36C25020B0007-003.pdf
PDF Posted
- Attached to
- Tuckpoint Various Buildings 515-18-106
- Solicitation number
- 36C25020B0007
About this file
This is a pre-solicitation announcement for a construction project to tuckpoint various buildings at the Battle Creek VA Medical Center in Battle Creek, Michigan. The Department of Veterans Affairs will issue an invitation for bid on or around December 10, 2019 via SAM.gov for project number 515-18-106. The project is set aside for SDVOSBs and involves preparing and repairing mortar, damaged brick, building joints, window ledges, and replacing corroded lintels across various medical center buildings. The period of performance is 270 calendar days from notice to proceed in Spring 2020. The NAICS code is 238140 for masonry contractors up to $16.5 million. The government intends to award a firm fixed price contract within 120 days of bid receipt. Prospective contractors must be registered in SAM, VetBiz, and have a current VETS-4212 report (if applicable).
36C25020B0007 515-18-106 DRAWING FINAL.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25020B0007-0005000.docx | DOCX document | |
| 36C25020B0007-0004000.docx | DOCX document | |
| 36C25020B0007-0003000.docx | DOCX document | |
| 36C25020B0007-0002001.docx | DOCX document | |
| 36C25020B0007-0002000.docx | DOCX document | |
| 36C25020B0007-0001000.docx | DOCX document | |
| 36C25020B0007-0001001.pdf | ||
| 36C25020B0007-0001002.pdf | ||
| 36C25020B0007-001.docx | DOCX document | |
| 36C25020B0007-005.docx | DOCX document | |
| 36C25020B0007-002.pdf | ||
| 36C25020B0007-004.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SIGNATURE BLOCK
SERVICE SIGNATURE DATE
DIRECTOR
ASSOCIATE DIRECTOR
CHIEF OF FMS
CHIEF OF ENGINEERING
SAFETY
INFECTION CONTROL
CONTRACTING OFFICER
D
U N I T
E D
STAT ES OF
A M
E R
IC
A
S
RI
A F F A
SN
AR
ETEVFO
TN
E
M T R A P
E
600 E. Michigan Ave., Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
7GAE PROJECT NO.: 218038 FILE NAME: VA_BATTLE CREEK_TUCKPOINTING
Office of Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o n e o e q u a rt e r in c h o th re e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs
100% BID DOCUMENTS
STAMP
G001
515-18-106
BATTLE CREEK, MICHIGAN 49037
OCTOBER 24, 2019
N/A
RJS NTF
COVER SHEET TUCKPOINT, VARIOUS
BUILDINGS
BATTLE CREEK, MICHIGAN
NORTH
LOCATION MAP
PROJECT TEAM DRAWING SHEET INDEX
ARCHITECTURE:
OWNER: DESCRIPTIONSHEET ISSUE DATE #OF
PHONE: 269.927.0144
ALLIANCE | 7GAE JV
KALAMAZOO, MI 49007
600 E. MICHIGAN AVE. - SUITE B
WEB: WWW.7GENAE.COM
OFFICE OF CONSTRUCTION &
FACILITIES MANAGEMENT
DEPARTMENT OF VETERANS AFFAIRS
MEDICAL CENTER
BATTLE CREEK, MICHIGAN, 49037
5500 ARMSTRONG ROAD
PROJECT NO. 515-18-106 TUCKPOINT, VARIOUS BUILDINGS
BATTLE CREEK, MICHIGAN
G001 COVER SHEET OCTOBER 24, 2019 1
G002 GENERAL INFORMATION & SYMBOL LEGEND OCTOBER 24, 2019 2
GS100 SITE CAMPUS MAP & LAYDOWN AREAS OCTOBER 24, 2019 3
004.AS200 EXTERIOR ELEVATIONS OCTOBER 24, 2019 4 BUILDING 4
004.AS201 EXTERIOR ELEVATIONS OCTOBER 24, 2019 5 BUILDING 4
005.AS200 EXTERIOR ELEVATIONS OCTOBER 24, 2019 6 BUILDING 5
006.AS200 EXTERIOR ELEVATIONS OCTOBER 24, 2019 7 BUILDING 6
007.AS200 EXTERIOR ELEVATIONS OCTOBER 24, 2019 8 BUILDING 7 (ALTERNATE #3)
007.AS201 EXTERIOR ELEVATIONS OCTOBER 24, 2019 9 BUILDING 7 (ALTERNATE #3)
014.AS200 EXTERIOR ELEVATIONS OCTOBER 24, 2019 10 BUILDING 14 (ALTERNATE #2)
014.AS201 EXTERIOR ELEVATIONS OCTOBER 24, 2019 11 BUILDING 14 (ALTERNATE #2)
022.AS200 EXTERIOR ELEVATIONS OCTOBER 24, 2019 12 BUILDING 22
026.AS200 EXTERIOR ELEVATIONS OCTOBER 24, 2019 13 BUILDING 26
027.AS200 EXTERIOR ELEVATIONS OCTOBER 24, 2019 14 BUILDING 27
028.AS200 EXTERIOR ELEVATIONS OCTOBER 24, 2019 15 BUILDING 28
039.AS200 EXTERIOR ELEVATIONS OCTOBER 24, 2019 16 BUILDING 39
039.AS201 EXTERIOR ELEVATIONS OCTOBER 24, 2019 17 BUILDING 39
083.AS200 EXTERIOR ELEVATIONS OCTOBER 24, 2019 18 BUILDING 83
083.AS201 EXTERIOR ELEVATIONS OCTOBER 24, 2019 19 BUILDING 83
084.AS200 EXTERIOR ELEVATIONS OCTOBER 24, 2019 20 BUILDING 84
084.AS201 EXTERIOR ELEVATIONS OCTOBER 24, 2019 21 BUILDING 84
134.AS200 EXTERIOR ELEVATIONS OCTOBER 24, 2019 22 BUILDING 134
138.AS200 EXTERIOR ELEVATIONS OCTOBER 24, 2019 23 BUILDING 138
200.AS100 CONNECTING CORRIDOR KEY PLAN OCTOBER 24, 2019 24 CONNECTING CORRIDOR (200)
200.AS101 PLANS & ELEVATIONS - AREA A OCTOBER 24, 2019 25 CONNECTING CORRIDOR (200)
200.AS102 PLANS & ELEVATIONS - AREA B OCTOBER 24, 2019 26 CONNECTING CORRIDOR (200)
200.AS103 PLANS & ELEVATIONS - AREA C OCTOBER 24, 2019 27 CONNECTING CORRIDOR (200)
200.AS104 PLANS & ELEVATIONS - AREA D OCTOBER 24, 2019 28 CONNECTING CORRIDOR (200)
200.AS105 PLANS & ELEVATIONS - AREA E OCTOBER 24, 2019 29 CONNECTING CORRIDOR (200)
200.AS106 PLANS & ELEVATIONS - AREA F OCTOBER 24, 2019 30 CONNECTING CORRIDOR (200)
200.AS107 PLANS & ELEVATIONS - AREA G OCTOBER 24, 2019 31 CONNECTING CORRIDOR (200)
200.AS108 PLANS & ELEVATIONS - AREA H OCTOBER 24, 2019 32 CONNECTING CORRIDOR (200)
200.AS109 PLANS & ELEVATIONS - AREA J OCTOBER 24, 2019 33 CONNECTING CORRIDOR (200)
200.AS110 PLANS & ELEVATIONS - AREA K OCTOBER 24, 2019 34 CONNECTING CORRIDOR (200)
200.AS111 PLANS - AREA L OCTOBER 24, 2019 35 CONNECTING CORRIDOR (200)
200.AS112 EXTERIOR ELEVATIONS - AREA L OCTOBER 24, 2019 36 CONNECTING CORRIDOR (200)
200.AS113 PLANS & ELEVATIONS - AREA M OCTOBER 24, 2019 37 CONNECTING CORRIDOR (200)
200.AS114 PLANS & ELEVATIONS - AREA N OCTOBER 24, 2019 38 CONNECTING CORRIDOR (200)
200.AS115 PLANS & ELEVATIONS - AREA P OCTOBER 24, 2019 39 CONNECTING CORRIDOR (200)
200.AS116 PLANS & ELEVATIONS - AREA Q OCTOBER 24, 2019 40 CONNECTING CORRIDOR (200)
200.AS117 PLANS - AREA R OCTOBER 24, 2019 41 CONNECTING CORRIDOR (200)
200.AS118 EXTERIOR ELEVATIONS - AREA R OCTOBER 24, 2019 42 CONNECTING CORRIDOR (200)
200.AS119 PLANS & ELEVATIONS - AREA S OCTOBER 24, 2019 43 CONNECTING CORRIDOR (200)
200.AS200 EXTERIOR ELEVATIONS - BTWN 83 & 84 OCTOBER 24, 2019 44 BUILDING 200
AS500 TYPICAL BRICK DAMAGE REPAIR DETAILS OCTOBER 24, 2019 45
PHONE: 202.617.8485
ALEXANDRIA, VA 22314
2850 EISENHOWER AVE, SUITE 310
WEB: WWW.ALLIANCE.US.COM
NOTES
TO
B
A
TT
LE
C
R E E K
TO
K
A
LA
M A
ZO
O
5500 ARMSTRONG ROAD
TO I-94
REVISIONS DATE
A300
A320
A420
A500
ARCHITECTURAL SYMBOLS & PLAN INDICATORS
ABBREVIATIONS
ROOMNAME
XXX
A
A
A
A
8'-0"
TOP OF STEEL
ELEV. 10'-0"
A200
TITLE
SCALE X" = 1'-0"
ELEVATION INDICATION
SHEET NO.
ELEVATION NUMBER
SECTION INDICATOR
ENLARGED PLAN OR
ELEVATION
PROPOSED SPOT
EXISTING SPOT
ELEVATION
100.57'
100.57'
STRUCTURAL SPAN
ROOF TRUSSES
FLOOR JOIST OR
RAMP
@ 16" O.C.
2 x 12
1" per 12"
SLOPE UP
REVISION TAG W/
REVISION NUMBER
KEYNOTE TAG
WINDOW TAG W/
WINDOW TYPE
INDICATOR
WALL SECTION CUT
COLUMN LINE
WALL TYPES
ELEVATION
BUILDING SECTION CUT
SHEET LOCATION
DETAIL NUMBER
TYPICAL
DIMENSIONING
SET-BACK LINE
PROPERTY LINE
EXISTING
CONTOUR
TOPOGRAPHY
CONTOUR
100'
100'
TOPOGRAPHY
PROPOSED
SECTIONS & DETAILS
TYPICAL TITLE FOR
DOOR NUMBER
DOOR TAG W/
ROOM NUMBER
ROOM NAME/
NORTH ARROW
60" DIAMETER CLEAR
WHEELCHAIR TURNING
SPACE - REFER TO PLAN
- REFER TO PLAN
AND GROUND SPACE
30" x 48" CLEAR FLOOR
CEILING HEIGHT TAG
4'-4"
XXXNORTH
@ AT
A/C AIR CONDITIONIN/AIR CONDITIONER
ACOUS ACOUSTICAL
AD AREA DRAIN, AUTOMATIC DAMPER
ADJ ADJUST, ADJUSTABLE
ALUM ALUMINUM
AP ACCESS PANEL
ACT ACOUSTICAL CEILING
B BASE
BAR BARRIER
BD BOARD
BF BARRIER FREE
BKT BRACKET
BLDG BUILDING
BLKG BLOCKING
BOTT BOTTOM
C TO C CENTER TO CENTER
CAB CABINET
CE COLUMN ENCLOSURE
CIR CIRCLE
CIR CIRCUIT
CL CENTER LINE, CLEARANCES
CLG CEILING
CJ CONTROL JOINT
CLKG CAULKING
CLO CLOSET
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
C.O. CLEANOUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CORR CORRIDOR
CPT CARPET
CSS CLINICAL SERVICE SINK
CT CERAMIC TILE
CTR CENTER
CUH CABINET UNIT HEATER
DEMO DEMOLITION, DEMOLISH
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA, D DIAMETER
DIM DIMENSION
DN DOWN
DR DRAIN
DS DOWNSPOUT
ELECT ELECTRICAL
ELEV ELEVATION
ENTR ENTRANCE
EQ EQUAL
EP ELECTRICAL PANEL
EXH EXHAUST
EXP EXPOSED
EXIST EXISTING, EXSIST'G
EXT EXTERIOR
EW EACH WAY
FA FIRE ALARM
FD FIRE DAMPER OR FLOOR DRAIN
FIN FINISH
FL, FLR FLOOR FINISH
FLG, FLRG FLOORING, FLOOR'G
FURN FURNITURE, FURNACE
FWC FABRIC WALL COVERING
FT FEET, FOOT
GALV GALVANIZE(D)
GL GLASS
GSB GYPSUM SHEATHING BOARD
GWB GYPSUM WALLBOARD
GYP. BD GYPSUM BOARD
ID INSIDE DIAMETER
INSUL INSULATION
IN INCH(ES)
JAN JANITOR'S CLOSET
HM HOLLOW METAL
HORIZ HORIZONTAL
HT HEIGHT
HW HEADWALL
LAM LAMINATED
LF LINEAL FEET
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MANUF MANUFACTURED, MANUFACTURER
MIN MINIMUM
MLD'G MOLDING
MTL METAL
N NORTH
NAT NATURAL
NIC NOT IN CONTRACT
NORM NORMAL
NTS NOT TO SCALE
OC ON CENTER
OPN'G OPENING
O, O2 OXYGEN
PLAST PLASTIC
PNT PAINT
PREFAB PREFABRICATED
PLYWD PLYWOOD, PLYW'D
R RADIUS
RA RETURN AIR
REQ'D REQUIRED
RM ROOM
S SINK, SOUTH, SHINGLE
SA SUPPLY AIR
SAN SANITARY
SMKD SMOKE DAMPER
SECT SECTION
SHWR SHOWER
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SS SERVICE SINK, STAINLESS STEEL
STD STANDARD
STOR STORAGE
SUSP SUSPEND(ED)
SYM SYMBOL, SYMMETRICAL
TOIL TOILET
TYP TYPICAL
UNFIN UNFINISHED
UTIL UTILITY
VAC VACUUM
VAV VARIABLE AIR VOLUME
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER
VERT VERTICAL
VT VINYL TILE
VWC VINYL WALL COVERING
W/ WITH
WC WATER CLOSET
WD WOOD
WNDW WINDOW
W. HTR WATER HEATER
W/O WITHOUT
WP WALL PROTECTION
EXISTING WINDOW OPENING
CAULKING SCOPE
BUILDING NUMBER
CAULKING REQUIRED
NO
NO
NO
NO
NO
NO
YES
YES
YES
NO
YES
YES
NO
YES
YES
CAULKING SCOPE NOTES:
1. IF 'YES' IS INDICATED ABOVE, CONTRACTOR TO
REMOVE/REAPPLY CAULK/SEALANT AT FULL PERIMETER OF
ALL EXISTING EXTERIOR WINDOW, DOOR & LOUVER
OPENINGS.
2. IF 'NO' IS INDICATED ABOVE, CONTRACTOR REMAINS
RESPONSIBLE TO REMOVE/REAPPLY CAULK/SEALANT FOR
FULL PERIMETER OF OPENINGS OTHER THAN WINDOWS.
3. CONTRACTOR TO REMOVE/REAPPLY CAULK/SEALANT AT
ALL EXISTING VERTICAL BRICK EXPANSION JOINTS ON
THESE BUILDINGS WITH NEW BACKER ROD, TYP.
REGARDLESS OF THIS TABLE.
4. CONTRACTOR TO REAPPLY CAULKING/SEALANT AT ANY
OTHER AREAS DISTURBED BY CONSTRUCTION.
(CONNECTING CORRIDORS)
YES
(DEDUCT ALTERNATE #1)
600 E. Michigan Ave., Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
7GAE PROJECT NO.: 218038 FILE NAME: VA_BATTLE CREEK_TUCKPOINTING
Office of Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs
100% BID DOCUMENTS
STAMP
G002
515-18-106
BATTLE CREEK, MICHIGAN 49037
OCTOBER 24, 2019
N/A
RJS NTF
GENERAL INFORMATION &
SYMBOL LEGEND
TUCKPOINT, VARIOUS
BUILDINGS
2REVISIONS DATE
SITE CAMPUS MAP LEGEND
EXISTING BUILDING TO REMAIN
BUILDING IN SCOPE OF WORK
SUGGESTED BUILDING LAYDOWN AREA (TO BE CONFIRMED W/ COR)
NOTES:
1. LAWN RESTORATION IS THE RESPONSIBILITY OF THE CONTRACTOR. THIS
ALSO APPLIES TO ANY BROKEN SIDEWALKS, CURBS, SPRINKLERS, AND
GEOTHERMAL SYSTEMS AS A RESULT OF CONSTRUCTION OPERATIONS.
2. CONTRACTOR TO COORDINATE WITH FACILITY REGARDING EXISTING
IRRIGATION & GEOTHERMAL FIELDS PRIOR TO USE OF HEAVY EQUIPMENT.
3. CONTRACTOR SHALL TAKE EXTRA PRECAUTIONS WITH AVOIDING
UNDERGROUND GEOTHERMAL WELLS WITH HEAVY EQUIPMENT.
KNOW AREA OF EXISTING SPRINKLER SYSTEM
KNOW AREA OF EXISTING GEOTHERMAL SYSTEM
144 168
SHAFTER CIRCLE WEST
PAUL LAMBERS TR
AIL
DUANE DEWEY LANE
SH
A
FTE
R
C
IR
C
LE
N O
R
TH
GOLF PARKING
URBAN D
RIV
E
A
F
SHAFTER C
IRC
LE SO
UTH D
G
D W
IG
H
T J O
H N
S O
N D
R
IV
E
S H
A F
TE
R C
IR
C
LE
E
A S T
WIALLIAMS LANE
STEPHEN CHANDLER CT
H A
M M
ER
BE
R G
L A
N E
L K
H
EN
R Y F
O X L
A N
E
FU
R
LO
N G
LA
N
E
C
R
FLO
RA
L LA
N
E
E
H
J
M
N
Q
B
A R
M S
TR
O N
G R
O A
D
26, 27, 28
83, 84, 5,6, 138
4, 134
7 &14
600 E. Michigan Ave., Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
7GAE PROJECT NO.: 218038 FILE NAME: VA_BATTLE CREEK_TUCKPOINTING
Office of Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs
100% BID DOCUMENTS
STAMP
GS100
515-18-106
BATTLE CREEK, MICHIGAN 49037
OCTOBER 24, 2019
N/A
RJS NTF
SITE CAMPUS MAP &
LAYDOWN AREAS
TUCKPOINT, VARIOUS
BUILDINGS
NORTH
SCALE: 1" = 100'-0"
SITE CAMPUS MAP
1ST FLOOR
ELEV. 925.00
2ND FLOOR
ELEV. 937.00
FIN. GRADE
ELEV. 921.50
2 2 2
12 1212
ATTIC FLOOR
ELEV. 948.50
4' - 0" 22' - 4" 60' - 8" 22' - 4" 4' - 0"
8 8 8222
2 2 2 2
1ST FLOOR
ELEV. 925.00
2ND FLOOR
ELEV. 937.00
FIN. GRADE
ELEV. 922.00
88 8 82 8
2 23
ATTIC FLOOR
ELEV. 948.50
17' - 2" 33' - 8" 29' - 8" 9' - 6"
AS500
TYP.
KEYNOTE 8
1ST FLOOR
ELEV. 925.00
2ND FLOOR
ELEV. 937.00
FIN. GRADE
ELEV. 922.00
19 1212
2 2 212
ATTIC FLOOR
ELEV. 948.50
4' - 0" 22' - 4" 60' - 8" 22' - 4" 4' - 0"
AS500
8 88
1ST FLOOR
ELEV. 925.00
2ND FLOOR
ELEV. 937.00
FIN. GRADE
ELEV. 922.00
1212121212
12 12
ATTIC FLOOR
ELEV. 948.50
29' - 8" 33' - 8" 17' - 2"
ELEVATION KEY
A
NORTH
NOT TO SCALE
BUILDING 4 KEY PLAN
B
D
C
E
F
F
E
FENCED EQUIPMENT
AREA
FENCED EQUIPMENT
AREA
GENERAL NOTES
1. PRIOR TO COMMENCING EACH NEW PHASE OF WORK CONTRACTORS ARE TO
VERIFY EXISTING FIELD CONDITIONS AND DIMENSIONS. INSPECT EXISTING FRAMING
MEMBERS AND OBSERVE FOR ANY DAMAGE OR POTENTIAL ADVERSE EFFECT OF
NEW WORK ON STRUCTURAL INTEGRITY OF THE BUILDING. IMMEDIATELY NOTIFY THE
COR OF ALL DISCREPANCIES OR CONCERNS A MINIMUM OF (10) TEN WORKING
DAYS IN ADVANCE OF THE WORK.
2. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TESTING & ALL
APPURTENANCES TO COMPLETE THE PROJECT.
3. ALL CONSTRUCTION AREAS ARE TO BE PROPERLY IDENTIFIED, CLEANED AND
MAINTAINED BY THE CONTRACTOR ON A DAILY BASIS. NO CONSTRUCTION DEBRIS IS
TO REMAIN ON SITE AT PROJECT COMPLETION.
4. CONTRACTOR TO VERIFY CONSTRUCTION WASTE DUMPSTER LOCATIONS WITH THE
COR PRIOR TO BEGINNING ANY DEMOLITION AT EACH BUILDING.
5. ALL CONTRACTORS ARE TO PROTECT EXISTING EQUIPMENT, FINISHES AND BUILDING
COMPONENTS FROM CONSTRUCTION ACTIVITIES.
6. CONTRACTORS SHALL BE RESPONSIBLE FOR ANY/ALL DAMAGE CAUSED DURING
CONSTRUCTION OPERATIONS INCLUDING BUT NOT LIMITED TO SIDEWALK, CURBS,
BUILDINGS, SPRINKLERS, PRIVATE PROPERTY, LAWN RESTORATION, ETC. THE
CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY IF ANY DAMAGE OCCURS AS A
RESULT OF WORK ACTIVITIES.
7. CONTRACTOR IS TO TAKE PRECAUTIONARY MEASURES TO PROTECT ALL TURF, TREES
AND PLANTS THAT ARE IN THE VICINITY OF CONSTRUCTION AREAS AND BE
RESPONSIBLE TO REPAIR/REPLACE ANY DAMAGED VEGETATION AND/OR PERFORM
ANY LAWN RESTORATION AS A RESULT.
8. CONTRACTOR SHALL NOT BLOCK AREAS OF INGRESS/EGRESS FOR VEHICLE TRAFFIC
OR PATIENT/STAFF ACCESS DURING CONSTRUCTION ACTIVITIES. IF THIS CANNOT BE
AVOIDED, WRITTEN PERMISSION MUST BE OBTAINED FROM THE COR PRIOR. PROVIDE
TRAFFIC CONES OR BARRICADES AND/OR PROVIDE A PERSON AT THE SUBJECT AREA
TO ALERT PEDESTRIANS DURING THE WORK.
9. EXISTING CAULKING AT LINTEL BEARING & PREVIOUS MASONRY REPAIR ARE SUSPECT
FOR ASBESTOS. REFER TO SPECIFICATION FOR PRECAUTIONS, TESTING AND
REQUIRED ABATEMENT MEASURES. LEGACY REPORTS ARE AVAILABLE FOR
CONTRACTOR REVIEW.
10. CONTRACTOR TO REMOVE/REAPPLY CAULK/SEALANT AT FULL PERIMETER OF ALL
EXTERIOR EXISTING WINDOW AND DOOR OPENINGS AND AT ALL EXISTING VERTICAL
BRICK EXPANSION JOINTS WITH NEW BACKER ROD AS APPLICABLE U.N.O., TYPICAL.
11. CONTRACTOR IS REQUIRED TO COMPLETE A REPRESENTATIVE SECTION OF A
BUILDING AS AN EXAMPLE SO THAT IT CAN BE CRITIQUED PRIOR TO COMMENCING
OF WORK. REFER TO MOCK-UP PORTION OF MASONRY SPECIFICATIONS.
ELEVATION LEGEND
AREA OF GENERAL TUCKPOINTING or REPAIR AS NOTED.
WORK SCOPE DEFINITION FOR HATCHED AREA KEYNOTES:
1. MORTAR REPONTING: EXISTING HEAVILY WEATHERED MASONRY JOINTS. DEFINED AS
ERODED GREATER THAN 1/4" IN DEPTH, THROUGH CRACKED OR IF A WIRE ROD OF 1/32"
DIAMETER (PAPER CLIP) CAN BE PASSED FURTHER THAN 1/2 THE DEPTH OF THE BRICK.
2. CAULK REPOINTING: EXISTING MORTAR JOINT DAMAGE AT CORRODING STEEL LINTELS
NOT SCHEDULED FOR REPLACEMENT WITH THIS PROJECT. DEFINITION SAME AS ITEM 1
ABOVE FOR MORTAR REPOINTING.
3. REPLACE EXISTING SPALLED OR DAMAGED MASONRY UNITS: BRICK FACES WITH LOSS
MORE THAN 25% OF SURFACE AREA, THROUGH CRACKED OR IF A WIRE ROD OF 1/32"
DIAMETER (PAPER CLIP) CAN BE PASSED FURTHER THAN 1/2 THE DEPTH OF THE BRICK.
NOTE:
NOT THE ENTIRETY OF HATCHED AREA INDICATED IS INTENDED TO REQUIRE THE
ASSOCIATED KEYNOTE REPAIR UNLESS NOTED OTHERWISE - USE THE KEYNOTE AREA IN
COMBINATION WITH THESE DEFINITIONS IN ORDER TO DETERMINE THE QUANTITIES. A PRE-
BID SITE INSPECTION IS MANDATORY PRIOR TO SUBMITTING A BID.
DEMOLITION/REPAIR KEYNOTES
REPAIR EXISTING CONCRETE SILL BY CLEANING LOOSE MATERIAL ON SURFACE OR IN
JOINTS, PERFORM A LIGHT POWER WASH, LET DRY COMPLETELY THEN COAT WITH EIFS
SKIM COAT ‘WHITE’/FINE TEXTURE APPLIED PER MANUFACTURERS WRITTEN
INSTRUCTIONS. TO MATCH EXISTING SIMILAR REPAIR ON CAMPUS.
TYP. MORTAR JOINT REPOINT AT WINDOW HEAD STEEL LINTEL BEARING. PROVIDE NEW
3/8" DIA. WEEP INSERTS W/SCREENS: MINIMUM (2) PER OPENING.
TYP. MORTAR JOINT REPOINT BETWEEN WINDOWS AT WINDOW HEAD STEEL LINTEL.
REFER TO WORK SCOPE DEFINITIONS ON THIS SHEET. PROVIDE NEW 3/8" DIA. WEEP
INSERTS W/SCREENS: MIN. (2) PER OPENING.
TYP. MORTAR JOINT REPOINT “STAIR-STEP” PATTERN MID-WALL. REFER TO WORK SCOPE
DEFINITIONS ON THIS SHEET.
TYP. MORTAR JOINT REPOINT “STAIR-STEP” PATTERN AROUND CORNER. REFER TO
WORK SCOPE DEFINITIONS ON THIS SHEET.
REMOVE/REPLACE DAMAGED BRICK & IF APPLICABLE, ALSO REMOVE IRON BAR
GRATING ANCHOR AT LOWER WINDOW SASH, EA. SIDE.
REMOVE/REPLACE DAMAGED BRICK (FACE SPALL OR BROKEN THROUGH). REFER TO
WORK SCOPE DEFINITIONS ON THIS SHEET.
REMOVE/REPLACE EXISTING STEEL LINTEL. REFER TO SHEET AS500.
CONCRETE WATER-TABLE CORNER OR OVERHEAD DOOR ‘CURB’ BROKEN (NOT IN
CONTRACT).
NOT USED.
SEVERE VERTICAL CRACKING AT BRICK CORNER OR PILASTER (ENTIRE HEIGHT). PILASTER
REQUIRES REBUILD. SEE DETAILS SHEET AS500
TYP. MORTAR JOINT REPOINT AROUND WINDOW SILL. REFER TO WORK SCOPE
DEFINITIONS ON THIS SHEET.
CONCRETE RETAINING WALLS SPALLING BADLY IN THIS AREA (NOT IN SCOPE)
ENTIRE BRICK WYTHE WAINSCOT FALLING AWAY IN THIS AREA. REMOVE/PATCH/REPAIR.
REMOVE DAMAGED CONCRETE OR LIMESTONE PARAPET CAP/TRIM. PREP FOR NEW TO
MATCH.
TYP. AREA OF DAMAGED/WEATHERED MORTAR JOINTS TO BE REPOINTED AND/OR
SPALLED BRICK TO BE REPLACED. REFER TO “ELEVATION LEGEND”/”WORK SCOPE
DEFINITIONS FOR HATCHED AREA KEYNOTES”, ON THIS SHEET.
NOTE: ONLY A PERCENTAGE OF THE HATCHED AREA WILL REQUIRE THESE REPAIRS BY
DEFINITION AND IT WILL VARY BASED ON EXISTING CONDITIONS FOR EACH. REPAIRS
REQUIRED BY DEFINITION OUTSIDE OF HATCHED AREA BOUNDARIES (AS MAY BE
IDENTIFIED BY THE CONTRACTOR DURING CONSTRUCTION) WILL BE EVALUATED
AGAINST BID ALLOWANCES FOR EACH – SEE OFFER SCHEDULE, TYPICAL.
TYP. MORTAR JOINTS OF LIMESTONE WATER TABLE OR WALL HEAD BANDING TO BE
REPOINTED. REFER TO WORK SCOPE DEFINITIONS ON THIS SHEET.
TYP. REPOINTING REQUIRED AT EXISTING WALL FLASHING.
REMOVE/REPLACE EXISTING CONCRETE SILL. REMOVE/REPLACE ANY DAMAGED BRICK
SURROUNDING THE SILL DURING SILL REMOVAL AND REPOINT. REMOVE/REINSTALL
WINDOW. REFER TO SHEET AS500.
BUCKLED CAST STONE CAP & BRICK REQUIRES REMOVAL/REPLACEMENT.
NOTES:
ALL KEY NOTES FOR THE PROJECT ARE LISTED BUT DO NOT NECESSARILY APPLY TO
EVERY PLAN OR ELEVATION. REFER TO DRAWINGS FOR APPLICABILITY.
THE VA HAS FIRST RIGHT OF REFUSAL ON ALL SALVAGED MATERIAL. SEE SPECIFICATIONS
FOR GENERAL DEMOLITION AND PATCHING REQUIREMENTS.
SEE DRAWING G002 FOR ALLOWANCES AND UNIT PRICES TO BE PROVIDED.
600 E. Michigan Ave., Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
7GAE PROJECT NO.: 218038 FILE NAME: VA_BATTLE CREEK_TUCKPOINTING
Office of Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs
100% BID DOCUMENTS
STAMP
004.AS200
515-18-106
BATTLE CREEK, MICHIGAN 49037
OCTOBER 24, 2019
RJS NTF
EXTERIOR ELEVATIONS TUCKPOINT, VARIOUS
BUILDINGS
SCALE: 1/8" = 1'-0"
ELEVATION - A1
SCALE: 1/8" = 1'-0"
ELEVATION - B2
SCALE: 1/8" = 1'-0"
ELEVATION - C3
SCALE: 1/8" = 1'-0"
ELEVATION - D4
SHEET NOTES:
1. THIS BUILDING HAS EXISTING ‘LATICRETE’ PRODUCT APPLIED; NO MATCHING
APPLICATION OVER NEW TUCKPOINTING REQUIRED.
2. MANY STEEL WINDOW LINTELS ARE CORRODED AND ARE TO BE REPLACED WHERE
KEYNOTED. THE INTENT IS TO REPLACE LINTELS AS DETAILED ON SHEET AS500
WITHOUT REMOVAL/REPLACEMENT OF THE ASSOCIATED WINDOW UNIT.
3. THIS BUILDING HAS UNDERGROUND GEOTHERMAL WELLS AROUND ITS PERIMETER.
REFER TO GS100 FOR LOCATIONS.
4. THIS BUILDING DOES NOT REQUIRE CAULKING/SEALANT TO BE
REMOVED/REAPPLIED AROUND EXISTING WINDOW OPENINGS. CONTRACTOR
TO REAPPLY CAULKING/SEALANT AT ANY AREA DISTURBED BY CONSTRUCTION.
5. ‘REPOINT’ METHODOLOGY/MATERIAL:
A. AT REMOVE/REPLACE EXISTING CORRODED LINTELS W/NEW GALV. STEEL,
PROVIDE NEW WEEPS (TUBE WITH A SCREEN TYPE) ABOVE LINTELS, REPOINT PER
KEYNOTE WITH COLOR/TEXTURE MATCHING MORTAR.
AT EXISTING CORRODED LINTELS TO BE LEFT IN PLACE, DRILL NEW WEEP INSERTS
(MIN. 2 PER OPNG.) AND REPOINT PER KEYNOTE WITH SANDED CAULK ILO
MORTAR TO MATCH/BLEND WITH SURROUNDING AREAS.
B. RE-CAULK ALL EXISTING BRICK EXPANSION JOINTS.
C. CONVENTIONAL NEW BRICK MORTAR TO BE LESSER STRENGTH (PSI) THAN
EXISTING TO REDUCE BRICK FACE SPALL OCCURRENCE.
ELEV. 925.00
2ND FLOOR
ELEV. 937.00
FIN. GRADE
ELEV. 922.00
ATTIC FLOOR
ELEV. 948.50
17' - 2" 41' - 0" 22' - 8"
8 8
1ST FLOOR
ELEV. 925.00
2ND FLOOR
ELEV. 937.00
FIN. GRADE
ELEV. 922.00
2 2
2 1 2
ATTIC FLOOR
ELEV. 948.50
9' - 6" 22' - 8" 41' - 0" 17' - 2"
ELEVATION KEY
A
NORTH
NOT TO SCALE
BUILDING 4 KEY PLAN
B
D
C
E
F
F
E
FENCED EQUIPMENT
AREA
FENCED EQUIPMENT
AREA
GENERAL NOTES
1. PRIOR TO COMMENCING EACH NEW PHASE OF WORK CONTRACTORS ARE TO
VERIFY EXISTING FIELD CONDITIONS AND DIMENSIONS. INSPECT EXISTING FRAMING
MEMBERS AND OBSERVE FOR ANY DAMAGE OR POTENTIAL ADVERSE EFFECT OF
NEW WORK ON STRUCTURAL INTEGRITY OF THE BUILDING. IMMEDIATELY NOTIFY THE
COR OF ALL DISCREPANCIES OR CONCERNS A MINIMUM OF (10) TEN WORKING
DAYS IN ADVANCE OF THE WORK.
2. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TESTING & ALL
APPURTENANCES TO COMPLETE THE PROJECT.
3. ALL CONSTRUCTION AREAS ARE TO BE PROPERLY IDENTIFIED, CLEANED AND
MAINTAINED BY THE CONTRACTOR ON A DAILY BASIS. NO CONSTRUCTION DEBRIS IS
TO REMAIN ON SITE AT PROJECT COMPLETION.
4. CONTRACTOR TO VERIFY CONSTRUCTION WASTE DUMPSTER LOCATIONS WITH THE
COR PRIOR TO BEGINNING ANY DEMOLITION AT EACH BUILDING.
5. ALL CONTRACTORS ARE TO PROTECT EXISTING EQUIPMENT, FINISHES AND BUILDING
COMPONENTS FROM CONSTRUCTION ACTIVITIES.
6. CONTRACTORS SHALL BE RESPONSIBLE FOR ANY/ALL DAMAGE CAUSED DURING
CONSTRUCTION OPERATIONS INCLUDING BUT NOT LIMITED TO SIDEWALK, CURBS,
BUILDINGS, SPRINKLERS, PRIVATE PROPERTY, LAWN RESTORATION, ETC. THE
CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY IF ANY DAMAGE OCCURS AS A
RESULT OF WORK ACTIVITIES.
7. CONTRACTOR IS TO TAKE PRECAUTIONARY MEASURES TO PROTECT ALL TURF, TREES
AND PLANTS THAT ARE IN THE VICINITY OF CONSTRUCTION AREAS AND BE
RESPONSIBLE TO REPAIR/REPLACE ANY DAMAGED VEGETATION AND/OR PERFORM
ANY LAWN RESTORATION AS A RESULT.
8. CONTRACTOR SHALL NOT BLOCK AREAS OF INGRESS/EGRESS FOR VEHICLE TRAFFIC
OR PATIENT/STAFF ACCESS DURING CONSTRUCTION ACTIVITIES. IF THIS CANNOT BE
AVOIDED, WRITTEN PERMISSION MUST BE OBTAINED FROM THE COR PRIOR. PROVIDE
TRAFFIC CONES OR BARRICADES AND/OR PROVIDE A PERSON AT THE SUBJECT AREA
TO ALERT PEDESTRIANS DURING THE WORK.
9. EXISTING CAULKING AT LINTEL BEARING & PREVIOUS MASONRY REPAIR ARE SUSPECT
FOR ASBESTOS. REFER TO SPECIFICATION FOR PRECAUTIONS, TESTING AND
REQUIRED ABATEMENT MEASURES. LEGACY REPORTS ARE AVAILABLE FOR
CONTRACTOR REVIEW.
10. CONTRACTOR TO REMOVE/REAPPLY CAULK/SEALANT AT FULL PERIMETER OF ALL
EXTERIOR EXISTING WINDOW AND DOOR OPENINGS AND AT ALL EXISTING VERTICAL
BRICK EXPANSION JOINTS WITH NEW BACKER ROD AS APPLICABLE U.N.O., TYPICAL.
11. CONTRACTOR IS REQUIRED TO COMPLETE A REPRESENTATIVE SECTION OF A
BUILDING AS AN EXAMPLE SO THAT IT CAN BE CRITIQUED PRIOR TO COMMENCING
OF WORK. REFER TO MOCK-UP PORTION OF MASONRY SPECIFICATIONS.
ELEVATION LEGEND
AREA OF GENERAL TUCKPOINTING or REPAIR AS NOTED.
WORK SCOPE DEFINITION FOR HATCHED AREA KEYNOTES:
1. MORTAR REPONTING: EXISTING HEAVILY WEATHERED MASONRY JOINTS. DEFINED AS
ERODED GREATER THAN 1/4" IN DEPTH, THROUGH CRACKED OR IF A WIRE ROD OF 1/32"
DIAMETER (PAPER CLIP) CAN BE PASSED FURTHER THAN 1/2 THE DEPTH OF THE BRICK.
2. CAULK REPOINTING: EXISTING MORTAR JOINT DAMAGE AT CORRODING STEEL LINTELS
NOT SCHEDULED FOR REPLACEMENT WITH THIS PROJECT. DEFINITION SAME AS ITEM 1
ABOVE FOR MORTAR REPOINTING.
3. REPLACE EXISTING SPALLED OR DAMAGED MASONRY UNITS: BRICK FACES WITH LOSS
MORE THAN 25% OF SURFACE AREA, THROUGH CRACKED OR IF A WIRE ROD OF 1/32"
DIAMETER (PAPER CLIP) CAN BE PASSED FURTHER THAN 1/2 THE DEPTH OF THE BRICK.
NOTE:
NOT THE ENTIRETY OF HATCHED AREA INDICATED IS INTENDED TO REQUIRE THE
ASSOCIATED KEYNOTE REPAIR UNLESS NOTED OTHERWISE - USE THE KEYNOTE AREA IN
COMBINATION WITH THESE DEFINITIONS IN ORDER TO DETERMINE THE QUANTITIES. A PRE-
BID SITE INSPECTION IS MANDATORY PRIOR TO SUBMITTING A BID.
DEMOLITION/REPAIR KEYNOTES
REPAIR EXISTING CONCRETE SILL BY CLEANING LOOSE MATERIAL ON SURFACE OR IN
JOINTS, PERFORM A LIGHT POWER WASH, LET DRY COMPLETELY THEN COAT WITH EIFS
SKIM COAT ‘WHITE’/FINE TEXTURE APPLIED PER MANUFACTURERS WRITTEN
INSTRUCTIONS. TO MATCH EXISTING SIMILAR REPAIR ON CAMPUS.
TYP. MORTAR JOINT REPOINT AT WINDOW HEAD STEEL LINTEL BEARING. PROVIDE NEW
3/8" DIA. WEEP INSERTS W/SCREENS: MINIMUM (2) PER OPENING.
TYP. MORTAR JOINT REPOINT BETWEEN WINDOWS AT WINDOW HEAD STEEL LINTEL.
REFER TO WORK SCOPE DEFINITIONS ON THIS SHEET. PROVIDE NEW 3/8" DIA. WEEP
INSERTS W/SCREENS: MIN. (2) PER OPENING.
TYP. MORTAR JOINT REPOINT “STAIR-STEP” PATTERN MID-WALL. REFER TO WORK SCOPE
DEFINITIONS ON THIS SHEET.
TYP. MORTAR JOINT REPOINT “STAIR-STEP” PATTERN AROUND CORNER. REFER TO
WORK SCOPE DEFINITIONS ON THIS SHEET.
REMOVE/REPLACE DAMAGED BRICK & IF APPLICABLE, ALSO REMOVE IRON BAR
GRATING ANCHOR AT LOWER WINDOW SASH, EA. SIDE.
REMOVE/REPLACE DAMAGED BRICK (FACE SPALL OR BROKEN THROUGH). REFER TO
WORK SCOPE DEFINITIONS ON THIS SHEET.
REMOVE/REPLACE EXISTING STEEL LINTEL. REFER TO SHEET AS500.
CONCRETE WATER-TABLE CORNER OR OVERHEAD DOOR ‘CURB’ BROKEN (NOT IN
CONTRACT).
NOT USED.
SEVERE VERTICAL CRACKING AT BRICK CORNER OR PILASTER (ENTIRE HEIGHT). PILASTER
REQUIRES REBUILD. SEE DETAILS SHEET AS500
TYP. MORTAR JOINT REPOINT AROUND WINDOW SILL. REFER TO WORK SCOPE
DEFINITIONS ON THIS SHEET.
CONCRETE RETAINING WALLS SPALLING BADLY IN THIS AREA (NOT IN SCOPE)
ENTIRE BRICK WYTHE WAINSCOT FALLING AWAY IN THIS AREA. REMOVE/PATCH/REPAIR.
REMOVE DAMAGED CONCRETE OR LIMESTONE PARAPET CAP/TRIM. PREP FOR NEW TO
MATCH.
TYP. AREA OF DAMAGED/WEATHERED MORTAR JOINTS TO BE REPOINTED AND/OR
SPALLED BRICK TO BE REPLACED. REFER TO “ELEVATION LEGEND”/”WORK SCOPE
DEFINITIONS FOR HATCHED AREA KEYNOTES”, ON THIS SHEET.
NOTE: ONLY A PERCENTAGE OF THE HATCHED AREA WILL REQUIRE THESE REPAIRS BY
DEFINITION AND IT WILL VARY BASED ON EXISTING CONDITIONS FOR EACH. REPAIRS
REQUIRED BY DEFINITION OUTSIDE OF HATCHED AREA BOUNDARIES (AS MAY BE
IDENTIFIED BY THE CONTRACTOR DURING CONSTRUCTION) WILL BE EVALUATED
AGAINST BID ALLOWANCES FOR EACH – SEE OFFER SCHEDULE, TYPICAL.
TYP. MORTAR JOINTS OF LIMESTONE WATER TABLE OR WALL HEAD BANDING TO BE
REPOINTED. REFER TO WORK SCOPE DEFINITIONS ON THIS SHEET.
TYP. REPOINTING REQUIRED AT EXISTING WALL FLASHING.
REMOVE/REPLACE EXISTING CONCRETE SILL. REMOVE/REPLACE ANY DAMAGED BRICK
SURROUNDING THE SILL DURING SILL REMOVAL AND REPOINT. REMOVE/REINSTALL
WINDOW. REFER TO SHEET AS500.
BUCKLED CAST STONE CAP & BRICK REQUIRES REMOVAL/REPLACEMENT.
NOTES:
ALL KEY NOTES FOR THE PROJECT ARE LISTED BUT DO NOT NECESSARILY APPLY TO
EVERY PLAN OR ELEVATION. REFER TO DRAWINGS FOR APPLICABILITY.
THE VA HAS FIRST RIGHT OF REFUSAL ON ALL SALVAGED MATERIAL. SEE SPECIFICATIONS
FOR GENERAL DEMOLITION AND PATCHING REQUIREMENTS.
SEE DRAWING G002 FOR ALLOWANCES AND UNIT PRICES TO BE PROVIDED.
600 E. Michigan Ave., Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
7GAE PROJECT NO.: 218038 FILE NAME: VA_BATTLE CREEK_TUCKPOINTING
Office of Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs
100% BID DOCUMENTS
STAMP
004.AS201
515-18-106
BATTLE CREEK, MICHIGAN 49037
OCTOBER 24, 2019
RJS NTF
EXTERIOR ELEVATIONS TUCKPOINT, VARIOUS
BUILDINGS
SCALE: 1/8" = 1'-0"
ELEVATION - E1
SCALE: 1/8" = 1'-0"
ELEVATION - F2
SHEET NOTES:
1. THIS BUILDING HAS EXISTING ‘LATICRETE’ PRODUCT APPLIED; NO MATCHING
APPLICATION OVER NEW TUCKPOINTING REQUIRED.
2. MANY STEEL WINDOW LINTELS ARE CORRODED AND ARE TO BE REPLACED WHERE
KEYNOTED. THE INTENT IS TO REPLACE LINTELS AS DETAILED ON SHEET AS500
WITHOUT REMOVAL/REPLACEMENT OF THE ASSOCIATED WINDOW UNIT.
3. THIS BUILDING HAS UNDERGROUND GEOTHERMAL WELLS AROUND ITS PERIMETER.
REFER TO GS100 FOR LOCATIONS.
4. THIS BUILDING DOES NOT REQUIRE CAULKING/SEALANT TO BE
REMOVED/REAPPLIED AROUND EXISTING WINDOW OPENINGS. CONTRACTOR
TO REAPPLY CAULKING/SEALANT AT ANY AREA DISTURBED BY CONSTRUCTION.
5. ‘REPOINT’ METHODOLOGY/MATERIAL:
A. AT REMOVE/REPLACE EXISTING CORRODED LINTELS W/NEW GALV. STEEL,
PROVIDE NEW WEEPS (TUBE WITH A SCREEN TYPE) ABOVE LINTELS, REPOINT PER
KEYNOTE WITH COLOR/TEXTURE MATCHING MORTAR.
AT EXISTING CORRODED LINTELS TO BE LEFT IN PLACE, DRILL NEW WEEP INSERTS
(MIN. 2 PER OPNG.) AND REPOINT PER KEYNOTE WITH SANDED CAULK ILO
MORTAR TO MATCH/BLEND WITH SURROUNDING AREAS.
B. RE-CAULK ALL EXISTING BRICK EXPANSION JOINTS.
C. CONVENTIONAL NEW BRICK MORTAR TO BE LESSER STRENGTH (PSI) THAN
ELEVATION KEY
NORTH
NOT TO SCALE
BUILDING 5 KEY PLAN
B
A
C11
1ST FLOOR
ELEV. 925.50
2ND FLOOR
ELEV. 937.50
FIN. GRADE
ELEV. 921.50
ATTIC
ELEV. 947.58
2 2
2 2 2 2 2 233
65' - 6 1/2" 33' - 5" 65' - 6 1/2"
222 3
22 4
1ST FLOOR
ELEV. 925.50
2ND FLOOR
ELEV. 937.50
FIN. GRADE
ELEV. 921.50
ATTIC
ELEV. 947.58
3 125
16 5
26' - 5" 42' - 7 1/2" 72' - 4" 22' - 5 1/2" 36' - 7 1/2"
2 4
161ST FLOOR
ELEV. 925.50
2ND FLOOR
ELEV. 937.50
FIN. GRADE
ELEV. 921.50
ATTIC
ELEV. 947.58 3
5 16
36' - 7 1/2" 36' - 2 1/2" 57' - 6" 68' - 2 1/2"
GENERAL NOTES
1. PRIOR TO COMMENCING EACH NEW PHASE OF WORK CONTRACTORS ARE TO
VERIFY EXISTING FIELD CONDITIONS AND DIMENSIONS. INSPECT EXISTING FRAMING
MEMBERS AND OBSERVE FOR ANY DAMAGE OR POTENTIAL ADVERSE EFFECT OF
NEW WORK ON STRUCTURAL INTEGRITY OF THE BUILDING. IMMEDIATELY NOTIFY THE
COR OF ALL DISCREPANCIES OR CONCERNS A MINIMUM OF (10) TEN WORKING
DAYS IN ADVANCE OF THE WORK.
2. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TESTING & ALL
APPURTENANCES TO COMPLETE THE PROJECT.
3. ALL CONSTRUCTION AREAS ARE TO BE PROPERLY IDENTIFIED, CLEANED AND
MAINTAINED BY THE CONTRACTOR ON A DAILY BASIS. NO CONSTRUCTION DEBRIS IS
TO REMAIN ON SITE AT PROJECT COMPLETION.
4. CONTRACTOR TO VERIFY CONSTRUCTION WASTE DUMPSTER LOCATIONS WITH THE
COR PRIOR TO BEGINNING ANY DEMOLITION AT EACH BUILDING.
5. ALL CONTRACTORS ARE TO PROTECT EXISTING EQUIPMENT, FINISHES AND BUILDING
COMPONENTS FROM CONSTRUCTION ACTIVITIES.
6. CONTRACTORS SHALL BE RESPONSIBLE FOR ANY/ALL DAMAGE CAUSED DURING
CONSTRUCTION OPERATIONS INCLUDING BUT NOT LIMITED TO SIDEWALK, CURBS,
BUILDINGS, SPRINKLERS, PRIVATE PROPERTY, LAWN RESTORATION, ETC. THE
CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY IF ANY DAMAGE OCCURS AS A
RESULT OF WORK ACTIVITIES.
7. CONTRACTOR IS TO TAKE PRECAUTIONARY MEASURES TO PROTECT ALL TURF, TREES
AND PLANTS THAT ARE IN THE VICINITY OF CONSTRUCTION AREAS AND BE
RESPONSIBLE TO REPAIR/REPLACE ANY DAMAGED VEGETATION AND/OR PERFORM
ANY LAWN RESTORATION AS A RESULT.
8. CONTRACTOR SHALL NOT BLOCK AREAS OF INGRESS/EGRESS FOR VEHICLE TRAFFIC
OR PATIENT/STAFF ACCESS DURING CONSTRUCTION ACTIVITIES. IF THIS CANNOT BE
AVOIDED, WRITTEN PERMISSION MUST BE OBTAINED FROM THE COR PRIOR. PROVIDE
TRAFFIC CONES OR BARRICADES AND/OR PROVIDE A PERSON AT THE SUBJECT AREA
TO ALERT PEDESTRIANS DURING THE WORK.
9. EXISTING CAULKING AT LINTEL BEARING & PREVIOUS MASONRY REPAIR ARE SUSPECT
FOR ASBESTOS. REFER TO SPECIFICATION FOR PRECAUTIONS, TESTING AND
REQUIRED ABATEMENT MEASURES. LEGACY REPORTS ARE AVAILABLE FOR
CONTRACTOR REVIEW.
10. CONTRACTOR TO REMOVE/REAPPLY CAULK/SEALANT AT FULL PERIMETER OF ALL
EXTERIOR EXISTING WINDOW AND DOOR OPENINGS AND AT ALL EXISTING VERTICAL
BRICK EXPANSION JOINTS WITH NEW BACKER ROD AS APPLICABLE U.N.O., TYPICAL.
11. CONTRACTOR IS REQUIRED TO COMPLETE A REPRESENTATIVE SECTION OF A
BUILDING AS AN EXAMPLE SO THAT IT CAN BE CRITIQUED PRIOR TO COMMENCING
OF WORK. REFER TO MOCK-UP PORTION OF MASONRY SPECIFICATIONS.
ELEVATION LEGEND
AREA OF GENERAL TUCKPOINTING or REPAIR AS NOTED.
WORK SCOPE DEFINITION FOR HATCHED AREA KEYNOTES:
1. MORTAR REPONTING: EXISTING HEAVILY WEATHERED MASONRY JOINTS. DEFINED AS
ERODED GREATER THAN 1/4" IN DEPTH, THROUGH CRACKED OR IF A WIRE ROD OF 1/32"
DIAMETER (PAPER CLIP) CAN BE PASSED FURTHER THAN 1/2 THE DEPTH OF THE BRICK.
2. CAULK REPOINTING: EXISTING MORTAR JOINT DAMAGE AT CORRODING STEEL LINTELS
NOT SCHEDULED FOR REPLACEMENT WITH THIS PROJECT. DEFINITION SAME AS ITEM 1
ABOVE FOR MORTAR REPOINTING.
3. REPLACE EXISTING SPALLED OR DAMAGED MASONRY UNITS: BRICK FACES WITH LOSS
MORE THAN 25% OF SURFACE AREA, THROUGH CRACKED OR IF A WIRE ROD OF 1/32"
DIAMETER (PAPER CLIP) CAN BE PASSED FURTHER THAN 1/2 THE DEPTH OF THE BRICK.
NOTE:
NOT THE ENTIRETY OF HATCHED AREA INDICATED IS INTENDED TO REQUIRE THE
ASSOCIATED KEYNOTE REPAIR UNLESS NOTED OTHERWISE - USE THE KEYNOTE AREA IN
COMBINATION WITH THESE DEFINITIONS IN ORDER TO DETERMINE THE QUANTITIES. A PRE-
BID SITE INSPECTION IS MANDATORY PRIOR TO SUBMITTING A BID.
DEMOLITION/REPAIR KEYNOTES
REPAIR EXISTING CONCRETE SILL BY CLEANING LOOSE MATERIAL ON SURFACE OR IN
JOINTS, PERFORM A LIGHT POWER WASH, LET DRY COMPLETELY THEN COAT WITH EIFS
SKIM COAT ‘WHITE’/FINE TEXTURE APPLIED PER MANUFACTURERS WRITTEN
INSTRUCTIONS. TO MATCH EXISTING SIMILAR REPAIR ON CAMPUS.
TYP. MORTAR JOINT REPOINT AT WINDOW HEAD STEEL LINTEL BEARING. PROVIDE NEW
3/8" DIA. WEEP INSERTS W/SCREENS: MINIMUM (2) PER OPENING.
TYP. MORTAR JOINT REPOINT BETWEEN WINDOWS AT WINDOW HEAD STEEL LINTEL.
REFER TO WORK SCOPE DEFINITIONS ON THIS SHEET. PROVIDE NEW 3/8" DIA. WEEP
INSERTS W/SCREENS: MIN. (2) PER OPENING.
TYP. MORTAR JOINT REPOINT “STAIR-STEP” PATTERN MID-WALL. REFER TO WORK SCOPE
DEFINITIONS ON THIS SHEET.
TYP. MORTAR JOINT REPOINT “STAIR-STEP” PATTERN AROUND CORNER. REFER TO
WORK SCOPE DEFINITIONS ON THIS SHEET.
REMOVE/REPLACE DAMAGED BRICK & IF APPLICABLE, ALSO REMOVE IRON BAR
GRATING ANCHOR AT LOWER WINDOW SASH, EA. SIDE.
REMOVE/REPLACE DAMAGED BRICK (FACE SPALL OR BROKEN THROUGH). REFER TO
WORK SCOPE DEFINITIONS ON THIS SHEET.
REMOVE/REPLACE EXISTING STEEL LINTEL. REFER TO SHEET AS500.
CONCRETE WATER-TABLE CORNER OR OVERHEAD DOOR ‘CURB’ BROKEN (NOT IN
CONTRACT).
NOT USED.
SEVERE VERTICAL CRACKING AT BRICK CORNER OR PILASTER (ENTIRE HEIGHT). PILASTER
REQUIRES REBUILD. SEE DETAILS SHEET AS500
TYP. MORTAR JOINT REPOINT AROUND WINDOW SILL. REFER TO WORK SCOPE
DEFINITIONS ON THIS SHEET.
CONCRETE RETAINING WALLS SPALLING BADLY IN THIS AREA (NOT IN SCOPE)
ENTIRE BRICK WYTHE WAINSCOT FALLING AWAY IN THIS AREA. REMOVE/PATCH/REPAIR.
REMOVE DAMAGED CONCRETE OR LIMESTONE PARAPET CAP/TRIM. PREP FOR NEW TO
MATCH.
TYP. AREA OF DAMAGED/WEATHERED MORTAR JOINTS TO BE REPOINTED AND/OR
SPALLED BRICK TO BE REPLACED. REFER TO “ELEVATION LEGEND”/”WORK SCOPE
DEFINITIONS FOR HATCHED AREA KEYNOTES”, ON THIS SHEET.
NOTE: ONLY A PERCENTAGE OF THE HATCHED AREA WILL REQUIRE THESE REPAIRS BY
DEFINITION AND IT WILL VARY BASED ON EXISTING CONDITIONS FOR EACH. REPAIRS
REQUIRED BY DEFINITION OUTSIDE OF HATCHED AREA BOUNDARIES (AS MAY BE
IDENTIFIED BY THE CONTRACTOR DURING CONSTRUCTION) WILL BE EVALUATED
AGAINST BID ALLOWANCES FOR EACH – SEE OFFER SCHEDULE, TYPICAL.
TYP. MORTAR JOINTS OF LIMESTONE WATER TABLE OR WALL HEAD BANDING TO BE
REPOINTED. REFER TO WORK SCOPE DEFINITIONS ON THIS SHEET.
TYP. REPOINTING REQUIRED AT EXISTING WALL FLASHING.
REMOVE/REPLACE EXISTING CONCRETE SILL. REMOVE/REPLACE ANY DAMAGED BRICK
SURROUNDING THE SILL DURING SILL REMOVAL AND REPOINT. REMOVE/REINSTALL
WINDOW. REFER TO SHEET AS500.
BUCKLED CAST STONE CAP & BRICK REQUIRES REMOVAL/REPLACEMENT.
NOTES:
ALL KEY NOTES FOR THE PROJECT ARE LISTED BUT DO NOT NECESSARILY APPLY TO
EVERY PLAN OR ELEVATION. REFER TO DRAWINGS FOR APPLICABILITY.
THE VA HAS FIRST RIGHT OF REFUSAL ON ALL SALVAGED MATERIAL. SEE SPECIFICATIONS
FOR GENERAL DEMOLITION AND PATCHING REQUIREMENTS.
SEE DRAWING G002 FOR ALLOWANCES AND UNIT PRICES TO BE PROVIDED.
600 E. Michigan Ave., Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
7GAE PROJECT NO.: 218038 FILE NAME: VA_BATTLE CREEK_TUCKPOINTING
Office of Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs
100% BID DOCUMENTS
STAMP
005.AS200
515-18-106
BATTLE CREEK, MICHIGAN 49037
OCTOBER 24, 2019
RJS NTF
EXTERIOR ELEVATIONS TUCKPOINT, VARIOUS
BUILDINGS
SCALE: 3/32" = 1'-0"
ELEVATION - A1
SCALE: 3/32" = 1'-0"
ELEVATION - B2
SCALE: 3/32" = 1'-0"
ELEVATION - C3
SHEET NOTES:
1. THIS BUILDING HAS EXISTING ‘LATICRETE’ PRODUCT APPLIED; NO MATCHING
APPLICATION OVER NEW TUCKPOINTING REQUIRED.
2. MANY STEEL WINDOW LINTELS ARE CORRODED AND ARE TO BE REPLACED WHERE
KEYNOTED. THE INTENT IS TO REPLACE LINTELS AS DETAILED ON SHEET AS500
WITHOUT REMOVAL/REPLACEMENT OF THE ASSOCIATED WINDOW UNIT.
3. THIS BUILDING DOES NOT REQUIRE CAULKING/SEALANT TO BE
REMOVED/REAPPLIED AROUND EXISTING WINDOW OPENINGS. CONTRACTOR
TO REAPPLY CAULKING/SEALANT AT ANY AREA DISTURBED BY CONSTRUCTION.
4. ‘REPOINT’ METHODOLOGY/MATERIAL:
A. AT REMOVE/REPLACE EXISTING CORRODED LINTELS W/NEW GALV. STEEL,
PROVIDE NEW WEEPS (TUBE WITH A SCREEN TYPE) ABOVE LINTELS, REPOINT PER
KEYNOTE WITH COLOR/TEXTURE MATCHING MORTAR.
AT EXISTING CORRODED LINTELS TO BE LEFT IN PLACE, DRILL NEW WEEP INSERTS
(MIN. 2 PER OPNG.) AND REPOINT PER KEYNOTE WITH SANDED CAULK ILO
MORTAR TO MATCH/BLEND WITH SURROUNDING AREAS.
B. RE-CAULK ALL EXISTING BRICK EXPANSION JOINTS.
C. CONVENTIONAL NEW BRICK MORTAR TO BE LESSER STRENGTH (PSI) THAN
A
NORTH
NOT TO SCALE
BUILDING 6 KEY PLAN
B
C
D
22' - 6" 31' - 11" 27' - 0" 42' - 8" 27' - 0"
1ST FLOOR
ELEV. 925.50
2ND FLOOR
ELEV. 937.50
ATTIC FLOOR
ELEV. 947.50
FIN. GRADE
ELEV. 922.00
BLDG. 6
RECREA
31' - 6" 53' - 6" 22' - 2"
1ST FLOOR
ELEV. 925.50
2ND FLOOR
ELEV. 937.50
ATTIC FLOOR
ELEV. 947.50
FIN. GRADE
ELEV. 922.00
4 16
12121212
22' - 6"47' - 5"64' - 0"14' - 0"
1ST FLOOR
ELEV. 925.50
2ND FLOOR
ELEV. 937.50
ATTIC FLOOR
ELEV. 947.50
FIN. GRADE
ELEV. 922.00
1' - 6" 22' - 0" 51' - 3" 31' - 9"
16 16
1ST FLOOR
ELEV. 925.50
2ND FLOOR
ELEV. 937.50
ATTIC FLOOR
ELEV. 947.50
FIN. GRADE
ELEV. 922.00
GENERAL NOTES
1. PRIOR TO COMMENCING EACH NEW PHASE OF WORK CONTRACTORS ARE TO
VERIFY EXISTING FIELD CONDITIONS AND DIMENSIONS. INSPECT EXISTING FRAMING
MEMBERS AND OBSERVE FOR ANY DAMAGE OR POTENTIAL ADVERSE EFFECT OF
NEW WORK ON STRUCTURAL INTEGRITY OF THE BUILDING. IMMEDIATELY NOTIFY THE
COR OF ALL DISCREPANCIES OR CONCERNS A MINIMUM OF (10) TEN WORKING
DAYS IN ADVANCE OF THE WORK.
2. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TESTING & ALL
APPURTENANCES TO COMPLETE THE PROJECT.
3. ALL CONSTRUCTION AREAS ARE TO BE PROPERLY IDENTIFIED, CLEANED AND
MAINTAINED BY THE CONTRACTOR ON A DAILY BASIS. NO CONSTRUCTION DEBRIS IS
TO REMAIN ON SITE AT PROJECT COMPLETION.
4. CONTRACTOR TO VERIFY CONSTRUCTION WASTE DUMPSTER LOCATIONS WITH THE
COR PRIOR TO BEGINNING ANY DEMOLITION AT EACH BUILDING.
5. ALL CONTRACTORS ARE TO PROTECT EXISTING EQUIPMENT, FINISHES AND BUILDING
COMPONENTS FROM CONSTRUCTION ACTIVITIES.
6. CONTRACTORS SHALL BE RESPONSIBLE FOR ANY/ALL DAMAGE CAUSED DURING
CONSTRUCTION OPERATIONS INCLUDING BUT NOT LIMITED TO SIDEWALK, CURBS,
BUILDINGS, SPRINKLERS, PRIVATE PROPERTY, LAWN RESTORATION, ETC. THE
CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY IF ANY DAMAGE OCCURS AS A
RESULT OF WORK ACTIVITIES.
7. CONTRACTOR IS TO TAKE PRECAUTIONARY MEASURES TO PROTECT ALL TURF, TREES
AND PLANTS THAT ARE IN THE VICINITY OF CONSTRUCTION AREAS AND BE
RESPONSIBLE TO REPAIR/REPLACE ANY DAMAGED VEGETATION AND/OR PERFORM
ANY LAWN RESTORATION AS A RESULT.
8. CONTRACTOR SHALL NOT BLOCK AREAS OF INGRESS/EGRESS FOR VEHICLE TRAFFIC
OR PATIENT/STAFF ACCESS DURING CONSTRUCTION ACTIVITIES. IF THIS CANNOT BE
AVOIDED, WRITTEN PERMISSION MUST BE OBTAINED FROM THE COR PRIOR. PROVIDE
TRAFFIC CONES OR BARRICADES AND/OR PROVIDE A PERSON AT THE SUBJECT AREA
TO ALERT PEDESTRIANS DURING THE WORK.
9. EXISTING CAULKING AT LINTEL BEARING & PREVIOUS MASONRY REPAIR ARE SUSPECT
FOR ASBESTOS. REFER TO SPECIFICATION FOR PRECAUTIONS, TESTING AND
REQUIRED ABATEMENT MEASURES. LEGACY REPORTS ARE AVAILABLE FOR
CONTRACTOR REVIEW.
10. CONTRACTOR TO REMOVE/REAPPLY CAULK/SEALANT AT FULL PERIMETER OF ALL
EXTERIOR EXISTING WINDOW AND DOOR OPENINGS AND AT ALL EXISTING VERTICAL
BRICK EXPANSION JOINTS WITH NEW BACKER ROD AS APPLICABLE U.N.O., TYPICAL.
11. CONTRACTOR IS REQUIRED TO COMPLETE A REPRESENTATIVE SECTION OF A
BUILDING AS AN EXAMPLE SO THAT IT CAN BE CRITIQUED PRIOR TO COMMENCING
OF WORK. REFER TO MOCK-UP PORTION OF MASONRY SPECIFICATIONS.
ELEVATION LEGEND
AREA OF GENERAL TUCKPOINTING or REPAIR AS NOTED.
WORK SCOPE DEFINITION FOR HATCHED AREA KEYNOTES:
1. MORTAR REPONTING: EXISTING HEAVILY WEATHERED MASONRY JOINTS. DEFINED AS
ERODED GREATER THAN 1/4" IN DEPTH, THROUGH CRACKED OR IF A WIRE ROD OF 1/32"
DIAMETER (PAPER CLIP) CAN BE PASSED FURTHER THAN 1/2 THE DEPTH OF THE BRICK.
2. CAULK REPOINTING: EXISTING MORTAR JOINT DAMAGE AT CORRODING STEEL LINTELS
NOT SCHEDULED FOR REPLACEMENT WITH THIS PROJECT. DEFINITION SAME AS ITEM 1
ABOVE FOR MORTAR REPOINTING.
3. REPLACE EXISTING SPALLED OR DAMAGED MASONRY UNITS: BRICK FACES WITH LOSS
MORE THAN 25% OF SURFACE AREA, THROUGH CRACKED OR IF A WIRE ROD OF 1/32"
DIAMETER (PAPER CLIP) CAN BE PASSED FURTHER THAN 1/2 THE DEPTH OF THE BRICK.
NOTE:
NOT THE ENTIRETY OF HATCHED AREA INDICATED IS INTENDED TO REQUIRE THE
ASSOCIATED KEYNOTE REPAIR UNLESS NOTED OTHERWISE - USE THE KEYNOTE AREA IN
COMBINATION WITH THESE DEFINITIONS IN ORDER TO DETERMINE THE QUANTITIES. A PRE-
BID SITE INSPECTION IS MANDATORY PRIOR TO SUBMITTING A BID.
DEMOLITION/REPAIR KEYNOTES
REPAIR EXISTING CONCRETE SILL BY CLEANING LOOSE MATERIAL ON SURFACE OR IN
JOINTS, PERFORM A LIGHT POWER WASH, LET DRY COMPLETELY THEN COAT WITH EIFS
SKIM COAT ‘WHITE’/FINE TEXTURE APPLIED PER MANUFACTURERS WRITTEN
INSTRUCTIONS. TO MATCH EXISTING SIMILAR REPAIR ON CAMPUS.
TYP. MORTAR JOINT REPOINT AT WINDOW HEAD STEEL LINTEL BEARING. PROVIDE NEW
3/8" DIA. WEEP INSERTS W/SCREENS: MINIMUM (2) PER OPENING.
TYP. MORTAR JOINT REPOINT BETWEEN WINDOWS AT WINDOW HEAD STEEL LINTEL.
REFER TO WORK SCOPE DEFINITIONS ON THIS SHEET. PROVIDE NEW 3/8" DIA. WEEP
INSERTS W/SCREENS: MIN. (2) PER OPENING.
TYP. MORTAR JOINT REPOINT “STAIR-STEP” PATTERN MID-WALL. REFER TO WORK SCOPE
DEFINITIONS ON THIS SHEET.
TYP. MORTAR JOINT REPOINT “STAIR-STEP” PATTERN AROUND CORNER. REFER TO
WORK SCOPE DEFINITIONS ON THIS SHEET.
REMOVE/REPLACE DAMAGED BRICK & IF APPLICABLE, ALSO REMOVE IRON BAR
GRATING ANCHOR AT LOWER WINDOW SASH, EA. SIDE.
REMOVE/REPLACE DAMAGED BRICK (FACE SPALL OR BROKEN THROUGH). REFER TO
WORK SCOPE DEFINITIONS ON THIS SHEET.
REMOVE/REPLACE EXISTING STEEL LINTEL. REFER TO SHEET AS500.
CONCRETE WATER-TABLE CORNER OR OVERHEAD DOOR ‘CURB’ BROKEN (NOT IN
CONTRACT).
NOT USED.
SEVERE VERTICAL CRACKING AT BRICK CORNER OR PILASTER (ENTIRE HEIGHT). PILASTER
REQUIRES REBUILD. SEE DETAILS SHEET AS500
TYP. MORTAR JOINT REPOINT AROUND WINDOW SILL. REFER TO WORK SCOPE
DEFINITIONS ON THIS SHEET.
CONCRETE RETAINING WALLS SPALLING BADLY IN THIS AREA (NOT IN SCOPE)
ENTIRE BRICK WYTHE WAINSCOT FALLING AWAY IN THIS AREA. REMOVE/PATCH/REPAIR.
REMOVE DAMAGED CONCRETE OR LIMESTONE PARAPET CAP/TRIM. PREP FOR NEW TO
MATCH.
TYP. AREA OF DAMAGED/WEATHERED MORTAR JOINTS TO BE REPOINTED AND/OR
SPALLED BRICK TO BE REPLACED. REFER TO “ELEVATION LEGEND”/”WORK SCOPE
DEFINITIONS FOR HATCHED AREA KEYNOTES”, ON THIS SHEET.
NOTE: ONLY A PERCENTAGE OF THE HATCHED AREA WILL REQUIRE THESE REPAIRS BY
DEFINITION AND IT WILL VARY BASED ON EXISTING CONDITIONS FOR EACH. REPAIRS
REQUIRED BY DEFINITION OUTSIDE OF HATCHED AREA BOUNDARIES (AS MAY BE
IDENTIFIED BY THE CONTRACTOR DURING CONSTRUCTION) WILL BE EVALUATED
AGAINST BID ALLOWANCES FOR EACH – SEE OFFER SCHEDULE, TYPICAL.
TYP. MORTAR JOINTS OF LIMESTONE WATER TABLE OR WALL HEAD BANDING TO BE
REPOINTED. REFER TO WORK SCOPE DEFINITIONS ON THIS SHEET.
TYP. REPOINTING REQUIRED AT EXISTING WALL FLASHING.
REMOVE/REPLACE EXISTING CONCRETE SILL. REMOVE/REPLACE ANY DAMAGED BRICK
SURROUNDING THE SILL DURING SILL REMOVAL AND REPOINT. REMOVE/REINSTALL
WINDOW. REFER TO SHEET AS500.
BUCKLED CAST STONE CAP & BRICK REQUIRES REMOVAL/REPLACEMENT.
NOTES:
ALL KEY NOTES FOR THE PROJECT ARE LISTED BUT DO NOT NECESSARILY APPLY TO
EVERY PLAN OR ELEVATION. REFER TO DRAWINGS FOR APPLICABILITY.
THE VA HAS FIRST RIGHT OF REFUSAL ON ALL SALVAGED MATERIAL. SEE SPECIFICATIONS
FOR GENERAL DEMOLITION AND PATCHING REQUIREMENTS.
SEE DRAWING G002 FOR ALLOWANCES AND UNIT PRICES TO BE PROVIDED.
600 E. Michigan Ave., Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
7GAE PROJECT NO.: 218038 FILE NAME: VA_BATTLE CREEK_TUCKPOINTING
Office of Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs
100% BID DOCUMENTS
STAMP
006.AS200
515-18-106
BATTLE CREEK, MICHIGAN 49037
OCTOBER 24, 2019
RJS NTF
EXTERIOR ELEVATIONS TUCKPOINT, VARIOUS
BUILDINGS
SCALE: 3/32" = 1'-0"
ELEVATION - A1
SCALE: 3/32" = 1'-0"
ELEVATION - B2
SCALE: 3/32" = 1'-0"
ELEVATION - C3
SCALE: 3/32" = 1'-0"
ELEVATION - D4
SHEET NOTES:
1. THIS BUILDING HAS EXISTING ‘LATICRETE’ PRODUCT APPLIED; NO MATCHING
APPLICATION OVER NEW TUCKPOINTING REQUIRED.
2. MANY STEEL WINDOW LINTELS ARE CORRODED AND ARE TO BE REPLACED WHERE
KEYNOTED. THE INTENT IS TO REPLACE LINTELS AS DETAILED ON SHEET AS500
WITHOUT REMOVAL/REPLACEMENT OF THE ASSOCIATED WINDOW UNIT.
3. THIS BUILDING HAS UNDERGROUND GEOTHERMAL WELLS AROUND ITS PERIMETER.
REFER TO GS100 FOR LOCATIONS.
4. THIS BUILDING DOES NOT REQUIRE CAULKING/SEALANT TO BE
REMOVED/REAPPLIED AROUND EXISTING WINDOW OPENINGS. CONTRACTOR
TO REAPPLY CAULKING/SEALANT AT ANY AREA DISTURBED BY CONSTRUCTION.
5. ‘REPOINT’ METHODOLOGY/MATERIAL:
A. AT REMOVE/REPLACE EXISTING CORRODED LINTELS W/NEW GALV. STEEL,
PROVIDE NEW WEEPS (TUBE WITH A SCREEN TYPE) ABOVE LINTELS, REPOINT PER
KEYNOTE WITH COLOR/TEXTURE MATCHING MORTAR.
AT EXISTING CORRODED LINTELS TO BE LEFT IN PLACE, DRILL NEW WEEP INSERTS
(MIN. 2 PER OPNG.) AND REPOINT PER KEYNOTE WITH SANDED CAULK ILO
MORTAR TO MATCH/BLEND WITH SURROUNDING AREAS.
B. RE-CAULK ALL EXISTING BRICK EXPANSION JOINTS.
C. CONVENTIONAL NEW BRICK MORTAR TO BE LESSER STRENGTH (PSI) THAN
NORTH
NOT TO SCALE
BUILDING 7 KEY PLAN
E
F
G
H
B
C
E
F
G
H
D
10' - 0" 32' - 6" 43' - 9" 32' - 0" 43' - 9" 32' - 6" 10' - 0"
16 16
16 16
1ST FLOOR
ELEV. 927.92
2ND FLOOR
ATTIC FLOOR
/2
/2
2 16 2
16 16
16 16
1ST FLOOR
ELEV. 927.92
2ND FLOOR
ATTIC FLOOR
/2
5' - 10 1/2" 45' - 3" 37' - 0" 71' - 5 5/8" 5' - 10 1/2"
2222222
2 22222
2 22
16 16
161616
1ST FLOOR
ELEV. 927.92
2ND FLOOR
ATTIC FLOOR
/2
10' - 2" 32' - 4" 43' - 6" 32' - 6" 43' - 6" 32' - 4" 10' - 2"
45' - 3"37' - 0"71' - 5 1/2"
24 2 2 2
16 16
1ST FLOOR
ELEV. 927.92
2ND FLOOR
ATTIC FLOOR
/2
GENERAL NOTES
1. PRIOR TO COMMENCING EACH NEW PHASE OF WORK CONTRACTORS ARE TO
VERIFY EXISTING FIELD CONDITIONS AND DIMENSIONS. INSPECT EXISTING FRAMING
MEMBERS AND OBSERVE FOR ANY DAMAGE OR POTENTIAL ADVERSE EFFECT OF
NEW WORK ON STRUCTURAL INTEGRITY OF THE BUILDING. IMMEDIATELY NOTIFY THE
COR OF ALL DISCREPANCIES OR CONCERNS A MINIMUM OF (10) TEN WORKING
DAYS IN ADVANCE OF THE WORK.
2. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TESTING & ALL
APPURTENANCES TO COMPLETE THE PROJECT.
3. ALL CONSTRUCTION AREAS ARE TO BE PROPERLY IDENTIFIED, CLEANED AND
MAINTAINED BY THE CONTRACTOR ON A DAILY BASIS. NO CONSTRUCTION DEBRIS IS
TO REMAIN ON SITE AT PROJECT COMPLETION.
4. CONTRACTOR TO VERIFY CONSTRUCTION WASTE DUMPSTER LOCATIONS WITH THE
COR PRIOR TO BEGINNING ANY DEMOLITION AT EACH BUILDING.
5. ALL CONTRACTORS ARE TO PROTECT EXISTING EQUIPMENT, FINISHES AND BUILDING
COMPONENTS FROM CONSTRUCTION ACTIVITIES.
6. CONTRACTORS SHALL BE RESPONSIBLE FOR ANY/ALL DAMAGE CAUSED DURING
CONSTRUCTION OPERATIONS INCLUDING BUT NOT LIMITED TO SIDEWALK, CURBS,
BUILDINGS, SPRINKLERS, PRIVATE PROPERTY, LAWN RESTORATION, ETC. THE
CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY IF ANY DAMAGE OCCURS AS A
RESULT OF WORK ACTIVITIES.
7. CONTRACTOR IS TO TAKE PRECAUTIONARY MEASURES TO PROTECT ALL TURF, TREES
AND PLANTS THAT ARE IN THE VICINITY OF CONSTRUCTION AREAS AND BE
RESPONSIBLE TO REPAIR/REPLACE ANY DAMAGED VEGETATION AND/OR PERFORM
ANY LAWN RESTORATION AS A RESULT.
8. CONTRACTOR SHALL NOT BLOCK AREAS OF INGRESS/EGRESS FOR VEHICLE TRAFFIC
OR PATIENT/STAFF ACCESS DURING CONSTRUCTION ACTIVITIES. IF THIS CANNOT BE
AVOIDED, WRITTEN PERMISSION MUST BE OBTAINED FROM THE COR PRIOR. PROVIDE
TRAFFIC CONES OR BARRICADES AND/OR PROVIDE A PERSON AT THE SUBJECT AREA
TO ALERT PEDESTRIANS DURING THE WORK.
9. EXISTING CAULKING AT LINTEL BEARING & PREVIOUS MASONRY REPAIR ARE SUSPECT
FOR ASBESTOS. REFER TO SPECIFICATION FOR PRECAUTIONS, TESTING AND
REQUIRED ABATEMENT MEASURES. LEGACY REPORTS ARE AVAILABLE FOR
CONTRACTOR REVIEW.
10. CONTRACTOR TO REMOVE/REAPPLY CAULK/SEALANT AT FULL PERIMETER OF ALL
EXTERIOR EXISTING WINDOW AND DOOR OPENINGS AND AT ALL EXISTING VERTICAL
BRICK EXPANSION JOINTS WITH NEW BACKER ROD AS APPLICABLE U.N.O., TYPICAL.
11. CONTRACTOR IS REQUIRED TO COMPLETE A REPRESENTATIVE SECTION OF A
BUILDING AS AN EXAMPLE SO THAT IT CAN BE CRITIQUED PRIOR TO COMMENCING
OF WORK. REFER TO MOCK-UP PORTION OF MASONRY SPECIFICATIONS.
ELEVATION LEGEND
AREA OF GENERAL TUCKPOINTING or REPAIR AS NOTED.
WORK SCOPE DEFINITION FOR HATCHED AREA KEYNOTES:
1. MORTAR REPONTING: EXISTING HEAVILY WEATHERED MASONRY JOINTS. DEFINED AS
ERODED GREATER THAN 1/4" IN DEPTH, THROUGH CRACKED OR IF A WIRE ROD OF 1/32"
DIAMETER (PAPER CLIP) CAN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .