36C25019R0057 Attach 8 ALTERNATE BID MATRIX.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Relocate CLC, Phase 4 539-326, newest first.
File Type Posted
36C25019R0057-0003000.docx DOCX document
36C25019R0057-0003001.pdf PDF
36C25019R0057-0002000.docx DOCX document
36C25019R0057-0002001.pdf PDF
36C25019R0057-0002002.pdf PDF
36C25019R0057-0001000.docx DOCX document
36C25019R0057-004.docx DOCX document
36C25019R0057-012.docx DOCX document
36C25019R0057-006.pdf PDF
36C25019R0057-016.pdf PDF
36C25019R0057-007.pdf PDF
36C25019R0057-021.pdf PDF
36C25019R0057-022.docx DOCX document
36C25019R0057-008.pdf PDF
36C25019R0057-020.pdf PDF
36C25019R0057-014.pdf PDF
36C25019R0057-005.docx DOCX document
36C25019R0057-019.pdf PDF
36C25019R0057-017.pdf PDF
36C25019R0057-011.docx DOCX document
36C25019R0057-015.pdf PDF
36C25019R0057-010.docx DOCX document
36C25019R0057-009.docx DOCX document
36C25019R0057-018.pdf PDF
36C25019R0057-000.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEDUCT ALTERNATE BID ITEM MATRIX

DE

DU

CT

A

LT

DE

DU

CT

A

LT

DESCRIPTION

2.4G003 x SITE PLAN Removal of site work from project.

C130 x LOCATION PLAN All scope of work removed within construction limits.

2.4L100 x LANDSCAPE PLAN Removal of all landscape scope 2.4L101 x LANDSCAPE DETAILS Removal of all landscape scope 2.4A201A x x SECOND FLOOR NEW WORK PLAN Remove roof garden scope (#1) and shell out rooms 243 ‐ 248 (#2) 2.4A431 x EXTERIOR DETAILS Exterior site details removed from scope 2.4A440 x ROOF GARDEN PLAN AND DETAILS All scope associated with roof garden is removed.

2.4A441 x PARAPET RAILING DETAILS All scope associated with roof garden is removed.

2.4A610 x DOOR DETAILS AND SCHEDULES Doors listed on schedule for rooms 243 ‐248 to be removed.

2.4A800 x SECOND FLOOR NEW WORK RCP Ceiling and associated appurtenances to be removed in rooms 243 ‐ 248 2.4A900 x FINISH NOTES AND SCHEDULE Finishes associated with rooms 243 ‐ 248 to be removed.

2.4A901 x x SECOND FLOOR FINISH FLOORING PLAN Finishes associated with roof (#1) and rooms 243 ‐ 248 (#2) to be removed.

2.4A902 x x SECOND FLOOR WALL PROTECTION PLAN Finishes associated with roof (#1) and rooms 243 ‐ 248 (#2) to be removed.

2.4A903 x x SECOND FLOOR WALL FINISH PLAN Finishes associated with roof (#1) and rooms 243 ‐ 248 (#2) to be removed.

2.4A904 x x SECOND FLOOR FURNITURE & EQUIPMENT PLAN Finishes associated with roof (#1) and rooms 243 ‐ 248 (#2) to be removed.

2‐FS1 x SECOND FLOOR NEW SPRINKLER PLAN Per Note 7 deduct area becomes ordinary hazard gp 1 with upright sprinklers 2‐P2 x SECOND FLOOR NEW PLUMBING PLAN See Note 16 for deduct scope removals.

2‐P4 x SOIL, WASTE, AND VENT DIAGRAM See Note 9 for reference to deduct alternate scope removals.

H3 x HVAC SCHEDULES See notes for scope removals under equipment schedules.

H8 x STEAM SYSTEM SCHEMATIC AND DETAILS See Note 21 for removal of scope under deduct alternate.

H9 x HOT WATER SYSTEM SCHEMATIC AND CONTROLS All scope on this sheet removed from scope under deduct alternate.

H10 x CONTROLS AND AUTOMATION Control and automation scope changes noted on drawings.

H11 x x CONTROLS AND AUTOMATION, AND AIRFLOW DIAGRAMS See sheet for changes to scope of aiflow diagrams.

2‐H1 x PARTIAL BASEMENT PLANS‐NEW WORK See note 41 for meter and wiring component changes to scope under deduct alternate.

2‐H2 x SECOND FLOOR PLAN DUCTWORK See notes 25‐28 for scope changes under deduct alternate.

2‐H3 x SECOND FLOOR PLAN PIPING See notes 12‐15 for scope changes under deduct alternate.

2‐H4 x ROOF PLAN HVAC See note 9 for scope changes under deduct alternate.

2‐H5 x ENLARGED PIPE ROOM AND SECTIONS See note 28 for scope changes under deduct alternate.

2‐E1 x PARTIAL BSMT PLANS‐LIGHTING, POWER AND SYSTEMS See notes 5 and 6 for scope changes under deduct alternate.

2‐E2 x SECOND FLOOR PLAN LIGHTING See notes 7 and 8 for scope changes under deduct alternate.

2‐E3 x SECOND FLOOR PLAN POWER See note 19 for scope changes under deduct alternate.

2‐E4 x SECOND FLOOR PLAN SIGNALS See notes 6 and 7 for scope changes under deduct alternate.

2‐E5 x ROOF PLAN ELECTRIC See note 8 for scope changes under deduct alternate.