36C25019Q0228-004.docx

DOCX document 27 KB Posted

Attached to
Indianapolis Patient Paratransit Services
Solicitation number
36C25019Q0228
Issued by

About this file

36C25019Q0228 S02- D.3- Draft Quality Assurance Surveillance Plan 02.docx

View the file

Other files

File Type Posted
36C25019D0056-000.docx DOCX document
36C25019Q0228-0001000.docx DOCX document
36C25019Q0228-003.docx DOCX document
36C25019Q0228-002.docx DOCX document
36C25019Q0228-001.docx DOCX document
36C25019Q0228-005.docx DOCX document
36C25019Q0228-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT D.3- QUALITY ASSURANCE SURVEILLANCE PLAN

QUALITY CONTROL PROGRAM — The Contractor is responsible for establishing a quality control program that at a minimum encompasses an inspection system that identifies, documents and remedies all deficiencies. All quality control records will be made available to the Government upon request.

QUALITY ASSURANCE PLAN - The Government will monitor the Contractor’s performance under this contract using the attached Quality Assurance Plan Worksheet.

Periodic and Unscheduled Inspections - The Contractor’s vehicles, facilities, or any other physical property tied to the performance of this contract may be inspected by the Contracting Officer, designated representative or a state inspector. After each inspection, the Contractor will be advised of any unsatisfactory conditions for which the Contractor is responsible. The Contractor shall promptly correct such deficiencies and communicate to the COR, by the following work day, the solution to each problem, when it will be corrected and what will be done to prevent recurrence of the problem.

Government Option. When inspection indicates that service is deficient, the Government may notify the Contractor in a timely manner that it may be held liable for any damages sustained by the Government including costs associated with re-evaluation. Meeting industry standards does not relieve the Contractor from responsibility to perform all other work IAW the terms of this Performance Work Statement.

Acceptable Performance. The Contractor shall be paid the full contract price if no repeat deficiencies are noted during a scheduled or special evaluation.

Unacceptable Performance - The Government Point of Contact (POC) may submit a Quality Assurance Worksheet at any time and as often as necessary to document quality levels. If Contractor response to an identified quality deficiency is unsatisfactory, the Contracting Officer or COR will contact the appropriate Contractor representative to implement a plan of action to remedy the identified deficiency.

Quality Assurance Plan Patient Paratransit Services Summary Worksheet Objective: Provide safe and timely transportation of veterans to and from Veterans Health Indiana facilities.

Task
Reference
Acceptable Quality Level (AQL)
Method of Surveillance /

Frequency

Adhere to the standards for vehicles & equipment.

PWS- Section titled “STANDARDS FOR VEHICLES AND EQUIPMENT”
Must maintain 95% compliance
Periodic and Unscheduled Inspections
Adhere to and maintain standards for vehicles and equipment maintenance.
PWS- Section titled “STANDARDS FOR MAINTENANCE”
Must maintain 95% compliance
Periodic and Unscheduled Inspections
Adhere to and maintain standards for driver qualifications.
PWS- Section titled “STANDARDS FOR DRIVER QUALIFICATIONS”
Must maintain 95% compliance
Periodic and Unscheduled Inspections
Adhere to and maintain standards for driver training.
PWS- Section titled “STANDARDS FOR DRIVER TRAINING”
Must maintain 95% compliance
Periodic and Unscheduled Inspections
Adhere to and maintain safety standards for passenger transportation.
PWS- Section titled “STANDARDS FOR PASSENGER TRANSPORTATION”
Must maintain 95% compliance
Periodic and Unscheduled Inspections / Customer Complaints

Quality Assurance Plan:

The COR will monitor Contractor performance and complete the Quality Assurance Worksheet provided, quarterly, at a minimum. The Quality Assurance Worksheet will be submitted directly to the Contracting Officer with a copy to the Contractor and the COR following the first quarter of performance, not later than the 5th day of the month following the evaluation. Future quarters will be submitted to the Contractor, and the COR. All quality performance ratings other than “Green” will be addressed and circumstances surrounding the rating will be documented for the contract file. The Contacting Officer will assume a quality performance rating of “Green” on all measured deliverables unless otherwise notified.

The quality rating may change from “Green” to “Red” without notice. We anticipate the Government POC utilizing the “Yellow” quality rating to alert the contracting office and the COR of quality issues that have the potential for a “Red” quality rating if corrective action is not taken.

The Government POC may submit a Quality Assurance Worksheet at anytime and as often as necessary to document quality levels. If Contractor response to an identified quality deficiency is unsatisfactory, the Contracting Officer or COR will contact the appropriate Contractor representative to implement a plan of action to remedy the identified deficiency.

COR must be formally trained which requires two (2) courses (proof of training certificates are required). New certificates required every two (2) years.

The COR referred to in this QASP is Erich Orrick, Patient Mobility Supervisor

Rating
Description
Green
Yes, performance and technical specifications are being met at AQL.

Yellow Yes, performance and technical specifications are currently being met at the minimum AQL, but the following service / deliverable needs Contractor attention.

The Customer must identify what component of the deliverable and/or service requires attention.

Red No, performance and technical specifications are not being met at AQL and the following service / deliverable needs immediate Contractor resolution.

The Customer must identify what component of the deliverable and/or service is below the minimum AQL.

QUALITY ASSURANCE PLAN WORKSHEET PARATRANSIT SERVICES

Performance Rating

Deliverable/Service

Quality Rating
Causative Factors
Effect on Mission
Action Required / Date

Adhere to the standards for vehicles & equipment.

Green
Comments Unnecessary for “Green” QA Rating.

Yellow

Red

Adhere to and maintain standards for vehicles and equipment maintenance.

Green
Comments Unnecessary for “Green” QA Rating.

Yellow

Red

Adhere to and maintain standards for driver qualifications.

Green
Comments Unnecessary for “Green” QA Rating.

Yellow

Red

Adhere to and maintain standards for driver training.

Green
Comments Unnecessary for “Green” QA Rating.

Yellow

Red

Adhere to and maintain safety standards for passenger transportation.

Green
Comments Unnecessary for “Green” QA Rating.

Yellow

Red

Period of Performance: From ___________to____________

Approved by: Date: ___________________ (Contracting Officer Representative)

File details come from the government source that posted it.