36C25019R0057-013.pdf
PDF 43 KB Posted
- Attached to
- Relocate CLC, Phase 4 539-326 Federal contract opportunity
- Solicitation number
- 36C25019R0057
About this file
36C25019R0057 Attach 8 ALTERNATE BID MATRIX.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25019R0057-0003000.docx | DOCX document | |
| 36C25019R0057-0003001.pdf | ||
| 36C25019R0057-0002000.docx | DOCX document | |
| 36C25019R0057-0002001.pdf | ||
| 36C25019R0057-0002002.pdf | ||
| 36C25019R0057-0001000.docx | DOCX document | |
| 36C25019R0057-004.docx | DOCX document | |
| 36C25019R0057-012.docx | DOCX document | |
| 36C25019R0057-006.pdf | ||
| 36C25019R0057-016.pdf | ||
| 36C25019R0057-007.pdf | ||
| 36C25019R0057-021.pdf | ||
| 36C25019R0057-022.docx | DOCX document | |
| 36C25019R0057-008.pdf | ||
| 36C25019R0057-020.pdf | ||
| 36C25019R0057-014.pdf | ||
| 36C25019R0057-005.docx | DOCX document | |
| 36C25019R0057-019.pdf | ||
| 36C25019R0057-017.pdf | ||
| 36C25019R0057-011.docx | DOCX document | |
| 36C25019R0057-015.pdf | ||
| 36C25019R0057-010.docx | DOCX document | |
| 36C25019R0057-009.docx | DOCX document | |
| 36C25019R0057-018.pdf | ||
| 36C25019R0057-000.docx | DOCX document |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEDUCT ALTERNATE BID ITEM MATRIX
DE
DU
CT
A
LT
DE
DU
CT
A
LT
DESCRIPTION
2.4G003 x SITE PLAN Removal of site work from project.
C130 x LOCATION PLAN All scope of work removed within construction limits.
2.4L100 x LANDSCAPE PLAN Removal of all landscape scope 2.4L101 x LANDSCAPE DETAILS Removal of all landscape scope 2.4A201A x x SECOND FLOOR NEW WORK PLAN Remove roof garden scope (#1) and shell out rooms 243 ‐ 248 (#2) 2.4A431 x EXTERIOR DETAILS Exterior site details removed from scope 2.4A440 x ROOF GARDEN PLAN AND DETAILS All scope associated with roof garden is removed.
2.4A441 x PARAPET RAILING DETAILS All scope associated with roof garden is removed.
2.4A610 x DOOR DETAILS AND SCHEDULES Doors listed on schedule for rooms 243 ‐248 to be removed.
2.4A800 x SECOND FLOOR NEW WORK RCP Ceiling and associated appurtenances to be removed in rooms 243 ‐ 248 2.4A900 x FINISH NOTES AND SCHEDULE Finishes associated with rooms 243 ‐ 248 to be removed.
2.4A901 x x SECOND FLOOR FINISH FLOORING PLAN Finishes associated with roof (#1) and rooms 243 ‐ 248 (#2) to be removed.
2.4A902 x x SECOND FLOOR WALL PROTECTION PLAN Finishes associated with roof (#1) and rooms 243 ‐ 248 (#2) to be removed.
2.4A903 x x SECOND FLOOR WALL FINISH PLAN Finishes associated with roof (#1) and rooms 243 ‐ 248 (#2) to be removed.
2.4A904 x x SECOND FLOOR FURNITURE & EQUIPMENT PLAN Finishes associated with roof (#1) and rooms 243 ‐ 248 (#2) to be removed.
2‐FS1 x SECOND FLOOR NEW SPRINKLER PLAN Per Note 7 deduct area becomes ordinary hazard gp 1 with upright sprinklers 2‐P2 x SECOND FLOOR NEW PLUMBING PLAN See Note 16 for deduct scope removals.
2‐P4 x SOIL, WASTE, AND VENT DIAGRAM See Note 9 for reference to deduct alternate scope removals.
H3 x HVAC SCHEDULES See notes for scope removals under equipment schedules.
H8 x STEAM SYSTEM SCHEMATIC AND DETAILS See Note 21 for removal of scope under deduct alternate.
H9 x HOT WATER SYSTEM SCHEMATIC AND CONTROLS All scope on this sheet removed from scope under deduct alternate.
H10 x CONTROLS AND AUTOMATION Control and automation scope changes noted on drawings.
H11 x x CONTROLS AND AUTOMATION, AND AIRFLOW DIAGRAMS See sheet for changes to scope of aiflow diagrams.
2‐H1 x PARTIAL BASEMENT PLANS‐NEW WORK See note 41 for meter and wiring component changes to scope under deduct alternate.
2‐H2 x SECOND FLOOR PLAN DUCTWORK See notes 25‐28 for scope changes under deduct alternate.
2‐H3 x SECOND FLOOR PLAN PIPING See notes 12‐15 for scope changes under deduct alternate.
2‐H4 x ROOF PLAN HVAC See note 9 for scope changes under deduct alternate.
2‐H5 x ENLARGED PIPE ROOM AND SECTIONS See note 28 for scope changes under deduct alternate.
2‐E1 x PARTIAL BSMT PLANS‐LIGHTING, POWER AND SYSTEMS See notes 5 and 6 for scope changes under deduct alternate.
2‐E2 x SECOND FLOOR PLAN LIGHTING See notes 7 and 8 for scope changes under deduct alternate.
2‐E3 x SECOND FLOOR PLAN POWER See note 19 for scope changes under deduct alternate.
2‐E4 x SECOND FLOOR PLAN SIGNALS See notes 6 and 7 for scope changes under deduct alternate.
2‐E5 x ROOF PLAN ELECTRIC See note 8 for scope changes under deduct alternate.