36C25019B0055-004.pdf
PDF 6 MB Posted
- Solicitation number
- 36C25019B0055
About this file
36C25019B0055 Drawing - 18 127 Mechanical.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25019C0295-000.docx | DOCX document | |
| 36C25019B0055-0001000.docx | DOCX document | |
| 36C25019B0055-0001001.docx | DOCX document | |
| 36C25019B0055-0001001.docx | DOCX document | |
| 36C25019B0055-0001000.docx | DOCX document | |
| 36C25019B0055-001.docx | DOCX document | |
| 36C25019B0055-008.doc | DOC document | |
| 36C25019B0055-004.pdf | ||
| 36C25019B0055-005.pdf | ||
| 36C25019B0055-002.pdf | ||
| 36C25019B0055-006.docx | DOCX document | |
| 36C25019B0055-007.xlsx | XLSX spreadsheet | |
| 36C25019B0055-003.pdf | ||
| 36C25019B0055-008.doc | DOC document | |
| 36C25019B0055-007.xlsx | XLSX spreadsheet | |
| 36C25019B0055-001.docx | DOCX document | |
| 36C25019B0055-006.docx | DOCX document | |
| 36C25019B0055-003.pdf | ||
| 36C25019B0055-002.pdf | ||
| 36C25019B0055-005.pdf | ||
| 36C25019B0055-000.docx | DOCX document | |
| 36C25019B0055-000.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHU AIR HANDLING UNIT
APD AIRSIDE PRESSURE DROP
BLDG BUILDING
BMS BUILDING MANAGEMENT SYSTEM
CFM CUBIC FEET PER MINUTE
CV CONSTANT VOLUME
CWR CHILLED WATER SUPPLY
CWS DOWN
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ETR EXISTING TO REMAIN
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
FCU FAN COIL UNIT
FPM FEET PER MINUTE
GC GENERAL CONTRACTOR
HP HORSEPOWER
HWHS HEATING HOT WATER SUPPLY
HWHR HEATING HOT WATER RETURN
HX HEAT EXCHANGER
LAT LEAVING AIR TEMPERATURE
LWT LEAVING WATER TEMPERATURE
MC MECHANICAL CONTRACTOR
N/A NOT AVAILABLE
NTS NOT TO SCALE
OA OUTSIDE AIR
RA RETURN AIR
SA SUPPLY AIR
VAV VARIABLE AIR VOLUME
FVAV 1-1
KEYED NOTE
EQUIPMENT
TAG
MECHANICAL ABBREVIATIONS
DRAWING SYMBOLS
CONTROL WIRING
LIMITS OF DEMOLITION
POINT OF CONNECTION TO EXISTING
MECHANICAL LEGEND
PL105
PL105
A
DRAWING NUMBER
WHERE SHOWN
SECTION LETTER
DRAWING NUMBER
WHERE DRAWN
DETAIL NUMBER
GATE VALVE
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/13/2019
UPGRADE BUILDING
MANAGEMENT SYSTEM -
MARION VAMC
610-18-105
VA NORTHERN INDIANA HEALTHCARE SYSTEM
1700 E. 38TH ST.
MARION, INDIANA 46953
18-127
BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
TEMPERATURE SENSOR
DUCT STATIC PRESSURE SENSOR
HUMIDITY SENSOR
MIXED AIR TEMPERATURE SENSOR
1 WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2 INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3 OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4 PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES
INTENDED.
5 WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR
PERFORMANCE FEATURES ARE REQUIRED.
6 EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE
ARCHITECT/ENGINEER. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT
EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE ARCHITECT/ENGINEER.
7 PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
8 INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
9 INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL
EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND
APPLICABLE CODES AND STANDARDS.
10 COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.
11 PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO
INSTALLATION.
12 PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
13 PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT IN COMPLIANCE WITH DIVISION 26.
14 DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE
EXACT ROUTING OF DUCTWORK AND PIPING IN THE FIELD.
15 FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING
OR EQUIPMENT.
16 NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE
PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS
AS FIT FOR THE PROPER EXECUTION OF THE WORK.
17 INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND
ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM
CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.
18 PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS
NOTED OTHERWISE.
19 SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
20 DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.
21 INSTALL PIPING FREE OF SAGS AND BENDS.
25 INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
26 SET MAXIMUM FAN SPEED SO AS TO NOT EXCEED THE RECOMMENDED MOTOR AMPS.
27 ALL ADJUSTABLE SETPOINTS BROUGHT OUT TO GRAPHICS PAGE.
GENERAL NOTES
A
M
AS SHOWN
M-001
WSHRCM
MECHANICAL LEGEND,
ABBREVIATIONS, AND GENERAL
NOTES
FULLY SPRINKLERED
DocuSign Envelope ID: F7E4F74A-C02E-44AA-BFC3-AED9BB473F69
6/17/2019
SUPPLY FAN STARTER WIRING DETAIL
M3:DI2
M3:DI1
M5:DI1
M2:DI2
M3:NO1
M3:NO2
AO BLAO BL
AI YL/BK
COM GR
GND GN/YL
L2 BK
AO BLAO BL
GND GN/YL
AI YL/BK
L2 BK
L1 RD
M2:AO2
0-3 V SIGNAL
6-9 V SIGNAL
AO BLAO BL
GND GN/YL
COM GR
M5:AO1
L2 BK
L1 RD
MTR STRTR H.O.A.
DESCRIPTIONITEM QTY
EXHAUST FAN STARTER WIRING DETAILEXHAUST FAN CONTROL DETAIL
M2:UI1
M5:UI2
M5:UI1
M2:UI2
M2:UI3
L1 RD
COM GR
M2:AO2
AI YL/BK
L2 BK
L1 RD
M5:DO1
OAD "L1 RD"
GND GN/YL
VLT
i6 i5
L6
L5
L6
L5
L6 i4
FRZ
ORNG
YEL
REPLACE SUPPLY AIR
TEMPERATURE SENSOR
AND CALIBRATE. ADD HIGH
AND LOW TEMPERATURE
SETPOINT LIMITS IN SEQUENCE
PROGRAMMING.
PROVIDE A SHUTOFF VALVE IN THE
BYPASS LINE FROM THE 3-WAY VALVE.
WITH BYPASS VALVE CLOSED, UTILIZE
3-WAY VALVE AS A TWO WAY.
L5 i3
FRZ
i2 i1
QTY
M4:DI1
M1:AO1
M3:UI2
M4:NO2
M1:UI3
M4:UI2
COM GR
AI YL/BK
L2 BK
M4:AO2
AO BLAO BL
COM GR
L1 RD
AI YL/BK
GND GN/YL
L2 BK
M4:AO1
AI YL/BK
COM GR
M3:AO1
DESCRIPTIONITEM
M3:DCP:C1
M4:UI3
M3:UI1
M3:AO2
M1:DI2
M4:UI1
M4:NO1
M1:DI1
M4:DI2
M1:UI1
M1:UI2
A
AB
AO BLAO BL
GND GN/YL
L1 RD
GND GN/YL
AI YL/BK
L2 BK
M4:AO2
AO BLAO BL
COM GR
L1 RD
M4:AO1
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
AO BLAO BL
GND GN/YL
L2 BK
L1 RD
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
M5:AO2
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
M1:AO2
L5
L6
L5
L6
L5
L6
L7
L8
L7
L8
L7
L8
REMOVE RETURN FAN
OVERRIDE AND TUNE THE
FAN VFD TO PREVENT
CYCLING AND SURGING.
VERIFY THE VFD IS SETUP
CORRECTLY FOR MINIMUM
FREQUENCY.
REPLACE HUMIDITY SENSOR
AND CALIBRATE.
REMOVE SUPPLY FAN OVERRIDE, TUNE THE FAN
VFD, AND CORRECT INPUT SIGNAL TO PREVENT
CYCLING AND SURGING. VERIFY THE VFD IS SETUP
CORRECTLY FOR MINIMUM FREQUENCY.
PROVIDE A SHUTOFF VALVE IN THE
BYPASS LINE FROM THE 3-WAY VALVE.
WITH BYPASS VALVE CLOSED, UTILIZE
3-WAY VALVE AS A TWO WAY.
ADD HIGH AND LOW TEMPERATURE
SETPOINT LIMITS IN SEQUENCE PROGRAMMING.
DESCRIPTIONITEM QTY
M2:AO1
M4:DI2
M4:DI1
M2:DI2
M3:UI1
M3:UI2
M1:DI2
M3:AO1
M4:NO2
M4:UI1
M3:UI3
M4:NO1
M1:AO1
M4:UI3
M4:AO1
M4:AO1
M4:AO2
M3:AO2
3- RELIEF DAMPERS
EAST - 2 ACTUATORS
WEST - 1 ACTUATOR
WEST - 1 ACTUATOR
VERIFY THE OA DAMPER IS OPEN
WHEN UNIT IS OPERATING.
M2:UI3
M3:DI1
M2:UI2
M1:DI1
M2:DI1
M1:UI2
M1:UI3
M1:UI1
M2:UI1
M4:AO2
M4:NO3
M1
M1:AO2
REMOVE RETURN FAN OVERRIDE AND TUNE
THE FAN VFD TO PREVENT CYCLING AND SURGING.
SET THE RETURN FAN VFD MINIMUM FREQUENCY TO
15 HZ AND THE MAXIMUM TO 75 HZ BUT DO NOT EXCEED MOTOR AMPS..
REPLACE CW COIL LEAVING AIR TEMPERATURE
SENSOR.
ADD HIGH AND LOW TEMPERATURE
SETPOINT LIMITS IN SEQUENCE PROGRAMMING.
SET THE SUPPLY FAN VFD MINIMUM
FREQUENCY TO 15 HZ AND THE MAXIMUM
TO 75 HZ BUT DO NOT EXCEED MOTOR AMPS.
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L7
L8
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L7
L8
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
M4:AO1
L7
L8
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L9
L10
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L9
L10
GND GN/YL
L2 BK
L1 RD
M4:NO3
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
REPLACE THE DUCT
STATIC PRESSURE
SENSORS ON SECOND
FLOOR CONTROLLING
THE SUPPLY FAN SPEED
AND CALIBRATE FOR
PROPER FAN OPERATION.
DISCONNECT FIRST FLOOR
DUCT SENSOR.
DESCRIPTIONITEM QTY
M1:DI1
M1:DI2
M3:UI3
M4:DI2
M4:DI1
M2:DI2
M2:AO1
M4:NO2
M4:UI1
M2:UI3
M4:UI3
M3:UI1
M4:UI2
M3:DI1
M1:UI3
M1:UI1
M3:UI2
M2:DI1
M1:AO1
M1:UI2
M4:NO1
M3:AO1
GND GN/YL
L2 BK
L1 RD
M4:NO3
M8
GND GN/YL
L2 BK
L1 RD
M4:NO3
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
M4:AO2
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
M4:AO1
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
M3:AO2
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
M1:AO2
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
M4:AO2
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
M4:AO1
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L7
L8
L7
L8
L7
L8
L7
L8
L9
L10
L9
L10
REPLACE HUMIDITY SENSOR
AND CALIBRATE
REMOVE RETURN FAN OVERRIDE AND TUNE THE FAN
VFD TO PREVENT CYCLING AND SURGING. VERIFY THE
VFD IS SETUP CORRECTLY TO RAMP LINEARLY WITH
THE SUPPLY FAN. CORRECT BINARY STATUS INPUT
(SHOWS ON WHEN FAN IS OFF).
BYPASS DAMPER DOES NOT RESPOND TO OVERRIDE
COMMANDS. VERIFY DAMPER OPERATES ACCORDING
TO CONTROLS SEQUENCE AND IN OVERRIDE MODE.
REMOVE SUPPLY FAN OVERRIDE (RETURN TO AUTOMATIC MODE),
TUNE THE FAN VFD, AND CORRECT INPUT SIGNAL TO PREVENT
CYCLING AND SURGING. VERIFY THE VFD IS SETUP CORRECTLY
FOR LINEAR OPERATION. SET MINIMUM VFD FREQUENCY TO 15
HZ AND MAXIMUM TO 75 HZ BUT DO NOT EXCEED MOTOR AMPS.
SUPPLY FAN STATIC VARIES FROM
0.4" TO 1.4" AT 100% SPEED. VERIFY
THAT THE CFM AND PRESSURE READINGS
ARE CORRECT.
REPLACE DUCT
STATIC PRESSURE SENSOR AND CALIBRATE.
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/13/2019
UPGRADE BUILDING
MANAGEMENT SYSTEM -
MARION VAMC
610-18-105
VA NORTHERN INDIANA HEALTHCARE SYSTEM
1700 E. 38TH ST.
MARION, INDIANA 46953
18-127
BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
M8
M2
M3
M4
M5
M7
M6
M1
M9
M2
M3
M4
M5
LK1
M1
M2
M3
M4
M5
LK1
M6
M7
M3
M4
M6
M7
M5
A
M
M-501
WRSRCM
MECHANICAL DETAILS
FULLY SPRINKLERED
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/13/2019
UPGRADE BUILDING
MANAGEMENT SYSTEM -
MARION VAMC
610-18-105
VA NORTHERN INDIANA HEALTHCARE SYSTEM
1700 E. 38TH ST.
MARION, INDIANA 46953
18-127
BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
QTYITEM DESCRIPTION
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L7
L2 BK
L1 RD
L6
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L19
L2 BK
L1 RD
L18
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L19
L2 BK
L1 RD
L18
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L21
L2 BK
L1 RD
L20
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L21
L2 BK
L1 RD
L20 i4 i3
PHT
i2 i1
MAT
i6 i5
CLG.COIL TMP
i8 i7
DAT
i10 i9
RAT
i12 i11
DSCH.STATIC
i14 i13
SPLY.STATIC
i16 i15
LO.LMT
i18 i17
SF.STAT
i20 i19
RTN.SMK
i24 i23
RAH
i26 i25
DAH
i30 i29
FLTR.STAT
L5
L4
SF.SS
SF.VFD
AAB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
AAB
GND GN/YL
L2 BK
L1 RD
L21
HUV
HUM.ENBL
L15
L14
L20
L13
L2 BK
L1 RD
L12
INTAKE DAMPER
RV-7 EF
L12 L13
L1
L2
ITEM DESCRIPTIONQTY
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L7
L2 BK
L1 RD
L6
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L17
L2 BK
L1 RD
L16
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L17
L2 BK
L1 RD
L16
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L19
L2 BK
L1 RD
L18
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L19
L2 BK
L1 RD
L18 i6 i5
CLG.COIL.TMP
i8 i7
DAT
i14 i13
SPLY.STATIC
i18 i17
SF.STAT
i26 i25
DAH
i4 i3
PHT
i2 i1
MAT
i16 i15
LO.LMT
i30 i29
FLTR.STAT
i10 i9
RAT
i20 i19
RTN.SMK
i24 i23
RAH
i12 i11
DSCH.STATIC
L5
L4
SF.SS
L14 L15
SF.VFD
AAB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
AAB
GND GN/YL
L2 BK
L1 RD
L19
L18
HUV
HUM.ENBL
L13
L12
L11
L2 BK
L1 RD
L10
INTAKE DAMPER
RV-6 EF
L10 L11
L1
L2
DESCRIPTIONITEM QTY
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L9
L2 BK
L1 RD
L8
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L21
L2 BK
L1 RD
L20
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L21
L2 BK
L1 RD
L20
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L23
L2 BK
L1 RD
L22
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L23
L2 BK
L1 RD
L22 i22 i21
RF.STAT
i2 i1
MAT
i4 i3
RA.CFM
i6 i5
SA.CFM
i8 i7
DAT
i10 i9
RAT
i12 i11
RAH
i14 i13
SPLY.STATIC
i16 i15
SPLY.SMK
i18 i17
LO.LMT
i20 i19
SF.STAT
i24 i23
DAH
i28 i27
PRE.FLTR
i30 i29
FNL.FLTR
i32 i31
PRE.HT.TMP
i34 i33
CW.COIL.TMP
L5
L4
SF.SS
L7
L6
RF.SS
SF.CNTRL
RF.CNTRL
L18 L19
SAFETY
i26 i25
SPC.TMP
L18 L19
SAFETY
S
E
R
I
E
S
A
AB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
AAB
GND GN/YL
L2 BK
L1 RD
L23
L22
HUV
HUM.ENBL
L11
L10 i36 i35
RTN.SMK
L17
L2 BK
L1 RD
L16
INTAKE DAMPER
RV8
L14 L15
L1
L2
RV3 & 8
L16 L17
RV3
RV8
TS1
DESCRIPTIONITEM QTY
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L9
L2 BK
L1 RD
L8
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L17
L2 BK
L1 RD
L16
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L17
L2 BK
L1 RD
L16
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L19
L2 BK
L1 RD
L18
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L19
L2 BK
L1 RD
L18 i22 i21
RF.STAT
i2 i1
MAT
i4 i3
RA.CFM
i6 i5
SA.CFM
i8 i7
DAT
i10 i9
RAT
i12 i11
RAH
i14 i13
SPLY.STATIC
i16 i15
SPLY.SMK
i18 i17
LO.LMT
i20 i19
SF.STAT
i24 i23
DAH
i28 i27
PRE.FLTR
i30 i29
FNL.FLTR
i32 i31
PRE.HT.TMP
i34 i33
CW.COIL.TMP
i36 i35
RTN.SMK
L5
L4
SF.SS
L7
L6
RF.SS
SF.CNTRL
RF.CNTRL
L14 L15
SAFETY
L14 L15
SAFETY
S
E
R
I
E
S
S
E
R
I
E
S
S
E
R
I
E
S i26 i25
SPC.TMP
AAB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
A
AB
GND GN/YL
L2 BK
L1 RD
L19
L18
HUV
HUM.ENBL
L11
L10
L12 L13
L1
L2
RV1 & 2
L20 L21
RV1
RV2
TS1
A
M
M-502
WRSRCM
MECHANICAL DETAILS
FULLY SPRINKLERED
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/13/2019
UPGRADE BUILDING
MANAGEMENT SYSTEM -
MARION VAMC
610-18-105
VA NORTHERN INDIANA HEALTHCARE SYSTEM
1700 E. 38TH ST.
MARION, INDIANA 46953
18-127
BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
DESCRIPTIONITEM QTY
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L19
L2 BK
L1 RD
L18
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L19
L2 BK
L1 RD
L18
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L9
L2 BK
L1 RD
L8
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L17
L2 BK
L1 RD
L16 i22 i21
RF.STAT
i2 i1
MAT
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L17
L2 BK
L1 RD
L16 i4 i3
RA.CFM
i6 i5
SA.CFM
i8 i7
DAT
i10 i9
RAT
i12 i11
RAH
i14 i13
SPLY.STATIC
i16 i15
SPLY.SMK
i18 i17
LO.LMT
i20 i19
SF.STAT
i24 i23
DAH
i28 i27
PRE.FLTR
i30 i29
FNL.FLTR
i32 i31
PRE.HT.TMP
i36 i35
RTN.SMK
L5
L4
SF.SS
L7
L6
RF.SS
SF.CNTRL
RF.CNTRL
L14 L15
SAFETY
S
E
R
I
E
S i34 i33
CW.COIL.TMP
L14 L15
SAFETY
S
E
R
I
E
S
S
E
R
I
E
S i26 i25
SPC.TMP
AAB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
A
AB
GND GN/YL
L2 BK
L1 RD
L23
L22
HUV
HUM.ENBL
L11
L10
DESCRIPTIONITEM QTY
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L29
L2 BK
L1 RD
L28
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L9
L2 BK
L1 RD
L8
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L29
L2 BK
L1 RD
L28
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L29
L2 BK
L1 RD
L28
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L31
L2 BK
L1 RD
L30
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L31
L2 BK
L1 RD
L30 i22 i21
RF.STAT
i10 i9
RAT
i42 i41
RAH
RF.CNTRL
i4 i3
RA.CFM
i46 i45
RTN.SMK
i2 i1
MAT
i18 i17
LO.LMT
L7
L6
RF.SS
L26 L27
SAFETY
i30 i29
PRE.FLTR
i26 i25
PRE.HT.TMP
i28 i27 i8 i7
DAT
i20 i19
SF.STAT
i32 i31
FNL.FLTR
L5
L4
SF.SS
SF.CNTRL
L26 L27
SAFETY
CW.COIL.TMP
i6 i5
SA.CFM
i14 i13
SPLY.STATIC
i16 i15
SPLY.SMK
i44 i43
DAH
S
E
R
I E
S
S
E
R
I
E
S
S
E
R
I
E
S i24 i23
SPC.TMP
AAB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
GND GN/YL
L2 BK
L1 RD
L31
L30
HUV
HUM.ENBL
L25
L24
AAB
L11
L2 BK
L1 RD
L10
INTAKE DAMPER
WEF25
L10 L11
L1
L2
WEF25
DESCRIPTIONITEM QTY
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L9
L2 BK
L1 RD
L8
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L25
L2 BK
L1 RD
L24
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L25
L2 BK
L1 RD
L24
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L27
L2 BK
L1 RD
L26
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L27
L2 BK
L1 RD
L26 i22 i21
RF.STAT
i2 i1
MAT
i4 i3
RA.CFM
i6 i5
SA.CFM
i8 i7
DAT
i10 i9
RAT
i12 i11
RAH
i14 i13
SPLY.STATIC
i16 i15
SPLY.SMK
i18 i17
LO.LMT
i20 i19
SF.STAT
i24 i23
DAH
i28 i27
PRE.FLTR
i30 i29
FNL.FLTR
i32 i31
PRE.HT.TMP
i34 i33
CW.COIL.TMP
i36 i35
RTN.SMK
L5
L4
SF.SS
L7
L6
RF.SS
SF.CNTRL
RF.CNTRL
L22 L23
SAFETY
L22 L23
SAFETY
i26 i25
SPC.TMP
AAB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
A
AB
GND GN/YL
L2 BK
L1 RD
L27
L26
HUV
HUM.ENBL
L11
L10
S
E
R
I
E
S
S
E
R
I
E
S
S
E
R
I
E
S
L21
L2 BK
L1 RD
L20
INTAKE DAMPER
WEF3
L20 L21
L1
L2
WEF3
DESCRIPTIONITEM QTY
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L29
L2 BK
L1 RD
L28
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L9
L2 BK
L1 RD
L8
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L29
L2 BK
L1 RD
L28
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L31
L2 BK
L1 RD
L30
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L31
L2 BK
L1 RD
L30
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L31
L2 BK
L1 RD
L30 i22
RF.STAT
i10 i9
RAT
i42 i41
RAH
RF.CNTRL
i4 i3
RA.CFM
i46 i45
RTN.SMK
i2 i1
MAT
i18 i17
LO.LMT
L7
L6
RF.SS
L26 L27
SAFETY
i30 i29
PRE.FLTR
i26 i25
PRE.HT.TMP
i28 i27 i8 i7
DAT
i20 i19
SF.STAT
i32 i31
FNL.FLTR
L5
L4
SF.SS
L26 L27
SAFETY
CW.COIL.TMP
i6 i5
SA.CFM
i14 i13
SPLY.STATIC
i16 i15
SPLY.SMK
i44 i43
DAH
i24 i23
SPC.TMP
AAB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
GND GN/YL
L2 BK
L1 RD
L31
L30
HUV
HUM.ENBL
L25
L24
AAB
S
E
R
I
E
S
S
E
R
I
E
S i21
S
E
R
I E
S
TS1
TS1
TS1
TS1
SET THE RETURN FAN VFD MINIMUM
FREQUENCY TO 15 HZ AND THE
MAXIMUM TO 75 HZ. CORRECT FAN
STATUS INPUT AND VERIFY ON
GRAPHIC.
REPLACE HUMIDITY SENSOR AND
CALIBRATE CURRENTLY 18% FROM ACTUAL.
REPLACE MIXED AIR
TEMPERATURE SENSOR
AND CALIBRATE. CURRENTLY
READING 6°F FROM ACTUAL.
ADD HIGH AND LOW TEMPERATURE
SETPOINT LIMITS IN SEQUENCE PROGRAMMING.
ADJUST OA AND EA DAMPERS TO CLOSE
AND ADJUST RA DAMPER TO FULL OPEN
WHEN UNIT IS OFF. PROVIDE ACCESS
PANEL TO ACCESS ALL DAMPER ACTUATORS.
CORRECT GRAPHICS TO SHOW 2-WAY VALVE
ADJUST HW AND CW VALVE
LINKAGES TO STROKE 0-100%
TO OPEN AND CLOSE FULLY.
SET THE SUPPLY FAN VFD
MINIMUM FREQUENCY TO
15HZ AND MAXIMUM TO 75 HZ
BUT DO NOT EXCEED MOTOR AMPS.
ADD SA-RA DIFFERENTIAL
CFM TO GRAPHIC.
ADJUST EXHAUST DAMPER
LINKAGE AND VERIFY DAMPER
STROKES PORPORTIONALLY
TO COMMAND.
REPLACE RETURN AIR HUMIDITY
SENSOR AND CALIBRATE.
CURRENTLY 6% FROM ACTUAL.
REPLACE SUPPLY AIR
HUMIDITY SENSOR AND
CALIBRATE. CURRENTLY
14% FROM ACTUAL.
SET SUPPLY FAN SPEED TO
MAINTAIN THE DUCT STATIC
PRESSURE SETPOINT.
REPLACE SUPPLY FAN SHEAVES.
SET SUPPLY FAN MINIMUM SPEED
TO 15 HZ AND MAXIMUM TO 75 HZ
BUT DO NOT EXCEED MOTOR AMPS..
REMOVE RETURN FAN FROM BYPASS MODE.
VERIFY FAN OPERATES IN AUTO PER THE
SEQUENCE. SET MINIMUM FAN SPEED TO
15 HZ AND MAXIMUM TO 75 HZ BUT
DO NOT EXCEED MOTOR AMPS. VERIFY
RETURN FAN IS OFF WHEN COMMANDED OFF.
REPLACE RETURN AIR TEMPERATURE
SENSOR AND CALIBRATE. CURRNETLY
4°F FROM ACTUAL.
REPLACE RETURN AIR HUMIDITY SENSOR
AND CALIBRATE. CURRENTLY 24% FROM
ACTUAL.
ADJUST OA AND EA DAMPERS TO CLOSE
AND ADJUST RA DAMPER TO FULL OPEN
WHEN UNIT IS OFF.
ADJUST HW VALVE TO CLOSE
100%. CONFIRM HW VALVE
LOCKOUT WHEN COOLING IS
ENABLED.
REMOVE SUPPLY FAN FROM BYPASS MODE. VERIFY
FAN OPERATES IN AUTO PER THE SEQUENCE. SET
MINIMUM FAN SPEED TO 15 HZ AND MAXIMUM TO
75 HZ BUT DO NOT EXCEED MOTOR AMPS.
VERIFY SUPPLY FAN IS OFF WHEN COMMANDED
OFF. SET SUPPLY FAN TO SATISFY DUCT
PRESSURE SETPOINT.
ADD HIGH AND LOW TEMPERATURE SETPOINT LIMITS IN
SEQUENCE PROGRAMMING. CONFIRM THAT DISCHARGE
AIR MEETS COOLING SETPOINT WITH CW VALVE 100% OPEN.
ADD SUPPLY AND RETURN
AIR DIFFERENTIAL CFM TO
GRAPHIC.
ADJUST CW VALVE TO
OPEN 100% AND
CLOSE 100%
REPLACE PREHEAT
TEMPERATURE
SENSOR AND
CALIBRATE.
CURRENTLY
READING 0°F.
REPAIR RETURN FAN STATUS
INPUT AND VERIFY FAN IS
OFF WHEN COMMANDED.
REPLACE RETURN AIR HUMIDITY
SENSOR AND CALIBRATE. CURRENTLY
9% FROM ACTUAL.
REPLACE SUPPLY FAN SHEAVES.
SET FAN MINIMUM SPEED TO 15 HZ
AND MAXIMUM TO 75 HZ BUT
DO NOT EXCEED MOTOR AMPS.
SET SUPPLY FAN SPEED TO MAINTAIN THE DUCT
PRESSURE SETPOINT. ADD SUPPLY
FAN START/STOP TO GRAPHICS.
REPLACE SUPPLY AIR HUMIDITY
SENSOR AND CALIBRATE. CURRENTLY
14% FROM ACTUAL.
INSTALL A SHUTOFF VALVE IN THE BYPASS
LINE FROM THE 3-WAY VALVE. WITH BYPASS
VALVE CLOSED, UTILIZE 3-WAY VALVE AS TWO
WAY.
INSTALL A SHUTOFF VALVE IN THE BYPASS
LINE FROM THE 3-WAY VALVE AND MAKE
CLOSED. CORRECT GRAPHICS SO HW VALVE
SHOWS CLOSED WHEN ACTUAL CLOSED.
LOCKOUT HW VALVE WHEN UNIT IS COOLING.
CORRECT GRAPHIC TO
SHOW 2-WAY VALVE
A
M
M-503
WRSRCM
MECHANICAL DETAILS
FULLY SPRINKLERED
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/13/2019
UPGRADE BUILDING
MANAGEMENT SYSTEM -
MARION VAMC
610-18-105
VA NORTHERN INDIANA HEALTHCARE SYSTEM
1700 E. 38TH ST.
MARION, INDIANA 46953
18-127
BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
DESCRIPTIONITEM QTY
SEQUENCE OF OPERATION
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L9
L2 BK
L1 RD
L8
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L25
L2 BK
L1 RD
L24
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L25
L2 BK
L1 RD
L24
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L27
L2 BK
L1 RD
L26
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L27
L2 BK
L1 RD
L26 i22 i21
RF.STAT
i2 i1
MAT
i4 i3
RA.CFM
i6 i5
SA.CFM
i8 i7
DAT
i10 i9
RAT
i12 i11
RAH
i14 i13
SPLY.STATIC
i16 i15
SPLY.SMK
i18 i17
LO.LMT
i20 i19
SF.STAT
i24 i23
DAH
i28 i27
PRE.FLTR
i30 i29
FNL.FLTR
i32 i31
PRE.HT.TMP
i34 i33
CW.COIL.TMP
i36 i35
RTN.SMK
L5
L4
SF.SS
L7
L6
RF.SS
SF.CNTRL
RF.CNTRL
L22 L23
SAFETY
L22 L23
SAFETY
i26 i25
SPC.TMP
AAB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
AAB
GND GN/YL
L2 BK
L1 RD
L27
L26
HUV
HUM.ENBL
L11
L10
S
E
R
I
E
S
S
E
R
I
E
S
S
E
R
I
E
S
TS1
DESCRIPTIONITEM QTY
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L9
L2 BK
L1 RD
L8
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L25
L2 BK
L1 RD
L24
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L25
L2 BK
L1 RD
L24
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L27
L2 BK
L1 RD
L26
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L27
L2 BK
L1 RD
L26 i22 i21
RF.STAT
i2 i1
MAT
i4 i3
RA.CFM
i6 i5
SA.CFM
i8 i7
DAT
i10 i9
RAT
i12 i11
RAH
i14 i13
SPLY.STATIC
i16 i15
SPLY.SMK
i18 i17
LO.LMT
i20 i19
SF.STAT
i24 i23
DAH
i28 i27
PRE.FLTR
i30 i29
FNL.FLTR
i32 i31
PRE.HT.TMP
i34 i33
CW.COIL.TMP
i36 i35
RTN.SMK
L5
L4
SF.SS
L7
L6
RF.SS
SF.CNTRL
RF.CNTRL
L22 L23
SAFETY
L22 L23
SAFETY
i26 i25
SPC.TMP
AAB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
GND GN/YL
L2 BK
L1 RD
L27
L26
HUV
HUM.ENBL
L11
L10
AAB
i48 i47
HW.DPT
i46 i45
HW.DPT
S
E
R
I
E
S
S
E
R
I
E
S
S
E
R
I
E
S
DESCRIPTIONITEM QTY
SEQUENCE OF OPERATION
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L9
L2 BK
L1 RD
L8
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L17
L2 BK
L1 RD
L16
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L17
L2 BK
L1 RD
L16
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L19
L2 BK
L1 RD
L18
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L19
L2 BK
L1 RD
L18 i22 i21
RF.STAT
i2 i1
MAT
i4 i3
RA.CFM
i6 i5
SA.CFM
i8 i7
DAT
i10 i9
RAT
i12 i11
RAH
i14 i13
SPLY.STATIC
i16 i15
SPLY.SMK
i18 i17
LO.LMT
i20 i19
SF.STAT
i24 i23
DAH
i28 i27
PRE.FLTR
i30 i29
FNL.FLTR
i32 i31
PRE.HT.TMP
i34 i33
CW.COIL.TMP
i36 i35
RTN.SMK
L5
L4
SF.SS
L7
L6
RF.SS
SF.CNTRL
RF.CNTRL
L14 L15
SAFETY
L14 L15
SAFETY
S
E
R
I
E
S i26 i25
SPC.TMP
AAB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
A
AB
GND GN/YL
L2 BK
L1 RD
L19
L18
HUV
HUM.ENBL
L11
L10
S
E
R
I
E
S
S
E
R
I
E
S
DESCRIPTIONITEM QTY
RETURN FAN STARTER WIRING DETAIL
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L9
L2 BK
L1 RD
L8
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L23
L2 BK
L1 RD
L22
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L23
L2 BK
L1 RD
L22
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L25
L2 BK
L1 RD
L24
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L25
L2 BK
L1 RD
L24 i22 i21
RF.STAT
i10 i9
RAT
i12 i11
RAH
i36 i35
RTN.SMK
i2 i1
MAT
i16 i15
LO.LMT
i8 i7
DAT
i20 i19
SF.STAT
L5
L4
SF.SS
L7
L6
RF.SS
i18 i17
SPLY.SMK
i14 i13
DAH
i26 i25
FNL.FLTR
i4 i3
PRE.HT.TMP
i6 i5
CW.COIL.TMP
i24 i23
PRE.FLTR
i40 i39
SPC.TMP
AAB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
AAB
GND GN/YL
L2 BK
L1 RD
L25
L24
HUV
HUM.ENBL
L11
L10
SUPPLY FAN STARTER WIRING DETAIL
L20 L21
SAFETY
L20 L21
SAFETY
TS1
TS1
TS1
REPAIR RETURN FAN TO OFF WHEN
COMMANDED OFF AT GRAPHIC. SET
MINIMUM RETURN FAN SPEED TO
15 HZ AND MAXIMUM TO 75 HZ.
REPLACE RETURN AIR
TEMPERATURE SENSOR
AND CALIBRATE.
CURRENTLY 4°F FROM
ACTUAL.
REPLACE RETURN AIR HUMIDITY
SENSOR AND CALIBRATE.
CURRENTLY 17% FROM ACTUAL.
ADJUST OA AND EA DAMPERS TO CLOSE
AND ADJUST RA DAMPER TO FULL OPEN
WHEN UNIT IS OFF.
SET MINIMUM SPEED FOR SUPPLY
AND RETURN FAN TO 15 HZ AND THE
MAXIMUM TO 75 HZ. SET SUPPLY FAN
SPEED TO MEET DUCT PRESSURE
SETPOINT.
ADD HIGH AND LOW TEMPERATURE SETPOINT
LIMITS IN SEQUENCE PROGRAMMING.
ADD HW VALVE LOCKOUT WHEN
COOLING IS ENABLED.
ADD ACCESS TO
THE PREHEAT
TEMPERATURE
SENSOR AND
CALIBRATE.
REPLACE COOLING COIL TEMPERATURE
SENSOR AND CALIBRATE.
ADD SA/RA DIFFERENTIAL
CFM TO GRAPHIC.
REPAIR RETURN FAN TO TURN OFF
WHEN COMMANDED OFF AT GRAPHIC.
SET MINIMUM RETURN FAN SPEED TO
15 HZ AND MAXIMUM TO 75 HZ.
REPLACE RETURN AIR TEMPERATURE SENSOR AND
CALIBRATE. CURRENTLY SHOWS 'FAILED'.
REPLACE RETURN AIR HUMIDITY
SENSOR AND CALIBRATE.
CURRENTLY 20% FROM ACTUAL.
SET MINIMUM SPEED FOR SUPPLY
AND RETURN FAN TO 15 HZ AND THE
MAXIMUM TO 75 HZ. SET SUPPLY FAN
SPEED TO MEET DUCT PRESSURE
SETPOINT BUT DO NOT
EXCEED MOTOR AMPS.
REPLACE SUPPLY AIR HUMIDITY SENSOR AND CALIBRATE.
CURRENTLY 7% FROM ACUTAL. ADD HIGH AND LOW TEMPERATURE.
SETPOINT LIMITS IN SEQUENCE PROGRAMMING.
ADD SA/RA DIFFERENTIAL
CFM TO GRAPHIC.
ADJUST OA AND EA DAMPERS TO CLOSE
AND ADJUST RA DAMPER TO FULL OPEN
WHEN UNIT IS OFF.
ADD HW VALVE LOCKOUT WHEN
COOLING IS ENABLED.
INVESTIGATE AND CORRECT RETURN
FAN NOT TURNING 'OFF' WHEN
COMMANDED TO 'OFF'. SET MINIMUM
SPEED TO 15 HZ.
REPLACE RETURN AIR TEMPERATURE
SENSOR AND CALIBRATE. CURRENTLY
READING 2.4°F FROM ACTUAL.
REPLACE RETURN AIR HUMIDITY SENSOR
AND CALIBRATE. CURRENTLY READING
31% FROM ACTUAL.
INVESTIGATE AND CORRECT EXHAUST
DAMPER. COMMANDS FROM GRAPHIC
NOT WORKING AND DAMPER BEING
CLOSED IN AUTO OR MANUAL.
INVESTIGATE AND CORRECT OSA
AND EA DAMPERS NOT CLOSING
AND RA DAMPER NOT OPENING
WHEN UNIT IS OFF.
MOVE PREHEAT TEMPERATUE
SENSOR TO AN ACCESSIBLE
LOCATION AND CALIBRATE.
INVESTIGATE AND CORRECT HW VALVE
COMMANDS FROM GRAPHIC NOT
WORKING. ADD HW VALVE LOCKOUT
WHEN COOLING IS ENABLED.
REPLACE MIXED
AIR TEMPERATURE
SENSOR AND
CALIBRATE.
CURRENTLY
READING 4.5°F
FROM ACTUAL.
INVESTIGATE AND CORRECT CW VALVE
COMMANDS FROM GRAPHIC NOT WORKING.
SET MINIMUM SPEED FOR
SUPPLY AND RETURN FAN
TO 15 HZ AND MAXIMUM
TO 75 HZ.
ADD SA/RA DIFFERENTIAL
CFM TO GRAPHIC.
REPLACE COOLING COIL
TEMPERATURE SENSOR.
CURRENTLY READING 4°F
FROM ACTUAL.
ADD HIGH AND LOW TEMPERATURE SETPOINT LIMITS
IN SEQUENCE PROGRAMMING. CONFIRM THAT DISCHARGE
AIR MEETS COOLING SETPOINT WITH CW VALVE 100% OPEN.
REPLACE SUPPLY AIR HUMIDITY
SENSOR AND CALIBRATE.
CURRENTLY READING 15% FROM
ACTUAL.
REPLACE MIXED AIR TEMPERATURE
SENSOR. CURRENTLY READING 23°
FROM ACTUAL.
REPLACE RETURN AIR TEMPERATURE SENSOR
CURRENTLY READING 4.5°F FROM ACTUAL.
REPLACE RETURN AIR HUMIDITY
SENSOR AND CALIBRATE.
CURRENTLY READING 13% FROM
ACTUAL.
ADD HIGH AND LOW TEMPERATURE SETPOINT
LIMITS IN SEQUENCE PROGRAMMING. CONFIRM
THAT DISCHARGE AIR MEETS COOLING
SETPOINT WITH CW VALVE 100% OPEN.
REPLACE SUPPLY AIR HUMIDITY
SENSOR AND CALIBRATE.
CURRENTLY READING 13% FROM
ACTUAL.
INVESTIGATE AND CORRECT CW
VALVE COMMANDS TO MAINTAIN
DISCHARGE AIR SETPOINT
TEMPERATURE.
PROVIDE A SHUTOFF VALVE IN THE BYPASS
LINE FROM THE 3-WAY VALVE. WITH BYPASS
VALVE CLOSED, UTILIZE 3-WAY VALVE AS TWO
WAY.
CORRECT GRAPHIC TO
SHOW 2-WAY VALVE.
CORRECT GRAPHIC TO
SHOW 2-WAY VALVE.
CORRECT GRAPHIC TO
SHOW 2-WAY VALVE.
A
M
M-504
WRSRCM
MECHANICAL DETAILS
FULLY SPRINKLERED
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/13/2019
UPGRADE BUILDING
MANAGEMENT SYSTEM -
MARION VAMC
610-18-105
VA NORTHERN INDIANA HEALTHCARE SYSTEM
1700 E. 38TH ST.
MARION, INDIANA 46953
18-127
BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
DESCRIPTIONITEM QTY
SEQUENCE OF OPERATION
NOTE:
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L9
L2 BK
L1 RD
L8
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L17
L2 BK
L1 RD
L16
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L17
L2 BK
L1 RD
L16
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L19
L2 BK
L1 RD
L18
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L19
L2 BK
L1 RD
L18 i22 i21
RF.STAT
i2 i1
MAT
i4 i3
RA.CFM
i6 i5
SA.CFM
i8 i7
DAT
i10 i9
RAT
i12 i11
RAH
i14 i13
SPLY.STATIC
i16 i15
SPLY.SMK
i18 i17
LO.LMT
i20 i19
SF.STAT
i24 i23
DAH
i28 i27
PRE.FLTR
i30 i29
FNL.FLTR
i32 i31
PRE.HT.TMP
i34 i33
CW.COIL.TMP
i36 i35
RTN.SMK
L5
L4
SF.SS
L7
L6
RF.SS
SF.CNTRL
RF.CNTRL
L14 L15
SAFETY
L14 L15
SAFETY
S
E
R
I
E
S
S
E
R
I
E
S
S
E
R
I
E
S i26 i25
SPC.TMP
AAB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
AAB
GND GN/YL
L2 BK
L1 RD
L19
L18
HUV
HUM.ENBL
L11
L10
L13
L2 BK
L1 RD
L12
W/ MA40-7073
*REPLACE PNEU ACT
INTAKE DAMPER
WEF8
L12 L13
L1
L2
WEF8
M3-Ui2
M4-DO1
UEF22,23 & 24/
WEF8
M4-Ui1
UEF22
M4-DO2 M4-Ui2
UEF23
M4-DO3 M4-Ui3
UEF24
DESCRIPTIONQTYITEM
SEQUENCE OF OPERATION
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L9
L2 BK
L1 RD
L8
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L23
L2 BK
L1 RD
L22
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L23
L2 BK
L1 RD
L22
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L25
L2 BK
L1 RD
L24
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L25
L2 BK
L1 RD
L24 i22 i21
RF.STAT
i2 i1
MAT
i4 i3
RA.CFM
i6 i5
SA.CFM
i8 i7
DAT
i10 i9
RAT
i12 i11
RAH
i14 i13
SPLY.STATIC
i16 i15
SPLY.SMK
i18 i17
LO.LMT
i20 i19
SF.STAT
i24 i23
DAH
i28 i27
PRE.FLTR
i30 i29
FNL.FLTR
i32 i31
PRE.HT.TMP
i34 i33
CW.COIL.TMP
i36 i35
RTN.SMK
L5
L4
SF.SS
L7
L6
RF.SS
SF.CNTRL
RF.CNTRL
L20 L21
SAFETY
L20 L21
SAFETY
i26 i25
SPC.TMP
A
AB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
AAB
GND GN/YL
L2 BK
L1 RD
L25
L24
HUV
HUM.ENBL
L11
L10
S
E
R
I
E
S
S
E
R
I
E
S
S
E
R
I
E
S
L14 L15
L1
L2
RV9,1 & 5
L16 L17
L18 L19
RV9
RV1
RV5
TS1
TS1
REPAIR RETURN FAN STATUS TO TURN
OFF WHEN COMMANDED OFF AT
GRAPHIC. SET MINIMUM RETURN FAN
SPEED TO 15 HZ AND MAXIMUM TO
75 HZ.
REPLACE RETURN AIR TEMPERATURE SENSOR
AND CALIBRATE. CURRENTLY 4°F FROM ACTUAL.
REPLACE RETURN AIR HUMIDITY SENSOR
AND CALIBRATE. CURRENTLY 21% FROM
ACTUAL.
SET MINIMUM SPEED FOR SUPPLY AND
RETURN FAN TO 15 HZ AND THE
MAXIMUM SPEED TO 75 HZ. SET SUPPLY
FAN SPEED TO MEET DUCT PRESSURE
SETPOINT.
REPLACE SUPPLY AIR HUMIDITY
SENSOR AND CALIBRATE.
CURRENTLY 13% FROM ACTUAL.
ADD SA/RA
DIFFERENTIAL
CFM TO GRAPHIC.
ADD HW VALVE LOCKOUT
WHEN COOLING IS
ENABLED.
REPAIR RETURN FAN STATUS TO TURN
OFF WHEN COMMANDED OFF AT
GRAPHIC. SET MINIMUM RETURN FAN
SPEED TO 15 HZ AND MAXIMUM TO
75 HZ.
REPLACE RETURN AIR TEMPERATURE
SENSOR AND CALIBRATE. CURRENTLY
4°F FROM ACTUAL.
REPLACE RETURN AIR HUMIDITY SENSOR
AND CALIBRATE. CURRENTLY 37% FROM
ACTUAL.
REPAIR SUPPLY FAN STATUS ON GRAPHIC CURRENTLY
SHOWS ON WHEN FAN IS OFF. SET MINIMUM SPEED
FOR SUPPLY AND RETURN FAN TO 15 HZ AND
MAXIMUM TO 75 HZ. SET SUPPLY FAN SPEED
TO MEET DUCT PRESSURE SETPOINT.
ADD HIGH AND LOW TEMPERATURE SETPOINT
LIMITS IN SEQUENCE PROGRAMMING.
REPLACE SUPPLY AIR HUMIDITY
SENSOR AND CALIBRATE.
CURRENTLY 18% FROM ACTUAL.
ADD SA/RA
DIFFERENTIAL
CFM TO GRAPHIC.
REPLACE COOLING
COIL TEMPERATURE
SENSOR AND
CALIBRATE.
CURRENTLY 4°F
FROM ACTUAL.
INSTALL A SHUTOFF VALVE IN THE BYPASS
LINE FROM THE 3-WAY VALVE. WITH BYPASS
VALVE CLOSED, UTILIZE 3-WAY VALVE AS TWO WAY.
ADD HW VALVE LOCKOUT
WHEN COOLING IS
ENABLED.
CORRECT GRAPHIC TO
SHOW 2-WAY VALVE.
A
M
M-505
WRSRCM
MECHANICAL DETAILS
FULLY SPRINKLERED
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/13/2019
UPGRADE BUILDING
MANAGEMENT SYSTEM -
MARION VAMC
610-18-105
VA NORTHERN INDIANA HEALTHCARE SYSTEM
1700 E. 38TH ST.
MARION, INDIANA 46953
18-127
BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
DESCRIPTIONITEM QTY
SEQUENCE OF OPERATION
M1:DI2
M3:UI3
M4:UI1
M2:UI2
M2:AO2
M1:NO2
M2:UI3
M1:DI1
M1:UI2
M5:UI1
M4:UI3
M1:NO1
M3:AO1
M4:DI2
M3:UI1
M2:UI1
M1:UI1
M4:UI2
M3:UI2
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L6
L2 BK
L1 RD
L5
M2:AO1
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L10
L2 BK
L1 RD
L9
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
RF.STAT
RTN.HUM
RTN.TMP
RTN.CFM
FBD
RF.VFD
MA.TMP
RF.SS
M1:AO1
FRZ
L8
L7
M2:AO1
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L8
L7
M2:AO1
L10
L9
M1:AO2
M4:DI1
PRE.FLTR
FNL.FLTR
PRE.HT.TMP
CLG.COIL.TMP
L10
L9
M4:AO1
SF.VFD
SF.SS
SPLY.SMK
AAB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
AAB
GND GN/YL
L2 BK
L1 RD
L10
L9
HUV
M4:AO2
M1:NO3
MHUV
SPLY.STATIC
RM.SENSOR
DSCH.HUM
SPLY.CFM
HI.STATIC
DSCH.TMP
SF.STAT
i6 i5 i4 i3
L3 L4
SAFETY
L3 L4
SAFETY
SMK
DESCRIPTIONITEM QTY
SUPPLY FAN STARTER WIRING DETAILRETURN FAN STARTER WIRING DETAIL
M1:DI2
M2:UI1
M3:UI1
M3:DI2
M1:UI2
M3:UI2
M2:UI3
M1:DI1
M3:UI3
M1:NO1M1:NO2
M1:UI3
M2:UI2
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L6
L2 BK
L1 RD
L5
M2:AO2
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L8
L7
M2:AO2
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L8
L7
M2:AO2
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L10
L9
M1:AO2
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L10
L9
M1:AO1
AAB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
AAB
GND GN/YL
L2 BK
L1 RD
L10
L9
HUV
M2:AO1
M1:NO4
MHUV
L3 L4
SAFETY
L3 L4
SAFETY
SPLY.SMK
i2 i1
FNL.FLTR
CLG.COIL.TMP
PRE.HT.TMP
PRE.FLTR
MA.TMP
FRZ
i6 i5
SF.STAT
DSCH.TMP
RF.SS
SF.SS
DSCH.HUM
RTN.SMK
i4 i3
RF.STAT
RTN.HUM
RTN.TMP
i26 i25
SPC.TMP
TS1
REPLACE BROKEN LINKAGE
ON OUTSIDE AIR DAMPER
AND BENT BLADE ON
RETURN DAMPER. VERIFY
OPERATION OF BOTH.
REPAIR RETURN FAN STATUS
TO TURN OFF WHEN COMMANDED
OFF AT GRAPHIC. SET MINIMUM
RETURN FAN SPEED TO 15 HZ AND
MAXIMUM TO 75 HZ.
REPLACE FAN SHEAVES AND TIGHTEN
FAN BELTS. SET MINIMUM SUPPLY FAN
SPEED TO 15 HZ AND MAXIMUM TO
75 HZ. SET SUPPLY FAN SPEED TO
SATISFY THE DUCT
PRESSURE SETPOINT.
REPLACE SUPPLY AIR HUMIDITY
SENSOR AND CALIBRATE.
CURRENTLY 69% FROM ACTUAL.
ADD SA/RA DIFFERENTIAL
CFM TO GRAPHIC.
ADD HIGH AND LOW
TEMPERATURE
SETPOINT LIMITS IN
SEQUENCE
PROGRAMMING.
VERIFY COIL FLOW
MEETS DESIGN.
VERIFY CHILLED
WATER VALVE IS
SET TO MEET
DISCHARGE AIR
SETPOINT.
PROVIDE ACCESS DOOR TO
ACCESS DISCHARGE AIR
DAMPER. VERIFY OPERATION
AND CALIBRATE DAMPER.
VERIFY THAT HEATING VALVE
STROKES 100% CLOSED.
REPLACE VALVE SEATS.
ADD HW VALVE LOCKOUT
WHEN COOLING IS
ENABLED.
VERIFY THAT CHILLED VALVE STROKES
100% CLOSED. REPLACE VALVE SEATS.
CORRECT CONTROL LOOP FOR CHILLED
AND HEATING VALVE TO MAINTAIN
DISCHARGE AIR TEMPERATURE SETPOINT.
ADD HIGH AND LOW
TEMPERATURE SETPOINT
LIMITS IN SEQUENCE
PROGRAMMING.
SEQUENCE OF OPERATION
A
M
M-506
WRSRCM
MECHANICAL DETAILS
FULLY SPRINKLERED
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/13/2019
UPGRADE BUILDING
MANAGEMENT SYSTEM -
MARION VAMC
610-18-105
VA NORTHERN INDIANA HEALTHCARE SYSTEM
1700 E. 38TH ST.
MARION, INDIANA 46953
18-127
BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
DESCRIPTIONDESCRIPTIONITEM QTY ITEM QTY
NOTE:
NOTE:
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L24
L2 BK
L1 RD
L22
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L24
L2 BK
L1 RD
L22
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L24
L2 BK
L1 RD
L22
GND GN/YL
L15
L2 BK
L1 RD
L16 i26 i25 i46 i45 i48 i47
OA.CFM PRE.FLTR
FNL.FLTR
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L24
L23 i42 i41
LO.LMT
i44 i43
LO.LMT.CRITICAL
i32 i31
CW.FLOW
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L24
L23 i16 i15
SF.STAT
L5
L4
SF.SS
TO RTN SMK DMPR
i38 i20 i19
DSCH.HI.STATIC
i8 i7
DSCH.STATIC
i10 i9
SPLY.STATIC
SF.VFD
i28 i27
DSCH.HUM
i6 i5
DAT
i12 i11
SPLY.CFMi4 i3
PRE.HT.TMP
AAB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
AAB
GND GN/YL
L2 BK
L1 RD
L24
L23
HUV
HUM.ENBL
L13
L12 i24 i23
MAT
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L24
L2 BK
L1 RD
L23
L7
L6
RF.SS
RF.VFD
i18 i17
RF.STAT
i2 i1
RAT
i22 i21
RTN.LO.STATIC
i30 i29
RAH
TO SPLY SMK DMPR
i37 i14 i13
RTN.CFM
SET MINIMUM RETURN FAN
SPEED TO 15 HZ AND
MAXIMUM TO 75 HZ.
REPLACE HUMIDITY SENSOR AND
CALIBRATE.
ADD RA/SA DIFFERENTIAL
CFM TO THE GRAPHICS.
ADD HIGH AND LOW TEMPERATURE SETPOINT
LIMITS IN SEQUENCE PROGRAMMING.
SET MINIMUM SUPPLY FAN SPEED TO
15 HZ AND MAXIMUM TO 75 HZ.
REPLACE MIXED AIR TEMPERATURE
SENSOR AND CALIBRATE.
ADD HEATING VALVE LOCKOUT WHEN
COOLING IS ENABLED. REPAIR STEAM
VALVE MODULATION TO OBTAIN LINEAR
RESPONSE FROM 0% TO 100% OPEN.
DESCRIPTIONDESCRIPTIONITEM QTY ITEM QTY
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L24
L2 BK
L1 RD
L22
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L24
L2 BK
L1 RD
L22
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L24
L2 BK
L1 RD
L22
GND GN/YL
L15
L2 BK
L1 RD
L16 i26 i25
OA.CFM
i46 i45 i48 i47
PRE.FLTR
FNL.FLTR
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L24
L23 i42 i41
LO.LMT
i44 i43
LO.LMT.CRITICAL
i32 i31
CW.FLOW
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L24
L23
W/ MS61-7203
*REPLACE PNEU ACT
i16 i15
SF.STAT
L5
L4
SF.SS
i8 i7
DSCH.STATIC
i20 i19
DSCH.HI.STATIC
TO RTN SMK DMPR
i38
SF.VFD
i10 i9
SPLY.STATIC[1]
AAB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L24
L23
HUV
i28 i27
DSCH.HUM
i6 i5
DAT
i12 i11
SPLY.CFM
NOTE:
TO SPLY SMK DMPR
i37 i14 i13
RTN.CFM
i22 i21
RTN.LO.STATIC
i30 i29
RAH
i4 i3
PRE.HT.TMP
L7
L6
RF.SS
RF.VFD
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L24
L2 BK
L1 RD
L23 i24 i23
MAT
i18 i17
RF.STAT
i2 i1
RAT
i40 i39
SPLY.STATIC[2]
SET MINIMUM RETURN FAN
SPEED TO 15 HZ AND
MAXIMUM TO 75 HZ.
ADD HIGH AND LOW TEMPERATURE SETPOINT
LIMITS IN SEQUENCE PROGRAMMING.
ADD RA/SA DIFFERENTIAL
CFM TO THE GRAPHICS.
SET MINIMUM SUPPLY FAN
SPEED TO 15 HZ AND
MAXIMUM TO 75 HZ.
REPAIR CW VALVE
PACKING TO STOP
LEAK AND REPLACE
INSULATION.
REPLACE FIRST FLOOR DUCT
PRESSURE SENSOR AND
CALIBRATE TO 0.0" WHEN FAN
IS OFF. CURRENTLY READS
1.0" W.C. WHEN OFF.
ADD HEATING VALVE LOCKOUT WHEN
COOLING IS ENABLED. REPAIR STEAM
VALVE MODULATION TO OBTAIN
LINEAR RESPONSE FROM 0% TO 100%
OPEN.
ADJUST MINIMUM OA AND EA
DAMPERS TO CLOSE AND ADJUST
RA DAMPER TO FULL OPEN WHEN
UNIT IS OFF. REPAIR DAMPER
OVERRIDE COMMANDS FROM
GRAPHICS.
A
M
M-507
WRSRCM
MECHANICAL DETAILS
FULLY SPRINKLERED
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/13/2019
UPGRADE BUILDING
MANAGEMENT SYSTEM -
MARION VAMC
610-18-105
VA NORTHERN INDIANA HEALTHCARE SYSTEM
1700 E. 38TH ST.
MARION, INDIANA 46953
18-127
BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
DESCRIPTIONITEM QTY
AHU-4 FAN STARTER WIRING DETAIL
EF-6 STARTER WIRING DETAIL
SEQUENCE OF OPERATION
i22 i21
FLTR.ALRM
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L24
L22
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L24
L2 BK
L1 RD
L22 i18 i17
LO.LMT
i4 i3
DAT
i2 i1
W.MECH.RM.ST
i20 i19
SMK.ALRM
i14 i13
SF.STAT
i28 i27
EF6.STAT
L9
L8
EF9.SS
i16 i15
EF9.STAT
GND GN/YL
L11
L2 BK
L1 RD
L10
GND GN/YL
L2 BK
L1 RD
L5
L4
SF.SS
L7
L6
REPAIR FACE DAMPER LINKAGE
AND VERIFY OPERATION.
REPLACE ROOM TEMPERATURE
SENSOR AND CALIBRATE.
CURRENTLY 4°F FROM ACTUAL.
CLARIFY DISCHARGE AIR
TEMPERATURE READING
ON GRAPHIC. CURRENTLY
CONFUSING.
DESCRIPTIONDESCRIPTIONITEM QTY ITEM QTY
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L24
L2 BK
L1 RD
L22
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L24
L2 BK
L1 RD
L22
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L24
L2 BK
L1 RD
L22
GND GN/YL
L15
L2 BK
L1 RD
L16 i26 i25
OA.CFM
i46 i45 i48 i47
PRE.FLTR
FNL.FLTR
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L24
L23 i42 i41
LO.LMT
i44 i43
LO.LMT.CRITICAL
i32 i31
CW.FLOW
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L24
L23 i16 i15
SF.STAT
L5
L4
SF.SS
i10 i9
SPLY.STATIC[1]
AAB
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L2 BK
L1 RD
L24
L23
HUV
i40 i39
SPLY.STATIC[2]
SF.VFD
i20 i19
DSCH.HI.STATIC
i8 i7
DSCH.STATIC
TO RTN SMK DMPR
i38 i28 i27
DSCH.HUM
i6 i5
DAT
i12 i11
SPLY.CFM
NOTE:
i4 i3
PRE.HT.TMP
AO BLAO BL
COM GR
GND GN/YL
AI YL/BK
L24
L2 BK
L1 RD
L23 i24 i23
MAT
i18 i17
RF.STAT
i2 i1
RAT
RF.VFD
i22 i21
RTN.LO.STATIC
i30 i29
RAH
L7
L6
RF.SS
NOTE:
TO SPLY SMK DMPR
i37
SMK.DMPRS
WIRE IN SERIES
W/ SPLY DMPR
i14 i13
RTN.CFM
SET MINIMUM RETURN FAN SPEED TO
15 HZ AND MAXIMUM TO 75 HZ.
REMAIN MIN OA DAMPER LINKAGE AND
REMOVE RELATED NOTE ON GRAPHICS.
REPLACE PREHEAT AIR TEMPERATURE
SENSOR AND CALIBRATE.
ADD HEATING VALVE LOCKOUT WHEN
COOLING IS ENABLED. REPAIR STEAM
VALVE MODULATION TO OBTAIN
LINEAR RESPONSE FROM 0% TO 100%
OPEN.
CORRECT HW AND CW VALVE
OPERATION TO MAINTAIN
DISCHARGE AIR TEMPERATURE
SETPOINT.
REPLACE FIRST FLOOR DUCT PRESSURE
SENSOR AND CALIBRATE TO 0.0" WHEN
FAN IS OFF.
REPLACE SUPPLY AIR HUMIDITY
SENSOR AND CALIBRATE.
SET MINIMUM SUPPY FAN SPEED
TO 15 HZ AND MAXIMUM TO
75 HZ.
ADD HIGH AND LOW TEMPERATURE SETPOINT
LIMITS IN SEQUENCE PROGRAMMING.
ADD RA/SA DIFFERENTIAL CFM
TO THE GRAPHICS.
CORRECT ENGINEERING UNITS FOR
DISCHARGE AIR TEMPERATURE RESET
OAT HI FROM PSI TO DEGF.
SEQUENCE OF OPERATION
A
M
M-508
WRSRCM
MECHANICAL DETAILS
FULLY SPRINKLERED
| Sheets and Views |
| 18-127 Mechanical Details-G-001 |
| 18-127 Mechanical Details-M-001 |
| 18-127 Mechanical Details-M-501 |
| 18-127 Mechanical Details-M-502 |
| 18-127 Mechanical Details-M-503 |
| 18-127 Mechanical Details-M-504 |
| 18-127 Mechanical Details-M-505 |
| 18-127 Mechanical Details-M-506 |
| 18-127 Mechanical Details-M-507 |
| 18-127 Mechanical Details-M-508 |
| 2019-06-17T09:15:15-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it.