N1187304

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

108 Outside Room B412a ND

2’ x 2’ White Bird Track Ceiling Tile

Doorway of Northwest Room (Electrophoresis

Core) 4th Floor- New

Pharmacy Rooms

ND

110 Doorway of Lac Produce ND

111 Doorway to West Lab ND

White Mastic over Fiberglass Pipe

Insulation

Large Area- East of South Column

4th Floor- South New Pharmacy

Area- Steam Lines

ND

Large Area

Northeast of South Column

ND

114 North Center of Large Room ND

Gray Duct Mastic

Center of Large Room

4th Floor- South New Pharmacy-

Duct Work

ND

116 Center of Large Room ND

117 Center of Large Room ND

White Mastic over Fiberglass Pipe

Insulation

2” Pipe- Middle East Wall

5th Floor Penthouse (B505E)- Steam

Lines on East Side of Room

ND

119 2” Pipe- Middle of Room ND

120 2” Pipe- Middle of Room ND

White Duct Tape

Southwest Corner of Room 5th Floor Penthouse

(B505E)- Duct Work

ND

122 Southwest Corner of Room ND

April 4, 2019 ■ Terracon Project No. N1187304

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

123 Southwest Corner of Room ND

White Mastic over Fiberglass Pipe

Insulation

4” Pipe- Southwest Corner of Room

5th Floor Penthouse (B505E)- Steam

Lines in Southwest Corner of Room

ND

125 4” Pipe- Southwest Corner of Room ND

126 4” Pipe- Southwest Corner of Room ND

White Duct Mastic

Southwest Corner of Room on

Uninsulated Duct Work

5th Floor Penthouse (B505E)- Duct

Work in southwest Corner of Room

ND

Southwest Corner of Room on

Uninsulated Duct Work

ND

Southwest Corner of Room on

Uninsulated Duct Work

ND

White Mastic over Fiberglass Pipe

Insulation

East Side of Area

AHU1- 4” Steam Lines

ND

131 Middle of Area ND

132 West Side of Area ND

Gray Caulking

Southwest Corner

AHU1 Roof

ND

134 Southwest Corner ND

135 Southwest Corner ND

136 White Mastic over Fiberglass Pipe

Insulation

Middle of North Wall 4th Floor- Throughout

Mechanical Room - 456A- Steam Lines

ND

137 Northeast Corner of Room ND

April 4, 2019 ■ Terracon Project No. N1187304

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

138 Middle of East Wall ND

White Mastic over Fiberglass Pipe

Insulation

South End

AHU 3 Steam Lines

ND

140 Middle ND

141 North End ND

Gray Caulking

Southeast Corner

AHU 3 Roof

ND

143 Southeast Corner ND

144 Southeast Corner ND

April 4, 2019 ■ Terracon Project No. N1187304

Responsive ■ Resourceful ■ Reliable

APPENDIX C

ASBESTOS ANALYTICAL LABORATORY DATA

Lab No.: 6743046 Client No.: 1-001

Analyst Observation: White Mastic Client Description: White Mastic Over Fiberglass Pipe Insulation

Location: West Side Of Machinery - 2" Pipe; Sub-Basement-South Facility:

Percent Asbestos:

None Detected

Percent Non-Asbestos Fibrous Material:

5 Wollastonite

Percent Non-Fibrous Material:

Lab No.: 6743047 Client No.: 1-002

Location: West Side Of Machinery - 4"

Facility:

Lab No.: 6743048 Client No.: 1-003

Location: East Side Of Machinery - 2"

Facility:

Lab No.: 6743049 Client No.: 2-004

Location: 2" Condensate Pipe; East Crawl Space Facility:

Lab No.: 6743050 Client No.: 2-005

Location: 4" Steam Pipe; East Crawl Space Facility:

Lab No.: 6743051 Client No.: 2-006

Location: 4" Steam Pipe; East Crawl Space

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Erik Swanson

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Client: TER940

Dated : 3/29/2019 7:02:58 Page 1 of 33

Lab No.: 6743052 Client No.: 3-007

Location: South Side Of West Tank; Sub- Basement Facility:

Lab No.: 6743053 Client No.: 3-008

Location: North Side Of West Tank; Sub-

Facility:

Lab No.: 6743054 Client No.: 3-009

Location: North Side Of East Tank; Sub-

Facility:

Lab No.: 6743055 Client No.: 4-010

Location: Center Of Room-4" Condensation Line; Sub-Basement Facility:

Lab No.: 6743056 Client No.: 4-011

Location: Northwest Corner Of Room-4" High Pressure Steam Line; Sub-Basement Facility:

Lab No.: 6743057 Client No.: 4-012

Location: Northeast Corner Of Room-1" Condensatiion Line; Sub-Basement Facility:

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Erik Swanson

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:58 Page 2 of 33

Lab No.: 6743058 Client No.: 5-013

Location: 4" Pipe; Basement - A-013 Closet

Lab No.: 6743059 Client No.: 5-014

Lab No.: 6743060 Client No.: 5-015

Lab No.: 6743061 Client No.: 6-016

Location: 4" Condensate Line; Basement - C003B Facility:

Lab No.: 6743062 Client No.: 6-017

Facility:

Lab No.: 6743063 Client No.: 6-018

Facility:

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Erik Swanson

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:58 Page 3 of 33

Lab No.: 6743064 Client No.: 7-019

Location: 1" Pipe; Basement - C003B Around Flow Meter Facility:

Lab No.: 6743065 Client No.: 7-020

Facility:

Lab No.: 6743066 Client No.: 7-021

Facility:

Lab No.: 6743067 Client No.: 8-022

Analyst Observation: White Fitting Client Description: Hard White Fittings With Fiberglass Pipe

Location: 5" Pipe; Basement - B010 Condensate/Steam Line Facility:

PC 2.6 Amosite

10 Fibrous Glass

87.4

Lab No.: 6743068 Client No.: 8-023

Location: 5" Pipe; Basement - B010

Facility:

PC 2.2 Amosite

87.8

Lab No.: 6743069 Client No.: 8-024

Location: 3" Pipe; Basement - B010

Facility:

PC 1.9 Amosite

88.1

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Erik Swanson

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:58 Page 4 of 33

Lab No.: 6743070 Client No.: 9-025

Analyst Observation: White Plaster Client Description: Plaster Wall

Location: Near Hatch; Basement - B010

Lab No.: 6743070(L2) Client No.: 9-025

Analyst Observation: Beige Plaster

Lab No.: 6743071 Client No.: 9-026

Lab No.: 6743071(L2) Client No.: 9-026

Lab No.: 6743072 Client No.: 9-027

Lab No.: 6743072(L2) Client No.: 9-027

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Erik Swanson

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:58 Page 5 of 33

Lab No.: 6743073 Client No.: 10-028

Location: 4" Pipe; 1st Floor-A123 Steam Lines Facility:

Lab No.: 6743074 Client No.: 10-029

Facility:

Lab No.: 6743075 Client No.: 10-030

Facility:

Lab No.: 6743076 Client No.: 11-031

Analyst Observation: Brown Mastic Client Description: Brown Caulking

Location: 2" Pipe; 1st Floor-B128-Steam

Facility:

PC 4.3 Chrysotile

95.7

Lab No.: 6743077 Client No.: 11-032

Location: 5" Pipe; 1st Floor-B128-Steam

Facility:

PC 4.1 Chrysotile

95.9

Lab No.: 6743078 Client No.: 11-033

Location: 5" Pipe; 1st Floor-B128-Steam

Facility:

PC 4.8 Chrysotile

95.2

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Erik Swanson

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:58 Page 6 of 33

Lab No.: 6743079 Client No.: 12-034

Analyst Observation: White Coating

Location: 4" Pipe; 2nd Floor-A221-Steam

Facility:

3 Cellulose

Lab No.: 6743080 Client No.: 12-035

Facility:

1 Cellulose

Lab No.: 6743080(L2) Client No.: 12-035

Analyst Observation: Grey Insulation

Facility:

95 Fibrous Glass

Lab No.: 6743081 Client No.: 12-036

Facility:

Lab No.: 6743082 Client No.: 13-037

Analyst Observation: Brown Non-Fibrous

Facility:

1 Fibrous Glass

Lab No.: 6743083 Client No.: 13-038

Facility:

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Zach Schwartz

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:58 Page 7 of 33

Lab No.: 6743083(L2) Client No.: 13-038

Analyst Observation: Grey Fibrous

Facility:

95 Fibrous Glass

Lab No.: 6743084 Client No.: 13-039

Facility:

5 Fibrous Glass

Lab No.: 6743085 Client No.: 14-040

Analyst Observation: Brown Caulk

Location: 2" Pipe; 2nd Floor-B226-Steam

Facility:

PC 2.4 Chrysotile

3 Fibrous Glass

94.6

Lab No.: 6743086 Client No.: 14-041

Analyst Observation: Tan Caulk

Location: 5" Pipe; 2nd Floor-B226-Steam

Facility:

PC 1.8 Chrysotile

2 Fibrous Glass

96.2

Lab No.: 6743087 Client No.: 14-042

Location: 5" Pipe; 2nd Floor-B226-Steam

Facility:

PC 3.2 Chrysotile

96.8

Lab No.: 6743088 Client No.: 15-043

Analyst Observation: Off-White Wrap

Location: 4" Pipe; 3rd Floor-A336-Steam

Facility:

15 Cellulose

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Zach Schwartz

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:58 Page 8 of 33

Lab No.: 6743088(L2) Client No.: 15-043

Analyst Observation: Yellow Insulation

Facility:

99 Fibrous Glass

Lab No.: 6743089 Client No.: 15-044

Analyst Observation: Off-White Coating

Facility:

20 Cellulose

Lab No.: 6743089(L2) Client No.: 15-044

Facility:

Lab No.: 6743090 Client No.: 15-045

Analyst Observation: Grey Coating

Facility:

Lab No.: 6743090(L2) Client No.: 15-045

Facility:

Lab No.: 6743091 Client No.: 16-046

Analyst Observation: Red Caulk Client Description: Red Fire-Stop Caulking

Facility:

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Zach Schwartz

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:58 Page 9 of 33

Lab No.: 6743092 Client No.: 16-047

Facility:

Lab No.: 6743093 Client No.: 16-048

Facility:

Lab No.: 6743094 Client No.: 17-049

Analyst Observation: Red Firestop

Location: 5" Pipe; 3rd Floor-A317-Steam

Facility:

Lab No.: 6743095 Client No.: 17-050

Location: 5" Pipe; 3rd Floor-A317-Steam

Facility:

Lab No.: 6743096 Client No.: 17-051

Location: 3" Pipe; 3rd Floor-A317-Steam

Facility:

Lab No.: 6743097 Client No.: 18-052

Location: 5" Pipe; 3rd Floor-B317-Steam

Facility:

50 Cellulose

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Zach Schwartz

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:58 Page 10 of 33

Lab No.: 6743098 Client No.: 18-053

Location: 5" Pipe; 3rd Floor-B317-Steam

Facility:

30 Cellulose

Lab No.: 6743099 Client No.: 18-054

Location: 3" Pipe; 3rd Floor-B317-Steam

Facility:

Lab No.: 6743099(L2) Client No.: 18-054

Analyst Observation: Brown Insulation

Location: 3" Pipe; 3rd Floor-B317-Steam

Facility:

Lab No.: 6743100 Client No.: 19-055

Location: 4" Pipe; 5th Floor-A525-Steam

Facility:

Lab No.: 6743101 Client No.: 19-056

Facility:

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Zach Schwartz

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:58 Page 11 of 33

Lab No.: 6743102 Client No.: 19-057

Facility:

Lab No.: 6743102(L2) Client No.: 19-057

Facility:

Lab No.: 6743103 Client No.: 20-058

Client Description: Red Firestop Caulking

Location: 5" Pipe; 5th Floor-B508-Steam

Facility:

Lab No.: 6743104 Client No.: 20-059

Location: 5" Pipe; 5th Floor-B508-Steam

Facility:

Lab No.: 6743105 Client No.: 20-060

Location: 3" Pipe; 5th Floor-B508-Steam

Facility:

Lab No.: 6743106 Client No.: 21-061

Location: 5" Pipe; 7th Floor-B711-Steam

Facility:

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Zach Schwartz

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:59 Page 12 of 33

Lab No.: 6743107 Client No.: 21-062

Facility:

Lab No.: 6743108 Client No.: 21-063

Location: 3" Pipe; 7th Floor-B711-Steam

Facility:

Lab No.: 6743108(L2) Client No.: 21-063

Analyst Observation: Brown Foam

Facility:

Lab No.: 6743109 Client No.: 22-064

Facility:

Lab No.: 6743110 Client No.: 22-065

Analyst Observation: White Wrap

Facility:

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Zach Schwartz

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:59 Page 13 of 33

Lab No.: 6743111 Client No.: 22-066

Facility:

Lab No.: 6743112 Client No.: 23-067

Location: 5" Pipe; 7th Floor-A725-Steam

Facility:

Lab No.: 6743113 Client No.: 23-068

Facility:

Lab No.: 6743114 Client No.: 23-069

Location: 3" Pipe; 7th Floor-A725-Steam

Facility:

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Zach Schwartz

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:59 Page 14 of 33

Lab No.: 6743115 Client No.: 24-070

Facility:

Lab No.: 6743116 Client No.: 24-071

Facility:

Lab No.: 6743117 Client No.: 24-072

Location: 3" Pipe; 7th Floor-A725-Steam

Facility:

Lab No.: 6743118 Client No.: 25-073

Analyst Observation: White/Grey Ceiling Tile Client Description: White 2'x2' Fine Textured Ceiling Tile

Location: South End Of Hallway; Bldg 2- Throughout Basement Facility:

55 Mineral Wool

Lab No.: 6743119 Client No.: 25-074

Location: Outside Room 0007; Bldg 2-

Facility:

Lab No.: 6743120 Client No.: 25-075

Facility:

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Terrence Mulhern

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:59 Page 15 of 33

Lab No.: 6743121 Client No.: 26-076

Location: South End Of Hallway; Bldg 2-

Facility:

Lab No.: 6743122 Client No.: 26-077

Facility:

Lab No.: 6743123 Client No.: 26-078

Location: North End Of Crawl Space; Bldg 2-Basement Facility:

Lab No.: 6743124 Client No.: 27-079

Basement All Wall Penetrations Facility:

5 Mineral Wool

Lab No.: 6743125 Client No.: 27-080

Facility:

Lab No.: 6743126 Client No.: 27-081

Facility:

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Terrence Mulhern

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:59 Page 16 of 33

Lab No.: 6743127 Client No.: 28-082

Location: Northwest Corner Of Mechanical Room; Bldg 8 Facility:

Lab No.: 6743128 Client No.: 28-083

Facility:

Lab No.: 6743129 Client No.: 28-084

Facility:

Lab No.: 6743130 Client No.: 29-085

Location: Northwest Of Entry To Ground's Crew Office-1" Pipe; Bldg 1 Facility:

Lab No.: 6743131 Client No.: 29-086

Facility:

Lab No.: 6743132 Client No.: 29-087

Facility:

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Terrence Mulhern

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:59 Page 17 of 33

Lab No.: 6743133 Client No.: 30-088

Location: 1" Pipe; 3rd Fl Operating Rm- Steam Line Near NE Corner Of Clean Rm Facility:

Lab No.: 6743134 Client No.: 30-089

Facility:

Lab No.: 6743135 Client No.: 30-090

Facility:

Lab No.: 6743136 Client No.: 31-091

Location: Center West; Bldg 15 Roof-West Wall Of AHU 30 Facility:

Lab No.: 6743137 Client No.: 31-092

Location: Northwest; Bldg 15 Roof-West

Facility:

Lab No.: 6743138 Client No.: 31-093

Location: Southwest; Bldg 15 Roof-West

Facility:

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Terrence Mulhern

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:59 Page 18 of 33

Lab No.: 6743139 Client No.: 32-094

Location: Northwest Corner; Bldg 15 Roof- AHU 30 Steam Line Facility:

Lab No.: 6743140 Client No.: 32-095

Location: Middle West; Bldg 15 Roof-AHU 30 Steam Line Facility:

Lab No.: 6743141 Client No.: 32-096

Location: Southwest Corner; Bldg 15 Roof- AHU 30 Steam Line Facility:

Lab No.: 6743142 Client No.: 33-097

Analyst Observation: Grey Putty Client Description: Tan Putty

AHU 30

Facility:

5 Cellulose

Lab No.: 6743143 Client No.: 33-098

Facility:

Lab No.: 6743144 Client No.: 33-099

Facility:

Laboratory Director

Approved By:

Date Analyzed:

3/18/2019Date Received:

Analyst:

Please refer to the Appendix of this report for further information regarding your analysis.

Signature:

Terrence Mulhern

03/28/2019 Frank E. Ehrenfeld, III

9000 Commerce Parkway Suite B Mt. Laurel, New Jersey 08054

Telephone: 856-231-9449 Email: customerservice@iatl.com

CERTIFICATE OF ANALYSIS

Client: Terracon

611 Lunken Park Drive Cincinnati OH 45226

3/29/2019Report Date:

Report No.: 585819 - PLM Project: CVAMC-Steam Lines-Phase 2 Project No.: N1187304

PLM BULK SAMPLE ANALYSIS SUMMARY

Dated : 3/29/2019 7:02:59 Page 19 of 33

Lab No.: 6743145 Client No.: 34-100

Analyst Observation: Clear Mastic Client Description: Transparent Mastic

Location: Outside Room B412; 4th Fl Throughout New Pharmacy On Ductwork Facility: