36C25019R0057-006.pdf

PDF 5 MB Posted

Attached to
Relocate CLC, Phase 4 539-326 Federal contract opportunity
Solicitation number
36C25019R0057
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25019R0057 Attachment 2 Specifications.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Relocate CLC, Phase 4 539-326, newest first.
File Type Posted
36C25019R0057-0003001.pdf PDF
36C25019R0057-0003000.docx DOCX document
36C25019R0057-0002000.docx DOCX document
36C25019R0057-0002001.pdf PDF
36C25019R0057-0002002.pdf PDF
36C25019R0057-0001000.docx DOCX document
36C25019R0057-004.docx DOCX document
36C25019R0057-012.docx DOCX document
36C25019R0057-016.pdf PDF
36C25019R0057-007.pdf PDF
36C25019R0057-005.docx DOCX document
36C25019R0057-019.pdf PDF
36C25019R0057-017.pdf PDF
36C25019R0057-021.pdf PDF
36C25019R0057-022.docx DOCX document
36C25019R0057-008.pdf PDF
36C25019R0057-020.pdf PDF
36C25019R0057-014.pdf PDF
36C25019R0057-011.docx DOCX document
36C25019R0057-015.pdf PDF
36C25019R0057-010.docx DOCX document
36C25019R0057-009.docx DOCX document
36C25019R0057-013.pdf PDF
36C25019R0057-018.pdf PDF
36C25019R0057-000.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For: Relocate Community Living Center, Phase 4

At: VETERANS AFFAIRS MEDICAL CENTER

3200 VINE STREET

CINCINNATI, OHIO 45220

Project.

No.

539-326

Bid Documents June 13, 2017

Attachment

Assemblies shall provide a 2-hour floor rating unless noted otherwise.

Standard Method of Test of Surface Burning Characteristics of Building Materials

(See 4.2.4.2.)

F.

1.

2.

3.

4.

5.

G.

1.

H.

1.

2.

3.

a.

b.

c.

d.

e.

f.

I.

the ystem the ystem

27 21 00-49 2012-04034

27 21 00-50 2012-04034

27 21 00-51 2012-04034 that all before in writing, all approvals for system changes relating to the published contract specifications and drawings, from the PM and/or the Project Engineer before proceeding with the change

MANDATORY

non-removal a.

Prior to implementing Vocera in the facility the wireless network for the deploying areas should meet the requirements specified and outlined in the Vocera

Infrastructure Planning Guide.

32 90 00 - 1

32 90 00 - 2

32 90 00 - 3

32 90 00 - 4

32 90 00 - 5

32 90 00 - 6

32 90 00 - 7

32 90 00 - 8

32 90 00 - 9

32 90 00 - 10

32 90 00 - 11

32 90 00 - 12

32 90 00 - 13

32 90 00 - 14

File details come from the government source that posted it.