36C25019R0057-008.pdf
PDF 16 MB Posted
- Attached to
- Relocate CLC, Phase 4 539-326 Federal contract opportunity
- Solicitation number
- 36C25019R0057
About this file
36C25019R0057 Attachment 3 Drawings_Part2.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25019R0057-0003000.docx | DOCX document | |
| 36C25019R0057-0003001.pdf | ||
| 36C25019R0057-0002001.pdf | ||
| 36C25019R0057-0002000.docx | DOCX document | |
| 36C25019R0057-0002002.pdf | ||
| 36C25019R0057-0001000.docx | DOCX document | |
| 36C25019R0057-021.pdf | ||
| 36C25019R0057-022.docx | DOCX document | |
| 36C25019R0057-020.pdf | ||
| 36C25019R0057-014.pdf | ||
| 36C25019R0057-004.docx | DOCX document | |
| 36C25019R0057-012.docx | DOCX document | |
| 36C25019R0057-006.pdf | ||
| 36C25019R0057-016.pdf | ||
| 36C25019R0057-007.pdf | ||
| 36C25019R0057-011.docx | DOCX document | |
| 36C25019R0057-015.pdf | ||
| 36C25019R0057-010.docx | DOCX document | |
| 36C25019R0057-009.docx | DOCX document | |
| 36C25019R0057-013.pdf | ||
| 36C25019R0057-018.pdf | ||
| 36C25019R0057-005.docx | DOCX document | |
| 36C25019R0057-019.pdf | ||
| 36C25019R0057-017.pdf | ||
| 36C25019R0057-000.docx | DOCX document |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B A
Revisions Date ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
F E
D C
B
A PROVIDE A COMPLETE FIRE SUPPRESSION SPRINKLER SYSTEM IN
THE RENOVATED AREAS/NEW ADDITION.
B COORDINATE WORK WITH VAMC, PHASING PLAN AND OTHER TRADES.
EACH CONTRACTOR SHALL BE RESPONSIBLE FOR OFFSETTING
AND/OR RELOCATING EXISTING SERVICES TO ACCOMMODATE NEW
WORK OF OTHER TRADES.
C DESIGN SERVICES SHALL FOLLOW ALL VA STANDARD DESIGN
PRACTICES, DETAILS, SPECIFICATIONS AND SITE SPECIFIC PROJECT
ENGINEER REQUIREMENTS AS WELL AS WORK SHOWN ON THESE
DOCUMENTS. ALL DEVIATIONS FROM AFOREMENTIONED REQUIREMENTS
SHALL BE APPROVED BY THE PROJECT ENGINEER.
D THE F.S.C. SHALL VERIFY THAT THERE IS ADEQUATE SPACE TO
INSTALL ALL NEW PIPING REQUIRED TO COMPLETE THIS WORK.
E ALL SPRINKLER PIPING IS LOCATED ABOVE THE CEILING (AT THE
BOTTOM OF STRUCTURE IN EXPOSED STRUCTURAL AREAS) UNLESS
OTHERWISE INDICATED.
F THE BASIS OF DESIGN OF SPACING AND SIZING FOR THE COMPLETE
FIRE SUPPRESSION SPRINKLER SYSTEM IS FOR A WET PIPE SYSTEM
HYDRAULICALLY CALCULATED FOR A:
1 LIGHT HAZARD AREA LIMITED TO A MAXIMUM OF 225 SQ. FT. PER
SPRINKLER WITH THE DENSITY OF 0.10 GPM/SQ. FT. OVER THE
MOST REMOTE 1500 SQ. FT. PROVIDE AN ADDITION OF 100 GPM
HOSE ALLOWANCE.
2 ALL MECHANICAL, ELECTRICAL AND ETC. AREAS SHALL BE
ORDINARY HAZARD (GROUP 1) LIMITED TO A MAXIMUM OF 130
SQ. FT. PER SPRINKLER WITH A DENSITY OF 0.15 GPM/SQ. FT.
PROVIDE AN ADDITION OF 250 GPM HOSE ALLOWANCE.
3 ALL STORAGE, TRASH, FILE STORAGE AND ETC. AREAS SHALL
BE ORDINARY HAZARD (GROUP 2) LIMITED TO A MAXIMUM OF
130 SQ. FT. PER SPRINKLER WITH A DENSITY OF 0.20 GPM/SQ.
FT. PROVIDE AN ADDITION OF 250 GPM HOSE ALLOWANCE.
G ALL SPRINKLER HEAD LOCATIONS AND RELATED PIPING SHALL BE BY
H THE ENTIRE SPRINKLER SYSTEM SHALL CONFORM TO VAMC, LOCAL,
STATE AND NFPA STANDARDS, RULES AND REGULATIONS.
I THE F.S.C. SHALL CAREFULLY COORDINATE THE LOCATION OF ALL
SPRINKLER HEADS AND PIPING WITH ALL OTHER TRADES AND THE
ARCHITECT.
J THE F.S.C. SHALL VERIFY THE LOCATION OF ALL LIGHTING FIXTURES
AND AIR DEVICES BEFORE INSTALLATION OF SPRINKLER HEADS.
K ALL SPRINKLER PIPING LAYOUT AND SIZING SHALL BE BY THE F.S.C.
L ALL SPRINKLER HEAD LOCATIONS MUST BE COORDINATED WITH ALL
EQUIPMENT KINDRED TO OTHER TRADES. HEAD LOCATIONS MUST BE
APPROVED BY THE ARCHITECT BEFORE WORK COMMENCES. REFER TO
THE ARCHITECTURAL AND REFLECTIVE CEILING PLANS FOR ADDITIONAL
INFORMATION ON ALL CEILING TYPES, HEIGHTS, AND OTHER
ARCHITECTURAL FEATURES.
M THE F.S.C. SHALL MAKE NECESSARY FLOW TEST, LAY OUT SYSTEMS,
OBTAIN APPROVALS FROM THE AUTHORITIES HAVING JURISDICTION
PRIOR TO BEGINNING ANY FABRICATION OR INSTALLATION WORK.
N SPRINKLER PIPING SHALL BE MINIMUM 1" SIZE.
O SPRINKLER HEADS (UNLESS OTHERWISE NOTED):
EXPOSED AREAS - UPRIGHT OR PENDENT TYPE - STANDARD BRASS
CEILING AREAS - RECESSED PENDENT TYPE. ALL HEADS SHALL BE UL
LISTED AND FM APPROVED.
P SPRINKLER HEADS SHALL BE "QUICK RESPONSE" TYPE IN ALL AREAS
EXCEPT HIGH TEMPERATURE AREAS.
Q ALL PENDENT TYPE SPRINKLER HEADS LOCATED IN SUSPENDED
CEILING TILE AREAS SHALL BE LOCATED IN THE CENTER OF THE
CEILING TILE.
R ANNULAR SPACE AT PIPE AND OTHER SIMILAR PENETRATION OF FIRE
RATED ASSEMBLIES SHALL BE FIRESTOPPED. REFER TO
SPECIFICATION SECTION 07 84 00 FIRESTOPPING. REFER TO
ARCHITECTURAL DRAWINGS FOR CONSTRUCTION, LAYOUT AND FIRE
RATING OF FLOORS, WALLS, PARTITIONS AND OTHER BUILDING
ELEMENTS.
S REFER TO SPECIFICATION SECTION 21 13 13 FOR FLOW TEST
INFORMATION.
T ALL EXISTING SMOKE COMPARTMENTS SHALL BE MAINTAINED. ALL
NEW SPRINKLER ZONES SHALL MATCH SMOKE COMPARTMENTS.
U REFER TO ARCHITECTURAL SHEET 2.4G001 FOR INFORMATION ON
SMOKE COMPARTMENTS, SMOKE PARTITIONS & FIRE BARRIERS.
THE F.S.C.
S
E.C. ELECTRICAL CONTRACTOR
FIRE SUPPRESSION CONTRACTORF.S.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
"NOTE" SYMBOL (FOR NOTES ON SAME SHEET)
ROOM NUMBER
SPRINKLER PIPE (WET)
SUPERVISED VALVE
FLOW SWITCH
DIRECTION OF FLOW
S
FIRE SUPPRESSION HAZARD CLASSIFICATION
ORDINARY HAZARD / GROUP 11
OH
FS
H.C. HVAC CONTRACTOR
242A
241A
240A
240 239
239A
238A 237A
236A
235A
234A
233A
S2.1
222 221
248A
247A
246A
245A
245 218
023QQ
244A
243A
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
3 3
ZONE SEPARATION LINE
ZONE 8
ZONE 6
SPRINKLER
ZONE 6
SPRINKLER
ZONE 8
NO FIRE SUPPRESSION
6 - TYP.
6 - TYP.
6 - TYP.
6TYP. -
6 - TYP.
OH
SFS
4" SPRINKLER
RISER -
FS
S
ZONE 6 -
FS
S
1ZONE 6 - - ZONE 71
4" FR &
DRAIN
RISER -
S
S
S
S
S
OH
OH
NO FIRE SUPPRESSION
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
Champlin Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
F E
D C
B A
539-326
PHASE 4
HEAPY PROJECT No.: 2012-04034 FIRM LICENSE No.: 01528
6/
/2
7:
:0
A
M
RELOCATE COMMUNITY LIVING
CENTER, PHASE 4
06/13/2017
SECOND FLOOR PLAN - NEW WORK
2-FS1
DPBRLT
177-4692
Cincinnati, Ohio
1/8" = 1'-0"2-FS1
1 SECOND FLOOR PLAN
FIRE SUPPRESSION DESIGN NOTES
LEGEND
DRAWING INDEX - FIRE SUPPRESSION
SHEET DESCRIPTION
2-FS1 SECOND FLOOR PLAN - NEW WORK
ROOM NAMES & NUMBERS -
SECOND FLOOR PLAN
Num ber Name
023QQ COURTYARD BELOW
201 CORRIDOR
202 TECH CLOSET
204 STORAGE
205 STORAGE
206 WORK ROOM
207 ROOF GARDEN
208 LAUNDRY
210 CLEAN SUPPLY
211 NURSE STATION
213 KITCHEN
214 LIVING ROOM
215 DINING ROOM
216 02 STORAGE
216 ENTRY
217 COMP. CLOSET
218 CORRIDOR
219 SOILED UTILITY
220 BATHING SUITE
221 STAFF WOMEN'S
222 STAFF MEN'S
224 HAC
225 LINEN CLOSET
226 QUIET ROOM
227 MED CLOSET
228 NURSE STATION
229 CORRIDOR
230 ELECTRIC CLOSET
232 CRASH CART
233 SPECIAL CARE RESIDENT ROOM
233A SPECIAL CARE BATHROOM
234 BEDROOM
234A BATHROOM
235 BEDROOM
235A BATHROOM
236 BEDROOM
236A BATHROOM
237 BEDROOM
237A BATHROOM
238 BEDROOM
238A BATHROOM
239 BEDROOM
239A BATHROOM
240 BEDROOM
240A BATHROOM
241 BEDROOM (NEGATIVE PRESSURE)
241A BATHROOM
242 BEDROOM (NEGATIVE
PRESSURE)
242A BATHROOM
243 BEDROOM
243A BATHROOM
244 BEDROOM
244A BATHROOM
245 BEDROOM
245A BATHROOM
246 BEDROOM
246A BATHROOM
247 BEDROOM
247A BATHROOM
248 BEDROOM
248A BATHROOM
S2.1 STAIR 1
NOTES
1 EXISTING TO REMAIN.
2 EXTEND PIPING FROM EXISTING SPRINKLER ZONE 6 TO
ACCOMMODATE LIMITED WORK IN NEW ADDITION. ALL
SPRINKLER ZONES SHALL MATCH SMOKE COMPARTMENTS.
3 OUTLINE OF AREA TO BE PROVIDED WITH A COMPLETE
FIRE SUPPRESSION SPRINKLER SYSTEM BY THE F.S.C.
4 CONNECT TO EXISTING 4" SPRINKLER MAIN. PROVIDE NEW
SUPERVISED VALVE, CHECK VALVE AND FLOW SWITCH AND
EXTEND PIPING (SIZE PER HYDRAULIC CALCULATIONS) TO
COMPLETE FIRE SUPPRESSION SPRINKLER SYSTEM IN NEW
ADDITION SPRINKLER ZONE 8 IN NEW PHASE 4 ADDITION.
5 REFER TO ARCHITECTURAL SHEET 2.4AG001 FOR ADDITIONAL
INFORMATION ON SMOKE COMPARTMENTS, SMOKE
PARTITIONS AND FIRE BARRIERS.
6 COORDINATE SPRINKLER PIPING/SUPPORT LOCATIONS WITH
PATIENT LIFT STRUCTURALLY MEMBERS.
7 UNDER BID ITEM 3, INDICATED AREA BECOMES ORDINARY
HAZARD, GROUP 1 AND OPEN TO STRUCTURE. PROVIDE QUICK
RESPONSE, UPRIGHT TYPE SPRINKLERS.
Revisions Date Schematic Review 08/17/2012 Design Development 10/15/2012 100% Review 12/14/2012 Issue For Bid 05/26/2016 Re-issue for Bid 06/13/2017
DRAIN SCHEDULE
FIXTURE SCHEDULE
LEGEND
EQUIPMENT SCHEDULE
SYMBOL
RD1
OD1
FD1
STRAINER/GRATE
3" FLANGED WITH ADJUSTABLE DRAINAGE COLLAR, SUMP RECIEVER,
BEARING PAN, DECK CLAMP, DOME STRAINER.
3" FLANGED WITH ADJUSTABLE DRAINAGE COLLAR, SUMP RECIEVER,
BEARING PAN, DECK CLAMP, DOME STRAINER, 3" STANDPIPE
DESCRIPTION
3" MEDIUM DUTY/DOUBLE DRAINAGE/V.P. WITH TRAP PRIMER (TYPE C)
BRASSC.I. C.R.S.S.
BODY
SQ.RD. FLATADJUST. DOMEFUNNEL C.I.BRONZE
NICKEL NOTES
C.R.
TOP FINISH
SYMBOL
P609
P701
P103
DRAINAGE CONNECTION
SHOWER VALVE & HEAD/ADA
WATER COOLER/DUAL HEIGHT/PUSH BARS/ADA
36"LOW
SPOUT
0.5"1.5/1.5
0.5
0.5"0.75
0.5"
1.5" 1.5"
WATER CLOSET/WALL HUNG/ELONGATED BOWL/ADA
MTG.
HGT. DESCRIPTION
HOT
SUPPLY
C/H
WATER
FIXTURE UNITS
DRAINS
COLD
5/- 1"
OUTLET
4"
VENT
2"
SURFACE WALL MOUNTED.
SHOWER HEAD W/SLIDE BAR
BATTERY POWERED SENSOR WITH MANUAL
INDIRECTDIRECT
BYPASS.
REMARKS
DETAIL B SHOWN ON SHEET P2
ABOVE FINISH FLOORAFF
DS DOWNSPOUT
SUPPLY RISERSR
VENT THRU ROOFVTR
CO CLEANOUT
VR VENT RISER
WSV WASTE STACK VENT
SS SANITARY STACK (SOIL/WASTE)
DRAIN (FD, RD, OD)FD2
PLUMBING FIXTUREP102
ZONE VALVE CABINET(S)ZVC
MEDICAL GAS AREA ALARM PANELAAP
MEDICAL VACUUM PIPEMV
MEDICAL OXYGEN PIPEO2
MA MEDICAL AIR PIPE
DOMESTIC HOT WATER PIPE (120 DEGS. F, DHW)
DOMESTIC COLD WATER PIPE (DCW)
EXISTING PIPE TO BE REMOVED
EXISTING PIPE TO REMAIN
DOMESTIC HOT WATER RETURN PIPE (120 DEGS. F, DHWR)
DIRECTION OF FLOW
SHUTOFF VALVE ON RISER
DIRECTION OF PITCH
SANITARY VENT PIPE
SANITARY DRAINAGE PIPE
ROOM NUMBER
"UP TO" SYMBOL (ITEM ON FLOOR ABOVE)
"NOTE" SYMBOL
"CONNECT TO EXISTING" SYMBOL
E.C. ELECTRICAL CONTRACTOR
HVAC CONTRACTORH.C.
FIRE SUPPRESSION CONTRACTORF.S.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
P102 WATER CLOSET/FLOOR SET/FLOOR OUTLET/SS/ADA 5/- 1"4 - 4" 2" -
VACUUM BREAKER/STN. STL. BARIATRIC UNIT.
BATTERY POWERED SENSOR WITH BEDPAN WASHER
P808 WASHING MACHINE SUPPLY AND DRAIN UNIT 3 3/3 0.5" 0.5" 3" 1.5"
RIM
18" TO
FD2
- - - - - 1
P104 WATER CLOSET/WALL HUNG/ELONGATED BOWL/ADA 4 5/- 1" - 4" 2" - BATTERY POWERED SENSOR WITH MANUAL
BYPASS/BEDPAN WASHER
44" TO
C.L.
RD2 4" FLANGED WITH ADJUSTABLE DRAINAGE COLLAR, SUMP RECIEVER,
BEARING PAN, DECK CLAMP, DOME STRAINER.
OD2 4" FLANGED WITH ADJUSTABLE DRAINAGE COLLAR, SUMP RECIEVER,
BEARING PAN, DECK CLAMP, DOME STRAINER, 3" STANDPIPE
P502 MOP SINK/28"X28"X12"/6" DROP FRONT/TERRAZZO
FLOOR
SET 3
2.25/
2.25 0.5" 0.5" 3" 1.5" -
PAIL HOOK FAUCET/VACUUM BREAKER/
WALL BRACE/CROSS HANDLES
FD3
P419
LAVATORY/UNDERMOUNT/VITREOUS CHINA/16" DIA./ADA
1 0.6/0.6 0.5" 0.5" 1.5" 1.5" - TRANSFORMER
120 VOLT SENSOR OPERATED/REMOTE
P505 CLINICAL SERVICE SINK/WALL HUNG/BEDPAN WASHER
30" TO
RIM 3 5/2.25
1"
(2)0.5" (2)0.5" 4" 2" -
WRIST BLADE HANDLES/FOOT CONTROL
BEDPAN WASHER/VACUUM BREAKER
STORM DRAINAGE PIPE
EMERGENCY OVERFLOW STORM DRAINAGE PIPE
ROOF/OVERFLOW DRAIN
3" MEDIUM DUTY/DOUBLE DRAINAGE/SECONDARY STRAINER (TYPE R)
SHUT-OFF BALL VALVE
A1
B P2
P420 1 0.6/0.6 0.5" 0.5" 1.5" 1.5" - TRANSFORMER
120 VOLT SENSOR OPERATED/REMOTE
P801 WALL HYDRANT/EXTERIOR FREEZE-PROOF 0 0 0.75" - - - - LOOSE KEY T-HANDLE/VACUUM BREAKER24" -
STM
OD
TRAP PRIMER TAP
1.5
0.5 -
0.5 -
FLOW
GPM
- 1.28
1.28-
- 1.28
GPF
RIM
18" TO
RIM
18" TO
3" MEDIUM DUTY/DOUBLE DRAINAGE/VANDAL RESISTANT (TYPE D)
RECESS STRAINER
2. INSTALL ALL "LOOSE" COMPONENTS.
TRAPS, FIX. DRAINS, CONTINUOUS WASTE, &
4. MAKE ALL FINAL CONNECTIONS.
3. PROVIDE ALL NECESSARY SUPPLIES, STOPS,
ALL INDIRECT WASTE.
DESCRIPTION
1. PROVIDE ROUGH-IN.
MARK W
A
S T
E -M
IN
D .H
.W
D E
G . F
SUPPLY
D .C
.W
F
IX
. D R
A
IN
F
IX
. O U
T
LE
T
T R
A P
V E
N T
-M
IN
IN
D
IR
E
C T
S C
H E
D . N
O T
E S
A
IR
B R
E A
K
T O
F
LR
. D R
S A
N
IT
A R
Y
K
IT
. W A
S T
E
A
IR
G A
P
S E
E E
Q U
IP
'T
WASTE SYS.WASTE & VENT
H .W
D
E G
. F
G A
S
SUPPLY & WASTE TRIM
B A
LL
V
A
LV
E
COFFEE DISPENSER (COUNTERTOP)M2
ICE MACHINE (COUNTERTOP)M1
A C
ID
W
A S
T E
P812 - 0.5/- 0.5" - - -
48" TO
C.L.
- -REFRIGERATOR/ICE MAKER/COFFEE MAKER/SUPPLY BOX - - MOUNTED ABOVE COUNTERTOP. PROVIDE
FLEXIBLE CONNECTER TO EQUIPMENT
LAVATORY/UNDERMOUNT/VITREOUS CHINA/16" DIA./ADA
RD1/OD1
SCHEDULE NOTES:
1. CONTRACTOR SHALL PERMANENTLY PLUG UNUSED TRAP PRIMER TAPS.
P
0.5" 0.75" 0.75" 0.75"
0.5"
P525 STAINLESS STEEL SINK/TWO COMP'T/UNDERMOUNT/31"x18" 2 1.5/1.5 0.5" 0.5" 1.5" 1.5" -
WRIST BLADE HANDLES/GOOSENECK
SPOUT1.0 -
P529 STAINLESS STEEL SINK/SINGLE COMP'T/UNDERMOUNT/22"x17" 2 1.5/1.5 0.5" 0.5" 1.5" 1.5" - SPOUT
WRIST BLADE HANDLES/GOOSENECK
1.0 -
P530 STAINLESS STEEL SINK/SINGLE COMP'T/C'TOP/22"x19"x10" DEEP 1.0 - 2 1.5/1.5 0.5" 0.5" 1.5" 1.5" -
SPOUT
WRIST BLADE HANDLES/GOOSENECK
OXYGEN OUTLET - HOSPITAL TYPE
MEDICAL VACUUM OUTLET - HOSPITAL TYPE
MEDICAL AIR OUTLET - HOSPITAL TYPE
DISHWASHER (UNDERCOUNTER)M3 0.5" 0.75" 0.75" 0.75"
FLOOR DRAIN
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
Champlin Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
F E
D C
B A
539-326
PHASE 4
HEAPY PROJECT No.: 2012-04034 FIRM LICENSE No.: 01528
6/
/2
7:
:3
A
M
RELOCATE COMMUNITY LIVING
CENTER, PHASE 4
06/13/2017
LEGEND, SCHEDULES AND
DRAWINGS INDEX
P1
DPBRLT
177-4692
Cincinnati, Ohio
DRAWING INDEX - PLUMBING
SHEET DESCRIPTION
P1 LEGEND, SCHEDULES AND DRAWINGS INDEX
P2 DETAILS
2-P1 FIRST FLOOR PLAN - REMOVALS & NEW WORK
2-P2 SECOND FLOOR PLAN - NEW WORK
2-P3 ROOF PLAN - NEW WORK
2-P4 SOIL, WASTE & VENT
Revisions Date Schematic Review 08/17/2012 Design Development 10/15/2012 100% Review 12/14/2012
MEDICAL GAS AND VACUUM SYSTEMS
CORNER PATIENT TOILET ROOMS TYPICAL PATIENT TOILET ROOMS
P104 SIMILAR EXCEPT WALL
HUNG FIXTURE
P103 WATER CLOSET
BRANCH TAKEOFF PIPING
MEDICAL GAS ZONE VALVE CABINET
TRAP PRIMER
P419/P420 LAVATORY
SUPPLY PIPING DIAGRAM SUPPLY PIPING DIAGRAM
P102 WATER CLOSET
WALL
SCALE:
FLOOR DRAIN
FLOOR
TP
SHALL BE RUN BELOW FLOOR,
UNLESS NOTED OTHERWISE.
PIPING TO FLOOR DRAINS
IN WALL IN FINISHED AREAS.
SURFACE IN UNFINISHED AREAS.
INSTALL PIPING TIGHT TO WALL
TP
OFF TOP OF MAIN
FINISHED CEILING
WHERE APPLICABLE
COLD WATER MAIN
SUPPLY SHALL BE
IN FINISHED AREAS.
UNIT WHEN SERVING MULTIPLE
DRAINS. LOCATE ABOVE CEILING
TRAP PRIMER, WITH DISTRIBUTION
INSTALL PIPING CONCEALEDTP
0.5"
VALVE SERVICES AND SIZES AT EACH INDIVIDUAL LOCATION.
SCALE:
1 REFER TO FLOOR PLANS FOR REQUIRED NUMBER OF VALVES,
NOTE:
MAIN OR BRANCH
SCALE:
VACUUM GAUGE
PIPING
SYSTEM
TO/FROM DISTRIBUTION
SYSTEM AND SERVICE
AREA LABEL, TYPICAL
MIN. 45 DEGREES
INLET OR SPECIAL STATION
TO STATION OUTLET,
BRANCH OR RUNOUT
PRESSURE
GAUGE, TYPICAL
INLETS AND OUTLETS
TO/FROM STATION
FINISHED FLOOR
STOP
FLUSH VALVE
DETAILS
SEE ARCH.
GRAB BAR
FLUSH BUTTON
WITH MANUAL OVERRIDE
SIDE MOUNTED OPERATOR
BATTERY POWERED
.5
2.5"
SCALE:
O2
MV
MA MA
O2
MV
MA O2 MV
FOR FUTURE EXTENSION
CAP PIPING ABOVE CEILING
E
P2NONE
B P2
D P2
NONE
NONE
C
P2NONE
SCALE:
A
P2NONE
MANUAL MIXER
SCALE:
G
P2NONE SCALE:
H
P2NONE
SCALE:
F
P2NONE
FINISHED FLOOR
STOP
FLUSH VALVE
DETAILS
SEE ARCH.
GRAB BAR 26
.5
2.5"
BEDPAN WASHER
FOLD DOWN
LOOSE
KEY/STOP
ESCUTCHEON
FINISHED FLOOR
COUNTERTOP
LAMINAR FLOW
CONTROL DEVICE
FAUCET SEE
SPECIFICATIONS
ENCLOSURE BY OTHERS
REFER TO ARCHITECTURAL
SHEETS
OFFSET WASTE
TRAP PARALLEL TO
WALL
ASSE 1070 MIXING VALVE
REMOVE INTEGRAL CHECKS FROM
FAUCET AND PROVIDE NEW CHECK
VALVES ON DCW & DHW SUPPLY
BATTERY POWERED SIDE
MOUNTED OPERATOR WITH
MANUAL OVERRIDE FLUSH
BUTTON
P104 P104
P419 P419
NEW SECOND FLOOR
BY G.C.
ACCESS PANEL
NEW PHASE 4 ROOF
P701
P701
2" 1"
2"
1"
2" 1"
0.75"
0.75"
0.5"
0.5"
0.5"
1.5"
0.75"
THIRD FLOOR SLAB
FUTURE PHASE
FUTURE
CAP PIPE FOR
WITH TEMPORARY INSULATION
IN PHASE ROOF FUTURE THIRD
FLOOR SLAB TO FACILITATE
FUTURE PHASE EXTENSION
STUBS LOCATED ABOVE EXISTING
CONNECT TO EXISTING DCW & DHW
ROOF/SECOND FLOOR SLAB & EXTEND
NEW PIPING TO PHASE 4 AS INDICATED
P701 P701
0.5"
0.5"
NEW PHASE 4 ROOF
2" 0.75"
2" 0.75"
THIRD FLOOR SLAB
FUTURE PHASE
FUTURE
CAP PIPE FOR
WITH TEMPORARY INSULATION IN
PHASE 4 ROOF/FUTURE THIRD FLOOR
SLAB TO FACILITATE FUTURE
PHASE EXTENSION
P104
P419
0.5" 1.5"
NEW PHASE 4 ROOF/
2" 1"
2"
1"
THIRD FLOOR SLAB
FUTURE PHASE
FUTURE
CAP PIPE FOR
WITH TEMPORARY INSULATION IN
PHASE 4 ROOF/FUTURE THIRD FLOOR
SLAB TO FACILITATE FUTURE
PHASE EXTENSION
P104
P419
0.5"
1.5" P420 P420
0.5"
P420
P420
0.5" 0.5"
PROVIDE PIPE SLEEVES FILLED
PROVIDE PIPE SLEEVES FILLED
PROVIDE PIPE SLEEVES FILLED
EXISTING ROOF/
2" 1"
NEW SECOND FLOOR
EXISTING ROOF/
NEW SECOND FLOOR
EXISTING ROOF/
STUBS LOCATED ABOVE EXISTING
CONNECT TO EXISTING DCW & DHW
ROOF/SECOND FLOOR SLAB & EXTEND
NEW PIPING TO PHASE 4 AS INDICATED
STUBS LOCATED ABOVE EXISTING
CONNECT TO EXISTING DCW & DHW
ROOF/SECOND FLOOR SLAB & EXTEND
NEW PIPING TO PHASE 4 AS INDICATED
0.75"
REFER TO PLAN NOTE 16 LOCATED ON
DRAWING 2-P2 FOR BID ITEM 3 BIDDING
DIRECTIONS.
REFER TO PLAN NOTE 16 LOCATED ON
DRAWING 2-P2 FOR BID ITEM 3 BIDDING
DIRECTIONS.
REFER TO PLAN NOTE 16 LOCATED ON
DRAWING 2-P2 FOR BID ITEM 3 BIDDING
DIRECTIONS.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
Champlin Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
F E
D C
B A
539-326
PHASE 4
HEAPY PROJECT No.: 2012-04034 FIRM LICENSE No.: 01528
6/
/2
7:
:3
A
M
RELOCATE COMMUNITY LIVING
CENTER, PHASE 4
06/13/2017
DETAILS
P2
DPBRLT
177-4692
Cincinnati, Ohio
Revisions Date Schematic Review 08/17/2012 Design Development 10/15/2012 100% Review 12/14/2012 Issue For Bid 05/26/2016 Re-issue for Bid 06/13/2017
P812
P812
P812
P812
P525
P609
P529
P505
THERAPY TUB
P102
P419
P103
P103
P419
P419
P530
P529
P808
P801
NEW PHASE 4 ROOF
EXISTING ROOF/
NEW SECOND FLOOR
CONNECT TO EXISTING
DCW & DHW STUBS LOCATED
ABOVE EXISTING ROOF/
SECOND FLOOR SLAB &
EXTEND NEW PIPING TO
PHASE 4 AS INDICATED
CAP PIPE
FOR FUTURE
FUTURE PHASE
THIRD FLOOR
PROVIDE PIPE SLEEVES FILLED
WITH TEMPORARY INSULATION
IN PHASE 4 ROOF/ FUTURE THIRD
FLOOR SLAB TO FACILITATE
FUTURE PHASE EXTENSION
0.5"
0.5"
0.5"
0.5"
0.5"
0.5" 0.5"
0.5"
0.5"
0.5"
0.5" 0.5"
0.5"
0.5"
0.75"1"
1"
0.75"
1.25"
1"
0.75"
0.75" 0.75"
0.75" 0.5"0.5"
1"1.5"
1"1.5"
1.25"
0.5" 0.5"
NEW PHASE 4
ROOF
EXISTING ROOF/
NEW SECOND FLOOR
CONNECT TO EXISTING
DCW & DHW STUBS LOCATED
ABOVE EXISTING ROOF/
SECOND FLOOR SLAB &
EXTEND NEW PIPING TO
PHASE 4 AS INDICATED
FUTURE PHASE
THIRD FLOOR
PROVIDE PIPE SLEEVES FILLED
WITH TEMPORARY INSULATION
IN PHASE 4 ROOF/ FUTURE THIRD
FLOOR SLAB TO FACILITATE
FUTURE PHASE EXTENSION
1"1.5"
2"1"
0.5" 0.5"
0.5" 1.25"
2"1"
1.25" DCW
0.5"
0.5"
0.5"
0.5"
0.75"
0.75"
1"
1.25"
SUPPLY PIPING DIAGRAM
ROOMS 220, 219, 210 & 213
SCALE: NONE
I
P2
SUPPLY PIPING DIAGRAM
ROOMS 206, 207, 208, 222 & 221
SCALE: NONE
J P2
R E
F.
DN
UP
4 4
1 1
1 1
8 1
M V
M A
O
MV
MAO2
MV MAO2
O
M A
M V
O
M A
M V
O
M A
M V
8 8
8 8
1 8
OD1
RD1
OD
STM
3"
3"
3"
3"
-(495 S.F.)
-(495 S.F.)
P529
OD
OD
STM
ST
M
O D
ST
M
O D
STM
OD
OD
STM
OD
STM
OD
ST
MO
D O
D
O D
STM
15 15
ST
M
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
Champlin Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
F E
D C
B A
539-326
PHASE 4
HEAPY PROJECT No.: 2012-04034 FIRM LICENSE No.: 01528
6/
/2
7:
:0
A
M
RELOCATE COMMUNITY LIVING
CENTER, PHASE 4
06/13/2017
FIRST FLOOR PLAN - REMOVALS &
NEW WORK
2-P1
DPBRLT
177-4692
Cincinnati, Ohio
GENERAL NOTES
NOTES
A REFER TO SHEET P1 FOR LEGEND, SCHEDULES & DRAWING INDEX.
B ALL DOMESTIC WATER, SANITARY AND VENT PIPING, MEDICAL GASES AND STORM
PIPING IS LOCATED ABOVE THE CEILING AT THE UNDERSIDE OF STRUCTURE
SLAB/ROOF IN EXPOSED STRUCTURAL AREAS, UNLESS OTHERWISE NOTED.
C COORDINATE ALL PLUMBING WORK WITH THAT OF ALL OTHER TRADES.
D ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN WALLS,
FURRED CHASE OR ABOVE THE SUSPENDED CEILING.
E REFER TO ARCHITECTURAL DRAWINGS FOR PHASING OF WORK.
F MINIMUM PIPING TO O2 AND MA OUTLETS SHALL BE 0.5" SIZE. MINIMUM MV PIPING
TO INLETS SHALL BE 0.75" SIZE.
G ALL MEDICAL GAS INSTALLERS SHALL BE CERTIFIED TO THE REQUIREMENTS OF
ASSE 6010. ALL MEDICAL GAS SYSTEM INSTALLERS SHALL BE CERTIFIED TO THE
REQUIREMENTS OF ASSE 6030.
H MEDICAL GAS AND VACUUM SYSTEMS INSTALLATION AND VERIFICATION SHALL
COMPLY WITH THE REQUIREMENTS OF NFPA 99C, GAS AND VACUUM SYSTEMS,
2005 EDITION.
I THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR
HORIZONTAL OFFSET WHICH MAY BE NECESSARY TO COMPLETE THE SYSTEMS.
COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT
IMMEDIATELY ANY DIFFICULTIES WHICH CAN BE ANTICIPATED.
J ALL ACCESS PANELS IN WALLS AND CEILINGS WILL BE BY THE G.C.
K FINISHED FIRST FLOOR ELEVATION: 728'-0".
L REFER TO ARCHITECTURAL FIRE-RATED PARTITION PLAN FOR LOCATIONS AND
FIRE-RATINGS OF NEW AND EXISTING WALL ASSEMBLIES. ALL PENETRATIONS
THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/OR FIRE-STOPPED
AS REQUIRED TO MAINTAIN FIRE-RATINGS INDICATED. G.C. SHALL COORDINATE
ALL TRADES TO ENSURE FIRE-RATED PENETRATION REQUIREMENTS AND DETAILS
ARE MET.
1 EXISTING TO REMAIN.
2 EXISTING DOWNSPOUT NOZZLE TO REMAIN IN SERVICE.
3 REMOVE EXISTING ROOF DRAIN GRATE & BODY ABOVE CONCRETE SLAB, PLUG
DRAIN OUTLET AND FILL DRAIN WITH CONCRETE FLUSH WITH EXISTING SECOND
FLOOR SLAB. NEW TOPPING SLAB BY G.C.
4 REMOVE EXISTING STORM PIPING (AFTER NEW STORM PIPING IS IN SERVICE) BACK
TO POINT OF NEW CONNECTION. CUTTING AND PATCHING TO EXISTING FINISH
SHALL BE INCLUDED IN THE DIVISION 22 CONTRACT.
5 CONNECT TO EXISTING 1" O2, 1" MA & 2" MV SUPPLY STUBS ABOVE FIRST FLOOR
CEILING AND EXTEND UP TO NEW SECOND FLOOR TO SERVE PHASE 4 WORK.
6 CONNECT TO EXISTING SOIL STACK & VENT RISER STUBS LOCATED ABOVE EXISTING
PHASE 3 ROOF/NEW SECOND FLOOR SLAB AND EXTEND PIPING UP THROUGH NEW
SECOND FLOOR TO SERVE PHASE 4 WORK. REFER TO SOIL, WASTE & VENT DIAGRAM
ON SHEET 2-P4.
7 CONNECT TO EXISTING DCW & DHW SUPPLY STUBS LOCATED ABOVE EXISTING PHASE
3 ROOF/NEW SECOND FLOOR CEILING AND EXTEND PIPING UP THROUGH NEW
SECOND FLOOR TO SERVE PHASE 4 WORK.
8 EXISTING PHASE 4 FLOOR DRAIN WITH STRAINER LOCATED ABOVE EXISTING PHASE 3
ROOF/NEW SECOND FLOOR SLAB. REMOVE EXISTING ROOFING MATERIAL & CAP TO
EXPOSE FLOOR DRAIN TO SERVE PHASE 4 WORK. SET STRAINER TO ACCOMMODATE
NEW TOPPING SLAB.
9 CONNECT TO EXISTING 2" DCW & 1" DHW SUPPLY STUBS LOCATED ABOVE EXISTING
PHASE 3 ROOF/NEW SECOND FLOOR SLAB AND EXTEND PIPING UP THROUGH NEW
SECOND FLOOR AS INDICATED IN DETAIL H/P2 TO SERVE PHASE 4 WORK.
10 CONNECT TO EXISTING 2" DCW & 0.75" DHW SUPPLY STUBS LOCATED ABOVE EXISTING
PHASE 3 ROOF/NEW SECOND FLOOR SLAB AND EXTEND PIPING UP THROUGH NEW
SECOND FLOOR AS INDICATED IN DETAIL G/P2 TO SERVE PHASE 4 WORK.
11 REMOVE EXISTING 3" VTR DOWN TO 2" WSV LOCATED ABOVE FIRST FLOOR CEILING
AND EXTEND NEW 2" WSV UP THROUGH NEW SECOND FLOOR.
12 EXISTING DOWNSPOUT TO REMAIN IN SERVICE. DISCONNECT AND CAP EXISTING
STORM PIPING ABOVE FIRST FLOOR CEILING AND EXTEND DOWNSPOUT UP TO ABOVE
SECOND FLOOR CEILING FOR CONNECTION TO NEW PHASE 4 STORM PIPING SYSTEM.
13 REMOVE EXISTING ROOF DRAIN AND ALL EXTRANEOUS PIPING BACK TO POINT OF NEW
CONNECTION. PATCH HOLE WITH CONCRETE FLUSH WITH NEW SECOND FLOOR
SLAB.
14 EXTEND NEW 3" STORM PIPING TO POINT OF NEW CONNECTION WITH EXISTING 3"
STORM PIPING.
15 DISCONNECT AND CAP EXISTING STORM PIPING ABOVE FIRST FLOOR CEILING.
16 EXISTING DOWNSPOUT TO REMAIN IN SERVICE. RETAIN CONNECTION TO EXISTING
STORM PIPING ABOVE FIRST FLOOR CEILING AND EXTEND DOWNSPOUT UP TO ABOVE
SECOND FLOOR CEILING FOR CONNECTION TO NEW PHASE 4 STORM PIPING SYSTEM.
17 CONNECT TO EXISTING WASTE STACK VENT RISER STUBS LOCATED ABOVE EXISTING
PHASE 3 ROOF/NEW SECOND FLOOR SLAB AND EXTEND PIPING UP THROUGH NEW
SECOND FLOOR TO SERVE PHASE 4 WORK. REFER TO SOIL, WASTE & VENT
DIAGRAM ON SHEET 2-P4.
1/8" = 1'-0"2-P1
1 FIRST FLOOR PLAN - REMOVALS & NEW WORK
Revisions Date Schematic Review 08/17/2012 Design Development 10/15/2012 100% Review 12/14/2012
DN
TECH
CLOSET
STORAGE
STORAGE
ROOF
GARDEN
CORRIDOR
CORRIDOR
WORK
ROOM
LAUNDRY
STAFF
MEN'S
STAFF
WOMEN'S
BEDROOM
BEDROOM 247A
248A
HAC
CORRIDOR
BATHING
SUITE
SOILED
UTILITY
COMP.
CLOSET
CLEAN
SUPPLY
KITCHEN
STORAGE
ENTRY
S2.1
STAIR 1
LIVING
ROOM
NURSE
STATION
BEDROOM
BEDROOM
BEDROOM
BEDROOM
243A
244A
245A
246A
LINEN
CLOSET
MED
CLOSET
NURSE
STATION
QUIET
ROOM
CORRIDOR
023QQ
COURTYARD
BELOW
DINING
ROOM
SPECIAL
CARE
RESIDENT
ROOM
BEDROOM
234A
233A
CRASH
CART
BEDROOM
235A
236A
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
(NEGATIVE
PRESSURE)
242A
241A
240A 239A
ELECTRIC
CLOSET 238A
237A
CORRIDOR
P609
P529
P525
P812
P812
P812
P812 P505
FD2
P419
FD1
P103
P419 P103
P419
P808
P530
FD3
P502
1 1 1 1
1" 0.5"
1.25"
0.5"
M V
M A
O
MVO2 MA
MV
O2
MA
MV
O2
MA
1.5"
0.75"
O
M A
M V
O
M A
M V
O
M A
M V
2-P2
2-P2
2-P2
1.5"
0.75"
0.75"
1.5"
1"
0.5"
RD1
OD1
STM
OD
3"
3"
RD2
OD2
RD2
OD2
STM
OD
4"
4"
ST
M
O D
ST
M
ST
M
ST
M
OD
O D
O D
STM
OD
4"
4"
4" 4"
4" 4"
ST
M
5" 5"
4" 6"
4"
6"
RD2
OD2
6" DS
(4,685 SF)
6" DS
(4,685 SF)
OD
STM
OD
STM
OD
OD2
RD2
RD2 OD2
5" DS
(2,730 SF)
5" DS
(2,730 SF)
5" DS
(3,420 SF)
5" DS
(3,420 SF)
5" DS
(4,270 SF)
RD1
OD1
RD2
OD2
3"
3"
4"
4"
5"
4"
4"
STM
OD
STM
O D
OD
STM
STM
OD
OD2
RD2
4"
4"
O D
ST
M
O D
ST
M
OD2
RD2
7 7
M3
M2
M1
VR
WSV
WSV
P801
(495 S.F.)- RD1 OD1 -(495 S.F.)
OD2
RD2
WSV
WSV
CO
CO
P529
0.5"
ACCESS PANEL
ACCESS PANEL
0.5"
1"
0.5"
0.75"
0.5"
WSV
ELECTRIC
FIREPLACE
4"
4"
WSV
4"
4"
4"
4"
5"
4"4" 4"
4"
ACCESS
PANEL
FD1
P102
0.5"
0.5"
0.75"
FD3
FD1 FD2
FD1
ZVC
AAP
P104
P419
FD1
FD1
P420
P420
P419
P104FD1
FD1
FD1
FD1
FD1
ACCESS PANEL
SS
VR
WSV
WSV
- SR
SS
VR
242A
241A
P701
P701
ACCESS PANEL
FD1
- SR13
FD1FD1
P104 P419
P420
P420 P419 P104
FD1
FD1
FD1FD1
FD1FD1
WSV
WSV
SS
VR
SR
ACCESS PANEL
P701
P701
243A
244A
P420
P420
P419
P419
P102
P102
FD1FD1
P701
FD1
FD1
P701
FD1
WSV
WSV
SR
FD1
233A
234A
ACCESS PANEL
SS
VR
11FD1
FD1
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
Champlin Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
F E
D C
B A
539-326
PHASE 4
HEAPY PROJECT No.: 2012-04034 FIRM LICENSE No.: 01528
6/
/2
7:
:2
A
M
RELOCATE COMMUNITY LIVING
CENTER, PHASE 4
06/13/2017
SECOND FLOOR PLAN - NEW WORK
2-P2
DPBRLT
177-4692
Cincinnati, Ohio
NOTES
A REFER TO SHEET P1 FOR LEGEND, SCHEDULES & DRAWING INDEX.
B ALL DOMESTIC WATER, SANITARY AND VENT PIPING, MEDICAL GASES AND STORM
PIPING IS LOCATED ABOVE THE CEILING AT THE UNDERSIDE OF STRUCTURE
SLAB/ROOF IN EXPOSED STRUCTURAL AREAS, UNLESS OTHERWISE NOTED.
C COORDINATE ALL PLUMBING WORK WITH THAT OF ALL OTHER TRADES.
D ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN WALLS, FURRED
CHASE OR ABOVE THE SUSPENDED CEILING.
E REFER TO ARCHITECTURAL DRAWINGS FOR PHASING OF WORK.
F MINIMUM PIPING SIZE TO O2 & MA OUTLETS SHALL BE 0.5". MINIMUM PIPING SIZE TO
MV INLETS SHALL BE 0.75".
G ALL MEDICAL GAS INSTALLERS SHALL BE CERTIFIED TO THE REQUIREMENTS OF ASSE
6010. ALL MEDICAL GAS SYSTEM INSTALLERS SHALL BE CERTIFIED TO THE
REQUIREMENTS OF ASSE 6030.
H MEDICAL GAS AND VACUUM SYSTEMS INSTALLATION AND VERIFICATION SHALL
COMPLY WITH THE REQUIREMENTS OF NFPA 99C, GAS AND VACUUM SYSTEMS, 2005
EDITION.
I THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR
HORIZONTAL OFFSET WHICH MAY BE NECESSARY TO COMPLETE THE SYSTEMS.
COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT
IMMEDIATELY ANY DIFFICULTIES WHICH CAN BE ANTICIPATED.
J ALL ACCESS PANELS IN WALLS AND CEILINGS WILL BE BY THE G.C.
K FINISHED SECOND FLOOR ELEVATION: 742'-0".
L REFER TO ARCHITECTURAL FIRE-RATED PARTITION PLAN FOR LOCATIONS AND FIRE-
RATINGS OF NEW AND EXISTING WALL ASSEMBLIES. ALL PENETRATIONS THROUGH
FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/OR FIRE-STOPPED AS
REQUIRED TO MAINTAIN FIRE-RATINGS INDICATED. G.C. SHALL COORDINATE ALL
TRADES TO ENSURE FIRE-RATED PENETRATION REQUIREMENTS AND DETAILS
ARE MET.
1 P.C. SHALL MAKE 0.5" MA, 0.5" O2 & 0.75" MV MEDICAL GAS CONNECTION TO MEDICAL
GAS OUTLETS. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS,
CONDITIONS AND REQUIREMENTS.
2 1" MA , 1" O2 & 2" MV RISERS UP FROM FIRST FLOOR. CAP 1" MA, 1" O2 & 2" MV ABOVE
SECOND FLOOR CEILING FOR FUTURE EXTENSION TO THIRD FLOOR.
3 BOX MOUNTED TRANSFORMER LOCATED ABOVE CEILING TO CONTROL SENSOR
OPERATED FAUCET ON FIXTURE(S) BELOW. 120V - 1PH POWER WILL BE LOCATED IN
A WIRING BOX ABOVE CEILING BY THE E.C. A 0.75" CONDUIT (FOR LOW VOLTAGE
WIRING) STUBBED ABOVE THE CEILING AND EXTENDED DOWN TO AN ELECTRICAL
WALL BOX LOCATED BELOW EACH LAVATORY WILL BE PROVIDED BY THE E.C.
TRANSFORMER AND LOW VOLTAGE WIRING SHALL BE BY THE P.C. THE P.C. SHALL
COORDINATE ALL WORK WITH THE E.C.
4 TRAP PRIMER, REFER TO DETAIL C/P2.
5 REFER TO DETAIL H ON SHEET P2 FOR SUPPLY PIPING SIZES AND REQUIREMENTS
IN CHASE.
6 EXTEND THERAPY TUB DRAIN PIPE TO FLOOR DRAIN. COORDINATE CONNECTION
REQUIREMENTS WITH PROJECT ENGINEER. THERAPY TUB UNIT PROVIDED BY OWNER.
7 REFER TO DETAIL 3/2-P2 FOR SIMILAR LAYOUT.
8 REFER TO DETAIL 2/2-P2. OPPOSITE HAND LAYOUT.
9 TRAP PRIMER, REFER TO DETAIL C/P2. TRAP PRIMER SHALL SERVE FLOOR DRAIN IN
PATIENT BATHROOMS AS INDICATED (NOT SHOWER DRAINS). AT CONTRACTOR'S
OPTION, TRAP PRIMER MAY BE LOCATED IN PLUMBING CHASE IF ACCESSIBLE FROM
ACCESS PANEL.
10 PROVIDE SHUT-OFF VALVES ON 1.25" DCW AND 0.5" DHW SERVING P104 & P419
FIXTURES IN BATHING SUITE #220 AT ACCESS PANEL.
11 PROVIDE TRAP PRIMER DISCHARGE PIPING ABOVE SECOND FLOOR CEILING FOR
FUTURE THIRD FLOOR FD1. EXTEND PIPING THROUGH ROOF AT FUTURE WALL
LOCATION AND CAP.
12 EXTEND NEW 3" STORM AND OVERFLOW PIPING TO EXISTING FIRST FLOOR BELOW AND
CONNECT TO EXISTING STORM/OVERFLOW PIPING SYSTEM AS INDICATED ON SHEET 2-P1.
13 REFER TO DETAIL G ON SHEET P2 FOR SUPPLY PIPING SIZES AND REQUIREMENTS
IN CHASE.
14 COORDINATE PIPING LOCATIONS/SUPPORTS WITH PATIENT LIFT STRUCTURAL
MEMBERS (TYPICAL TO EACH PATIENT ROOM).
15 UNDER BID ITEM 1 PROVIDE ALL DIVISION 22 WORK AS SHOWN.
16 UNDER BID ITEM 3:
• DELETE ALL PLUMBING FIXTURES IN AREA INDICATED.
• DELETE ALL MEDICAL GAS BRANCH PIPING AND MEDICAL GAS OUTLETS/INLETS IN AREA
INDICATED. MEDICAL GAS MAIN PIPING SHALL REMAIN AS SHOWN.
• DELETE ALL TRAP PRIMERS IN AREA INDICATED.
• DELETE ALL BOX-MOUNTED TRANSFORMERS AND LOW VOLTAGE WIRING SERVING
SENSOR OPERATED FAUCETS IN AREA INDICATED.
• DELETE ALL DOMESTIC WATER BRANCH PIPING SERVING PLUMBING FIXTURES IN
AREA INDICATED. DELETE DOMESTIC WATER SUPPLY PIPING BACK TO SUPPLY
RISER LOCATIONS AT PLUMBING CHASES AND VALVE AND CAP ABOVE SECOND
FLOOR SLAB FOR FUTURE EXTENSION.
• DELETE ALL SANITARY, WASTE AND VENT BRANCH PIPING SERVING PLUMBING
FIXTURES (EXCEPT FUTURE SHOWER AND FLOOR DRAINS) IN AREA INDICATED.
DELETE SANITARY, WASTE AND VENT PIPING BACK TO RISER LOCATIONS AT
PLUMBING CHASES. SANITARY, WASTE AND VENT PIPING STACKS LOCATED IN
PLUMBING CHASES AND SERVING FUTURE SHOWER AND FLOOR DRAINS SHALL
REMAIN AS SHOWN.
• STORM PIPING SHALL REMAIN AS SHOWN.
1/8" = 1'-0"2-P2
1 SECOND FLOOR PLAN - NEW WORK
1/4" = 1'-0"2-P2
2 TYPICAL BATHROOM GROUP CORNERS
1/4" = 1'-0"2-P2
3 TYPICAL BATHROOM GROUP
1/4" = 1'-0"2-P2
4 BATHROOM GROUP ROOMS 133A/134A
GENERAL NOTES
Revisions Date Schematic Review 08/17/2012 Design Development 10/15/2012 100% Review 12/14/2012
FD1
FD1
FD1
FD1
FD1
FD1 FD1
FD1
FD1
FD1 FD1
FD1 FD1
FD1
FD1
FD1
FD1FD1
FD1FD1
RD2
OD2
RD1
OD1
RD1
OD1
RD2
OD2
OD2
RD2
FD1
FD1
FD1
FD1
FD1
FD1
FD1FD1
FD1
FD1
FD1FD1
3" VTR 3" VTR
4" SS
3" WSV
3" WSV
3" SS
3" VTR
3" VTR
4" VTR
4" SS
4" SS
4" SS
3" VTR 3" WSV
3" WSV
3" SS
4" SS
3" VTR
3" WSV3" WSV
4" SS
3" VTR
3" WSV3" WSV
3" VTR
4" SS
3" WSV
3" WSV
3" VTR
4" SS
3" WSV
3" WSV
3" VTR
4" SS
3" WSV
3" WSV
4" SS
3" VTR
3" WSV
3" WSV
FD3
FD2
3" SS
3" VTR
4" SS 3" VTR
4" SS
4" SS
3" VTR
3" SS
3" SS
3" VTR
4" SS
4" SS
2" VTR
3" WSV 3" WSV
3" WSV
4" WSV
3" VTR
RD2OD2 RD2OD2
OD2RD2
RD2
OD2
RD2
OD2
RD2
OD2
1 1
OPEN TO BELOW
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
Champlin Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
F E
D C
B A
539-326
PHASE 4
HEAPY PROJECT No.: 2012-04034 FIRM LICENSE No.: 01528
6/
/2
7:
:2
A
M
RELOCATE COMMUNITY LIVING
CENTER, PHASE 4
06/13/2017
ROOF PLAN - NEW WORK
2-P3
DPBRLT
177-4692
Cincinnati, Ohio
1/8" = 1'-0"2-P3
1 ROOF PLAN - NEW WORK
A REFER TO SHEET P1 FOR LEGEND, SCHEDULES & DRAWING INDEX.
B COORDINATE ALL PLUMBING WORK WITH THAT OF ALL OTHER TRADES.
C REFER TO ARCHITECTURAL DRAWINGS FOR PHASING OF WORK.
D FINISHED ROOF ELEVATION: 756.00'.
GENERAL NOTES
Revisions Date Schematic Review 08/17/2012 Design Development 10/15/2012 100% Review 12/14/2012 Issue For Bid 05/26/2016 Re-issue for Bid 06/13/2017
1 APPROXIMATE LOCATION OF PIPING SLEEVE WITH TEMPORARY INSULATION FOR
FUTURE EXTENSION OF DOMESTIC WATER SUPPLY RISERS. REFER TO DIAGRAMS
ON SHEET P2 FOR PIPE SIZES.
2 FLOOR DRAIN LOCATED IN PHASE 4 ROOF SLAB (FUTURE THIRD FLOOR SLAB) TO
FACILITATE FUTURE PHASE ADDITION. TEMPORARILY PLUG FUTURE DRAIN AND
COVER STRAINER. FUTURE FLOOR DRAIN TO BE COVERED WITH ROOFING
MATERIAL BY G.C. REFER TO SOIL, WASTE & VENT DIAGRAM ON SHEET 2-P4 FOR
ADDITIONAL INFORMATION.
NOTES
P104
P419
FD1 FD1
FD1
FD1
1.5"
P420
P104
P419
P420
P420
P419
P419
P420
P104
P104
P419
P419
P420
P420
P104
P104
FD1
FD1
FD1
FD1
FD1
P104
P420 P419
P104
FD1
FD1
FD1
FD1
P420
P104
P419
P420
P419
P104
FD1
FD1
FD1
FD1
FD1
FD1
P419
P420
P420
P419
FD1
FD1
P104
P419
P420
P420
P104
FD1
FD1
FD1
FD1
FD1
FD1
3"
3"
3"
3"
3"
3"
3"
3"
3"
3" WSV
3" VTR
4" SS
3" WSV
3"
3"
3"
3"
4"
1.5"
2"
1.5"1.5"
1.5"
1.5"
1.5"1.5"
1.5"1.5"
3"
3"3"
1.5" 3"
3"
3"
1.5"
1.5"
3"
3" 3"
3"3" 1.5"
3" WSV
3"
3"
3"
3" WSV
3"
3"
3"
3" VTR
4" SS
1.5"
4"
3" 1.5"
4" SS3" VTR
3"
3"
3"
3"
3"
3"
3"
3"
3"
3" VTR
4" SS
3" WSV
3" WSV
3"
3"
3"
4"
2"
1.5"1.5" 1.5"
1.5"
P420
1.5"
3"3"
3" WSV
3" VTR
4" SS
3" WSV
3" 3"3"
4"
3"
3"
3" 3"
4"
3" 3"
3"
2"
1.5"
1.5"
1.5"
1.5"
3"
3"
4"
4" SS
3" VTR
4"
3"
3"
3"
3"
3"
3" WSV
3"1.5"
1.5"
1.5"1.5" 2"
4"
3"
2" 3"
3"
3" 3"
3"
3" 1.5"
1.5"
1.5"3" SS
3"
4" 3"
1.5"
3"3" 4"
3"
3" WSV
3" WSV
3"3"
3"
3" VTR
3" VTR
4" SS
4" VTR
1.5"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3" WSV
3"
1.5" 2"
P419 1.5"
1.5"
1.5"
3" 2"
3"
3" 4"
3"
3"
3" WSV
4" SS
3" VTR
3"
3"
4"
3"
3"
3"
3"
3" WSV
3"FD1
ROOF
ROOF ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
3" 3"
4" SS
3" VTR
3"
3"
1.5"1.5" 2"
3" 2"
1.5" 1.5"
1.5"
4"
3"
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF 3" SS
3"
ROOF
ROOF
ROOF
ROOF ROOF
ROOF
1.5" 1.5"
1.5"
2"
1.5" 2"
1.5"
2"
4"
P419 2"
3"
3"
ROOF
ROOF ROOF
ROOF
ROOF
ROOF
2"
ROOF
ROOF ROOF
ROOF
ROOF
ROOF
3"
3"
3"
VR
P525
FD2
FD3
P609
P529
P505
P419
P103
P419
P103
P419
P530 P808
P104
P104
P419
P420
P420
P419
FD1
FD1
FD1
FD1
3"
3"
3"
2"2"
1.5"
3"
3"
3"
3"
3"
3" VTR
3" SS
3"1.5"1.5"
1.5"
2"
1.5"
3"
1.5"
3"
3"4"
3"
3"
3"
3" WSV
3"
3"
3"
3" WSV
3" VTR
4" SS
3"
3" 3"
3"
3"
1.5"
1.5"
FD1
1.5" 4"
3" 1.5"
2"
3"
4"
3"
3"
2"
3" VTR
4" SS
2"
2" 2"
3"
1.5"
3"
3" WSV
3"
3"
3" VTR
4" WSV
4"
4"
4"4"
4"4" 3"
3"
2"
3"
3" VTR
4" SS4" SS
4"4"
4"
2"
2"
3" WSV
3"
3"
FD1
1.5"
3"
4"3"
1.5" 1.5"
1.5"
1.5"
1.5"
1.5" 3"
1.5"
3"
1.5"
3" VTR
4" SS
2"
2"4"
4" SS
4"
4"
3" WSV
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
3"
3"
2" VTR
ROOF
2"
3" WSV
3" WSV
ROOF
ROOF
P502
ROOF
ROOF
3" 3"
3" SS
3"
4" 4"
2"
1.5"
1.5"
1.5"
1.5"
1.5"
1.5"
P529
1.5"
2ND FL
3"
3"
3"
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
Champlin Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
F E
D C
B A
539-326
PHASE 4
HEAPY PROJECT No.: 2012-04034 FIRM LICENSE No.: 01528
6/
/2
7:
:2
A
M
RELOCATE COMMUNITY LIVING
CENTER, PHASE 4
06/13/2017
SOIL, WASTE & VENT
2-P4
DPBRLT
177-4692
Cincinnati, Ohio
N.T.S.Scale:
SOIL, WASTE & VENT
246A246A
245A
242A 241
241A
241A
238A
236 235
235A
247A
248A 248A
205205
8FD -
NOTES
1 EXISTING TO REMAIN.
2 CONNECT TO EXISTING STACK/RISER PROVIDED UNDER PHASE 3 CONTRACT.
3 STUB SOIL STACK ABOVE ROOF (SIZE AS INDICATED) FOR FUTURE EXTENSION.
4 STUB VENT RISER ABOVE ROOF (SIZE AS INDICATED) FOR FUTURE EXTENSION.
5 STUB WASTE STACK VENT ABOVE ROOF (SIZE AS INDICATED) FOR FUTURE
EXTENSION.
6 INSTALL FLOOR DRAIN BODY AND STRAINER IN PHASE 4 ROOF (FUTURE THIRD FLOOR
SLAB). TEMPORARILY CAP DRAIN & COVER STRAINER. REFER TO ROOF PLAN.
7 REMOVE EXISTING 3" VTR DOWN TO ABOVE FIRST FLOOR CEILING AND REPLACE
PIPING WITH NEW 2" WSV.
8 EXISTING FLOOR DRAIN INSTALLED UNDER PHASE 3 CONSTRUCTION TO REMAIN. THE
P.C. SHALL RESET STRAINER AS REQUIRED TO FACILITATE NEW FINISHED FLOOR
SLAB.
9 REFER TO PLAN NOTE 16 LOCATED ON DRAWING 2-P2 FOR BID ITEM 3 BIDDING
DIRECTIONS.
NOTES
A REFER TO SHEET P1 FOR LEGEND, SCHEDULES AND DRAWING INDEX.
- 2ND FLR
- 2ND FLR
- 2ND FLR
- 2ND FLR
- 2ND FLR
- 2ND FLR
- 2ND FLR
2ND FLR -
2ND FLR -
- 2ND FLR
2ND FLR -
- 2ND FLR
FD -
2 - 2ND FLR
- 2ND FLR
22ND FLR -
2 - 2ND FLR
1 - FD
1FD -
247A
8 - FD
8FD -
- 2ND FLR
245A
- 2ND FLR
246A
244A244A
243A
8 - FD
8FD -
- 2ND FLR
243A
- 2ND FLR
244A
1FD -
1 - FD
- 2ND FLR
22ND FLR -
2 - 2ND FLR242A
241A
233A
8 - FD
8FD -
- 2ND FLR
234A
22ND FLR -
233A
233A
233234A
234A
32 - 2ND FLR
22ND FLR -
235A
8 - FD
235A
236A
236A
2ND FLR
8FD -
237A8 - FD
238A
238A 8FD -
237A
237A238
2 - 2ND FLR
22ND FLR -
239A8 - FD
2 - 2ND FLR
240A
240A
240A 8FD -
239A
239A240
22ND FLR -
2 - 2ND FLR
Revisions Date Schematic Review 08/17/2012 Design Development 10/15/2012 100% Review 12/14/2012 Issue For Bid 05/26/2016 Re-issue for Bid 06/13/2017
P102
P102
P102
4"
6 6
2"
8FD -
8FD -
DUCT THERMOSTAT WITH AVERAGING ELEMENT
DUCT STATIC PRESSURE SENSOR
DUCT HUMIDITY SENSOR
ROOM SENSOR: TEMPERATURE, HUMIDITY
LENGTH IN DUCT WHEN SPACE PERMITS)
REMOTE BULB THERMOSTAT
ROOM CONTROL: THERMOSTAT, HUMIDISTAT
DIFFERENTIAL PRESSURE SWITCH
DUCT TEMPERATURE SENSOR WITH AVERAGING ELEMENT
SMOKE DETECTOR (SEE ELECTRICAL SPECIFICATIONS)
DUCT OR PIPE TEMP. SENSOR
DUCT OR PIPE THERMOSTAT (NOTE 1: PROVIDE 12" MIN.
AFTER FILTER
CURRENT SENSING RELAY
AIR FOIL WHEEL (FAN)
AIR HANDLING UNIT
ANALOG INPUT
AIR PRESSURE DROP
ANALOG OUTPUT
AUTOMATIC TEMPERATURE CONTROLS
BACKWARD INCLINED WHEEL (FAN)
AIR FLOW MEASURING DEVICE
ABOVE FINISHED FLOOR
DIFFERENTIAL OR STATIC PRESSURE TRANSMITTER
COOLING COIL
CONVERTOR
CONVECTOR
CLEAN OUT
CEILING GRILLE
CENTRIFUGAL FAN
CEILING DIFFUSER
BOTTOM REGISTER (WALL TYPE)
BOTTOM GRILLE (WALL TYPE)
CEILING REGISTER
COLD WATER (POTABLE)
DIGITAL OUTPUT
DIGITAL INPUT
DIRECT DIGITAL CONTROLS
DRY BULB TEMPERATURE, DEG. F
AUTOMATIC CONTROL DAMPER
EXHAUST FAN
ENGINEERING CONTROL CENTER
DOUBLE WIDTH DOUBLE INLET (FAN)
DOOR UNDERCUT
ITEM, AND TO THE CENTER OF PIPE. (TO BE USED AS AN AID
LISTED SIZE OF DUCT, DEVICE, OR EQUIPMENT
APPROXIMATE ELEVATION FROM FLOOR TO BOTTOM OF
MANUAL VOLUME DAMPER
U/C
IN COORDINATING THE VARIOUS TRADES.)
FIRE DAMPER
BUTTERFLY VALVE
CIRCUIT SETTER
BALL VALVE
COMBINATION BALANCING/SHUT-OFF VALVE
MANUAL AIR VENT
AUTOMATIC FLOW CONTROL VALVE
TEST PLUG (PRESSURE/TEMPERATURE)
SAFETY VALVE OR PRESSURE RELIEF
PRESSURE REDUCING VALVE
STRAIGHT-THRU TWO-POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
STRAIGHT-THRU MODULATING CONTROL VALVE
EX.
EF
EXISTING
DWDI
ECC
DI
DO
DB
DDC
D
Db
DECIBELS
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
EQUIPMENT ABBREVIATION (SUPPLY FAN)
SUPPLY FAN NO.3 IN BUILDING NO.1
DRAWING NUMBER WHERE DRAWN
DRAWING NUMBER WHERE DRAWN
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
RETURN DUCT (UP & DOWN)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
EXHAUST OR RETURN TOP REGISTER OR GRILLE,
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE,
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
SUPPLY DUCT (UP & DOWN)
INCLINED RISE, IN DIRECTION OF AIR FLOW
NEW DUCT - WIDTH X DEPTH
RECTANGULAR ELBOWS WITH VANES EVEN IF
VANED ELBOW (PROVIDE ALL SQUARE OR
INCLINED DROP, IN DIRECTION OF AIR FLOW
ACOUSTICAL DUCT LINING
STANDARD RADIUS ELBOW
R
10/8
FC
D
SYMBOL IS MISSING)
FLEXIBLE CONNECTION
UP
(WALL TYPE)
(WALL TYPE)
DN
UP
1-01
1-SF3
AIR HANDLING UNIT NUMBER
TERMINAL UNIT DESIGNATION
TYPICAL UNIT NO.
DN
SECTION LETTER
DETAIL NUMBER
ECCENTRIC REDUCER
DIRECTION OF FLOW
CAPPED OUTLET
SIDE CONNECTION
EXISTING WORK.
ACCESSORIES (SEE STANDARD DETAIL)
INVERTED BUCKET TRAP SET INCLUDING PIPING
POINT OF CONNECTION BETWEEN NEW AND
RISE OR DROP IN PIPE
BOTTOM CONNECTION, 45 DEG. OR 90 DEG.
TOP CONNECTION, 45 DEG. OR 90 DEG.
REDUCER OR INCREASER
DIRECTION OF PIPE PITCH (DOWN)
THERMOMETER
THERMOSTATIC TRAP
STRAINER
GATE VALVE
PRESSURE GAGE
CHECK VALVE
GLOBE VALVE
PIPING ACCESSORIES (SEE STANDARD DETAIL)
FLOAT AND THERMOSTATIC TRAP SET INCLUDING
GATE VALVE WITH 3/4" HOSE END ADAPTER
EXISTING PIPE TO BE REMOVED
DRAIN LINE
UNION
D
CONV
CW
CR
CO
CG
CF
CD
CC
C
BR
BIW
BG
ATC
AFW
AI
APD
AO
AHU
AFM
AFF
AF
VENT LINE
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG & BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
NUMBER INDICATES STEAM PRESSURE
NUMBER INDICATES STEAM PRESSURE
LPR
V
HWS
HWR
LPS (5)
MPS (30)
MPR
HEATING
SP
S F
T
H
T
T H
WET BULB TEMPERATURE, DEG. FWb
ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE
CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.
THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE
SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.
ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS ARE REQUIRED
FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC.
COORDINATE SIZES AND LOCATIONS WITH OTHER TRADES.
TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT
SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.
FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO
EQUIPMENT, SEE STANDARD DETAILS AND PIPING SCHEMATICS.
DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE
NECK SIZES.
WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL
BE MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO
BE INSTALLED WITH BOTTOM OF REGISTERS SEVEN INCHES ABOVE
FINISHED FLOOR.
REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT
LOCATION OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.
ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE
NOTED.
ALL CUTTING AND PATCHING REQUIRED FOR THIS PROJECT SHALL BE
INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE DISTURBED UNDER
THIS WORK TO MATCH EXISTING.
IN GENERAL, KEEP DUCT AND PIPING MAINS NEXT TO UNDERSIDE OF
STRUCTURE.
ANNULAR SPACE OF ALL PIPE, CONDUIT, DUCT & OTHER SIMILAR
PENETRATIONS OF FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED.
IN ADDITION, PENETRATIONS THROUGH 0-HOUR RATED WALLS &
FLOORS SHALL BE FIRESTOPPED TO RETARD PASSAGE OF FIRE &
SMOKE.
INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS
BEEN DAMAGED AND/OR REMOVED IN THE PERFORMANCE OF WORK
IN THIS PROJECT.
EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON AVAILABLE DRAWING
INFORMATION, AND MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE. THE
CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND
WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE
THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY
VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY TO
COMPLETE THE SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL
OTHER TRADES AND REPORT IMMEDIATELY ANY DIFFICULTIES WHICH CAN
BE ANTICIPATED.
FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND
EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO PERFORMING
WORK.
HEPA FILTERED EXHAUST IS REQUIRED TO MAINTAIN A MINIMUM OF
WHERE DUCTS OR PIPES ARE REMOVED THRU WALL/FLOOR/ROOF THAT
IS TO REMAIN, PATCH WALL/FLOOR/ROOF OPENING TO MATCH EXISTING
WHERE OPENING IS NOT RE-USED.
MAXIMUM
OUTSIDE AIR
(16 PSIG THRU 59 PSIG)
PRE-FILTER
PUMPED CONDENSATE
PREHEAT COIL
RELATIVE HUMIDITY
SUPPLY FAN
STEAM HUMIDIFIER
TRANSFER GRILLE
UNIT HEATER
STATIC PRESSURE (INCHES OF WATER)
POWER OPERATED, PARALLEL BLADE DAMPER
POWER OPERATED, OPPOSED BLADE DAMPER
PRESSURE REDUCING VALVE
MEDIUM PRESSURE STEAM SUPPLY
MEDIUM PRESSURE STEAM CONDENSATE RETURN
PRESSURE DROP (FEET OF WATER)
TOP REGISTER (WALL TYPE)
VARIABLE FREQUENCY DRIVE
STATIC PRESSURE SENSOR
DOOR UNDERCUT BY GENERAL CONTRACTOR
SPS
TR
U/C
VFD
UH
V
TG
VALVE
S.P.
SH
SF
Rh
PD
PF
POD
PH
PRV
PPD
MPR
MAX
O.A.
NOM
MIN
PC
MPS
NOMINAL
MINIMUM
HEATING COIL
HORSEPOWER
FIN TUBE RADIATION
MIXING BOX
POUNDS PER HOUR
HIGH PRESSURE STEAM SUPPLY (60 PSIG & ABOVE)
LOW PRESSURE STEAM SUPPLY (15 PSIG & BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM CONDENSATE RETURN
LOCAL TEMPERATURE CONTROL PANEL
HYDRONIC RADIANT CEILING PANEL
HPR
HPS
HRP
LPR
LTCP
LBS/HR
MB
LPS
FLR.
FTR
HC
HP
FLOOR
BLOW UNLESS OTHERWISE NOTED)
CEILING DIFFUSERS (FOUR WAY
CHILLED WATER RETURN
CHILLED WATER SUPPLYCHS
CHR
AIR CONDITIONING
CONTROL CIRCUIT CONN.H1 N
WHITE BAKED ENAMELW.B.E.
BRAKE HORSEPOWERBHP
BRITISH THERMAL UNITBTU
BRITISH THERMAL UNIT PER HOURBTUH
CUBIC FEET PER MINUTECFM
CLEAN STEAM GENERATORCSG
DEGREEDEG
DIAMETERDIA
DIFFERENTIAL PRESSURE SENSORDPS
ENTERINGENT
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FPM FEET PER MINUTE
FT FEET
GALLONS PER MINUTEGPM
HEADHD
CHILLED WATER RETURNCHR
CHILLED WATER SUPPLYCHS
HEATING HOT WATER RETURNHWR
HEATING HOT WATER SUPPLYHWS
INCHESIN
INCHES WATER COLUMNIN WC
INCHES WATER GAUGEIN WG
LEAVING AIR TEMPERATURELAT
LEAVINGLVG
MBH 1000 BTUH
MERV MINIMUM EFFICIENCY REPORTING VALUE
NC NOISE CRITERIA
REVOLUTIONS PER MINUTERPM
SMOKE DAMPER (SUPPLY)SDS
SMOKE DAMPER (RETURN)SDR
STEAM PRESSURE REDUCING VALVESPRV
VARIABLE AIR VOLUMEVAV
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
NUMBER INDICATES STEAM PRESSURE
HPS (125)
HPR
PIPE UP
PIPE DOWN
IN-LINE CENTRIFUGAL FANICF
T
T
T
T
H dP
CS
DP SP
H4
A H7
9'-6"
MV MANUAL AIR VENT
GENERAL
VALVES
EXHAUST DUCT (UP & DOWN)UP DN
PUMPED CONDENSATE RETURNPC
ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING,
MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY
PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS,
WITHOUT THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT
ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND STRAINER, TRANSMITTERS,
CONTROL DEVICES, ETC.
EXPANSION TANK PIPEET
CONDENSATE PUMPCP
CABINET UNIT HEATERCUH
FCU FAN COIL UNIT
EXPANSION TANKET
PUMPP
RETURN FANRF
WATER FILTERWF
23 WHERE ROOFING WORK IS REQUIRED, THE EXISTING ROOFING MEMBRANE AND
INSULATION SHALL BE CUT, REMOVED AND RESTORED AS REQUIRED TO ATTAIN A
POWER TYPE ROOF VENTILATORRV
WHEN NEW SUPPLY AND RETURN AIR DUCTS ARE CONNECTED TO EXISTING
DUCTWORK, CLEAN BOTH NEW AND EXISTING DUCTWORK BY MOPPING AND VACUUM
CLEANING INSIDE AND OUTSIDE BEFORE OPERATION. CLEANING OF EXISTING
DUCTWORK SHALL BE LIMITED TO THE IMMEDIATE AREA WITHIN REACH OF THE OPEN
END OF THE DUCT.
INTEGRAL FACE AND BYPASSIFB
0.01" W.G. NEGATIVE PRESSURE IN CONSTRUCTION AREAS. COORDINATE
WITH GENERAL CONTRACTOR AND THE PROJECT ENGINEER.
25 RUNOUT PIPING TO TERMINAL UNITS SHALL BE 0.75" SIZE UNLESS OTHERWISE NOTED.
26 INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO
ARCHITECTURAL DRAWINGS AND GENERAL REQUIREMENTS SECTION 01 00 00.
27 TESTING, ADJUSTING AND BALANCING OF THE NEW SYSTEMS AND EXISTING SYSTEMS
AFFECTED BY THE NEW WORK SHALL BE PERFORMED AS PART OF A SEPARATE
CONTRACT THRU THE ENGINEER, AND IS NOT PART OF THE HVAC CONTRACT.
28 REFER TO ARCHITECTURAL FIRE-RATED PARTITION PLAN, SHEET 2.4G001 FOR LOCATIONS
AND FIRE-RATINGS OF NEW AND EXISTING WALL ASSEMBLIES. ALL PENETRATIONS
THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/OR FIRE-STOPPED AS
REQUIRED TO MAINTAIN FIRE-RATINGS INDICATED. COORDINATE WITH ALL TRADES
TO ENSURE FIRE-RATED PENETRATION REQUIREMENTS AND DETAILS ARE MET.
WATERTIGHT CONDITION. THE ROOFING SUB-CONTRACTOR SHALL BE A CERTIFIED
INSTALLER FOR SUCH INSTALLATION TO MAINTAIN THE EXISTING WARRANTY ON THE
ROOF.
PROPELLER TYPE EXHAUST FANPEF
RETURN AIRR.A.
SUPPLY AIRS.A.
SINGLE WIDTH SINGLE INLET TOP GRILLE (WALL TYPE)SWSI
SPECIFIC GRAVITYSP. GR.
ACCESS DOORAD
GRAVITY HOODGH
FD FLOOR DRAIN
FCW FOWARD CURVED WHEEL
FC FLEXIBLE CONNECTION
FACP FIRE ALARM CONTROL PANEL
ENERGY EFFICIENCY RATIOEER
EXHAUST AIRE.A.
CENTRIFUGAL OR HELICAL ROTARY SCREW CHILLER UNITCCU
BOTTOM GRILLE (WALL TYPE)BG
AIR SEPARATORAS
ANGLE GLOBE VALVE
PIPE GUIDE
PIPE ANCHOR
ORIFICE UNION
STAINLESS STEEL DUCT
METERM
PROJECT ENGINEERPE
THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS.
FIELD VERIFY ALL CONDITIONS AFFECTING THE EXECUTION OF THE WORK. ANY
DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE
CONTRACT DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL
BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER IN WRITING FOR
RESOLUTION BEFORE PROCEEDING WITH THE WORK.
CONSTRUCTION OF THIS PROJECT, THIS WORK SHALL BE PERFORMED ON
WEEKENDS OR WEEK NIGHTS, IF REQUIRED BY THE PROJECT ENGINEER.
DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED AND
SCHEDULED WELL IN ADVANCE WITH THE PROJECT ENGINEER.
29 APPROXIMATE ELEVATIONS NOTED ON FLOOR PLANS ARE TO THE BOTTOM OF DUCTS
AND EQUIPMENT, AND TO THE CENTER OF PIPES.
FBW FLAT BLADE WHEEL
ABBREVIATIONSCONTROLSPIPING SYMBOLSDRAWING SYMBOLS
DUCTWORK SYMBOLS
GENERAL NOTES
ABBREVIATIONS
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
Champlin Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
F E
D C
B A
539-326
PHASE 4
HEAPY PROJECT No.: 2012-04034 FIRM LICENSE No.: 01528
6/
/2
9:
:2
A
M
RELOCATE COMMUNITY LIVING
CENTER, PHASE 4
06/13/2017
INDEX, LEGEND, AND GENERAL
NOTES
H1
TEGDLE
177-4692
Cincinnati, Ohio
INDEX OF DRAWINGS
Sheet Number Sheet Name
H1 INDEX, LEGEND, AND GENERAL NOTES
H2 SCHEDULES
H3 SCHEDULES
H4 DETAILS
H5 DETAILS
H6 DETAILS
H7 DETAILS
H8 STEAM SYSTEM SCHEMATIC AND DETAILS
H9 HOT WATER SYSTEM SCHEMATIC AND CONTROLS
H10 CONTROLS AND…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.