36C25020B0007-002.pdf

PDF Posted

Attached to
Tuckpoint Various Buildings 515-18-106
Solicitation number
36C25020B0007
Issued by

About this file

This pre-solicitation announcement describes a forthcoming solicitation for construction services. The Department of Veterans Affairs will issue an invitation for bid on December 10, 2019 for project number 515-18-106 titled "Tuckpoints Various Buildings" at the Battle Creek VA Medical Center in Battle Creek, Michigan. The project scope involves repairing and replacing mortar, damaged brick, building joints, window ledges and lintels, and sealing around windows, doors and other exterior elements at multiple medical center buildings. The performance period is 270 calendar days from notice to proceed, with work to commence in Spring 2020. The solicitation will utilize NAICS code 238140 for masonry contractors with a size standard of $16.5 million. The government intends to award a firm fixed price contract valued between $500,000 and $1,000,000 within 120 days of bid receipt. The solicitation will be a 100% SDVOSB set-aside and available electronically on SAM.gov with responses due on the date specified. Interested parties should monitor the website for amendment and deadline updates.

36C25020B0007 515-18-106 SPECS - FINAL.pdf

View the file

Other files

File Type Posted
36C25020B0007-0005000.docx DOCX document
36C25020B0007-0004000.docx DOCX document
36C25020B0007-0003000.docx DOCX document
36C25020B0007-0002001.docx DOCX document
36C25020B0007-0002000.docx DOCX document
36C25020B0007-0001000.docx DOCX document
36C25020B0007-0001001.pdf PDF
36C25020B0007-0001002.pdf PDF
36C25020B0007-003.pdf PDF
36C25020B0007-001.docx DOCX document
36C25020B0007-005.docx DOCX document
36C25020B0007-004.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

100% BID DOCUMENTS

SPECIFICATION DIVISIONS 0 through 07

October 24, 2019

Tuckpoint, Various Buildings VA Medical Center

Battle Creek, Michigan Project No. 515-18-106

OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT

DEPARTMENT OF VETERANS AFFAIRS

Alliance | 7GAE JV, Architects

600 E. Michigan Ave., Suite B Kalamazoo, Michigan 49007

(269) 927-0144

2850 Eisenhower Avenue, Suite 310 Alexandria, VA 22314

(202) 617-8485

BC VAMC Project 515-18-106 Tuckpoint, Various Buildings (09-01-18)

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 10-17

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13

01 33 23 Shop Drawings, Product Data, and Samples 05-17

01 35 26 Safety Requirements 02-17

01 42 19 Reference Standards 05-16

01 57 19 Temporary Environmental Controls 01-11

01 74 19 Construction Waste Management 09-13

01 81 13 Sustainable Construction Requirements 10-17

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement 09-15

02 83 33.13 Lead-Based Paint Removal and Disposal 08-16

DIVISION 03 – CONCRETE

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 02-16

04 72 00 Cast Stone Masonry 02-15

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 02-16

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES (NOT USED)

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 24 00 Direct Exterior Finish Systems 02-16

07 92 00 Joint Sealants 10-17

DIVISION 08 – OPENINGS (NOT USED)

DIVISION 09 – FINISHES (NOT USED)

DIVISION 10 – SPECIALTIES (NOT USED)

DIVISION 11 – EQUIPMENT (NOT USED)

DIVISION 12 – FURNISHINGS (NOT USED)

BC VAMC Project 515-18-106 Tuckpoint, Various Buildings (09-01-18)

00 01 10-2

DIVISION 13 - SPECIAL CONSTRUCTION (NOT USED)

DIVISION 14– CONVEYING EQUIPEMENT (NOT USED)

DIVISION 21- FIRE SUPPRESSION (NOT USED)

DIVISION 22 – PLUMBING (NOT USED)

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC) (NOT USED)

DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)

DIVISION 26 – ELECTRICAL (NOT USED)

DIVISION 27 – COMMUNICATIONS (NOT USED)

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY (NOT USED)

DIVISION 31 – EARTHWORK (NOT USED)

DIVISION 32 – EXTERIOR IMPROVEMENTS (NOT USED)

DIVISION 33 – UTILITIES (NOT USED)

DIVISION 34 – TRANSPORTATION (NOT USED)

DIVISION 48 – Electrical Power Generation (NOT USED)

APPENDIX A Hazardous Materials Survey Report

BC VAMC Project 515-18-106 Tuckpoint, Various Buildings (07-01-15)

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL INFORMATION

G001....................COVER SHEET

G002....................GENERAL INFORMATION & SYMBOLS LEGEND

GS100...................SITE CAMPUS PLAN & LAYDOWN AREAS

ARCHITECTURAL

004.AS200...............EXTERIOR ELEVATIONS – BUILDING 4

004.AS201...............EXTERIOR ELEVATIONS – BUILDING 4

005.AS200...............EXTERIOR ELEVATIONS – BUILDING 5

006.AS200...............EXTERIOR ELEVATIONS – BUILDING 6

007.AS200...............EXTERIOR ELEVATIONS – BUILDING 7

007.AS201...............EXTERIOR ELEVATIONS – BUILDING 7

014.AS200...............EXTERIOR ELEVATIONS – BUILDING 14

014.AS201...............EXTERIOR ELEVATIONS – BUILDING 14

022.AS200...............EXTERIOR ELEVATIONS – BUILDING 22

026.AS200...............EXTERIOR ELEVATIONS – BUILDING 26

027.AS200...............EXTERIOR ELEVATIONS – BUILDING 27

028.AS200...............EXTERIOR ELEVATIONS – BUILDING 28

039.AS200...............EXTERIOR ELEVATIONS – BUILDING 39

039.AS201...............EXTERIOR ELEVATIONS – BUILDING 39

083.AS200...............EXTERIOR ELEVATIONS – BUILDING 83

083.AS201...............EXTERIOR ELEVATIONS – BUILDING 83

084.AS200...............EXTERIOR ELEVATIONS – BUILDING 84

084.AS201...............EXTERIOR ELEVATIONS – BUILDING 84

134.AS200...............EXTERIOR ELEVATIONS – BUILDING 134

138.AS200...............EXTERIOR ELEVATIONS – BUILDING 138

200.AS100...............CONNECTING CORRIDOR KEY PLAN

200.AS101...............CONNECTING CORRIDOR PLANS & ELEVATIONS – AREA A

200.AS102...............CONNECTING CORRIDOR PLANS & ELEVATIONS – AREA B

200.AS103...............CONNECTING CORRIDOR PLANS & ELEVATIONS – AREA C

200.AS104...............CONNECTING CORRIDOR PLANS & ELEVATIONS – AREA D

200.AS105...............CONNECTING CORRIDOR PLANS & ELEVATIONS – AREA E

200.AS106...............CONNECTING CORRIDOR PLANS & ELEVATIONS – AREA F

200.AS107...............CONNECTING CORRIDOR PLANS & ELEVATIONS – AREA G

BC VAMC Project 515-18-106 Tuckpoint, Various Buildings (07-01-15)

00 01 15 - 2

200.AS108...............CONNECTING CORRIDOR PLANS & ELEVATIONS – AREA H

200.AS109...............CONNECTING CORRIDOR PLANS & ELEVATIONS – AREA J

200.AS110...............CONNECTING CORRIDOR PLANS & ELEVATIONS – AREA K

200.AS111...............CONNECTING CORRIDOR PLANS – AREA L

200.AS112...............CONNECTING CORRIDOR ELEVATIONS – AREA L

200.AS113...............CONNECTING CORRIDOR PLANS & ELEVATIONS – AREA M

200.AS114...............CONNECTING CORRIDOR PLANS & ELEVATIONS – AREA N

200.AS115...............CONNECTING CORRIDOR PLANS & ELEVATIONS – AREA P

200.AS116...............CONNECTING CORRIDOR PLANS & ELEVATIONS – AREA Q

200.AS117...............CONNECTING CORRIDOR PLANS – AREA R

200.AS118...............CONNECTING CORRIDOR ELEVATIONS – AREA R

200.AS119...............CONNECTING CORRIDOR PLANS & ELEVATIONS – AREA S

200.AS200...............CONNECTING CORRIDOR B200 (BETWEEN B83 & B84)

AS500...................TYPICAL BRICK DAMAGE REPAIR DETAILS

- - - E N D - - -

BC VAMC Project 515-18-106 Tuckpoint, Various Buildings (10-01-17) i

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

1.10 RESTORATION

1.11 AS-BUILT DRAWINGS

1.12 USE OF ROADWAYS

1.13 TEMPORARY TOILETS

1.14 AVAILABILITY AND USE OF UTILITY SERVICES

1.15 CONSTRUCTION SIGN (NOT APPLICABLE)

1.16 SAFETY SIGN (NOT APPLICABLE)

1.17 PHOTOGRAPHIC DOCUMENTATION (NOT APPLICABLE)

1.18 HISTORIC PRESERVATION

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including selective demolition and removal, and furnish labor and materials and perform work for Tuckpointing and related work on buildings #4, 5, 6, 7, 14, 22, 26, 27, 28, 39, 83, 84, 134, 138 and 200

(connecting corridors) as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

COR.

C. Offices of Alliance|7GAE JV, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. All employees of general contractor and subcontractors shall comply with VA security management program.

1.3 STATEMENT OF BID ITEM(S)

BID ITEM 1 - Tuckpointing

Description: Furnish all labor, material, supervision, equipment, etc. to perform tuckpointing per project specifications and drawings for buildings

#4, 5, 6, 7, 14, 22, 26, 27, 28, 39, 83, 84, 134, 138, 200 and connecting corridors. The drawings identify the areas to be tuckpointed however the total quantity to be priced shall include an additional Seven Thousand Five

Hundred (7,500) Square Feet of wall area to have tuckpointing that will be identified after contract award and during the course of the project.

Quantity: All Areas to be Tuckpointed Buildings 4, 5, 6, 7, 14, 22, 26, 27, 28, 39, 83, 84, 134, 138, 200 and connecting corridors as indicated on the drawings plus an additional Seven Thousand Five Hundred (7,500) Square Feet

(Wall Area)

Proposed Price: $_________________

01 00 00 -2

BID ITEM 2 - Brick Replacement

Description: Furnish all labor, material, supervision, equipment, etc. to replace damaged brick per project specifications and drawings for buildings

#4, 5, 6, 7, 14, 22, 26, 27, 28, 39, 83, 84, 134, 138, 200 and connecting corridors. The drawings identify the areas that have damaged brick however the total quantity to be priced shall include an additional One Thousand

Three Hundred (1,300) Square Feet of wall area to have damaged brick replaced that will be identified after contract award and during the course of the project.

Quantity: All Areas to have Brick Replacement Buildings #4, 5, 6, 7, 14, 22, 26, 27, 28, 39, 83, 84, 134, 138, 200 and connecting corridors as indicated on the drawings plus and additional One Thousand Three Hundred (1,300) Square

Feet (Wall Area)

Proposed Price: $_________________

BID ITEM 3 - Lintel Replacement*

Description: Furnish all labor, material, supervision, equipment, etc. to replace damaged steel lintels per project specifications and drawings. The drawings identify 33 steel lintels that are damaged requiring replacement however the total quantity to be priced shall include an additional Twelve

(12) steel lintels to be replaced that will be identified after contract award and during the course of the project.

Quantity: 45 Steel Lintels

Proposed Price: $________________

BID ITEM 4 - Sill Repair

Description: Furnish all labor, material, supervision, equipment, etc. to repair or replace damaged concrete sills per project specifications and drawings for buildings #4, 5, 6, 7, 14, 22, 26, 27, 28, 39, 83, 84, 134, 138, 200 and connecting corridors. The drawings identify the areas that have damaged sills and specify repair or replacement.

Quantity: All Areas to have Sill Repair Buildings #4, 5, 6, 7, 14, 22, 26, 27, 28, 39, 83, 84, 134, 138, 200 and connecting corridors as indicated on the drawings.

Proposed Price: $_________________

BID ITEM 5 - Cap Stone Replacement

Description: Furnish all labor, material, supervision, equipment, etc. to replace damaged cap stone per project specifications and drawings for buildings #4,5, 6, 7, 14, 22, 26, 27, 28, 39, 83, 84, 134, 138, 200 and connecting corridors. The drawings identify the areas that have damaged cap stones.

Quantity: All Areas to have Cap Stone Replacement Buildings #4, 5, 6, 7, 14, 22, 26, 27, 28, 39, 83, 84, 134, 138, 200 and connecting corridors as indicated on the drawings.

Proposed Price: $_________________

01 00 00 -3

BID ITEM 6 - Caulking Replacement

Description: Furnish all labor, material, supervision, equipment, etc. to replace caulking per project specifications and drawings for buildings #4, 5, 6, 7, 14, 22,26, 27, 28, 39, 83, 84, 134, 138, 200 and connecting corridors.

The drawings identify the areas that will receive caulking.

Quantity: All Areas to have Caulking Replacement Buildings #4, 5, 6, 7, 14, 22, 26, 27, 28, 39, 83, 84, 134, 138, 200 and connecting corridors as indicated on the drawings.

Proposed Price: $_________________

Total Proposed Price for Bid Items 1, 2, 3, 4, 5 and 6: $_____________

BID ITEM 7 - DEDUCTIVE NO. 1

Description: Furnish all labor, material, supervision, equipment, etc. to complete all work described in BID ITEMS 1-6 except delete the requirement to remove and replace caulk and backer rod at full perimeter of all existing openings for the covered walk structures (connecting corridors) as shown on drawings 200.AS100 through 200.AS119.

Proposed Deduction from Total Proposed Price for Bid Items 1-6:

BID ITEM 8 - DEDUCTIVE NO. 2

Description: Furnish all labor, material, supervision, equipment, etc. to complete all work described in BID ITEMS 1-6 except delete the requirement to remove and replace caulk and backer rod at full perimeter of all existing openings for the covered walk structures (connecting corridors) as shown on drawings 200.AS100 through 200.AS119 and also delete all work for Building

No. 14 in its entirety.

Proposed Deduction from Total Proposed Price for Bid Items 1-6:

BID ITEM 9 - DEDUCTIVE NO. 3

Description: Furnish all labor, material, supervision, equipment, etc. to complete all work described in BID ITEMS 1-6 except delete the requirement to remove and replace caulk and backer rod at full perimeter of all existing openings for the covered walk structures (connecting corridors) as shown on drawings 200.AS100 through 200.AS119, delete all work for Building No. 14 in its entirety, and also delete all work for Building No. 7 in its entirety.

Proposed Deduction from Total Proposed Price for Bid Items 1-6:

NOTE: FOR THE ADDITIONAL QUANITIES NOTED IN BID ITEMS 1, 2 AND 3, IT IS TO BE

ASSUMED THAT 80% SHALL REQUIRE SCAFFOLDING, LIFT, OR OTHER MEANS OF ELEVATED

ACCESS.

*LINTEL REPLACEMENT VALUE SHALL INCLUDE ANY SHORING, BRICK REMOVAL &

REPLACEMENT, LINTEL REMOVAL & REPLACEMENT AND WEEP INSERTS PER DETAILS.

01 00 00 -4

NOTE 1: Offerors shall propose a price on all items. Failure to offer a price on all items shall be cause for the offer to be deemed non-compliant and shall not receive any consideration. Award will be made to that compliant and responsible offeror offering the lowest price on the item being awarded (see

NOTE 2). Only one contract will be awarded as a result of this solicitation.

NOTE 2: DEDUCTIVE BID ITEMS - A single award will be made to the offeror offering the lowest total price for Bid Items 1-6 but in the event the lowest offer exceeds the funds available, a single award will be made to the offeror offering the lowest price for Deductive Item 1, Deductive Item 2, or

Deductive Item 3 in that order of precedence based on available funding.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. AFTER AWARD OF CONTRACT, drawings and specifications available will consist of those returned by prospective bidders.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give two weeks’ notice to the COR so that security arrangements can be provided for the employees.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close-down or shut-down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

B. Work Hours:

1. Normal working hours are Monday through Friday, 7:00 am to 4:30pm, Federal holidays excluded. The contractor may request that work not required or scheduled to be accomplished outside normal working hours be done so. The request is subject to approval of the CO and if approved, no additional cost to the government will result.

C. Keys: Building 300 Power Plant clerk.

D. Document Control:

01 00 00 -5

1. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

2. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

3. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

4. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

5. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

E. Motor Vehicle Restrictions

1. A limited number of permits shall be issued for General Contractor and its employees for parking in designated areas only. Please contact the COR for permits.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

01 00 00 -6

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

C. Working space and space available for storing materials shall be generally as shown on the drawings and/or as further determined by the

COR.

D. Workmen are subject to rules of Medical Center applicable to their conduct.

E. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Before construction operations begin, Contractor shall provide a safety fence, around the material storage area. Provide gates as required for access with necessary hardware, including hasps and padlocks. Remove the fence when directed by COR. Orange ‘snow fencing’ or similar barricades can be utilized at actual work areas of each building as work progresses.

4. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of

01 00 00 -7 traffic and the use of roadways, as specified in Article, USE OF

ROADWAYS.

G. Phasing:

The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

To insure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to insure accomplishment of this work in successive phases mutually agreeable to

COR and Contractor.

I. Construction Fence: Before construction operations begin, Contractor shall provide various fencing and barricades as follows. Work areas and barricades can be flexible orange ‘snow’ fencing. Material storage shall require a chain link construction fence, 1.8m (six feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. No requirement for contractor’s equipment fencing – contractor’s option (endeavor to take equipment keys at the end of each work day). Remove the fence when directed by COR.

K. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing conduits, wires, cables, etc. of

01 00 00 -8 utility services or of communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

M. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

H. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

01 00 00 -9

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the Contractor. This includes landscape irrigation systems.

(FAR 52.236-9)

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall

01 00 00 -10 conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR

52.236-2).

1.11 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.12 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor

01 00 00 -11 at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

1.13 TEMPORARY TOILETS

A. Provide where directed, (for use of all Contractor's workmen) ample temporary sanitary toilet accommodations, provide suitable dry closets where directed. Keep such places clean and free from flies, and all connections and appliances connected therewith are to be removed prior to completion of contract, and premises left perfectly clean.

1.14 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.

B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines. Before final acceptance of the work by the

Government, the Contractor shall remove all the temporary connections, distribution lines, and associated paraphernalia and repair restore the infrastructure as required.

D. Heat: Furnish temporary heat (exterior to Medical Center buildings) necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials.

E. Electricity (for Construction and Testing): Furnish all temporary electric services.

1. Obtain electricity by connecting to the Medical Center electrical distribution system. The Contractor shall meter and pay for electricity required for electric cranes and hoisting devices, electrical welding devices and any electrical heating devices

01 00 00 -12 providing temporary heat. Electricity for all other uses is available at no cost to the Contractor.

F. Water (for Construction and Testing):

1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the

Contractor.

2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (at COR discretion) of use of water from Medical Center's system.

1.15 CONSTRUCTION SIGN (NOT APPLICABLE)

1.16 SAFETY SIGN (NOT APPLICABLE)

1.17 PHOTOGRAPHIC DOCUMENTATION (NOT APPLICABLE)

1.18 HISTORIC PRESERVATION

Where the Contractor or any of the Contractor's employees, prior to, or during the construction work, are advised of or discover any possible archeological, historical and/or cultural resources, the Contractor shall immediately notify the COR verbally, and then with a written follow up.

BC VAMC Project 515-18-106 Tuckpoint, Various Buildings (02-01-15)

01 32 16.15 - 1

SECTION 01 32 16.15

PROJECT SCHEDULES

(SMALL PROJECTS – DESIGN/BID/BUILD)

PART 1- GENERAL

1.1 DESCRIPTION:

A. The Contractor shall develop a Critical Path Method (CPM) plan and schedule demonstrating fulfillment of the contract requirements

(Project Schedule), and shall keep the Project Schedule up-to-date in accordance with the requirements of this section and shall utilize the plan for scheduling, coordinating and monitoring work under this contract (including all activities of subcontractors, equipment vendors and suppliers). Conventional Critical Path Method (CPM) technique shall be utilized to satisfy both time and cost applications.

B. Seasonal Restrictions: Schedule construction activities to occur during the Spring/Summer/Fall months (March through October) as well as temperature and elemental constraints per standard practice and individual product specifications.

1.2 CONTRACTOR'S REPRESENTATIVE:

A. The Contractor shall designate an authorized representative responsible for the Project Schedule including preparation, review and progress reporting with and to the Contracting Officer's Representative (COR).

B. The Contractor's representative shall have direct project control and complete authority to act on behalf of the Contractor in fulfilling the requirements of this specification section.

C. The Contractor’s representative shall have the option of developing the project schedule within their organization or to engage the services of an outside consultant. If an outside scheduling consultant is utilized, Section 1.3 of this specification will apply.

1.3 CONTRACTOR'S CONSULTANT:

A. The Contractor shall submit a qualification proposal to the COR, within

10 days of bid acceptance. The qualification proposal shall include:

1. The name and address of the proposed consultant.

2. Information to show that the proposed consultant has the qualifications to meet the requirements specified in the preceding paragraph.

3. A representative sample of prior construction projects, which the proposed consultant has performed complete project scheduling

01 32 16.15 - 2 services. These representative samples shall be of similar size and scope.

B. The COR has the right to approve or disapprove the proposed consultant, and will notify the Contractor of the VA decision within seven calendar days from receipt of the qualification proposal. In case of disapproval, the Contractor shall resubmit another consultant within 10 calendar days for renewed consideration. The Contractor shall have their scheduling consultant approved prior to submitting any schedule for approval.

1.4 COMPUTER PRODUCED SCHEDULES

A. The contractor shall provide monthly, to the Department of Veterans

Affairs (VA), all computer-produced time/cost schedules and reports generated from monthly project updates. This monthly computer service will include: three copies of up to five different reports (inclusive of all pages) available within the user defined reports of the scheduling software approved by the Contracting Officer; a hard copy listing of all project schedule changes, and associated data, made at the update and an electronic file of this data. These must be submitted with and substantively support the contractor’s monthly payment request and the signed look ahead report. The COR shall identify the five different report formats that the contractor shall provide.

B. The contractor shall be responsible for the correctness and timeliness of the computer-produced reports. The Contractor shall also responsible for the accurate and timely submittal of the updated project schedule and all CPM data necessary to produce the computer reports and payment request that is specified.

C. The VA will report errors in computer-produced reports to the

Contractor’s representative within ten calendar days from receipt of reports. The Contractor shall reprocess the computer-produced reports, when requested by the Contracting Officer’s representative, to correct errors which affect the payment and schedule for the project.

1.5 THE COMPLETE PROJECT SCHEDULE SUBMITTAL

A. Within 45 calendar days after receipt of Notice to Proceed, the

Contractor shall submit for the Contracting Officer's review; three blue line copies of the interim schedule on sheets of paper 765 x 1070 mm (30 x 42 inches) and an electronic file in the previously approved

CPM schedule program. The submittal shall also include three copies of

01 32 16.15 - 3 a computer-produced activity/event ID schedule showing project duration; phase completion dates; and other data, including event cost.

Each activity/event on the computer-produced schedule shall contain as a minimum, but not limited to, activity/event ID, activity/event description, duration, budget amount, early start date, early finish date, late start date, late finish date and total float. Work activity/event relationships shall be restricted to finish-to-start or start-to-start without lead or lag constraints. Activity/event date constraints, not required by the contract, will not be accepted unless submitted to and approved by the Contracting Officer. The contractor shall make a separate written detailed request to the Contracting

Officer identifying these date constraints and secure the Contracting

Officer’s written approval before incorporating them into the network diagram. The Contracting Officer’s separate approval of the Project

Schedule shall not excuse the contractor of this requirement. Logic events (non-work) will be permitted where necessary to reflect proper logic among work events, but must have zero duration. The complete working schedule shall reflect the Contractor's approach to scheduling the complete project. The final Project Schedule in its original form shall contain no contract changes or delays which may have been incurred during the final network diagram development period and shall reflect the entire contract duration as defined in the bid documents.

These changes/delays shall be entered at the first update after the final Project Schedule has been approved. The Contractor should provide their requests for time and supporting time extension analysis for contract time as a result of contract changes/delays, after this update, and in accordance with Article, ADJUSTMENT OF CONTRACT

COMPLETION.

D. Within 30 calendar days after receipt of the complete project interim

Project Schedule and the complete final Project Schedule, the

Contracting Officer or his representative, will do one or both of the following:

1. Notify the Contractor concerning his actions, opinions, and objections.

2. A meeting with the Contractor at or near the job site for joint review, correction or adjustment of the proposed plan will be scheduled if required. Within 14 calendar days after the joint review, the Contractor shall revise and shall submit three blue line

01 32 16.15 - 4 copies of the revised Project Schedule, three copies of the revised computer-produced activity/event ID schedule and a revised electronic file as specified by the Contracting Officer. The revised submission will be reviewed by the Contracting Officer and, if found to be as previously agreed upon, will be approved.

E. The approved baseline schedule and the computer-produced schedule(s) generated there from shall constitute the approved baseline schedule until subsequently revised in accordance with the requirements of this section.

F. The Complete Project Schedule shall contain approximately 60 (minimum) work activities/events.

1.6 WORK ACTIVITY/EVENT COST DATA

A. The Contractor shall cost load all work activities/events except procurement activities. The cumulative amount of all cost loaded work activities/events (including alternates) shall equal the total contract price. Prorate overhead, profit and general conditions on all work activities/events for the entire project length. The contractor shall generate from this information cash flow curves indicating graphically the total percentage of work activity/event dollar value scheduled to be in place on early finish, late finish. These cash flow curves will be used by the Contracting Officer to assist him in determining approval or disapproval of the cost loading. Negative work activity/event cost data will not be acceptable, except on VA issued contract changes.

B. The Contractor shall cost load work activities/events for guarantee period services, test, balance and adjust various systems in accordance with the provisions in Article, FAR 52.232 – 5 (PAYMENT UNDER

FIXED-PRICE CONSTRUCTION CONTRACTS) and VAAR 852.236 – 83 (PAYMENT

UNDER FIXED-PRICE CONSTRUCTION CONTRACTS).

C. In accordance with FAR 52.236 – 1 (PERFORMANCE OF WORK BY THE

CONTRACTOR) and VAAR 852.236 – 72 (PERFORMANCE OF WORK BY THE

CONTRACTOR), the Contractor shall submit, simultaneously with the cost per work activity/event of the construction schedule required by this

Section, a responsibility code for all activities/events of the project for which the Contractor's forces will perform the work.

D. The Contractor shall cost load work activities/events for all BID ITEMS including ASBESTOS ABATEMENT. The sum of each BID ITEM work shall equal the value of the bid item in the Contractors' bid.

01 32 16.15 - 5

1.7 PROJECT SCHEDULE REQUIREMENTS

A. Show on the project schedule the sequence of work activities/events required for complete performance of all items of work. The Contractor

Shall:

1. Show activities/events as:

a. Contractor's time required for submittal of shop drawings, templates, fabrication, delivery and similar pre-construction work.

b. Contracting Officer's and Architect-Engineer's review and approval of shop drawings, equipment schedules, samples, template, or similar items.

c. Interruption of VA Facilities utilities, delivery of Government furnished equipment, and rough-in drawings, project phasing and any other specification requirements.

d. Test, balance and adjust various systems and pieces of equipment, maintenance and operation manuals, instructions and preventive maintenance tasks.

e. VA inspection and acceptance activity/event with a minimum duration of five work days at the end of each phase and immediately preceding any VA move activity/event required by the contract phasing for that phase.

2. Show not only the activities/events for actual construction work for each trade category of the project, but also trade relationships to indicate the movement of trades from one area, floor, or building, to another area, floor, or building, for at least five trades who are performing major work under this contract.

3. Break up the work into activities/events of a duration no longer than 20 work days each or one reporting period, except as to non-construction activities/events (i.e., procurement of materials, delivery of equipment, concrete and asphalt curing) and any other activities/events for which the COR may approve the showing of a longer duration. The duration for VA approval of any required submittal, shop drawing, or other submittals will not be less than

20 work days.

4. Describe work activities/events clearly, so the work is readily identifiable for assessment of completion. Activities/events labeled

"start," "continue," or "completion," are not specific and will not be allowed. Lead and lag time activities will not be acceptable.

01 32 16.15 - 6

5. The schedule shall be generally numbered in such a way to reflect either discipline, phase or location of the work.

B. The Contractor shall submit the following supporting data in addition to the project schedule:

1. The appropriate project calendar including working days and holidays.

2. The planned number of shifts per day.

3. The number of hours per shift.

Failure of the Contractor to include this data shall delay the review of the submittal until the Contracting Officer is in receipt of the missing data.

C. To the extent that the Project Schedule or any revised Project Schedule shows anything not jointly agreed upon, it shall not be deemed to have been approved by the COR. Failure to include any element of work required for the performance of this contract shall not excuse the

Contractor from completing all work required within any applicable completion date of each phase regardless of the COR’s approval of the

Project Schedule.

D. Compact Disk Requirements and CPM Activity/Event Record Specifications:

Submit to the VA an electronic file(s) containing one file of the data required to produce a schedule, reflecting all the activities/events of the complete project schedule being submitted.

1.8 PAYMENT TO THE CONTRACTOR:

A. Monthly, the contractor shall submit an application and certificate for payment using the AIA application and certificate for payment documents

G702 & G703 reflecting updated schedule activities and cost data in accordance with the provisions of the following Article, PAYMENT AND

PROGRESS REPORTING, as the basis upon which progress payments will be made pursuant to Article, FAR 52.232 – 5 (PAYMENT UNDER FIXED-PRICE

CONSTRUCTION CONTRACTS) and VAAR 852.236 – 83 (PAYMENT UNDER FIXED-

PRICE CONSTRUCTION CONTRACTS). The Contractor shall be entitled to a monthly progress payment upon approval of estimates as determined from the currently approved updated project schedule. Monthly payment requests shall include: a listing of all agreed upon project schedule changes and associated data; and an electronic file (s) of the resulting monthly updated schedule.

01 32 16.15 - 7

B. Approval of the Contractor’s monthly Application for Payment shall be contingent, among other factors, on the submittal of a satisfactory monthly update of the project schedule.

1.9 PAYMENT AND PROGRESS REPORTING

A. Monthly schedule update meetings will be held on dates mutually agreed to by the COR and the Contractor. Contractor and their CPM consultant

(if applicable) shall attend all monthly schedule update meetings. The

Contractor shall accurately update the Project Schedule and all other data required and provide this information to the COR three work days in advance of the schedule update meeting. Job progress will be reviewed to verify:

1. Actual start and/or finish dates for updated/completed activities/events.

2. Remaining duration for each activity/event started, or scheduled to start, but not completed.

3. Logic, time and cost data for change orders, and supplemental agreements that are to be incorporated into the Project Schedule.

4. Changes in activity/event sequence and/or duration which have been made, pursuant to the provisions of following Article, ADJUSTMENT OF

CONTRACT COMPLETION.

5. Completion percentage for all completed and partially completed activities/events.

6. Logic and duration revisions required by this section of the specifications.

7. Activity/event duration and percent complete shall be updated independently.

B. After completion of the joint review, the contractor shall generate an updated computer-produced calendar-dated schedule and supply the

Contracting Officer’s representative with reports in accordance with the Article, COMPUTER PRODUCED SCHEDULES, specified.

C. After completing the monthly schedule update, the contractor’s representative or scheduling consultant shall rerun all current period contract change(s) against the prior approved monthly project schedule.

The analysis shall only include original workday durations and schedule logic agreed upon by the contractor and COR for the contract change(s).

When there is a disagreement on logic and/or durations, the Contractor shall use the schedule logic and/or durations provided and approved by the COR. After each rerun update, the resulting electronic project

01 32 16.15 - 8 schedule data file shall be appropriately identified and submitted to the VA in accordance to the requirements listed in articles 1.4 and

1.7. This electronic submission is separate from the regular monthly project schedule update requirements and shall be submitted to the COR within fourteen (14) calendar days of completing the regular schedule update. Before inserting the contract changes durations, care must be taken to ensure that only the original durations will be used for the analysis, not the reported durations after progress. In addition, once the final network diagram is approved, the contractor must recreate all manual progress payment updates on this approved network diagram and associated reruns for contract changes in each of these update periods as outlined above for regular update periods. This will require detailed record keeping for each of the manual progress payment updates.

D. Following approval of the CPM schedule, the VA, the General Contractor, its approved CPM Consultant and all subcontractors needed, as determined by the COR, shall meet to discuss the monthly updated schedule. The main emphasis shall be to address work activities to avoid slippage of project schedule and to identify any necessary actions required to maintain project schedule during the reporting period. The Government representatives and the Contractor should conclude the meeting with a clear understanding of those work and administrative actions necessary to maintain project schedule status during the reporting period. This schedule coordination meeting will occur after each monthly project schedule update meeting utilizing the resulting schedule reports from that schedule update. If the project is behind schedule, discussions should include ways to prevent further slippage as well as ways to improve the project schedule status, when appropriate.

1.10 RESPONSIBILITY FOR COMPLETION

A. If it becomes apparent from the current revised monthly progress schedule that phasing or contract completion dates will not be met, the

Contractor shall execute some or all of the following remedial actions:

1. Increase construction manpower in such quantities and crafts as necessary to eliminate the backlog of work.

2. Increase the number of working hours per shift, shifts per working day, working days per week, the amount of construction equipment, or any combination of the foregoing to eliminate the backlog of work.

01 32 16.15 - 9

3. Reschedule the work in conformance with the specification requirements.

B. Prior to proceeding with any of the above actions, the Contractor shall notify and obtain approval from the COR for the proposed schedule changes. If such actions are approved, the representative schedule revisions shall be incorporated by the Contractor into the Project

Schedule before the next update, at no additional cost to the

Government.

1.11 CHANGES TO THE SCHEDULE

A. Within 30 calendar days after VA acceptance and approval of any updated project schedule, the Contractor shall submit a revised electronic file

(s) and a list of any activity/event changes including predecessors and successors for any of the following reasons:

1. Delay in completion of any activity/event or group of activities/events, which may be involved with contract changes, strikes, unusual weather, and other delays will not relieve the

Contractor from the requirements specified unless the conditions are shown on the CPM as the direct cause for delaying the project beyond the acceptable limits.

2. Delays in submittals, or deliveries, or work stoppage are encountered which make rescheduling of the work necessary.

3. The schedule does not…

This is the start of the file's text. The full file is on GovTribe.