36C25019R0057-008.pdf

PDF 16 MB Posted

Attached to
Relocate CLC, Phase 4 539-326 Federal contract opportunity
Solicitation number
36C25019R0057
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25019R0057 Attachment 3 Drawings_Part2.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Relocate CLC, Phase 4 539-326, newest first.
File Type Posted
36C25019R0057-0003000.docx DOCX document
36C25019R0057-0003001.pdf PDF
36C25019R0057-0002001.pdf PDF
36C25019R0057-0002000.docx DOCX document
36C25019R0057-0002002.pdf PDF
36C25019R0057-0001000.docx DOCX document
36C25019R0057-021.pdf PDF
36C25019R0057-022.docx DOCX document
36C25019R0057-020.pdf PDF
36C25019R0057-014.pdf PDF
36C25019R0057-004.docx DOCX document
36C25019R0057-012.docx DOCX document
36C25019R0057-006.pdf PDF
36C25019R0057-016.pdf PDF
36C25019R0057-007.pdf PDF
36C25019R0057-011.docx DOCX document
36C25019R0057-015.pdf PDF
36C25019R0057-010.docx DOCX document
36C25019R0057-009.docx DOCX document
36C25019R0057-013.pdf PDF
36C25019R0057-018.pdf PDF
36C25019R0057-005.docx DOCX document
36C25019R0057-019.pdf PDF
36C25019R0057-017.pdf PDF
36C25019R0057-000.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B A

Revisions Date ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

F E

D C

B

A PROVIDE A COMPLETE FIRE SUPPRESSION SPRINKLER SYSTEM IN

THE RENOVATED AREAS/NEW ADDITION.

B COORDINATE WORK WITH VAMC, PHASING PLAN AND OTHER TRADES.

EACH CONTRACTOR SHALL BE RESPONSIBLE FOR OFFSETTING

AND/OR RELOCATING EXISTING SERVICES TO ACCOMMODATE NEW

WORK OF OTHER TRADES.

C DESIGN SERVICES SHALL FOLLOW ALL VA STANDARD DESIGN

PRACTICES, DETAILS, SPECIFICATIONS AND SITE SPECIFIC PROJECT

ENGINEER REQUIREMENTS AS WELL AS WORK SHOWN ON THESE

DOCUMENTS. ALL DEVIATIONS FROM AFOREMENTIONED REQUIREMENTS

SHALL BE APPROVED BY THE PROJECT ENGINEER.

D THE F.S.C. SHALL VERIFY THAT THERE IS ADEQUATE SPACE TO

INSTALL ALL NEW PIPING REQUIRED TO COMPLETE THIS WORK.

E ALL SPRINKLER PIPING IS LOCATED ABOVE THE CEILING (AT THE

BOTTOM OF STRUCTURE IN EXPOSED STRUCTURAL AREAS) UNLESS

OTHERWISE INDICATED.

F THE BASIS OF DESIGN OF SPACING AND SIZING FOR THE COMPLETE

FIRE SUPPRESSION SPRINKLER SYSTEM IS FOR A WET PIPE SYSTEM

HYDRAULICALLY CALCULATED FOR A:

1 LIGHT HAZARD AREA LIMITED TO A MAXIMUM OF 225 SQ. FT. PER

SPRINKLER WITH THE DENSITY OF 0.10 GPM/SQ. FT. OVER THE

MOST REMOTE 1500 SQ. FT. PROVIDE AN ADDITION OF 100 GPM

HOSE ALLOWANCE.

2 ALL MECHANICAL, ELECTRICAL AND ETC. AREAS SHALL BE

ORDINARY HAZARD (GROUP 1) LIMITED TO A MAXIMUM OF 130

SQ. FT. PER SPRINKLER WITH A DENSITY OF 0.15 GPM/SQ. FT.

PROVIDE AN ADDITION OF 250 GPM HOSE ALLOWANCE.

3 ALL STORAGE, TRASH, FILE STORAGE AND ETC. AREAS SHALL

BE ORDINARY HAZARD (GROUP 2) LIMITED TO A MAXIMUM OF

130 SQ. FT. PER SPRINKLER WITH A DENSITY OF 0.20 GPM/SQ.

FT. PROVIDE AN ADDITION OF 250 GPM HOSE ALLOWANCE.

G ALL SPRINKLER HEAD LOCATIONS AND RELATED PIPING SHALL BE BY

H THE ENTIRE SPRINKLER SYSTEM SHALL CONFORM TO VAMC, LOCAL,

STATE AND NFPA STANDARDS, RULES AND REGULATIONS.

I THE F.S.C. SHALL CAREFULLY COORDINATE THE LOCATION OF ALL

SPRINKLER HEADS AND PIPING WITH ALL OTHER TRADES AND THE

ARCHITECT.

J THE F.S.C. SHALL VERIFY THE LOCATION OF ALL LIGHTING FIXTURES

AND AIR DEVICES BEFORE INSTALLATION OF SPRINKLER HEADS.

K ALL SPRINKLER PIPING LAYOUT AND SIZING SHALL BE BY THE F.S.C.

L ALL SPRINKLER HEAD LOCATIONS MUST BE COORDINATED WITH ALL

EQUIPMENT KINDRED TO OTHER TRADES. HEAD LOCATIONS MUST BE

APPROVED BY THE ARCHITECT BEFORE WORK COMMENCES. REFER TO

THE ARCHITECTURAL AND REFLECTIVE CEILING PLANS FOR ADDITIONAL

INFORMATION ON ALL CEILING TYPES, HEIGHTS, AND OTHER

ARCHITECTURAL FEATURES.

M THE F.S.C. SHALL MAKE NECESSARY FLOW TEST, LAY OUT SYSTEMS,

OBTAIN APPROVALS FROM THE AUTHORITIES HAVING JURISDICTION

PRIOR TO BEGINNING ANY FABRICATION OR INSTALLATION WORK.

N SPRINKLER PIPING SHALL BE MINIMUM 1" SIZE.

O SPRINKLER HEADS (UNLESS OTHERWISE NOTED):

EXPOSED AREAS - UPRIGHT OR PENDENT TYPE - STANDARD BRASS

CEILING AREAS - RECESSED PENDENT TYPE. ALL HEADS SHALL BE UL

LISTED AND FM APPROVED.

P SPRINKLER HEADS SHALL BE "QUICK RESPONSE" TYPE IN ALL AREAS

EXCEPT HIGH TEMPERATURE AREAS.

Q ALL PENDENT TYPE SPRINKLER HEADS LOCATED IN SUSPENDED

CEILING TILE AREAS SHALL BE LOCATED IN THE CENTER OF THE

CEILING TILE.

R ANNULAR SPACE AT PIPE AND OTHER SIMILAR PENETRATION OF FIRE

RATED ASSEMBLIES SHALL BE FIRESTOPPED. REFER TO

SPECIFICATION SECTION 07 84 00 FIRESTOPPING. REFER TO

ARCHITECTURAL DRAWINGS FOR CONSTRUCTION, LAYOUT AND FIRE

RATING OF FLOORS, WALLS, PARTITIONS AND OTHER BUILDING

ELEMENTS.

S REFER TO SPECIFICATION SECTION 21 13 13 FOR FLOW TEST

INFORMATION.

T ALL EXISTING SMOKE COMPARTMENTS SHALL BE MAINTAINED. ALL

NEW SPRINKLER ZONES SHALL MATCH SMOKE COMPARTMENTS.

U REFER TO ARCHITECTURAL SHEET 2.4G001 FOR INFORMATION ON

SMOKE COMPARTMENTS, SMOKE PARTITIONS & FIRE BARRIERS.

THE F.S.C.

S

E.C. ELECTRICAL CONTRACTOR

FIRE SUPPRESSION CONTRACTORF.S.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

"NOTE" SYMBOL (FOR NOTES ON SAME SHEET)

ROOM NUMBER

SPRINKLER PIPE (WET)

SUPERVISED VALVE

FLOW SWITCH

DIRECTION OF FLOW

S

FIRE SUPPRESSION HAZARD CLASSIFICATION

ORDINARY HAZARD / GROUP 11

OH

FS

H.C. HVAC CONTRACTOR

242A

241A

240A

240 239

239A

238A 237A

236A

235A

234A

233A

S2.1

222 221

248A

247A

246A

245A

245 218

023QQ

244A

243A

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

3 3

ZONE SEPARATION LINE

ZONE 8

ZONE 6

SPRINKLER

ZONE 6

SPRINKLER

ZONE 8

NO FIRE SUPPRESSION

6 - TYP.

6 - TYP.

6 - TYP.

6TYP. -

6 - TYP.

OH

SFS

4" SPRINKLER

RISER -

FS

S

ZONE 6 -

FS

S

1ZONE 6 - - ZONE 71

4" FR &

DRAIN

RISER -

S

S

S

S

S

OH

OH

NO FIRE SUPPRESSION

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

Champlin Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

F E

D C

B A

539-326

PHASE 4

HEAPY PROJECT No.: 2012-04034 FIRM LICENSE No.: 01528

6/

/2

7:

:0

A

M

RELOCATE COMMUNITY LIVING

CENTER, PHASE 4

06/13/2017

SECOND FLOOR PLAN - NEW WORK

2-FS1

DPBRLT

177-4692

Cincinnati, Ohio

1/8" = 1'-0"2-FS1

1 SECOND FLOOR PLAN

FIRE SUPPRESSION DESIGN NOTES

LEGEND

DRAWING INDEX - FIRE SUPPRESSION

SHEET DESCRIPTION

2-FS1 SECOND FLOOR PLAN - NEW WORK

ROOM NAMES & NUMBERS -

SECOND FLOOR PLAN

Num ber Name

023QQ COURTYARD BELOW

201 CORRIDOR

202 TECH CLOSET

204 STORAGE

205 STORAGE

206 WORK ROOM

207 ROOF GARDEN

208 LAUNDRY

210 CLEAN SUPPLY

211 NURSE STATION

213 KITCHEN

214 LIVING ROOM

215 DINING ROOM

216 02 STORAGE

216 ENTRY

217 COMP. CLOSET

218 CORRIDOR

219 SOILED UTILITY

220 BATHING SUITE

221 STAFF WOMEN'S

222 STAFF MEN'S

224 HAC

225 LINEN CLOSET

226 QUIET ROOM

227 MED CLOSET

228 NURSE STATION

229 CORRIDOR

230 ELECTRIC CLOSET

232 CRASH CART

233 SPECIAL CARE RESIDENT ROOM

233A SPECIAL CARE BATHROOM

234 BEDROOM

234A BATHROOM

235 BEDROOM

235A BATHROOM

236 BEDROOM

236A BATHROOM

237 BEDROOM

237A BATHROOM

238 BEDROOM

238A BATHROOM

239 BEDROOM

239A BATHROOM

240 BEDROOM

240A BATHROOM

241 BEDROOM (NEGATIVE PRESSURE)

241A BATHROOM

242 BEDROOM (NEGATIVE

PRESSURE)

242A BATHROOM

243 BEDROOM

243A BATHROOM

244 BEDROOM

244A BATHROOM

245 BEDROOM

245A BATHROOM

246 BEDROOM

246A BATHROOM

247 BEDROOM

247A BATHROOM

248 BEDROOM

248A BATHROOM

S2.1 STAIR 1

NOTES

1 EXISTING TO REMAIN.

2 EXTEND PIPING FROM EXISTING SPRINKLER ZONE 6 TO

ACCOMMODATE LIMITED WORK IN NEW ADDITION. ALL

SPRINKLER ZONES SHALL MATCH SMOKE COMPARTMENTS.

3 OUTLINE OF AREA TO BE PROVIDED WITH A COMPLETE

FIRE SUPPRESSION SPRINKLER SYSTEM BY THE F.S.C.

4 CONNECT TO EXISTING 4" SPRINKLER MAIN. PROVIDE NEW

SUPERVISED VALVE, CHECK VALVE AND FLOW SWITCH AND

EXTEND PIPING (SIZE PER HYDRAULIC CALCULATIONS) TO

COMPLETE FIRE SUPPRESSION SPRINKLER SYSTEM IN NEW

ADDITION SPRINKLER ZONE 8 IN NEW PHASE 4 ADDITION.

5 REFER TO ARCHITECTURAL SHEET 2.4AG001 FOR ADDITIONAL

INFORMATION ON SMOKE COMPARTMENTS, SMOKE

PARTITIONS AND FIRE BARRIERS.

6 COORDINATE SPRINKLER PIPING/SUPPORT LOCATIONS WITH

PATIENT LIFT STRUCTURALLY MEMBERS.

7 UNDER BID ITEM 3, INDICATED AREA BECOMES ORDINARY

HAZARD, GROUP 1 AND OPEN TO STRUCTURE. PROVIDE QUICK

RESPONSE, UPRIGHT TYPE SPRINKLERS.

Revisions Date Schematic Review 08/17/2012 Design Development 10/15/2012 100% Review 12/14/2012 Issue For Bid 05/26/2016 Re-issue for Bid 06/13/2017

DRAIN SCHEDULE

FIXTURE SCHEDULE

LEGEND

EQUIPMENT SCHEDULE

SYMBOL

RD1

OD1

FD1

STRAINER/GRATE

3" FLANGED WITH ADJUSTABLE DRAINAGE COLLAR, SUMP RECIEVER,

BEARING PAN, DECK CLAMP, DOME STRAINER.

3" FLANGED WITH ADJUSTABLE DRAINAGE COLLAR, SUMP RECIEVER,

BEARING PAN, DECK CLAMP, DOME STRAINER, 3" STANDPIPE

DESCRIPTION

3" MEDIUM DUTY/DOUBLE DRAINAGE/V.P. WITH TRAP PRIMER (TYPE C)

BRASSC.I. C.R.S.S.

BODY

SQ.RD. FLATADJUST. DOMEFUNNEL C.I.BRONZE

NICKEL NOTES

C.R.

TOP FINISH

SYMBOL

P609

P701

P103

DRAINAGE CONNECTION

SHOWER VALVE & HEAD/ADA

WATER COOLER/DUAL HEIGHT/PUSH BARS/ADA

36"LOW

SPOUT

0.5"1.5/1.5

0.5

0.5"0.75

0.5"

1.5" 1.5"

WATER CLOSET/WALL HUNG/ELONGATED BOWL/ADA

MTG.

HGT. DESCRIPTION

HOT

SUPPLY

C/H

WATER

FIXTURE UNITS

DRAINS

COLD

5/- 1"

OUTLET

4"

VENT

2"

SURFACE WALL MOUNTED.

SHOWER HEAD W/SLIDE BAR

BATTERY POWERED SENSOR WITH MANUAL

INDIRECTDIRECT

BYPASS.

REMARKS

DETAIL B SHOWN ON SHEET P2

ABOVE FINISH FLOORAFF

DS DOWNSPOUT

SUPPLY RISERSR

VENT THRU ROOFVTR

CO CLEANOUT

VR VENT RISER

WSV WASTE STACK VENT

SS SANITARY STACK (SOIL/WASTE)

DRAIN (FD, RD, OD)FD2

PLUMBING FIXTUREP102

ZONE VALVE CABINET(S)ZVC

MEDICAL GAS AREA ALARM PANELAAP

MEDICAL VACUUM PIPEMV

MEDICAL OXYGEN PIPEO2

MA MEDICAL AIR PIPE

DOMESTIC HOT WATER PIPE (120 DEGS. F, DHW)

DOMESTIC COLD WATER PIPE (DCW)

EXISTING PIPE TO BE REMOVED

EXISTING PIPE TO REMAIN

DOMESTIC HOT WATER RETURN PIPE (120 DEGS. F, DHWR)

DIRECTION OF FLOW

SHUTOFF VALVE ON RISER

DIRECTION OF PITCH

SANITARY VENT PIPE

SANITARY DRAINAGE PIPE

ROOM NUMBER

"UP TO" SYMBOL (ITEM ON FLOOR ABOVE)

"NOTE" SYMBOL

"CONNECT TO EXISTING" SYMBOL

E.C. ELECTRICAL CONTRACTOR

HVAC CONTRACTORH.C.

FIRE SUPPRESSION CONTRACTORF.S.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

P102 WATER CLOSET/FLOOR SET/FLOOR OUTLET/SS/ADA 5/- 1"4 - 4" 2" -

VACUUM BREAKER/STN. STL. BARIATRIC UNIT.

BATTERY POWERED SENSOR WITH BEDPAN WASHER

P808 WASHING MACHINE SUPPLY AND DRAIN UNIT 3 3/3 0.5" 0.5" 3" 1.5"

RIM

18" TO

FD2

- - - - - 1

P104 WATER CLOSET/WALL HUNG/ELONGATED BOWL/ADA 4 5/- 1" - 4" 2" - BATTERY POWERED SENSOR WITH MANUAL

BYPASS/BEDPAN WASHER

44" TO

C.L.

RD2 4" FLANGED WITH ADJUSTABLE DRAINAGE COLLAR, SUMP RECIEVER,

BEARING PAN, DECK CLAMP, DOME STRAINER.

OD2 4" FLANGED WITH ADJUSTABLE DRAINAGE COLLAR, SUMP RECIEVER,

BEARING PAN, DECK CLAMP, DOME STRAINER, 3" STANDPIPE

P502 MOP SINK/28"X28"X12"/6" DROP FRONT/TERRAZZO

FLOOR

SET 3

2.25/

2.25 0.5" 0.5" 3" 1.5" -

PAIL HOOK FAUCET/VACUUM BREAKER/

WALL BRACE/CROSS HANDLES

FD3

P419

LAVATORY/UNDERMOUNT/VITREOUS CHINA/16" DIA./ADA

1 0.6/0.6 0.5" 0.5" 1.5" 1.5" - TRANSFORMER

120 VOLT SENSOR OPERATED/REMOTE

P505 CLINICAL SERVICE SINK/WALL HUNG/BEDPAN WASHER

30" TO

RIM 3 5/2.25

1"

(2)0.5" (2)0.5" 4" 2" -

WRIST BLADE HANDLES/FOOT CONTROL

BEDPAN WASHER/VACUUM BREAKER

STORM DRAINAGE PIPE

EMERGENCY OVERFLOW STORM DRAINAGE PIPE

ROOF/OVERFLOW DRAIN

3" MEDIUM DUTY/DOUBLE DRAINAGE/SECONDARY STRAINER (TYPE R)

SHUT-OFF BALL VALVE

A1

B P2

P420 1 0.6/0.6 0.5" 0.5" 1.5" 1.5" - TRANSFORMER

120 VOLT SENSOR OPERATED/REMOTE

P801 WALL HYDRANT/EXTERIOR FREEZE-PROOF 0 0 0.75" - - - - LOOSE KEY T-HANDLE/VACUUM BREAKER24" -

STM

OD

TRAP PRIMER TAP

1.5

0.5 -

0.5 -

FLOW

GPM

- 1.28

1.28-

- 1.28

GPF

RIM

18" TO

RIM

18" TO

3" MEDIUM DUTY/DOUBLE DRAINAGE/VANDAL RESISTANT (TYPE D)

RECESS STRAINER

2. INSTALL ALL "LOOSE" COMPONENTS.

TRAPS, FIX. DRAINS, CONTINUOUS WASTE, &

4. MAKE ALL FINAL CONNECTIONS.

3. PROVIDE ALL NECESSARY SUPPLIES, STOPS,

ALL INDIRECT WASTE.

DESCRIPTION

1. PROVIDE ROUGH-IN.

MARK W

A

S T

E -M

IN

D .H

.W

D E

G . F

SUPPLY

D .C

.W

F

IX

. D R

A

IN

F

IX

. O U

T

LE

T

T R

A P

V E

N T

-M

IN

IN

D

IR

E

C T

S C

H E

D . N

O T

E S

A

IR

B R

E A

K

T O

F

LR

. D R

S A

N

IT

A R

Y

K

IT

. W A

S T

E

A

IR

G A

P

S E

E E

Q U

IP

'T

WASTE SYS.WASTE & VENT

H .W

D

E G

. F

G A

S

SUPPLY & WASTE TRIM

B A

LL

V

A

LV

E

COFFEE DISPENSER (COUNTERTOP)M2

ICE MACHINE (COUNTERTOP)M1

A C

ID

W

A S

T E

P812 - 0.5/- 0.5" - - -

48" TO

C.L.

- -REFRIGERATOR/ICE MAKER/COFFEE MAKER/SUPPLY BOX - - MOUNTED ABOVE COUNTERTOP. PROVIDE

FLEXIBLE CONNECTER TO EQUIPMENT

LAVATORY/UNDERMOUNT/VITREOUS CHINA/16" DIA./ADA

RD1/OD1

SCHEDULE NOTES:

1. CONTRACTOR SHALL PERMANENTLY PLUG UNUSED TRAP PRIMER TAPS.

P

0.5" 0.75" 0.75" 0.75"

0.5"

P525 STAINLESS STEEL SINK/TWO COMP'T/UNDERMOUNT/31"x18" 2 1.5/1.5 0.5" 0.5" 1.5" 1.5" -

WRIST BLADE HANDLES/GOOSENECK

SPOUT1.0 -

P529 STAINLESS STEEL SINK/SINGLE COMP'T/UNDERMOUNT/22"x17" 2 1.5/1.5 0.5" 0.5" 1.5" 1.5" - SPOUT

WRIST BLADE HANDLES/GOOSENECK

1.0 -

P530 STAINLESS STEEL SINK/SINGLE COMP'T/C'TOP/22"x19"x10" DEEP 1.0 - 2 1.5/1.5 0.5" 0.5" 1.5" 1.5" -

SPOUT

WRIST BLADE HANDLES/GOOSENECK

OXYGEN OUTLET - HOSPITAL TYPE

MEDICAL VACUUM OUTLET - HOSPITAL TYPE

MEDICAL AIR OUTLET - HOSPITAL TYPE

DISHWASHER (UNDERCOUNTER)M3 0.5" 0.75" 0.75" 0.75"

FLOOR DRAIN

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

Champlin Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

F E

D C

B A

539-326

PHASE 4

HEAPY PROJECT No.: 2012-04034 FIRM LICENSE No.: 01528

6/

/2

7:

:3

A

M

RELOCATE COMMUNITY LIVING

CENTER, PHASE 4

06/13/2017

LEGEND, SCHEDULES AND

DRAWINGS INDEX

P1

DPBRLT

177-4692

Cincinnati, Ohio

DRAWING INDEX - PLUMBING

SHEET DESCRIPTION

P1 LEGEND, SCHEDULES AND DRAWINGS INDEX

P2 DETAILS

2-P1 FIRST FLOOR PLAN - REMOVALS & NEW WORK

2-P2 SECOND FLOOR PLAN - NEW WORK

2-P3 ROOF PLAN - NEW WORK

2-P4 SOIL, WASTE & VENT

Revisions Date Schematic Review 08/17/2012 Design Development 10/15/2012 100% Review 12/14/2012

MEDICAL GAS AND VACUUM SYSTEMS

CORNER PATIENT TOILET ROOMS TYPICAL PATIENT TOILET ROOMS

P104 SIMILAR EXCEPT WALL

HUNG FIXTURE

P103 WATER CLOSET

BRANCH TAKEOFF PIPING

MEDICAL GAS ZONE VALVE CABINET

TRAP PRIMER

P419/P420 LAVATORY

SUPPLY PIPING DIAGRAM SUPPLY PIPING DIAGRAM

P102 WATER CLOSET

WALL

SCALE:

FLOOR DRAIN

FLOOR

TP

SHALL BE RUN BELOW FLOOR,

UNLESS NOTED OTHERWISE.

PIPING TO FLOOR DRAINS

IN WALL IN FINISHED AREAS.

SURFACE IN UNFINISHED AREAS.

INSTALL PIPING TIGHT TO WALL

TP

OFF TOP OF MAIN

FINISHED CEILING

WHERE APPLICABLE

COLD WATER MAIN

SUPPLY SHALL BE

IN FINISHED AREAS.

UNIT WHEN SERVING MULTIPLE

DRAINS. LOCATE ABOVE CEILING

TRAP PRIMER, WITH DISTRIBUTION

INSTALL PIPING CONCEALEDTP

0.5"

VALVE SERVICES AND SIZES AT EACH INDIVIDUAL LOCATION.

SCALE:

1 REFER TO FLOOR PLANS FOR REQUIRED NUMBER OF VALVES,

NOTE:

MAIN OR BRANCH

SCALE:

VACUUM GAUGE

PIPING

SYSTEM

TO/FROM DISTRIBUTION

SYSTEM AND SERVICE

AREA LABEL, TYPICAL

MIN. 45 DEGREES

INLET OR SPECIAL STATION

TO STATION OUTLET,

BRANCH OR RUNOUT

PRESSURE

GAUGE, TYPICAL

INLETS AND OUTLETS

TO/FROM STATION

FINISHED FLOOR

STOP

FLUSH VALVE

DETAILS

SEE ARCH.

GRAB BAR

FLUSH BUTTON

WITH MANUAL OVERRIDE

SIDE MOUNTED OPERATOR

BATTERY POWERED

.5

2.5"

SCALE:

O2

MV

MA MA

O2

MV

MA O2 MV

FOR FUTURE EXTENSION

CAP PIPING ABOVE CEILING

E

P2NONE

B P2

D P2

NONE

NONE

C

P2NONE

SCALE:

A

P2NONE

MANUAL MIXER

SCALE:

G

P2NONE SCALE:

H

P2NONE

SCALE:

F

P2NONE

FINISHED FLOOR

STOP

FLUSH VALVE

DETAILS

SEE ARCH.

GRAB BAR 26

.5

2.5"

BEDPAN WASHER

FOLD DOWN

LOOSE

KEY/STOP

ESCUTCHEON

FINISHED FLOOR

COUNTERTOP

LAMINAR FLOW

CONTROL DEVICE

FAUCET SEE

SPECIFICATIONS

ENCLOSURE BY OTHERS

REFER TO ARCHITECTURAL

SHEETS

OFFSET WASTE

TRAP PARALLEL TO

WALL

ASSE 1070 MIXING VALVE

REMOVE INTEGRAL CHECKS FROM

FAUCET AND PROVIDE NEW CHECK

VALVES ON DCW & DHW SUPPLY

BATTERY POWERED SIDE

MOUNTED OPERATOR WITH

MANUAL OVERRIDE FLUSH

BUTTON

P104 P104

P419 P419

NEW SECOND FLOOR

BY G.C.

ACCESS PANEL

NEW PHASE 4 ROOF

P701

P701

2" 1"

2"

1"

2" 1"

0.75"

0.75"

0.5"

0.5"

0.5"

1.5"

0.75"

THIRD FLOOR SLAB

FUTURE PHASE

FUTURE

CAP PIPE FOR

WITH TEMPORARY INSULATION

IN PHASE ROOF FUTURE THIRD

FLOOR SLAB TO FACILITATE

FUTURE PHASE EXTENSION

STUBS LOCATED ABOVE EXISTING

CONNECT TO EXISTING DCW & DHW

ROOF/SECOND FLOOR SLAB & EXTEND

NEW PIPING TO PHASE 4 AS INDICATED

P701 P701

0.5"

0.5"

NEW PHASE 4 ROOF

2" 0.75"

2" 0.75"

THIRD FLOOR SLAB

FUTURE PHASE

FUTURE

CAP PIPE FOR

WITH TEMPORARY INSULATION IN

PHASE 4 ROOF/FUTURE THIRD FLOOR

SLAB TO FACILITATE FUTURE

PHASE EXTENSION

P104

P419

0.5" 1.5"

NEW PHASE 4 ROOF/

2" 1"

2"

1"

THIRD FLOOR SLAB

FUTURE PHASE

FUTURE

CAP PIPE FOR

WITH TEMPORARY INSULATION IN

PHASE 4 ROOF/FUTURE THIRD FLOOR

SLAB TO FACILITATE FUTURE

PHASE EXTENSION

P104

P419

0.5"

1.5" P420 P420

0.5"

P420

P420

0.5" 0.5"

PROVIDE PIPE SLEEVES FILLED

PROVIDE PIPE SLEEVES FILLED

PROVIDE PIPE SLEEVES FILLED

EXISTING ROOF/

2" 1"

NEW SECOND FLOOR

EXISTING ROOF/

NEW SECOND FLOOR

EXISTING ROOF/

STUBS LOCATED ABOVE EXISTING

CONNECT TO EXISTING DCW & DHW

ROOF/SECOND FLOOR SLAB & EXTEND

NEW PIPING TO PHASE 4 AS INDICATED

STUBS LOCATED ABOVE EXISTING

CONNECT TO EXISTING DCW & DHW

ROOF/SECOND FLOOR SLAB & EXTEND

NEW PIPING TO PHASE 4 AS INDICATED

0.75"

REFER TO PLAN NOTE 16 LOCATED ON

DRAWING 2-P2 FOR BID ITEM 3 BIDDING

DIRECTIONS.

REFER TO PLAN NOTE 16 LOCATED ON

DRAWING 2-P2 FOR BID ITEM 3 BIDDING

DIRECTIONS.

REFER TO PLAN NOTE 16 LOCATED ON

DRAWING 2-P2 FOR BID ITEM 3 BIDDING

DIRECTIONS.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

Champlin Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

F E

D C

B A

539-326

PHASE 4

HEAPY PROJECT No.: 2012-04034 FIRM LICENSE No.: 01528

6/

/2

7:

:3

A

M

RELOCATE COMMUNITY LIVING

CENTER, PHASE 4

06/13/2017

DETAILS

P2

DPBRLT

177-4692

Cincinnati, Ohio

Revisions Date Schematic Review 08/17/2012 Design Development 10/15/2012 100% Review 12/14/2012 Issue For Bid 05/26/2016 Re-issue for Bid 06/13/2017

P812

P812

P812

P812

P525

P609

P529

P505

THERAPY TUB

P102

P419

P103

P103

P419

P419

P530

P529

P808

P801

NEW PHASE 4 ROOF

EXISTING ROOF/

NEW SECOND FLOOR

CONNECT TO EXISTING

DCW & DHW STUBS LOCATED

ABOVE EXISTING ROOF/

SECOND FLOOR SLAB &

EXTEND NEW PIPING TO

PHASE 4 AS INDICATED

CAP PIPE

FOR FUTURE

FUTURE PHASE

THIRD FLOOR

PROVIDE PIPE SLEEVES FILLED

WITH TEMPORARY INSULATION

IN PHASE 4 ROOF/ FUTURE THIRD

FLOOR SLAB TO FACILITATE

FUTURE PHASE EXTENSION

0.5"

0.5"

0.5"

0.5"

0.5"

0.5" 0.5"

0.5"

0.5"

0.5"

0.5" 0.5"

0.5"

0.5"

0.75"1"

1"

0.75"

1.25"

1"

0.75"

0.75" 0.75"

0.75" 0.5"0.5"

1"1.5"

1"1.5"

1.25"

0.5" 0.5"

NEW PHASE 4

ROOF

EXISTING ROOF/

NEW SECOND FLOOR

CONNECT TO EXISTING

DCW & DHW STUBS LOCATED

ABOVE EXISTING ROOF/

SECOND FLOOR SLAB &

EXTEND NEW PIPING TO

PHASE 4 AS INDICATED

FUTURE PHASE

THIRD FLOOR

PROVIDE PIPE SLEEVES FILLED

WITH TEMPORARY INSULATION

IN PHASE 4 ROOF/ FUTURE THIRD

FLOOR SLAB TO FACILITATE

FUTURE PHASE EXTENSION

1"1.5"

2"1"

0.5" 0.5"

0.5" 1.25"

2"1"

1.25" DCW

0.5"

0.5"

0.5"

0.5"

0.75"

0.75"

1"

1.25"

SUPPLY PIPING DIAGRAM

ROOMS 220, 219, 210 & 213

SCALE: NONE

I

P2

SUPPLY PIPING DIAGRAM

ROOMS 206, 207, 208, 222 & 221

SCALE: NONE

J P2

R E

F.

DN

UP

4 4

1 1

1 1

8 1

M V

M A

O

MV

MAO2

MV MAO2

O

M A

M V

O

M A

M V

O

M A

M V

8 8

8 8

1 8

OD1

RD1

OD

STM

3"

3"

3"

3"

-(495 S.F.)

-(495 S.F.)

P529

OD

OD

STM

ST

M

O D

ST

M

O D

STM

OD

OD

STM

OD

STM

OD

ST

MO

D O

D

O D

STM

15 15

ST

M

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

Champlin Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

F E

D C

B A

539-326

PHASE 4

HEAPY PROJECT No.: 2012-04034 FIRM LICENSE No.: 01528

6/

/2

7:

:0

A

M

RELOCATE COMMUNITY LIVING

CENTER, PHASE 4

06/13/2017

FIRST FLOOR PLAN - REMOVALS &

NEW WORK

2-P1

DPBRLT

177-4692

Cincinnati, Ohio

GENERAL NOTES

NOTES

A REFER TO SHEET P1 FOR LEGEND, SCHEDULES & DRAWING INDEX.

B ALL DOMESTIC WATER, SANITARY AND VENT PIPING, MEDICAL GASES AND STORM

PIPING IS LOCATED ABOVE THE CEILING AT THE UNDERSIDE OF STRUCTURE

SLAB/ROOF IN EXPOSED STRUCTURAL AREAS, UNLESS OTHERWISE NOTED.

C COORDINATE ALL PLUMBING WORK WITH THAT OF ALL OTHER TRADES.

D ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN WALLS,

FURRED CHASE OR ABOVE THE SUSPENDED CEILING.

E REFER TO ARCHITECTURAL DRAWINGS FOR PHASING OF WORK.

F MINIMUM PIPING TO O2 AND MA OUTLETS SHALL BE 0.5" SIZE. MINIMUM MV PIPING

TO INLETS SHALL BE 0.75" SIZE.

G ALL MEDICAL GAS INSTALLERS SHALL BE CERTIFIED TO THE REQUIREMENTS OF

ASSE 6010. ALL MEDICAL GAS SYSTEM INSTALLERS SHALL BE CERTIFIED TO THE

REQUIREMENTS OF ASSE 6030.

H MEDICAL GAS AND VACUUM SYSTEMS INSTALLATION AND VERIFICATION SHALL

COMPLY WITH THE REQUIREMENTS OF NFPA 99C, GAS AND VACUUM SYSTEMS,

2005 EDITION.

I THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR

HORIZONTAL OFFSET WHICH MAY BE NECESSARY TO COMPLETE THE SYSTEMS.

COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT

IMMEDIATELY ANY DIFFICULTIES WHICH CAN BE ANTICIPATED.

J ALL ACCESS PANELS IN WALLS AND CEILINGS WILL BE BY THE G.C.

K FINISHED FIRST FLOOR ELEVATION: 728'-0".

L REFER TO ARCHITECTURAL FIRE-RATED PARTITION PLAN FOR LOCATIONS AND

FIRE-RATINGS OF NEW AND EXISTING WALL ASSEMBLIES. ALL PENETRATIONS

THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/OR FIRE-STOPPED

AS REQUIRED TO MAINTAIN FIRE-RATINGS INDICATED. G.C. SHALL COORDINATE

ALL TRADES TO ENSURE FIRE-RATED PENETRATION REQUIREMENTS AND DETAILS

ARE MET.

1 EXISTING TO REMAIN.

2 EXISTING DOWNSPOUT NOZZLE TO REMAIN IN SERVICE.

3 REMOVE EXISTING ROOF DRAIN GRATE & BODY ABOVE CONCRETE SLAB, PLUG

DRAIN OUTLET AND FILL DRAIN WITH CONCRETE FLUSH WITH EXISTING SECOND

FLOOR SLAB. NEW TOPPING SLAB BY G.C.

4 REMOVE EXISTING STORM PIPING (AFTER NEW STORM PIPING IS IN SERVICE) BACK

TO POINT OF NEW CONNECTION. CUTTING AND PATCHING TO EXISTING FINISH

SHALL BE INCLUDED IN THE DIVISION 22 CONTRACT.

5 CONNECT TO EXISTING 1" O2, 1" MA & 2" MV SUPPLY STUBS ABOVE FIRST FLOOR

CEILING AND EXTEND UP TO NEW SECOND FLOOR TO SERVE PHASE 4 WORK.

6 CONNECT TO EXISTING SOIL STACK & VENT RISER STUBS LOCATED ABOVE EXISTING

PHASE 3 ROOF/NEW SECOND FLOOR SLAB AND EXTEND PIPING UP THROUGH NEW

SECOND FLOOR TO SERVE PHASE 4 WORK. REFER TO SOIL, WASTE & VENT DIAGRAM

ON SHEET 2-P4.

7 CONNECT TO EXISTING DCW & DHW SUPPLY STUBS LOCATED ABOVE EXISTING PHASE

3 ROOF/NEW SECOND FLOOR CEILING AND EXTEND PIPING UP THROUGH NEW

SECOND FLOOR TO SERVE PHASE 4 WORK.

8 EXISTING PHASE 4 FLOOR DRAIN WITH STRAINER LOCATED ABOVE EXISTING PHASE 3

ROOF/NEW SECOND FLOOR SLAB. REMOVE EXISTING ROOFING MATERIAL & CAP TO

EXPOSE FLOOR DRAIN TO SERVE PHASE 4 WORK. SET STRAINER TO ACCOMMODATE

NEW TOPPING SLAB.

9 CONNECT TO EXISTING 2" DCW & 1" DHW SUPPLY STUBS LOCATED ABOVE EXISTING

PHASE 3 ROOF/NEW SECOND FLOOR SLAB AND EXTEND PIPING UP THROUGH NEW

SECOND FLOOR AS INDICATED IN DETAIL H/P2 TO SERVE PHASE 4 WORK.

10 CONNECT TO EXISTING 2" DCW & 0.75" DHW SUPPLY STUBS LOCATED ABOVE EXISTING

PHASE 3 ROOF/NEW SECOND FLOOR SLAB AND EXTEND PIPING UP THROUGH NEW

SECOND FLOOR AS INDICATED IN DETAIL G/P2 TO SERVE PHASE 4 WORK.

11 REMOVE EXISTING 3" VTR DOWN TO 2" WSV LOCATED ABOVE FIRST FLOOR CEILING

AND EXTEND NEW 2" WSV UP THROUGH NEW SECOND FLOOR.

12 EXISTING DOWNSPOUT TO REMAIN IN SERVICE. DISCONNECT AND CAP EXISTING

STORM PIPING ABOVE FIRST FLOOR CEILING AND EXTEND DOWNSPOUT UP TO ABOVE

SECOND FLOOR CEILING FOR CONNECTION TO NEW PHASE 4 STORM PIPING SYSTEM.

13 REMOVE EXISTING ROOF DRAIN AND ALL EXTRANEOUS PIPING BACK TO POINT OF NEW

CONNECTION. PATCH HOLE WITH CONCRETE FLUSH WITH NEW SECOND FLOOR

SLAB.

14 EXTEND NEW 3" STORM PIPING TO POINT OF NEW CONNECTION WITH EXISTING 3"

STORM PIPING.

15 DISCONNECT AND CAP EXISTING STORM PIPING ABOVE FIRST FLOOR CEILING.

16 EXISTING DOWNSPOUT TO REMAIN IN SERVICE. RETAIN CONNECTION TO EXISTING

STORM PIPING ABOVE FIRST FLOOR CEILING AND EXTEND DOWNSPOUT UP TO ABOVE

SECOND FLOOR CEILING FOR CONNECTION TO NEW PHASE 4 STORM PIPING SYSTEM.

17 CONNECT TO EXISTING WASTE STACK VENT RISER STUBS LOCATED ABOVE EXISTING

PHASE 3 ROOF/NEW SECOND FLOOR SLAB AND EXTEND PIPING UP THROUGH NEW

SECOND FLOOR TO SERVE PHASE 4 WORK. REFER TO SOIL, WASTE & VENT

DIAGRAM ON SHEET 2-P4.

1/8" = 1'-0"2-P1

1 FIRST FLOOR PLAN - REMOVALS & NEW WORK

Revisions Date Schematic Review 08/17/2012 Design Development 10/15/2012 100% Review 12/14/2012

DN

TECH

CLOSET

STORAGE

STORAGE

ROOF

GARDEN

CORRIDOR

CORRIDOR

WORK

ROOM

LAUNDRY

STAFF

MEN'S

STAFF

WOMEN'S

BEDROOM

BEDROOM 247A

248A

HAC

CORRIDOR

BATHING

SUITE

SOILED

UTILITY

COMP.

CLOSET

CLEAN

SUPPLY

KITCHEN

STORAGE

ENTRY

S2.1

STAIR 1

LIVING

ROOM

NURSE

STATION

BEDROOM

BEDROOM

BEDROOM

BEDROOM

243A

244A

245A

246A

LINEN

CLOSET

MED

CLOSET

NURSE

STATION

QUIET

ROOM

CORRIDOR

023QQ

COURTYARD

BELOW

DINING

ROOM

SPECIAL

CARE

RESIDENT

ROOM

BEDROOM

234A

233A

CRASH

CART

BEDROOM

235A

236A

BEDROOM

BEDROOM

BEDROOM

BEDROOM

BEDROOM

BEDROOM

(NEGATIVE

PRESSURE)

242A

241A

240A 239A

ELECTRIC

CLOSET 238A

237A

CORRIDOR

P609

P529

P525

P812

P812

P812

P812 P505

FD2

P419

FD1

P103

P419 P103

P419

P808

P530

FD3

P502

1 1 1 1

1" 0.5"

1.25"

0.5"

M V

M A

O

MVO2 MA

MV

O2

MA

MV

O2

MA

1.5"

0.75"

O

M A

M V

O

M A

M V

O

M A

M V

2-P2

2-P2

2-P2

1.5"

0.75"

0.75"

1.5"

1"

0.5"

RD1

OD1

STM

OD

3"

3"

RD2

OD2

RD2

OD2

STM

OD

4"

4"

ST

M

O D

ST

M

ST

M

ST

M

OD

O D

O D

STM

OD

4"

4"

4" 4"

4" 4"

ST

M

5" 5"

4" 6"

4"

6"

RD2

OD2

6" DS

(4,685 SF)

6" DS

(4,685 SF)

OD

STM

OD

STM

OD

OD2

RD2

RD2 OD2

5" DS

(2,730 SF)

5" DS

(2,730 SF)

5" DS

(3,420 SF)

5" DS

(3,420 SF)

5" DS

(4,270 SF)

RD1

OD1

RD2

OD2

3"

3"

4"

4"

5"

4"

4"

STM

OD

STM

O D

OD

STM

STM

OD

OD2

RD2

4"

4"

O D

ST

M

O D

ST

M

OD2

RD2

7 7

M3

M2

M1

VR

WSV

WSV

P801

(495 S.F.)- RD1 OD1 -(495 S.F.)

OD2

RD2

WSV

WSV

CO

CO

P529

0.5"

ACCESS PANEL

ACCESS PANEL

0.5"

1"

0.5"

0.75"

0.5"

WSV

ELECTRIC

FIREPLACE

4"

4"

WSV

4"

4"

4"

4"

5"

4"4" 4"

4"

ACCESS

PANEL

FD1

P102

0.5"

0.5"

0.75"

FD3

FD1 FD2

FD1

ZVC

AAP

P104

P419

FD1

FD1

P420

P420

P419

P104FD1

FD1

FD1

FD1

FD1

ACCESS PANEL

SS

VR

WSV

WSV

- SR

SS

VR

242A

241A

P701

P701

ACCESS PANEL

FD1

- SR13

FD1FD1

P104 P419

P420

P420 P419 P104

FD1

FD1

FD1FD1

FD1FD1

WSV

WSV

SS

VR

SR

ACCESS PANEL

P701

P701

243A

244A

P420

P420

P419

P419

P102

P102

FD1FD1

P701

FD1

FD1

P701

FD1

WSV

WSV

SR

FD1

233A

234A

ACCESS PANEL

SS

VR

11FD1

FD1

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

Champlin Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

F E

D C

B A

539-326

PHASE 4

HEAPY PROJECT No.: 2012-04034 FIRM LICENSE No.: 01528

6/

/2

7:

:2

A

M

RELOCATE COMMUNITY LIVING

CENTER, PHASE 4

06/13/2017

SECOND FLOOR PLAN - NEW WORK

2-P2

DPBRLT

177-4692

Cincinnati, Ohio

NOTES

A REFER TO SHEET P1 FOR LEGEND, SCHEDULES & DRAWING INDEX.

B ALL DOMESTIC WATER, SANITARY AND VENT PIPING, MEDICAL GASES AND STORM

PIPING IS LOCATED ABOVE THE CEILING AT THE UNDERSIDE OF STRUCTURE

SLAB/ROOF IN EXPOSED STRUCTURAL AREAS, UNLESS OTHERWISE NOTED.

C COORDINATE ALL PLUMBING WORK WITH THAT OF ALL OTHER TRADES.

D ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN WALLS, FURRED

CHASE OR ABOVE THE SUSPENDED CEILING.

E REFER TO ARCHITECTURAL DRAWINGS FOR PHASING OF WORK.

F MINIMUM PIPING SIZE TO O2 & MA OUTLETS SHALL BE 0.5". MINIMUM PIPING SIZE TO

MV INLETS SHALL BE 0.75".

G ALL MEDICAL GAS INSTALLERS SHALL BE CERTIFIED TO THE REQUIREMENTS OF ASSE

6010. ALL MEDICAL GAS SYSTEM INSTALLERS SHALL BE CERTIFIED TO THE

REQUIREMENTS OF ASSE 6030.

H MEDICAL GAS AND VACUUM SYSTEMS INSTALLATION AND VERIFICATION SHALL

COMPLY WITH THE REQUIREMENTS OF NFPA 99C, GAS AND VACUUM SYSTEMS, 2005

EDITION.

I THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR

HORIZONTAL OFFSET WHICH MAY BE NECESSARY TO COMPLETE THE SYSTEMS.

COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT

IMMEDIATELY ANY DIFFICULTIES WHICH CAN BE ANTICIPATED.

J ALL ACCESS PANELS IN WALLS AND CEILINGS WILL BE BY THE G.C.

K FINISHED SECOND FLOOR ELEVATION: 742'-0".

L REFER TO ARCHITECTURAL FIRE-RATED PARTITION PLAN FOR LOCATIONS AND FIRE-

RATINGS OF NEW AND EXISTING WALL ASSEMBLIES. ALL PENETRATIONS THROUGH

FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/OR FIRE-STOPPED AS

REQUIRED TO MAINTAIN FIRE-RATINGS INDICATED. G.C. SHALL COORDINATE ALL

TRADES TO ENSURE FIRE-RATED PENETRATION REQUIREMENTS AND DETAILS

ARE MET.

1 P.C. SHALL MAKE 0.5" MA, 0.5" O2 & 0.75" MV MEDICAL GAS CONNECTION TO MEDICAL

GAS OUTLETS. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS,

CONDITIONS AND REQUIREMENTS.

2 1" MA , 1" O2 & 2" MV RISERS UP FROM FIRST FLOOR. CAP 1" MA, 1" O2 & 2" MV ABOVE

SECOND FLOOR CEILING FOR FUTURE EXTENSION TO THIRD FLOOR.

3 BOX MOUNTED TRANSFORMER LOCATED ABOVE CEILING TO CONTROL SENSOR

OPERATED FAUCET ON FIXTURE(S) BELOW. 120V - 1PH POWER WILL BE LOCATED IN

A WIRING BOX ABOVE CEILING BY THE E.C. A 0.75" CONDUIT (FOR LOW VOLTAGE

WIRING) STUBBED ABOVE THE CEILING AND EXTENDED DOWN TO AN ELECTRICAL

WALL BOX LOCATED BELOW EACH LAVATORY WILL BE PROVIDED BY THE E.C.

TRANSFORMER AND LOW VOLTAGE WIRING SHALL BE BY THE P.C. THE P.C. SHALL

COORDINATE ALL WORK WITH THE E.C.

4 TRAP PRIMER, REFER TO DETAIL C/P2.

5 REFER TO DETAIL H ON SHEET P2 FOR SUPPLY PIPING SIZES AND REQUIREMENTS

IN CHASE.

6 EXTEND THERAPY TUB DRAIN PIPE TO FLOOR DRAIN. COORDINATE CONNECTION

REQUIREMENTS WITH PROJECT ENGINEER. THERAPY TUB UNIT PROVIDED BY OWNER.

7 REFER TO DETAIL 3/2-P2 FOR SIMILAR LAYOUT.

8 REFER TO DETAIL 2/2-P2. OPPOSITE HAND LAYOUT.

9 TRAP PRIMER, REFER TO DETAIL C/P2. TRAP PRIMER SHALL SERVE FLOOR DRAIN IN

PATIENT BATHROOMS AS INDICATED (NOT SHOWER DRAINS). AT CONTRACTOR'S

OPTION, TRAP PRIMER MAY BE LOCATED IN PLUMBING CHASE IF ACCESSIBLE FROM

ACCESS PANEL.

10 PROVIDE SHUT-OFF VALVES ON 1.25" DCW AND 0.5" DHW SERVING P104 & P419

FIXTURES IN BATHING SUITE #220 AT ACCESS PANEL.

11 PROVIDE TRAP PRIMER DISCHARGE PIPING ABOVE SECOND FLOOR CEILING FOR

FUTURE THIRD FLOOR FD1. EXTEND PIPING THROUGH ROOF AT FUTURE WALL

LOCATION AND CAP.

12 EXTEND NEW 3" STORM AND OVERFLOW PIPING TO EXISTING FIRST FLOOR BELOW AND

CONNECT TO EXISTING STORM/OVERFLOW PIPING SYSTEM AS INDICATED ON SHEET 2-P1.

13 REFER TO DETAIL G ON SHEET P2 FOR SUPPLY PIPING SIZES AND REQUIREMENTS

IN CHASE.

14 COORDINATE PIPING LOCATIONS/SUPPORTS WITH PATIENT LIFT STRUCTURAL

MEMBERS (TYPICAL TO EACH PATIENT ROOM).

15 UNDER BID ITEM 1 PROVIDE ALL DIVISION 22 WORK AS SHOWN.

16 UNDER BID ITEM 3:

• DELETE ALL PLUMBING FIXTURES IN AREA INDICATED.

• DELETE ALL MEDICAL GAS BRANCH PIPING AND MEDICAL GAS OUTLETS/INLETS IN AREA

INDICATED. MEDICAL GAS MAIN PIPING SHALL REMAIN AS SHOWN.

• DELETE ALL TRAP PRIMERS IN AREA INDICATED.

• DELETE ALL BOX-MOUNTED TRANSFORMERS AND LOW VOLTAGE WIRING SERVING

SENSOR OPERATED FAUCETS IN AREA INDICATED.

• DELETE ALL DOMESTIC WATER BRANCH PIPING SERVING PLUMBING FIXTURES IN

AREA INDICATED. DELETE DOMESTIC WATER SUPPLY PIPING BACK TO SUPPLY

RISER LOCATIONS AT PLUMBING CHASES AND VALVE AND CAP ABOVE SECOND

FLOOR SLAB FOR FUTURE EXTENSION.

• DELETE ALL SANITARY, WASTE AND VENT BRANCH PIPING SERVING PLUMBING

FIXTURES (EXCEPT FUTURE SHOWER AND FLOOR DRAINS) IN AREA INDICATED.

DELETE SANITARY, WASTE AND VENT PIPING BACK TO RISER LOCATIONS AT

PLUMBING CHASES. SANITARY, WASTE AND VENT PIPING STACKS LOCATED IN

PLUMBING CHASES AND SERVING FUTURE SHOWER AND FLOOR DRAINS SHALL

REMAIN AS SHOWN.

• STORM PIPING SHALL REMAIN AS SHOWN.

1/8" = 1'-0"2-P2

1 SECOND FLOOR PLAN - NEW WORK

1/4" = 1'-0"2-P2

2 TYPICAL BATHROOM GROUP CORNERS

1/4" = 1'-0"2-P2

3 TYPICAL BATHROOM GROUP

1/4" = 1'-0"2-P2

4 BATHROOM GROUP ROOMS 133A/134A

GENERAL NOTES

Revisions Date Schematic Review 08/17/2012 Design Development 10/15/2012 100% Review 12/14/2012

FD1

FD1

FD1

FD1

FD1

FD1 FD1

FD1

FD1

FD1 FD1

FD1 FD1

FD1

FD1

FD1

FD1FD1

FD1FD1

RD2

OD2

RD1

OD1

RD1

OD1

RD2

OD2

OD2

RD2

FD1

FD1

FD1

FD1

FD1

FD1

FD1FD1

FD1

FD1

FD1FD1

3" VTR 3" VTR

4" SS

3" WSV

3" WSV

3" SS

3" VTR

3" VTR

4" VTR

4" SS

4" SS

4" SS

3" VTR 3" WSV

3" WSV

3" SS

4" SS

3" VTR

3" WSV3" WSV

4" SS

3" VTR

3" WSV3" WSV

3" VTR

4" SS

3" WSV

3" WSV

3" VTR

4" SS

3" WSV

3" WSV

3" VTR

4" SS

3" WSV

3" WSV

4" SS

3" VTR

3" WSV

3" WSV

FD3

FD2

3" SS

3" VTR

4" SS 3" VTR

4" SS

4" SS

3" VTR

3" SS

3" SS

3" VTR

4" SS

4" SS

2" VTR

3" WSV 3" WSV

3" WSV

4" WSV

3" VTR

RD2OD2 RD2OD2

OD2RD2

RD2

OD2

RD2

OD2

RD2

OD2

1 1

OPEN TO BELOW

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

Champlin Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

F E

D C

B A

539-326

PHASE 4

HEAPY PROJECT No.: 2012-04034 FIRM LICENSE No.: 01528

6/

/2

7:

:2

A

M

RELOCATE COMMUNITY LIVING

CENTER, PHASE 4

06/13/2017

ROOF PLAN - NEW WORK

2-P3

DPBRLT

177-4692

Cincinnati, Ohio

1/8" = 1'-0"2-P3

1 ROOF PLAN - NEW WORK

A REFER TO SHEET P1 FOR LEGEND, SCHEDULES & DRAWING INDEX.

B COORDINATE ALL PLUMBING WORK WITH THAT OF ALL OTHER TRADES.

C REFER TO ARCHITECTURAL DRAWINGS FOR PHASING OF WORK.

D FINISHED ROOF ELEVATION: 756.00'.

GENERAL NOTES

Revisions Date Schematic Review 08/17/2012 Design Development 10/15/2012 100% Review 12/14/2012 Issue For Bid 05/26/2016 Re-issue for Bid 06/13/2017

1 APPROXIMATE LOCATION OF PIPING SLEEVE WITH TEMPORARY INSULATION FOR

FUTURE EXTENSION OF DOMESTIC WATER SUPPLY RISERS. REFER TO DIAGRAMS

ON SHEET P2 FOR PIPE SIZES.

2 FLOOR DRAIN LOCATED IN PHASE 4 ROOF SLAB (FUTURE THIRD FLOOR SLAB) TO

FACILITATE FUTURE PHASE ADDITION. TEMPORARILY PLUG FUTURE DRAIN AND

COVER STRAINER. FUTURE FLOOR DRAIN TO BE COVERED WITH ROOFING

MATERIAL BY G.C. REFER TO SOIL, WASTE & VENT DIAGRAM ON SHEET 2-P4 FOR

ADDITIONAL INFORMATION.

NOTES

P104

P419

FD1 FD1

FD1

FD1

1.5"

P420

P104

P419

P420

P420

P419

P419

P420

P104

P104

P419

P419

P420

P420

P104

P104

FD1

FD1

FD1

FD1

FD1

P104

P420 P419

P104

FD1

FD1

FD1

FD1

P420

P104

P419

P420

P419

P104

FD1

FD1

FD1

FD1

FD1

FD1

P419

P420

P420

P419

FD1

FD1

P104

P419

P420

P420

P104

FD1

FD1

FD1

FD1

FD1

FD1

3"

3"

3"

3"

3"

3"

3"

3"

3"

3" WSV

3" VTR

4" SS

3" WSV

3"

3"

3"

3"

4"

1.5"

2"

1.5"1.5"

1.5"

1.5"

1.5"1.5"

1.5"1.5"

3"

3"3"

1.5" 3"

3"

3"

1.5"

1.5"

3"

3" 3"

3"3" 1.5"

3" WSV

3"

3"

3"

3" WSV

3"

3"

3"

3" VTR

4" SS

1.5"

4"

3" 1.5"

4" SS3" VTR

3"

3"

3"

3"

3"

3"

3"

3"

3"

3" VTR

4" SS

3" WSV

3" WSV

3"

3"

3"

4"

2"

1.5"1.5" 1.5"

1.5"

P420

1.5"

3"3"

3" WSV

3" VTR

4" SS

3" WSV

3" 3"3"

4"

3"

3"

3" 3"

4"

3" 3"

3"

2"

1.5"

1.5"

1.5"

1.5"

3"

3"

4"

4" SS

3" VTR

4"

3"

3"

3"

3"

3"

3" WSV

3"1.5"

1.5"

1.5"1.5" 2"

4"

3"

2" 3"

3"

3" 3"

3"

3" 1.5"

1.5"

1.5"3" SS

3"

4" 3"

1.5"

3"3" 4"

3"

3" WSV

3" WSV

3"3"

3"

3" VTR

3" VTR

4" SS

4" VTR

1.5"

3"

3"

3"

3"

3"

3"

3"

3"

3"

3" WSV

3"

1.5" 2"

P419 1.5"

1.5"

1.5"

3" 2"

3"

3" 4"

3"

3"

3" WSV

4" SS

3" VTR

3"

3"

4"

3"

3"

3"

3"

3" WSV

3"FD1

ROOF

ROOF ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

3" 3"

4" SS

3" VTR

3"

3"

1.5"1.5" 2"

3" 2"

1.5" 1.5"

1.5"

4"

3"

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF 3" SS

3"

ROOF

ROOF

ROOF

ROOF ROOF

ROOF

1.5" 1.5"

1.5"

2"

1.5" 2"

1.5"

2"

4"

P419 2"

3"

3"

ROOF

ROOF ROOF

ROOF

ROOF

ROOF

2"

ROOF

ROOF ROOF

ROOF

ROOF

ROOF

3"

3"

3"

VR

P525

FD2

FD3

P609

P529

P505

P419

P103

P419

P103

P419

P530 P808

P104

P104

P419

P420

P420

P419

FD1

FD1

FD1

FD1

3"

3"

3"

2"2"

1.5"

3"

3"

3"

3"

3"

3" VTR

3" SS

3"1.5"1.5"

1.5"

2"

1.5"

3"

1.5"

3"

3"4"

3"

3"

3"

3" WSV

3"

3"

3"

3" WSV

3" VTR

4" SS

3"

3" 3"

3"

3"

1.5"

1.5"

FD1

1.5" 4"

3" 1.5"

2"

3"

4"

3"

3"

2"

3" VTR

4" SS

2"

2" 2"

3"

1.5"

3"

3" WSV

3"

3"

3" VTR

4" WSV

4"

4"

4"4"

4"4" 3"

3"

2"

3"

3" VTR

4" SS4" SS

4"4"

4"

2"

2"

3" WSV

3"

3"

FD1

1.5"

3"

4"3"

1.5" 1.5"

1.5"

1.5"

1.5"

1.5" 3"

1.5"

3"

1.5"

3" VTR

4" SS

2"

2"4"

4" SS

4"

4"

3" WSV

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

3"

3"

2" VTR

ROOF

2"

3" WSV

3" WSV

ROOF

ROOF

P502

ROOF

ROOF

3" 3"

3" SS

3"

4" 4"

2"

1.5"

1.5"

1.5"

1.5"

1.5"

1.5"

P529

1.5"

2ND FL

3"

3"

3"

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

Champlin Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

F E

D C

B A

539-326

PHASE 4

HEAPY PROJECT No.: 2012-04034 FIRM LICENSE No.: 01528

6/

/2

7:

:2

A

M

RELOCATE COMMUNITY LIVING

CENTER, PHASE 4

06/13/2017

SOIL, WASTE & VENT

2-P4

DPBRLT

177-4692

Cincinnati, Ohio

N.T.S.Scale:

SOIL, WASTE & VENT

246A246A

245A

242A 241

241A

241A

238A

236 235

235A

247A

248A 248A

205205

8FD -

NOTES

1 EXISTING TO REMAIN.

2 CONNECT TO EXISTING STACK/RISER PROVIDED UNDER PHASE 3 CONTRACT.

3 STUB SOIL STACK ABOVE ROOF (SIZE AS INDICATED) FOR FUTURE EXTENSION.

4 STUB VENT RISER ABOVE ROOF (SIZE AS INDICATED) FOR FUTURE EXTENSION.

5 STUB WASTE STACK VENT ABOVE ROOF (SIZE AS INDICATED) FOR FUTURE

EXTENSION.

6 INSTALL FLOOR DRAIN BODY AND STRAINER IN PHASE 4 ROOF (FUTURE THIRD FLOOR

SLAB). TEMPORARILY CAP DRAIN & COVER STRAINER. REFER TO ROOF PLAN.

7 REMOVE EXISTING 3" VTR DOWN TO ABOVE FIRST FLOOR CEILING AND REPLACE

PIPING WITH NEW 2" WSV.

8 EXISTING FLOOR DRAIN INSTALLED UNDER PHASE 3 CONSTRUCTION TO REMAIN. THE

P.C. SHALL RESET STRAINER AS REQUIRED TO FACILITATE NEW FINISHED FLOOR

SLAB.

9 REFER TO PLAN NOTE 16 LOCATED ON DRAWING 2-P2 FOR BID ITEM 3 BIDDING

DIRECTIONS.

NOTES

A REFER TO SHEET P1 FOR LEGEND, SCHEDULES AND DRAWING INDEX.

- 2ND FLR

- 2ND FLR

- 2ND FLR

- 2ND FLR

- 2ND FLR

- 2ND FLR

- 2ND FLR

2ND FLR -

2ND FLR -

- 2ND FLR

2ND FLR -

- 2ND FLR

FD -

2 - 2ND FLR

- 2ND FLR

22ND FLR -

2 - 2ND FLR

1 - FD

1FD -

247A

8 - FD

8FD -

- 2ND FLR

245A

- 2ND FLR

246A

244A244A

243A

8 - FD

8FD -

- 2ND FLR

243A

- 2ND FLR

244A

1FD -

1 - FD

- 2ND FLR

22ND FLR -

2 - 2ND FLR242A

241A

233A

8 - FD

8FD -

- 2ND FLR

234A

22ND FLR -

233A

233A

233234A

234A

32 - 2ND FLR

22ND FLR -

235A

8 - FD

235A

236A

236A

2ND FLR

8FD -

237A8 - FD

238A

238A 8FD -

237A

237A238

2 - 2ND FLR

22ND FLR -

239A8 - FD

2 - 2ND FLR

240A

240A

240A 8FD -

239A

239A240

22ND FLR -

2 - 2ND FLR

Revisions Date Schematic Review 08/17/2012 Design Development 10/15/2012 100% Review 12/14/2012 Issue For Bid 05/26/2016 Re-issue for Bid 06/13/2017

P102

P102

P102

4"

6 6

2"

8FD -

8FD -

DUCT THERMOSTAT WITH AVERAGING ELEMENT

DUCT STATIC PRESSURE SENSOR

DUCT HUMIDITY SENSOR

ROOM SENSOR: TEMPERATURE, HUMIDITY

LENGTH IN DUCT WHEN SPACE PERMITS)

REMOTE BULB THERMOSTAT

ROOM CONTROL: THERMOSTAT, HUMIDISTAT

DIFFERENTIAL PRESSURE SWITCH

DUCT TEMPERATURE SENSOR WITH AVERAGING ELEMENT

SMOKE DETECTOR (SEE ELECTRICAL SPECIFICATIONS)

DUCT OR PIPE TEMP. SENSOR

DUCT OR PIPE THERMOSTAT (NOTE 1: PROVIDE 12" MIN.

AFTER FILTER

CURRENT SENSING RELAY

AIR FOIL WHEEL (FAN)

AIR HANDLING UNIT

ANALOG INPUT

AIR PRESSURE DROP

ANALOG OUTPUT

AUTOMATIC TEMPERATURE CONTROLS

BACKWARD INCLINED WHEEL (FAN)

AIR FLOW MEASURING DEVICE

ABOVE FINISHED FLOOR

DIFFERENTIAL OR STATIC PRESSURE TRANSMITTER

COOLING COIL

CONVERTOR

CONVECTOR

CLEAN OUT

CEILING GRILLE

CENTRIFUGAL FAN

CEILING DIFFUSER

BOTTOM REGISTER (WALL TYPE)

BOTTOM GRILLE (WALL TYPE)

CEILING REGISTER

COLD WATER (POTABLE)

DIGITAL OUTPUT

DIGITAL INPUT

DIRECT DIGITAL CONTROLS

DRY BULB TEMPERATURE, DEG. F

AUTOMATIC CONTROL DAMPER

EXHAUST FAN

ENGINEERING CONTROL CENTER

DOUBLE WIDTH DOUBLE INLET (FAN)

DOOR UNDERCUT

ITEM, AND TO THE CENTER OF PIPE. (TO BE USED AS AN AID

LISTED SIZE OF DUCT, DEVICE, OR EQUIPMENT

APPROXIMATE ELEVATION FROM FLOOR TO BOTTOM OF

MANUAL VOLUME DAMPER

U/C

IN COORDINATING THE VARIOUS TRADES.)

FIRE DAMPER

BUTTERFLY VALVE

CIRCUIT SETTER

BALL VALVE

COMBINATION BALANCING/SHUT-OFF VALVE

MANUAL AIR VENT

AUTOMATIC FLOW CONTROL VALVE

TEST PLUG (PRESSURE/TEMPERATURE)

SAFETY VALVE OR PRESSURE RELIEF

PRESSURE REDUCING VALVE

STRAIGHT-THRU TWO-POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

STRAIGHT-THRU MODULATING CONTROL VALVE

EX.

EF

EXISTING

DWDI

ECC

DI

DO

DB

DDC

D

Db

DECIBELS

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

EQUIPMENT ABBREVIATION (SUPPLY FAN)

SUPPLY FAN NO.3 IN BUILDING NO.1

DRAWING NUMBER WHERE DRAWN

DRAWING NUMBER WHERE DRAWN

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

RETURN DUCT (UP & DOWN)

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

EXHAUST OR RETURN TOP REGISTER OR GRILLE,

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE,

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

SUPPLY DUCT (UP & DOWN)

INCLINED RISE, IN DIRECTION OF AIR FLOW

NEW DUCT - WIDTH X DEPTH

RECTANGULAR ELBOWS WITH VANES EVEN IF

VANED ELBOW (PROVIDE ALL SQUARE OR

INCLINED DROP, IN DIRECTION OF AIR FLOW

ACOUSTICAL DUCT LINING

STANDARD RADIUS ELBOW

R

10/8

FC

D

SYMBOL IS MISSING)

FLEXIBLE CONNECTION

UP

(WALL TYPE)

(WALL TYPE)

DN

UP

1-01

1-SF3

AIR HANDLING UNIT NUMBER

TERMINAL UNIT DESIGNATION

TYPICAL UNIT NO.

DN

SECTION LETTER

DETAIL NUMBER

ECCENTRIC REDUCER

DIRECTION OF FLOW

CAPPED OUTLET

SIDE CONNECTION

EXISTING WORK.

ACCESSORIES (SEE STANDARD DETAIL)

INVERTED BUCKET TRAP SET INCLUDING PIPING

POINT OF CONNECTION BETWEEN NEW AND

RISE OR DROP IN PIPE

BOTTOM CONNECTION, 45 DEG. OR 90 DEG.

TOP CONNECTION, 45 DEG. OR 90 DEG.

REDUCER OR INCREASER

DIRECTION OF PIPE PITCH (DOWN)

THERMOMETER

THERMOSTATIC TRAP

STRAINER

GATE VALVE

PRESSURE GAGE

CHECK VALVE

GLOBE VALVE

PIPING ACCESSORIES (SEE STANDARD DETAIL)

FLOAT AND THERMOSTATIC TRAP SET INCLUDING

GATE VALVE WITH 3/4" HOSE END ADAPTER

EXISTING PIPE TO BE REMOVED

DRAIN LINE

UNION

D

CONV

CW

CR

CO

CG

CF

CD

CC

C

BR

BIW

BG

ATC

AFW

AI

APD

AO

AHU

AFM

AFF

AF

VENT LINE

HEATING HOT WATER RETURN

HEATING HOT WATER SUPPLY

LOW PRESSURE STEAM CONDENSATE RETURN

LOW PRESSURE STEAM (15 PSIG & BELOW)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

NUMBER INDICATES STEAM PRESSURE

NUMBER INDICATES STEAM PRESSURE

LPR

V

HWS

HWR

LPS (5)

MPS (30)

MPR

HEATING

SP

S F

T

H

T

T H

WET BULB TEMPERATURE, DEG. FWb

ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE

CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.

THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE

SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.

ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS ARE REQUIRED

FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC.

COORDINATE SIZES AND LOCATIONS WITH OTHER TRADES.

TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT

SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.

FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO

EQUIPMENT, SEE STANDARD DETAILS AND PIPING SCHEMATICS.

DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE

NECK SIZES.

WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL

BE MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.

WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO

BE INSTALLED WITH BOTTOM OF REGISTERS SEVEN INCHES ABOVE

FINISHED FLOOR.

REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT

LOCATION OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.

ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE

NOTED.

ALL CUTTING AND PATCHING REQUIRED FOR THIS PROJECT SHALL BE

INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE DISTURBED UNDER

THIS WORK TO MATCH EXISTING.

IN GENERAL, KEEP DUCT AND PIPING MAINS NEXT TO UNDERSIDE OF

STRUCTURE.

ANNULAR SPACE OF ALL PIPE, CONDUIT, DUCT & OTHER SIMILAR

PENETRATIONS OF FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED.

IN ADDITION, PENETRATIONS THROUGH 0-HOUR RATED WALLS &

FLOORS SHALL BE FIRESTOPPED TO RETARD PASSAGE OF FIRE &

SMOKE.

INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS

BEEN DAMAGED AND/OR REMOVED IN THE PERFORMANCE OF WORK

IN THIS PROJECT.

EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON AVAILABLE DRAWING

INFORMATION, AND MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE. THE

CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND

WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE

THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY

VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY TO

COMPLETE THE SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL

OTHER TRADES AND REPORT IMMEDIATELY ANY DIFFICULTIES WHICH CAN

BE ANTICIPATED.

FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND

EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO PERFORMING

WORK.

HEPA FILTERED EXHAUST IS REQUIRED TO MAINTAIN A MINIMUM OF

WHERE DUCTS OR PIPES ARE REMOVED THRU WALL/FLOOR/ROOF THAT

IS TO REMAIN, PATCH WALL/FLOOR/ROOF OPENING TO MATCH EXISTING

WHERE OPENING IS NOT RE-USED.

MAXIMUM

OUTSIDE AIR

(16 PSIG THRU 59 PSIG)

PRE-FILTER

PUMPED CONDENSATE

PREHEAT COIL

RELATIVE HUMIDITY

SUPPLY FAN

STEAM HUMIDIFIER

TRANSFER GRILLE

UNIT HEATER

STATIC PRESSURE (INCHES OF WATER)

POWER OPERATED, PARALLEL BLADE DAMPER

POWER OPERATED, OPPOSED BLADE DAMPER

PRESSURE REDUCING VALVE

MEDIUM PRESSURE STEAM SUPPLY

MEDIUM PRESSURE STEAM CONDENSATE RETURN

PRESSURE DROP (FEET OF WATER)

TOP REGISTER (WALL TYPE)

VARIABLE FREQUENCY DRIVE

STATIC PRESSURE SENSOR

DOOR UNDERCUT BY GENERAL CONTRACTOR

SPS

TR

U/C

VFD

UH

V

TG

VALVE

S.P.

SH

SF

Rh

PD

PF

POD

PH

PRV

PPD

MPR

MAX

O.A.

NOM

MIN

PC

MPS

NOMINAL

MINIMUM

HEATING COIL

HORSEPOWER

FIN TUBE RADIATION

MIXING BOX

POUNDS PER HOUR

HIGH PRESSURE STEAM SUPPLY (60 PSIG & ABOVE)

LOW PRESSURE STEAM SUPPLY (15 PSIG & BELOW)

LOW PRESSURE STEAM CONDENSATE RETURN

HIGH PRESSURE STEAM CONDENSATE RETURN

LOCAL TEMPERATURE CONTROL PANEL

HYDRONIC RADIANT CEILING PANEL

HPR

HPS

HRP

LPR

LTCP

LBS/HR

MB

LPS

FLR.

FTR

HC

HP

FLOOR

BLOW UNLESS OTHERWISE NOTED)

CEILING DIFFUSERS (FOUR WAY

CHILLED WATER RETURN

CHILLED WATER SUPPLYCHS

CHR

AIR CONDITIONING

CONTROL CIRCUIT CONN.H1 N

WHITE BAKED ENAMELW.B.E.

BRAKE HORSEPOWERBHP

BRITISH THERMAL UNITBTU

BRITISH THERMAL UNIT PER HOURBTUH

CUBIC FEET PER MINUTECFM

CLEAN STEAM GENERATORCSG

DEGREEDEG

DIAMETERDIA

DIFFERENTIAL PRESSURE SENSORDPS

ENTERINGENT

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FPM FEET PER MINUTE

FT FEET

GALLONS PER MINUTEGPM

HEADHD

CHILLED WATER RETURNCHR

CHILLED WATER SUPPLYCHS

HEATING HOT WATER RETURNHWR

HEATING HOT WATER SUPPLYHWS

INCHESIN

INCHES WATER COLUMNIN WC

INCHES WATER GAUGEIN WG

LEAVING AIR TEMPERATURELAT

LEAVINGLVG

MBH 1000 BTUH

MERV MINIMUM EFFICIENCY REPORTING VALUE

NC NOISE CRITERIA

REVOLUTIONS PER MINUTERPM

SMOKE DAMPER (SUPPLY)SDS

SMOKE DAMPER (RETURN)SDR

STEAM PRESSURE REDUCING VALVESPRV

VARIABLE AIR VOLUMEVAV

HIGH PRESSURE STEAM CONDENSATE RETURN

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

NUMBER INDICATES STEAM PRESSURE

HPS (125)

HPR

PIPE UP

PIPE DOWN

IN-LINE CENTRIFUGAL FANICF

T

T

T

T

H dP

CS

DP SP

H4

A H7

9'-6"

MV MANUAL AIR VENT

GENERAL

VALVES

EXHAUST DUCT (UP & DOWN)UP DN

PUMPED CONDENSATE RETURNPC

ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING,

MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY

PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS,

WITHOUT THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT

ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND STRAINER, TRANSMITTERS,

CONTROL DEVICES, ETC.

EXPANSION TANK PIPEET

CONDENSATE PUMPCP

CABINET UNIT HEATERCUH

FCU FAN COIL UNIT

EXPANSION TANKET

PUMPP

RETURN FANRF

WATER FILTERWF

23 WHERE ROOFING WORK IS REQUIRED, THE EXISTING ROOFING MEMBRANE AND

INSULATION SHALL BE CUT, REMOVED AND RESTORED AS REQUIRED TO ATTAIN A

POWER TYPE ROOF VENTILATORRV

WHEN NEW SUPPLY AND RETURN AIR DUCTS ARE CONNECTED TO EXISTING

DUCTWORK, CLEAN BOTH NEW AND EXISTING DUCTWORK BY MOPPING AND VACUUM

CLEANING INSIDE AND OUTSIDE BEFORE OPERATION. CLEANING OF EXISTING

DUCTWORK SHALL BE LIMITED TO THE IMMEDIATE AREA WITHIN REACH OF THE OPEN

END OF THE DUCT.

INTEGRAL FACE AND BYPASSIFB

0.01" W.G. NEGATIVE PRESSURE IN CONSTRUCTION AREAS. COORDINATE

WITH GENERAL CONTRACTOR AND THE PROJECT ENGINEER.

25 RUNOUT PIPING TO TERMINAL UNITS SHALL BE 0.75" SIZE UNLESS OTHERWISE NOTED.

26 INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO

ARCHITECTURAL DRAWINGS AND GENERAL REQUIREMENTS SECTION 01 00 00.

27 TESTING, ADJUSTING AND BALANCING OF THE NEW SYSTEMS AND EXISTING SYSTEMS

AFFECTED BY THE NEW WORK SHALL BE PERFORMED AS PART OF A SEPARATE

CONTRACT THRU THE ENGINEER, AND IS NOT PART OF THE HVAC CONTRACT.

28 REFER TO ARCHITECTURAL FIRE-RATED PARTITION PLAN, SHEET 2.4G001 FOR LOCATIONS

AND FIRE-RATINGS OF NEW AND EXISTING WALL ASSEMBLIES. ALL PENETRATIONS

THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/OR FIRE-STOPPED AS

REQUIRED TO MAINTAIN FIRE-RATINGS INDICATED. COORDINATE WITH ALL TRADES

TO ENSURE FIRE-RATED PENETRATION REQUIREMENTS AND DETAILS ARE MET.

WATERTIGHT CONDITION. THE ROOFING SUB-CONTRACTOR SHALL BE A CERTIFIED

INSTALLER FOR SUCH INSTALLATION TO MAINTAIN THE EXISTING WARRANTY ON THE

ROOF.

PROPELLER TYPE EXHAUST FANPEF

RETURN AIRR.A.

SUPPLY AIRS.A.

SINGLE WIDTH SINGLE INLET TOP GRILLE (WALL TYPE)SWSI

SPECIFIC GRAVITYSP. GR.

ACCESS DOORAD

GRAVITY HOODGH

FD FLOOR DRAIN

FCW FOWARD CURVED WHEEL

FC FLEXIBLE CONNECTION

FACP FIRE ALARM CONTROL PANEL

ENERGY EFFICIENCY RATIOEER

EXHAUST AIRE.A.

CENTRIFUGAL OR HELICAL ROTARY SCREW CHILLER UNITCCU

BOTTOM GRILLE (WALL TYPE)BG

AIR SEPARATORAS

ANGLE GLOBE VALVE

PIPE GUIDE

PIPE ANCHOR

ORIFICE UNION

STAINLESS STEEL DUCT

METERM

PROJECT ENGINEERPE

THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS.

FIELD VERIFY ALL CONDITIONS AFFECTING THE EXECUTION OF THE WORK. ANY

DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE

CONTRACT DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL

BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER IN WRITING FOR

RESOLUTION BEFORE PROCEEDING WITH THE WORK.

CONSTRUCTION OF THIS PROJECT, THIS WORK SHALL BE PERFORMED ON

WEEKENDS OR WEEK NIGHTS, IF REQUIRED BY THE PROJECT ENGINEER.

DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED AND

SCHEDULED WELL IN ADVANCE WITH THE PROJECT ENGINEER.

29 APPROXIMATE ELEVATIONS NOTED ON FLOOR PLANS ARE TO THE BOTTOM OF DUCTS

AND EQUIPMENT, AND TO THE CENTER OF PIPES.

FBW FLAT BLADE WHEEL

ABBREVIATIONSCONTROLSPIPING SYMBOLSDRAWING SYMBOLS

DUCTWORK SYMBOLS

GENERAL NOTES

ABBREVIATIONS

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

Champlin Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

F E

D C

B A

539-326

PHASE 4

HEAPY PROJECT No.: 2012-04034 FIRM LICENSE No.: 01528

6/

/2

9:

:2

A

M

RELOCATE COMMUNITY LIVING

CENTER, PHASE 4

06/13/2017

INDEX, LEGEND, AND GENERAL

NOTES

H1

TEGDLE

177-4692

Cincinnati, Ohio

INDEX OF DRAWINGS

Sheet Number Sheet Name

H1 INDEX, LEGEND, AND GENERAL NOTES

H2 SCHEDULES

H3 SCHEDULES

H4 DETAILS

H5 DETAILS

H6 DETAILS

H7 DETAILS

H8 STEAM SYSTEM SCHEMATIC AND DETAILS

H9 HOT WATER SYSTEM SCHEMATIC AND CONTROLS

H10 CONTROLS AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.