This document provides a pre-solicitation notice for a construction project to add additional space to Building 14 at the Cincinnati VA Medical Center.
The project, known as Replace Animal Research Facility Phase 3 (Project 539-327), involves constructing 22,000 gross square feet of wet labs and administrative spaces. The scope of work includes new finishes, plumbing, HVAC, electrical, technology, HVAC controls, fire alarm, and security devices. All work must be conducted according to project specifications and drawings.
The period of performance is estimated at 450 calendar days. The solicitation documents are expected to be posted on October 16, 2019 on FBO.gov, with proposals due approximately 30 days later. The NAICS code is 236220 for Commercial and Institutional Building Construction, with a $39.5 million small business size standard.
This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The estimated value is between $5-10 million. A site visit will be scheduled. All questions must be submitted in writing to the contracting officer. Amendments will be posted on FBO.gov and notifications sent by email.
36C25019B0019 539-327 ARC Phase 3 Drawings Revised 3-26-19 Part2.pdf
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
W
E/A
S D
E1
DN
DN
UP
A
B
C
E
F
1 2
2.1
VR 1
M1
M1
L1
L1
L1
L1
4" SS UP
- 4" VS
P609
FD1
P502
FD1
4" SS UP
P707 L4L5
4" SS UP
4" SS DN
C R
P
CRP
C R
P
CRP
4" SS DN
4" SS DN
HOLDING
HOLDING
HOLDING
STORAGE
LOADING DOCK
VESTIBULE
CORRIDOR
SHELL SPACE
CORRIDOR
103 SHELL SPACE
CORRIDOR
CLEAN STORAGE
CAGE WASH CLEAN
STORAGE
QUARANTINE
HOLDING
CAGE WASH DIRTY
CORRIDOR
PROCEDURE
SURGERY
NECROPSY
STAIR
S-2-1
FEED/BEDDING
STAIR
S-1-1
M1
FD2
8" DS
- 4" SS
FD3 4
FD2
4" DS UP3
VR
3" - OD
4" - STM
3" - OD
3" - OD
3" - OD
4"
S T
M
4"
S T
M
4" -
4"
O D
SHELL SPACE
COCO
CO
CO
CO
RO/DI
RO/DI
R O
/D I
R O
/D I
CRP
S T
M
FD1
P524
CAP
CAP
6" - STM
3"
S T
M5 5
MATTHEW S.
OH
A
T
S T
E
OF
I O
GRAHAM
E-72670
IEF
O
R P
A
SS
NOI GNEL
SIGER DERET
E
N
R E
01/18/2019
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. ofHeapy Projcet No.: 2018-05045 Firm License No.: 01528
/1
/2
:0
:0
A
M
ANIMAL RESEARCH FACILITY -
BLDG. 14
PHASE 3
01/18/2019
FIRST FLOOR PLAN
14PP101
KMBJMW
12030.01
539-327
Cincinnati, Ohio
N Scale: 1/8" = 1'-0"
FIRST FLOOR PLAN
PLAN NOTES
1 EXISTING TO REMAIN.
2 EXTEND NEW 1.5" SIZE RO/DI WATER PIPING SYSTEM SUPPLY AND RETURN RISERS
ABOVE SECOND FLOOR SLAB. CONNECT TO RO/DI WATER PIPING SYSTEM ABOVE
SECOND FLOOR SLAB.
3 LOCATION OF EXISTING EMERGENCY OVERFLOW STORM DOWNSPOUT ON SECOND
FLOOR ABOVE. CONNECT TO EXISTING DOWNSPOUT PIPING ABOVE SECOND FLOOR
SLAB.
4 LOCATION OF EXISTING SANITARY PIPE RISER SERVING PLUMBING FIXTURE OR LAB
EQUIPMENT ON SECOND FLOOR ABOVE. CONNECT TO EXISTING SANITARY WASTE
PIPING ABOVE SECOND FLOOR SLAB.
5 PROVIDE NEW 24"x24" ACCESS PANEL.
GENERAL NOTES
A REFER TO 14P001 FOR LEGEND, NOTES, DETAILS, SCHEDULES AND INDEX.
B FIRST FLOOR WILL BE OCCUPIED DURING CONSTRUCTION. ENSURE ALL INFECTION
CONTROL MEASURES ARE FOLLOWED. COORDINATE FIRST FLOOR CONSTRUCTION
WITH COR MINIMUM 2 WEEKS IN ADVANCE.
F.F.E : 100' 0" (726.50')
Revisions Date
L5
M5
L4
M5
L1
L1
M5
M1
M1
M5
L1
L1
UP
L5
M5
L4
M5
L1
L1
M5
M1
M1
M5
L1
L1
UP
L5
M5
L4
M5
L1
L1
M5
M1
M1
M5
L1
L1
UP
L4
M5
L1
L1
M5
M1
M1
L1
L1
A
B
C
1 2 6
4" SS UP
4" SS DN
3" VR UP
L1
L2
L4
L1
L3
1.25"1"1.5"
1.25" - DHWR
2.5" - DHW
3" - DCW
0.5"0.5"
L1
4" SS UP
4" SS DN.
2.5" - LA
LA
LA
LV
LA
LV
FD1
FD2
1.5"VR
FD
G
G G
1.5"
G
0.5"
2" - G
14PP202
FD1
FD1
2"VR
0.75" 0.75"
LV LV
LV
G
0.75" 0.5"
1"1"
1"1"
1.25"
1"1"
14PP202
14PP202
LV
LV
0.75"
M1
VR
FD2
FD2
L4
CO
0.75"
C R
P
12124" DS UP
4"SS
LV
LA
ACCESS HATCH -
6"DS
(10,820 SQ FT)
6"DS UP
1.5" 1.5"
14PP202
13131517
14 1"1"
L1
G
6"@ 1/4" PER FT
P707
ZVC
EMER.
GAS
VALVE
3" VS DN.
3" VS UP
FD3
FD3
RD1
OD1
RD2
OD2
CO
FD3
P707
CO
P706
FD3
WALK IN
COOLER
203A
BSL 2
STOR.
BSL 2 LAB
EQUIP.
EXIT
CORRIDOR
EL-3
ELEV. 3
CORRIDOR
STORAGE
SIGNALS
EMERGENCY
ELECTRIC
MAIN
ELECTRIC
MECHANICAL
S-2-1
STAIR 1
STORAGE
HAC
MEN
WOMEN
MECHANICAL
MICRO.
HOOD
ALCOVE
213A
STORAGE
LAB
TISSUE
CULTURE
TISSUE
CULTURE
S-2-2
STAIR 2
3" - V
CO
2" - LA
5 6 7
TYP.
CO
4" - CRP
CRP
CRP
CRP
CRP
M1
FD2
FD2
SAN
FD2
O D
FD2
LA
LA
LV
G LV
V
V
5 6 7
5 6 7
5 6 7
1.5" 1.5"
DCW DHW
LA
LV G
RO/DI
LV LA G
R O
/D I
V
LV
STM
OD
V
V
V
RO/DI
CRP
CRP
CO
CRP
4" DS UP
CO
SAN
CO
14PP201
H
14PP201
I
0.5"
CONFERENCE
OPEN
OFFICE
P524
DN
1.25"
FD3
P420
P420
P502 P103 (2)
P103
(2)
FD1
P201
1.5"VR
LAB
P609
TYP.
TYP.
A
B
C
1 2 6
14PP202
14PP202
14PP202
4" SS DN
3" VR UP
L3
1.25"1"1.5"
1.25" - DHWR
2.5" - DHW
3" - DCW
0.5"0.5"
L1
0.5"0.5"
4" SS UP
4" SS DN.
2.5" - LA
LA
LA
LV
LA
LV
FD1
L1
FD
G
G G
1.5"
G
0.5"
2" - G
FD1
FD1
4"SS
2"VR
0.75" 0.75"
LV LV
LV
G
0.75" 0.5"
1"1"
1"1"
1.25"
1"1"
LV
LV
0.75"
VR
FD2
FD2
L4
CO
0.75"
C R
P
4"SS
LV
LA
ACCESS HATCH -
6"DS
(10,820 SQ FT)
6"DS UP
1.5" 1.5"
13131517
1"1"
L1
G
6"@ 1/4" PER FT
ZVC
EMER.
GAS
VALVE
3" VS DN.
3" VS UP
RD1
OD1
RD2
OD2
FD3
P707
P706
FD3
WALK IN
COOLER
203A
BSL 2
STOR.
BSL 2 LAB
EQUIP.
EXIT
CORRIDOR
EL-3
ELEV. 3
CORRIDOR
STORAGE
SIGNALS
EMERGENCY
ELECTRIC
MAIN
ELECTRIC
MECHANICAL
S-2-1
STAIR 1
STORAGE
HAC
MEN
WOMEN
MECHANICAL
MICRO.
HOOD
ALCOVE
213A
STORAGE
LAB
TISSUE
CULTURE
TISSUE
CULTURE
S-2-2
STAIR 2
3" - V
CO
2" - LA
5 6 7
TYP.
CRP
CRP
M1
FD2
FD2
SAN
FD2
FD2
LA
LA
LV
G LV
V
V
5 6 7
5 6 7
5 6 7
1.5" 1.5"
DCW DHW
LA
LV G
RO/DI
LV LA G
R O
/D I
V
LV
STM
OD
V
V
V
RO/DI
CRP
CRP
CO
CRP
4" DS UP
CO
SAN
CO1.5"VR
OPEN
OFFICE
CONFERENCE
EQUIP.
TYP.
TYP.
FD3
L1
P524
FD3
L4
P707
6" DS
4" (1150 SQ FT) 4" (1150 SQ FT)
O D
STM
OD
OD2 RD2
A
B
C
1 2 6
14PP202
14PP202
14PP202
1.25"1"1.5"
1.25" - DHWR
2.5" - DHW
3" - DCW
0.5"0.5"
0.5"0.5"
4" SS UP
4" SS DN.
2.5" - LA
LA
LA
LV
LA
LV
FD2
1.5"VR
FD
G
G G
1.5"
G
0.5"
2" - G
FD1
FD1
4"SS
2"VR
0.75"
0.75"
LV LV
LV
G
0.75"
0.5" 1"1"
1"1"
1.25"
1"1"
LV
LV
0.75"
CO
0.75"
C R
P
4"SS
LV
LA
6"DS
(10,820 SQ FT)
6"DS UP
1.5" 1.5"
1"1"
G
6"@ 1/4" PER FT
ZVC
EMER.
GAS
VALVE
3" VS DN.
3" VS UP
RD1
OD1
RD2
OD2
FD3
P707
P706
FD3
WALK IN
COOLER
203A
BSL 2
STOR.
EXIT
CORRIDOR
EL-3
ELEV. 3
CORRIDOR
STORAGE
SIGNALS
EMERGENCY
ELECTRIC
MAIN
ELECTRIC
MECHANICAL
S-2-1
STAIR 1
STORAGE
HAC
MEN
WOMEN
MECHANICAL
MICRO.
HOOD
ALCOVE
213A
STORAGE
LAB
TISSUE
CULTURE
TISSUE
CULTURE
S-2-2
STAIR 2
3" - V
2" - LA
TYP.
FD2
FD2
SAN
FD2
O D
FD2
LA
LA
LV
G LV
V
1.5" 1.5"
DCW DHW
LA
LV G
RO/DI
LV LA G
R O
/D I
V
LV
STM
OD
V
V
V
RO/DI
SAN
CO1.5"VR
OPEN
OFFICE
CONFERENCE
EQUIP.
BSL 2 LAB
ACCESS HATCH - 1
TYP.
TYP.
P524
OD2 RD2
RD2OD2
O D
STM
4" (1480 SQ FT)
4" (1480 SQ FT)
4" (1150 SQ FT)
4" (1150 SQ FT)
6" (2630 SQ FT)
6" (2630 SQ FT)
B
C
2 6
14PP202
14PP202
14PP202
1.25"1"1.5"
1.25" - DHWR
2.5" - DHW
3" - DCW
0.5"0.5"
0.5"0.5"
4" SS UP
4" SS DN.
2.5" - LA
LA
LA
LV
LA
LV
FD
G
G G
1.5"
0.5"
2" - G
FD1
FD1
4"SS
2"VR
0.75"
1"1"
1.25"
1"1"
LV
LV
0.75"
CO
0.75"
C R
P
4"SS
LV
LA
6"DS
(10,820 SQ FT)
6"DS UP
1.5" 1.5"
1"1"
G
6"@ 1/4" PER FT
ZVC
EMER.
GAS
VALVE
3" VS DN.
3" VS UP
RD1
OD1
RD2
OD2
FD3
P707
P706
FD3
EXIT
CORRIDOR
EL-3
ELEV. 3
CORRIDOR
STORAGE
SIGNALS
EMERGENCY
ELECTRIC
MAIN
ELECTRIC
MECHANICAL
S-2-1
STAIR 1
STORAGE
HAC
MEN
WOMEN
MECHANICAL
MICRO.
HOOD
ALCOVE
213A
STORAGE
LAB
TISSUE
CULTURE
TISSUE
CULTURE
S-2-2
STAIR 2
3" - V
2" - LA
TYP.
FD2
FD2
SAN
FD2
V
1.5" 1.5"
DCW DHW
LA
LV G
RO/DI
LV LA G
R O
/D I
V
LV
STM
OD
V
V
V
SAN
CO1.5"VR
ACCESS HATCH - 1
TYP.
TYP.
OD2
RD2
6" (2630 SQ FT)
4" (950 SQ FT)
4" (950 SQ FT) 6" (3580 SQ FT)
MATTHEW S.
OH
A
T
S T
E
OF
I O
GRAHAM
E-72670
IEF
O
R P
A
SS
NOI GNEL
SIGER DERET
E
N
R E
01/18/2019
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. ofHeapy Projcet No.: 2018-05045 Firm License No.: 01528
/1
/2
:0
:3
A
M
ANIMAL RESEARCH FACILITY -
BLDG. 14
PHASE 3
01/18/2019
SECOND FLOOR PLAN
14PP102
KMBJMW
12030.01
539-327
Cincinnati, Ohio
N Scale: 1/8" = 1'-0"
SECOND FLOOR PLAN - BASE BID PLAN
PLAN NOTES
1 EXISTING TO REMAIN.
2 TYPICAL EMERGENCY EYEWASH STATION. EXTEND 0.5" DCW & DHW TO SERVE LAB
SINK AND EMERGENCY EQUIPMENT TEMPERING VALVE WITH INTEGRAL BY-PASS,
CERTIFIED TO ASSE 1071, BELOW LAB CASEWORK TO SERVE EMERGENCY
EYEWASH. REFER TO DETAIL 3/ 14PP202 FOR ADDITIONAL INFORMATION.
3 1.5" SIZE RO/ DI WATER SYSTEM PIPING TO THIRD FLOOR ABOVE. REFER TO SHEET
14PP103A - THIRD FLOOR PLAN.
4 EMERGENCY EQUIPMENT TEMPERING VALVE WITH INTEGRAL BY-PASS,
CERTIFIED TO ASSE 1071, TO SERVE EMERGENCY SHOWER.
CAPACITY: 23 GPM @ 10 PSI PRESSURE DROP.
SET UNIT TO PROVIDE 85 DEGREE F TEPID WATER.
SECURE TO WALL ABOVE ACCESSIBLE CEILING WITH HEAVY DUTY MOUNTING
BRACKET.
5 LAB BENCH GAS PIPING. REFER TO SECTION 5/ 14PP304.
6 LAB BENCH GAS PIPING. REFER TO SECTION 6/ 14PP304.
7 EXTEND 0.5" G, 0.5" LA & 0.75" LV PIPING DOWN IN WALL AND THROUGH TWO
CHANNEL, SURFACE MOUNTED RACEWAY PROVIDED PER DIVISION 1 TO
SERVE LAB BENCH OUTLETS. REFER TO CASEWORK SECTIONS ON SHEET
14A512 FOR EXACT LOCATION OF TWO CHANNEL, SURFACE MOUNTED RACEWAY
PROVIDED PER DIVISION 1.
8 1.5" SIZE RO/ DI WATER SYSTEM PIPING FROM FIRST FLOOR BELOW. PIPING
CONTINUED ON SHEET 14PP101 - FIRST FLOOR PLAN.
9 DCW, DHW & DHWR PIPING RACKED VERTICALLY ALONG WALL ABOVE SECOND
FLOOR CEILING.
10 EMERGENCY EQUIPMENT TEMPERING VALVE WITH INTEGRAL BY-PASS,
CERTIFIED TO ASSE 1071, TO SERVE EMERGENCY COMBINATION UNIT
(EMERGENCY SHOWER/EYE/FACE WASH).
CAPACITY: 23GPM @ 10 PSI PRESSURE DROP
SET UNIT TO PROVIDE 85 DEGREE F TEPID WATER.
SECURE TO WALL ABOVE ACCESSIBLE CEILING WITH HEAVY DUTY MOUNTING
BRACKET.
11 EXTEND 3" DCW, 2.5" DHW, 1.25" DHWR, 2.5" LV, 2" LA & 2" G UP TO BELOW
PENTHOUSE FLOOR SLAB. VALVE AND CAP FOR FUTURE EXTENSION.
12 ENCASE SANITARY PIPING IN AN ENCASED PIPING SYSTEM AND EXTEND LARGER
PIPE TO OUTSIDE OF ELECTRIC ROOM(S). PROVIDE WATERTIGHT SEAL ON ALL
PIPING ABOVE ELECTRIC ROOM(S).
13 EXTEND 0.5" G & 0.75" LV DOWN WALL AND THROUGH TWO CHANNEL, SURFACE
MOUNTED RACEWAY PROVIDED PER DIVISION 1 TO SERVE LAB GAS OUTLETS
LOCATED ABOVE COUNTERTOP. REFER TO ARCHITECTURAL INTERIOR
ELEVATIONS ON SHEETS 14A402 & 14A403 FOR EXACT LOCATION OF
OUTLETS. COORDINATE INSTALLATION WITH LAB EQUIPMENT PROVIDER.
14 PROVIDE ACID WASTE TRAP. SET ON FLOOR AND ANCHOR SECURELY.
15 EXTEND 1.5" SIZE RO/DI WATER PIPING MAIN DOWN TO WITHIN 0'-6" FROM FIXTURE.
PROVIDE 0.5" CONNECTION WITH SHUT-OFF VALVE TO SERVE LAB EQUIPMENT AND
EXTEND 1.5" SIZE RO/DI WATER PIPING MAIN BACK UP ABOVE CEILING TO EXTEND
AS RO/ DI MAIN. KEEP PIPING STRAIGHT WITH MINIMAL TURNS. ALL TURNS SHALL
BE ACCOMPLISHED WITH LONG SWEEP 90 DEGREE ELLS OR TWO (2) 45
DEGREE ELLS.
16 EXTEND 0.5" LA, 0.75" LV & 0.5" DCW DOWN WALL TO SERVE M1 LAB EQUIPMENT.
REFER TO ARCHITECTURAL INTERIOR ELEVATIONS ON SHEETS 14A402 & 14A403 FOR
EXACT LOCATION OF EQUIPMENT. COORDINATE INSTALLATION WITH LAB EQUIPMENT
PROVIDER.
17 EXTEND 0.5" LA & 0.75" LV DOWN WALL TO SERVE M5 LAB EQUIPMENT. REFER TO
ARCHITECTURAL INTERIOR ELEVATIONS ON SHEET 14A402 & 14A403 FOR EXACT
LOCATION OF EQUIPMENT. COORDINATE INSTALLATION WITH LAB EQUIPMENT
PROVIDER.
18 UNDER BID ITEM 4, CONTINUE OD PIPING TO OD PIPING IN OPEN OFFICE ROOM 206.
GENERAL NOTES
A REFER TO 14P001 FOR LEGEND, NOTES, SECTIONS, SCHEDULES AND INDEX.
N Scale: 1/8" = 1'-0"
SECOND FLOOR PLAN - BID ITEM 2
N Scale: 1/8" = 1'-0"
SECOND FLOOR PLAN - BID ITEM 3
N Scale: 1/8" = 1'-0"
SECOND FLOOR PLAN - BID ITEM 4
DN
M2
M3
L3
L4
M4
M5
L1
M5
L4
L1
L1L2L1
M1
M5
B F
P
BFP
M1
UP
DN
M2
M3
L3
L4
M4
M5
L1
M5
B F
P
BFP
L1
L4
L1
M5
M1
DN
B F
P
BFP
L1
M5
M1
DN
B F
P
BFP
A
B
C
1 2
0.75"
1"1"1"1"
1"
1"
1" 1"
FD1
P707
1"
1.5"1.5"
1.5"
1.5"
1.5"
1.5"
LAB
SIGNALS
CLOSET
ELEC.
S-1-3
STAIR 1
MEN
WOMEN
S-2-3
STAIR 2
CORRIDOR
MECHANICAL
CORRIDOR
HOOD
ALCOVE
TISSUE
CULTURE
GLASS
WASH
AUTOCLAVE 302
CORRIDOR
EQUIPMENT
WALK IN
FREEZER
CORRIDOR
EQUIPMENT
CORRIDOR
MICROSCOPY
DARK
ROOM 316
BSL 2 317
HOOD
ALCOVE
EXISTING BUILDING 15
P706
1.25"
1.25"
1"
0.75"0.75"
0.75"0.75"
R O
/D I
RO/DI RO/DI
RO/DI
RO/DI
RO/DI
1.5"
1.5"
RO/DI
R O
/D I
1.5"
1"
1"
1"
1"
1" 1"
0.75"
1"
1"
0.75"
0.75"
0.75"
1" 1"
FD3
P706
1.25"
P420P420
P420 P420 P201
P502
P103 P103
P103
2"
MECHANICAL
ELEV. 3
EL-3
HAC
M3 (FUTURE)
14PP202
P609
A
B
C
1 2 6
0.75"
1"1"
LAB
SIGNALS
CLOSET
ELEC.
S-1-3
STAIR 1
MEN
WOMEN
S-2-3
STAIR 2
CORRIDOR
MECHANICAL
CORRIDOR
CORRIDOR
EXISTING BUILDING 15
1.5"
1.5" 0.75" 1"
1"
1" 1.5"
0.75"
1.5" 1"
1.5"
1.5"
0.75" 1.5"
1.5"
0.75"
0.75"
RO/DI
RO/DI
R O
/D I
RO/DI
RO/DI
R O
/D I
0.75" 1.5" 2"
AUTOCLAVE
GLASS
WASH
TISSUE
CULTURE
CORRIDOR
WALK IN
FREEZER
MICROSCOPY
P707
RO/DI
RO/DI
R O
/D I
1.5"
1" 1" 0.75"0.75"
1.5"
1.5" 0.75"0.75"
1" 1"
1"
M3 (FUTURE)
P609
A
B
C
1 2 6
0.75"
SIGNALS
CLOSET 303
ELEC.
S-1-3
STAIR 1
MEN
WOMEN
S-2-3
STAIR 2
MECHANICAL
CORRIDOR
0.75"
1.5" 2"
2"
1.5"
1"
1"
0.75"
RO/DI
R O
/D I
RO/DI
1.5"
1.5"
0.75"
1"
1.5"
1"
1" 1.5"
1" 1"
1.5"
0.75"
1.5"
0.75"
RO/DI
R O
/D I
RO/DI
BLS 2
HOOD ALCOVE
LAB
0.5"
P609
B
C
2 6
0.75"
SIGNALS
CLOSET 303
ELEC.
S-1-3
STAIR 1
MEN
WOMEN
S-2-3
STAIR 2
MECHANICAL
CORRIDOR
0.75"
1.5" 2"
0.75" 2"
1.5"
1"
1"
0.75"
FD2
FD2
FD2
P609
MATTHEW S.
OH
A
T
S T
E
OF
I O
GRAHAM
E-72670
IEF
O
R P
A
SS
NOI GNEL
SIGER DERET
E
N
R E
01/18/2019
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. ofHeapy Projcet No.: 2018-05045 Firm License No.: 01528
/1
/2
:1
:0
A
M
ANIMAL RESEARCH FACILITY -
BLDG. 14
PHASE 3
01/18/2019
THIRD FLOOR PLAN -
DISTRIBUTION
14PP103A
KMBJMW
12030.01
539-327
Cincinnati, Ohio
N Scale: 1/8" = 1'-0"
THIRD FLOOR PLAN - BASE BID PLAN
N Scale: 1/8" = 1'-0"
THIRD FLOOR PLAN - BID ITEM 2
N Scale: 1/8" = 1'-0"
THIRD FLOOR PLAN - BID ITEM 3
PLAN NOTES
1 UNDER DEDUCT PLANS, CAP DOMESTIC COLD WATER AND DOMESTIC HOT WATER
WITH SHUT-OFF VALVE FOR FUTURE EXTENSION. DEAD END LENGTHS SHALL BE NO
GREATER THAN TWO PIPE DIAMETERS FROM THE MAIN THAT IT IS CONNECTED TO.
2 TYPICAL EMERGENCY EYEWASH STATION. EXTEND 0.5" DCW & DHW TO SERVE LAB
SINK AND EMERGENCY EQUIPMENT TEMPERING VALVE WITH INTEGRAL BY-PASS,
CERTIFIED TO ASSE 1071, BELOW LAB CASEWORK TO SERVE EMERGENCY EYEWASH.
REFER TO DETAIL 3/14PP202 FOR ADDITIONAL INFORMATION.
3 PROVIDE 0.75" BALL TYPE SHUT-OFF VALVE AND PIPE STUBS FOR EXTENSION PER
DIVISION 23. COORDINATE WORK WITH DIVISION 23.
4 EMERGENCY EQUIPMENT TEMPERING VALVE WITH INTEGRAL BY-PASS, CERTIFIED TO
ASSE 1071, TO SERVE EMERGENCY COMBINATION UNIT (EMERGENCY
SHOWER/EYE/FACE WASH).
CAPACITY: 23 GPM @ 10 PSI PRESSURE DROP
SET UNIT TO PROVIDE 85 DEGREE F TEPID WATER.
SECURE TO WALL ABOVE ACCESSIBLE CEILING WITH HEAVY DUTY MOUNTING
BRACKET.
5 EMERGENCY EQUIPMENT TEMPERING VALVE WITH INTEGRAL BY-PASS, CERTIFIED TO
ASSE 1071, TO SERVE EMERGENCY SHOWER.
CAPACITY: 23 GPM @ 10 PSI PRESSURE DROP
SET UNIT TO PROVIDE 85 DEGREE F TEPID WATER.
SECURE TO WALL ABOVE ACCESSIBLE CEILING WITH HEAVY DUTY MOUNTING
BRACKET.
6 1.5" SIZE RO/DI WATER SYSTEM PIPING FROM 2ND FLOOR. REFER TO SHEET
14PP102 - SECOND FLOOR PLAN FOR ADDITIONAL INFORMATION.
7 EXTEND 0.5" DCW DOWN WALL TO SERVE M1 LAB EQUIPMENT. REFER TO
ARCHITECTURAL INTERIOR ELEVATIONS ON SHEETS 14A401 & 14A402 FOR EXACT
LOCATION OF EQUIPMENT. COORDINATE INSTALLATION WITH LAB EQUIPMENT
PROVIDER.
8 EXTEND 0.5" DCW DOWN IN WALL TO SERVE ICE MAKER AND ICE MAKER FILTRATION
SYSTEM. REFER TO ARCHITECTURAL INTERIOR ELEVATIONS ON SHEETS 14A402 &
14A403 FOR EXACT LOCATION OF EQUIPMENT. COORDINATE INSTALLATION WITH LAB
EQUIPMENT PROVIDER.
9 EXTEND 0.5" DCW TO SERVE M2 EQUIPMENT. REFER TO ARCHITECTURAL INTERIOR
ELEVATIONS ON SHEETS 14A402 & 14A403 FOR EXACT LOCATION OF EQUIPMENT.
COORDINATE INSTALLATION WITH LAB EQUIPMENT PROVIDER.
10 EXTEND 1.5" SIZE RO/DI WATER PIPING MAIN DOWN TO WITHIN 0'-6" FROM FIXTURE.
PROVIDE 0.5" CONNECTION WITH SHUT-OFF VALVE TO SERVE M3 LAB EQUIPMENT
AND EXTEND 1.5" SIZE RO/DI WATER PIPING MAIN BACK UP ABOVE CEILING TO
EXTEND AS RO/DI MAIN. KEEP PIPING STRAIGHT WITH MINIMAL TURNS. ALL TURNS
SHALL BE ACCOMPLISHED WITH LONG SWEEP 90 DEGREE ELLS OR TWO (2) 45
DEGREE ELLS.
11 CAP 3" DCW, 2.5" DHW & 1.25" DHWR IN CHASE FOR EXTENSION TO FUTURE FOURTH
FLOOR.
12 UNDER DEDUCT 3, CAP RO/DI PIPING AT RISER WITH SHUT-OFF VALVE FOR FUTURE
EXTENSION.
GENERAL NOTES
A REFER TO 14P001 FOR LEGEND, NOTES, SECTIONS, SCHEDULES AND INDEX.
N Scale: 1/8" = 1'-0"
THIRD FLOOR PLAN - BID ITEM 4
M2
M3
L3
L4
M4
M5
L1
M5
M1
L4
L1
L1L2L1
M1
M5
UP
DN
M2
M3
L3
L4
M4
M5
M1
L1
M5 L1
L4
L1
M5
DN
L1
L1
M5
M1
DN
A
B
C
14PP202
LA
LV
G
7 777
0.75" - LA
LA
0.5" G
0.5" LA
0.75" LV
0.75" G
0.75" LA
0.75" LV
0.5" G
0.5" LA
0.75" LV
0.75" G
0.75" LA
1" LV
0.75" G
0.75" LA
0.75" LV
0.75" G
0.75" LA
1" LV
0.75" - G
1" - LV
ZVC & EMER.
GAS VALVE
LAB
SIGNALS
CLOSET
ELEC.
S-1-3
STAIR 1
MEN
WOMEN
S-2-3
STAIR 2
CORRIDOR 319
MECHANICAL
CORRIDOR
HOOD
ALCOVE
TISSUE
CULTURE
GLASS
WASH
AUTOCLAVE 302
CORRIDOR
EQUIPMENT
WALK IN
FREEZER
CORRIDOR
EQUIPMENT
CORRIDOR
MICROSCOPY
DARK
ROOM
BSL 2
HOOD
ALCOVE
1" - LA
0.5" - LA
0.75" - LV
0.75" - LA
1" - LV
0.75"
1.5" - G
1" - LA
1.5" - LV
0.5"0.75"
1"
G
LA
LV
1"
1"
1.5"
LV
LA
G
0.5" - G
0.5" - LV
LV
LA
G
2" - G
2" - LA
2" - LV
HAC
MECHANICAL
ELEV. 3
EL-3
14PP202
A
B
C
1 2 6
14PP202
LAB
SIGNALS
CLOSET 303
ELEC.
S-1-3
STAIR 1
MEN
WOMEN
S-2-3
STAIR 2
CORRIDOR
MECHANICAL
CORRIDOR
CORRIDOR
0.5" G
0.5" LA
0.75" LV
0.75" G
0.75" LA
1" LV
0.75" G
0.75" LA
0.75" LV
ZVC &
EMER. GAS
VALVE
1.5" - G
1" - LA
1.5" - LV
2" - G
1.5" - LA
2" - LV
AUTOCLAVE
GLASS
WASH
CORRIDOR
MICROSCOPY
TISSUE
CULTURE
WALK IN
FREEZER
G LV
LA
LV
G
LA
G
LV
LAG
LV
LA
G
LV
0.75" 1"
1"
1.5"
1" 1"
0.5" 0.75" 1" 0.5" 0.75"
1"
1" 0.75"
A
B
C
1 2 6
14PP202
1" 0.75"
1" 1"
0.5"
SIGNALS
CLOSET
ELEC.
S-1-3
STAIR 1
MEN
WOMEN
S-2-3
STAIR 2
CORRIDOR
MECHANICAL
CORRIDOR
CORRIDOR
ZVC &
EMER. GAS
VALVE
1.5" - G
1" - LA
1.5" - LV
2" - LA
1.5" - G
2" - LV
1" - LV
0.75" - LA
0.5" - G
0.5" G
0.5" LA
0.75" LV
0.75" G
0.75" LA
1" LV
0.75" G
0.75" LA
0.75" LV
1.5"
0.75" 1"
1.5"
G
LV
LA
LV
G
LA
G LV
LA
G
LV
LA
B
C
2 6
14PP202
SIGNALS
CLOSET
ELEC.
S-1-3
STAIR 1
MEN
WOMEN
S-2-3
STAIR 2
CORRIDOR
MECHANICAL
CORRIDOR
CORRIDOR
ZVC &
EMER. GAS
VALVE
1.5" - G
1" - LA
1.5" - LV
2" - LA
1.5" - G
2" - LV
1" - LV
0.75" - LA
0.5" - G
1.5" - G
1" - LA
1" - LV
MATTHEW S.
OH
A
T
S T
E
OF
I O
GRAHAM
E-72670
IEF
O
R P
A
SS
NOI GNEL
SIGER DERET
E
N
R E
01/18/2019
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. ofHeapy Projcet No.: 2018-05045 Firm License No.: 01528
/1
/2
:1
:3
A
M
ANIMAL RESEARCH FACILITY -
BLDG. 14
PHASE 3
01/18/2019
THIRD FLOOR PLAN - LAB GAS
14PP103B
KMBJMW
12030.01
539-327
Cincinnati, Ohio
N Scale: 1/8" = 1'-0"
THIRD FLOOR PLAN - BASE BID PLAN
N Scale: 1/8" = 1'-0"
THIRD FLOOR PLAN - BID ITEM 2
N Scale: 1/8" = 1'-0"
THIRD FLOOR PLAN - BID ITEM 3
PLAN NOTES
1 UNDER DEDUCT PLANS, CAP LABORATORY AIR, VACUUM AND NATURAL GAS PIPING
WITH SHUT-OFF VALVE FOR FUTURE EXTENSION.
2 EXTEND 0.75" G, 0.75" LA & 0.75" LV PIPING DOWN IN WALL TO KNEE WALL SPACE TO
SERVE LAB BENCH OUTLETS.
3 EXTEND 0.5" LA & 0.75" LV DOWN WALL TO SERVE M5 LAB EQUIPMENT. REFER TO
ARCHITECTURAL INTERIOR ELEVATIONS ON SHEETS 14A402 & 14A403 FOR EXACT
LOCATION OF EQUIPMENT. COORDINATE INSTALLATION WITH LAB EQUIPMENT
PROVIDER.
4 EXTEND 0.5" LA & 0.5" LV DOWN WALL TO SERVE M1 LAB EQUIPMENT. REFER TO
ARCHITECTURAL INTERIOR ELEVATIONS ON SHEETS 14A401 & 14A402 FOR EXACT
LOCATION OF EQUIPMENT. COORDINATE INSTALLATION WITH LAB EQUIPMENT
PROVIDER.
5 EXTEND 0.5" G & 0.5" LV DOWN WALL AND THROUGH TWO CHANNEL, SURFACE
MOUNTED RACEWAY PROVIDED BY DIVISION 1 TO SERVE LAB GAS OUTLETS ABOVE
COUNTERTOP. REFER TO ARCHITECTURAL INTERIOR ELEVATIONS ON SHEETS 14A402
& 14A403 FOR EXACT LOCATION OF OUTLETS. COORDINATE INSTALLATION WITH LAB
EQUIPMENT PROVIDER.
6 EXTEND 0.5" LA TO SERVE M2 EQUIPMENT. REFER TO ARCHITECTURAL INTERIOR
ELEVATIONS ON SHEETS 14A402 & 14A403 FOR EXACT LOCATION OF EQUIPMENT.
COORDINATE INSTALLATION WITH LAB EQUIPMENT PROVIDER.
7 EXTEND 0.5" G, 0.5" LA & 0.5" LV THRU TWO CHANNEL, SURFACE MOUNTED RACEWAY
PROVIDED PER DIVISION 1 TO SERVE LAB BENCH OUTLETS. REFER TO SHEETS
14A512 FOR ADDITIONAL INFORMATION.
8 EXTEND G, LA & LV PIPING IN KNEE WALL TO SERVE LAB BENCHES (SIZE AS
INDICATED). REFER TO ARCHITECTURAL WALL SECTIONS ON SHEET 14A512 FOR
ADDITIONAL INFORMATION.
9 CAP 2.5" LV, 2" LA & 2" G IN CHASE FOR EXTENSION TO FUTURE FOURTH FLOOR.
GENERAL NOTES
A REFER TO 14P001 FOR LEGEND, NOTES, SECTIONS, SCHEDULES AND INDEX.
N Scale: 1/8" = 1'-0"
M2
M3
L3
L4
M4
M5
L1
M5
M1
L4
L1
L1L2L1
M1
M5
UP
DN
M2
M3
L3
L4
M4
M5
M1
L1
M5 L1
L4
L1
M5
DN
L1
L1
M5
M1
DN
A
B
C
1 2 6
RD2
OD2
RD2
OD2
RD2
FD2
FD2
OD2
RD2
CO
LAB
SIGNALS
CLOSET 303
ELEC.
S-1-3
STAIR 1
MEN
S-2-3
STAIR 2
CORRIDOR
MECHANICAL
HOOD
ALCOVE
TISSUE
CULTURE
GLASS
WASH
AUTOCLAVE
CORRIDOR
WALK IN
FREEZER
EQUIPMENT
CORRIDOR
MICROSCOPY
DARK
ROOM 316
BSL 2
HOOD
ALCOVE
O D
CO
CO
3" VTR
4" SS
4" DS
(5,770 SF)
FD2
OD2
RD2
OD2
RD1 (580 SF)
OD1 (580 SF)
RD2 (1,340 SF)
OD2 (1,340 SF)
EXISTING BUILDING 15
FD2
FD2
FD2
FD3
FD3
FD1
CO
CO
4" SS
3" VTR
CO
4" DS DN
3" VTR
P420 P420
P103
P103
P103 P502
P420
P420 P201
FD1
FD1
FD1
WOMEN
EQUIPMENT
EQUIPMENT
CORRIDOR
MECHANICAL
ELEV. 3
EL-3
P609
V
P706
FD3
P706
RD2
OD2
RD2
OD2
OD2
RD2
CO
CO
COCO
CO
4" - OD
4" - STM
4" - OD
4" - OD
4"
S T
M
4"
S T
M
4"
O D
4"
O D
4" - OD
4"
O D
4"
S T
M
CO
4" - STM
4"
S T
M
4" - STM
4" - STM
4" (2365 SQ FT)
4" (1565 SQ FT)
6" (6780 SQ FT)
4" (800 SQ FT)
6" (9145 SQ FT)
V V
V
V
V
14PP202
A
B
C
1 2 6
FD2
FD2
4"
CO
LAB
SIGNALS
CLOSET
ELEC.
S-1-3
STAIR 1
MEN
S-2-3
STAIR 2
CORRIDOR
MECHANICAL
CORRIDOR
CO
RD2
OD2
OD2
RD2
3" VS 4" SS
4" DS
(6,245 SF)
RD2
6" DS (10,820 SF)
OD2
RD1 (580 SF)
OD1 (580 SF)
RD2 (1,340 SF)
OD2 (1,340 SF)
FD2
FD2
FD2
4"
4"
OD
STM
STM
FD1
FD3
RD2
OD2
TISSUE
CULTURE
4"
O D
4" - STM
4" - OD
4" - STM
COCO
COCO
CO
4" - OD
4" - OD
4" - OD
4" - STM
4" - STM
4" - OD
4"
O D
4"
S T
M
CO
OD2
RD2
RD2
OD2
OD2
RD2
V
V
V
V
V
4" (1,480 SQ FT)
4" (2,730 SQ FT)
4" (3,880 SQ FT)
4" (800 SQ FT)
4" (815 SQ FT)
4" (750 SQ FT)
4" (2365 SQ FT)
4" (800 SQ FT)
4" (1565 SQ FT)
P609
RD2 (1,150 S.F.)(1,150 S.F.) OD2
A
B
C
1 2 6
CO
SIGNALS
CLOSET 303
ELEC.
S-1-3
STAIR 1
MEN
S-2-3
STAIR 2
CORRIDOR
MECHANICAL
CORRIDOR
RD2
OD2
4" DS
(5,770 SF)
RD1 (580 SF)
OD1 (580 SF)
RD2 (1,340 SF)
OD2 (1,340 SF)
FD2
FD2
FD2
CO
4"
4" SS
6" DS (10,820 SF)
3" VS
RD2
OD2
OD2
RD2
V
V
OD2
RD2 CO
CO
CO
CO
CO
RD2
OD2RD2
OD2
4" - STM
4" - STM
4"
S T
M
4" - STM
4"
STM
4"
O D
4" - OD
4"
S T
M
4" - STM
CO
4" - OD
4" - STM
4"
O D
4" - OD
4"
O D
4" - OD
V
P609
RD2 (1,480 S.F.)(1,480 S.F.) OD2
RD2 (1,150 S.F.)(1,150 S.F.) OD2
B
C
2 6
CO
SIGNALS
CLOSET 303
ELEC.
S-1-3
STAIR 1
MEN
S-2-3
STAIR 2
CORRIDOR
MECHANICAL
CORRIDOR
RD2
OD2
4" DS
(5,770 SF)
RD1 (580 SF)
OD1 (580 SF)
RD2 (1,340 SF)
OD2 (1,340 SF)
FD2
FD2
FD2
CO
4"
4" SS
6" DS (10,820 SF)
3" VS
RD2
OD2
4" - STM
4" - OD
4" - STM
4"
S T
M 4"
S
T M
4" - STM
4" - OD
4" - STM
4"
O D
4" - OD
4"
STM
OD2
RD2
OD2
RD2 CO
CO
CO
OD2
RD2
COCO
4"
O D
V
P609
RD2 (950 S.F.)(950 S.F.) OD2
MATTHEW S.
OH
A
T
S T
E
OF
I O
GRAHAM
E-72670
IEF
O
R P
A
SS
NOI GNEL
SIGER DERET
E
N
R E
01/18/2019
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. ofHeapy Projcet No.: 2018-05045 Firm License No.: 01528
/1
/2
:1
:5
A
M
ANIMAL RESEARCH FACILITY -
BLDG. 14
PHASE 3
01/18/2019
THIRD FLOOR PLAN - DRAINAGE
14PP103C
KMBJMW
12030.01
539-327
Cincinnati, Ohio
N Scale: 1/8" = 1'-0"
THIRD FLOOR PLAN - BASE BID PLAN
N Scale: 1/8" = 1'-0"
THIRD FLOOR PLAN - BID ITEM 2
N Scale: 1/8" = 1'-0"
THIRD FLOOR PLAN - BID ITEM 3
PLAN NOTES
1 PROVIDE ACID DILUTION TRAP. SET ON FLOOR AND ANCHOR SECURELY.
GENERAL NOTES
A REFER TO 14P001 FOR LEGEND, NOTES, SECTIONS, SCHEDULES AND INDEX.
N Scale: 1/8" = 1'-0"
A
B
C
1 2 6
TOP OF
ELEVATOR SHAFT
RD2 (1,480 S.F.)
RD2 (1,250 S.F.)
(1,480 S.F.) OD2
RD2 (1,150 S.F.)
(1,250 S.F.) OD2
(1,150 S.F.) OD2 RD2 (950 S.F.)(950 S.F.) OD2
3" VTR
RD2 (1,150 S.F.)
(1,150 S.F.) OD2
4" VTR
4" DS
4" SS
3"VTR
4"SS
4" SS
EXISTING BUILDING 15
TOP OF
ELEVATOR SHAFT
RD2 (800 S.F.)(800 S.F.) OD2 RD2 (750 S.F.)(750 S.F.) OD2
RD2 (815 S.F.)
(815 S.F.) OD2
3" VTR
3" VTR
4" SS
A
B
C
1 2 6
LOW ROOF
TOP OF
ELEVATOR SHAFT
RD2 (1,250 S.F.)(1,250 S.F.) OD2
RD2 (1,170 S.F.)(1,170 S.F.) OD2
RD2 (1,150 S.F.)
(1,150 S.F.) OD2
4" VTR
3"VTR
4"SS
4" SS
TOP OF
ELEVATOR SHAFT
RD2 (750 S.F.)(750 S.F.) OD2
RD2 (815 S.F.)
(815 S.F.) OD2RD2 (800 S.F.)(800 S.F.) OD2
RD2 (1,480 S.F.)(1,480 S.F.) OD2
3" VTR
3" VTR
4" SS
A
B
C
1 2 6
LOW ROOF
TOP OF
ELEVATOR SHAFT
RD2 (1,250 S.F.)(1,250 S.F.) OD2
RD2 (1,150 S.F.)
(1,150 S.F.) OD2
4" VTR
3"VTR
4"SS
4" SS
TOP OF
ELEVATOR SHAFT
RD2 (800 S.F.)(800 S.F.) OD2 RD2 (750 S.F.)(750 S.F.) OD2
RD2 (815 S.F.)
(815 S.F.) OD2RD2 (1,170 S.F.)(1,170 S.F.) OD2
3" VTR
4" SS
B
C
2 6
LOW ROOF
TOP OF
ELEVATOR SHAFT
RD2 (1,250 S.F.)(1,250 S.F.) OD2
RD2 (1,150 S.F.)
(1,150 S.F.) OD2
4" VTR
3"VTR
4"SS
4" SS
TOP OF
ELEVATOR SHAFT
RD2 (800 S.F.)(800 S.F.) OD2 RD2 (750 S.F.)(750 S.F.) OD2
RD2 (815 S.F.)
(815 S.F.) OD2
3" VTR
4" SS
MATTHEW S.
OH
A
T
S T
E
OF
I O
GRAHAM
E-72670
IEF
O
R P
A
SS
NOI GNEL
SIGER DERET
E
N
R E
01/18/2019
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. ofHeapy Projcet No.: 2018-05045 Firm License No.: 01528
/1
/2
:1
:0
A
M
ANIMAL RESEARCH FACILITY -
BLDG. 14
PHASE 3
01/18/2019
ROOF PLAN
14PP104
KMBJMW
12030.01
539-327
Cincinnati, Ohio
N Scale: 1/8" = 1'-0"
ROOF PLAN - BASE BID
GENERAL NOTES
A REFER TO 14P001 FOR LEGEND, NOTES, DETAILS, SCHEDULES
AND INDEX.
N Scale: 1/8" = 1'-0"
ROOF PLAN - BID ITEM 2
N Scale: 1/8" = 1'-0"
ROOF PLAN - BID ITEM 3
N Scale: 1/8" = 1'-0"
ROOF PLAN - BID ITEM 4
NOTES
INSULATION REQUIRED
INSULATION BY GC. COORDINATE
MEMBRANE ROOF
ROOF DECK
BALLAST
JOIST
PRIMARY ROOF DRAIN
FLASH ROOF DRAIN INTO ROOF
UNDERDECK CLAMP
MEMBRANE SYSTEM (COORDINATE
STORM DRAIN LINE
WITH ROOFING INSTALLER)
PIPE HANGER & SUPPORT ASSEMBLY-
ATTACH TO STRUCTURAL MEMBER
5 DEPTH AT DRAIN.
SECONDARY ROOF DRAIN W/
3" STANDPIPE
TRAP PRIMER, WITH DISTRIBUTION
UNIT WHEN SERVING MULTIPLE
DRAINS. LOCATE ABOVE CEILING
IN FINISHED AREAS.
0.5''SUPPLY SHALL BE
OFF TOP OF MAIN
COLD WATER MAIN
T P
T P
WALL
FINISHED CEILING
WHERE APPLICABLE
FLOOR DRAINS
FLOOR
TP
PIPING TO FLOOR DRAINS
SHALL BE RUN BELOW FLOOR,
UNLESS NOTED OTHERWISE.
INSTALL PIPING CONCEALED
IN WALL IN FINISHED AREAS.
INSTALL PIPING TIGHT TO WALL
SURFACE IN UNFINISHED AREAS.
MIN. 45 DEGREES
BRANCH OR RUNOUT
TO STATION OUTLET,
INLET OR SPECIAL STATION
MAIN OR BRANCH PIPING
EMERG. STOP
0' - 4 1/2"
0'
/2
0' - 2 1/2"
EMERGENCY GAS SHUT-OFF VALVE
FLUSH MOUNTED GAS CONTROL VALVE
2-WAY NORMALLY CLOSED SOLENOID VALVE
EXPLOSION PROOF
120 V/60Hz CONTROL VOLTAGE
COORDINATE INSTALLATION WITH DIVISION 26.
SIDE MOUNTED OPERATOR
WITH MANUAL OVERRIDE
FLUSH BUTTON
FLUSH VALVE
STOP
FINISHED FLOOR
2.5"
.5
GRAB BAR. REFER TO
ARCHITECTURAL DETAILS
FOR MOUNTING HEIGHT
FAUCET. REFER TO SPECIFICATIONS NON-AERATED LAMINAR FLOW CONTROL DEVICE
1070 MIXING VALVE
OFFSET WASTE
TRAP PARALLEL TO WALL
LAV SHIELD ENCLOSURE
FINISHED FLOOR
LOOSE KEY / STOP
ESCUTCHEON
6"
8"
[8 m m
/4
[2 m m
FAUCET. REFER TO SPECIFICATIONS NON-AERATED LAMINAR FLOW CONTROL DEVICE
1070 MIXING VALVE
OFFSET WASTE
TRAP PARALLEL TO WALL
FINISHED FLOOR
LOOSE KEY / STOP
ESCUTCHEON
COUNTERTOP
REMOVE INTEGRAL CHECKS FROM FAUCET
AND PROVIDE NEW CHECK VALVES ON
DCW & DHW SUPPLIES
ADA PIPE WRAP PER
SPECIFICATIONS
1.5" - RO/DI
1.5" - RO/DI
0.5" - DHW
0.5" - DCW
0.75" - LV
0.5" - LA
1.5" - G1.5" - RO/DI
1.5" - RO/DI
1.5" - G
0.75" - LV
0.75" - LA
1.25" - DHW
1.25" - DHW
0.75" - DCW
0.5" - LA
0.5" - DHW
0.75" - DCW
1.5" - G
0.75" - LV
1.5" RO/DI UP
1.5"RO/ DI DN
1.5" RO/ DI RETURN
FROM 3RD FLR.
1.5"RO/ DI
V
V
V
V
V
4"OD UP
4"OD DN
CO
CO
O
DS
T M
4" STM DN
4"SS UP
4" VR
4"SS DN
SAN
MATTHEW S.
OH
A
T
S T
E
OF
I O
GRAHAM
E-72670
IEF
O
R P
A
SS
NOI GNEL
SIGER DERET
E
N
R E
01/18/2019
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. ofHeapy Projcet No.: 2018-05045 Firm License No.: 01528
/1
/2
:1
:1
A
M
ANIMAL RESEARCH FACILITY -
BLDG. 14
PHASE 3
01/18/2019
SCHEDULES & DETAILS
14PP201
KMBJMW
12030.01
539-327
Cincinnati, Ohio
FIXTURE SCHEDULE
SYMBOL
MOUNTING
HEIGHT DESCRIPTION
FLOW FIXTURE UNITS SUPPLY WASTE & VENT
REMARKSGPM GPF DRAINS
WATER
COLD HOT TEPID OUTLET VENT DIRECT INDIRECTCOLD HOT
P103 17" TO RIM WATER CLOSET/ FLOOR SET/ BACK OUTLET/ ELONGATED
BOWL/ ADA
- 1.28 4 10 1.25" 4" 2" HARDWIRED/ SENSOR OPERATED/ FLUSH VALVE WITH MANUAL BY-PASS
P201 17" TO RIM URINAL/ WALL HUNG/ ADA - 0.125 4 5 0 0.75" 2" 1.5" HARDWIRED/ SENSOR OPERATED/ FLUSH VALVE WITH MANUAL BY-PASS
P418 34" TO RIM LAVATORY/ WALL HUNG/ 20"x18"/ ADA 0.5 - 1 0.5 0.5 0.5" 0.5" 1.25" 1.5" SENSOR OPERATED/ NON-AERATED FLOW CONTROL DEVICE/ GOOSENECK
SPOUT/ LAV SHIELD
P420 C'TOP LAVATORY/ INTEGRAL WITH C'TOP/ 19" DIAMETER/ ADA 0.5 - 0.5" 0.5" 1.25" 1.5" SENSOR OPERATED/ NON-AERATED FLOW CONTROL DEVICE/ GOOSENECK
SPOUT/ LAV SHIELD
P502 - MOP SINK/ 28"x28"x12"/ 6" DROP FRONT/ TERRAZO - - 3 2.25 2.25 0.5" 0.5" 3" PAIL HOOK FAUCET/ NON-AERATED FLOW CONTROL DEVICE/ VACUUM
BREAKERS/ CROSS HANDLES
P524 C'TOP SINK/ STAINLESS STEEL/ INTEGRAL WITH C'TOP/ SINGLE
COMP'T/ 22"x19"
1.5 - 2 1 1 0.5" 0.5" 1.5" WRIST BLADE HANDLES/ NON-AERATED FLOW CONTROL DEVICE/
GOOSENECK SPOUT
P609 36" TO
SPOUT
WATER COOLER/ DRINKING FOUNTAIN/ DUAL HEIGHT/ ADA - - 0 0 0 0.375" 1.5" WALL MOUNTED/ DUAL HEIGHT/ ADA
P706 SEE SPECS EMERGENCY SHOWER/ RECESS MOUNTED IN FINISHED
CEILING
- - 1" 2" EMERGENCY EQUIPMENT TEMPERING VALVE/ TEPID WATER TO FIXTURE/ 10"
DIA. STN.ST. HEAD
P707 SEE SPECS EMERGENCY SHOWER/ EYE/ FACE WASH/ FREE STANDING - - 1.25" 1.25" EMERGENCY EQUIPMENT TEMPERING VALVE/ TEPID WATER TO FIXTURE
DRAIN SCHEDULE
SYMBOL DESCRIPTION
BODY STRAINER / GRATE TOP FINISH
C.I. S.S. C.R. BRASS RD. SQ. ADJUST. FLAT RECESS DOME
NICKLE
BRONZE C.I. C.R. S.S.
FD1 3" MEDIUM DUTY/ DOUBLE DRAINAGE/ VANDAL RESISTANT (TYPE C)/ TRAP PRIMER CONNECTION ● ● ● ●
FD2 4" MEDIUM DUTY/ DOUBLE DRAINAGE/ SECONDARY STRAINER (TYPE O)/ TRAP PRIMER CONNECTION ● ● ● ●
FD3 3" MEDIUM DUTY/ DOUBLE DRAINAGE/ VANDAL RESISTANT (TYPE C)/ TRAP PRIMER CONNECTION ● ● ●
RD1 3" FLANGED W/ ADJUSTABLE DRAINAGE COLLAR, SUMP RECEIVER, BEARING PAN, DECK CLAMP, DOME STRAINER ● ● ● ●
RD2 4" FLANGED W/ ADJUSTABLE DRAINAGE COLLAR, SUMP RECEIVER, BEARING PAN, DECK CLAMP, DOME STRAINER ● ● ● ●
OD1 3" FLANGED W/ ADJUSTABLE DRAINAGE COLLAR, SUMP RECEIVER, BEARING PAN, DECK CLAMP, DOME STRAINER, 3" STANDPIPE ● ● ● ●
OD2 4" FLANGED W/ ADJUSTABLE DRAINAGE COLLAR, SUMP RECEIVER, BEARING PAN, DECK CLAMP, DOME STRAINER, 3" STANDPIPE ● ● ● ●
FIXTURE SCHEDULE NOTES:
1 DO NOT USE AERATORS ON LAVATORY AND SINK FAUCETS. USE NON-AERATED FLOW DEVICES ONLY.
2 SUPPLY PIPE SIZES IN THIS SCHEDULE ARE FIXTURE CONNECTION SIZES. DOMESTIC COLD WATER SUPPLY PIPE SIZES SERVING FLUSH VALVES SHALL BE MINIMUM ONE PIPE SIZE LARGER THAN THE
INDICATED CONNECTION SIZE, OR SIZED AS SHOWN ON THE FLOOR PLANS. PIPING AT THE FLUSH VALVE CONNECTION, OF A SIZE EQUAL TO THE CONNECTION SIZE, SHALL BE LIMITED TO A MAXIMUM 2 FEET IN DEVELOPED LENGTH AND INCLUDE A MAXIMUM ONE 90 DEGREE ELBOW FITTING. FULL SIZE MANIFOLDS, WHERE INDICATED ON THE FLOOR PLANS, SHALL BE PROVIDED FULL
SIZE THE LENGTH OF THE PIPING CHASE AND TERMINATED WITH A FULL SIZE CAP.
DRAIN SCHEDULE NOTES:
1 PLUG UNUSED TRAP PRIMERS.
EQUIPMENT SCHEDULE NOTES:
1 PROVIDE ACID DILUTION TRAP BELOW LAB SINK OR LAB EQUIPMENT.
2 PROVIDE BALL TYPE SHUT-OFF VALVES WITH STAINLESS STEEL BALL & STEM FOR SINK AND EMERGENCY TEMPERING VALVE BELOW SINK TO PROVIDE TEPID WATER TO EMERGENCY EYEWASH.
COORDINATE ALL WORK.
3 PROVIDE ICE MAKER FILTRATION SYSTEM WITH IN/OUT CONNECTIONS OF 0.5", IN/OUT BALL VALVES, GAUGES, SEDIMENT FILTER, CARBON BLOCK FILTER, POLYPHOSPHATE FILTER AND FLUSH KIT
SERVING POTABLE WATER INLET. MAXIMUM FLOW RATE SHALL BE 2 GPM.
4 PROVIDE BACKFLOW PREVENTOR AS REQUIRED BY EQUIPMENT, REFER TO SPECIFICATIONS 22 05 23 - 2.5 FOR ADDITIONAL INFORMATION.
SCALE: NONE
TRAP PRIMER
A
SCALE: NONE
BRANCH TAKE-OFF PIPING - MEDICAL GAS
B
SCALE: NONE
EMERGENCY GAS SHUT-OFF VALVE
C
SCALE: NONE
P103 WATER CLOSET
D
SCALE: NONE
P418 WALL HUNG LAVATORY
E
SCALE: NONE
P419 COUNTERTOP LAVATORY
F
SCALE: NONE
ROOF DRAIN
G
NOTES:
1. PROVIDE ACID DILUTION TRAP BELOW LAB SINK OR LAB EQUIPMENT.
2. PROVIDE BALL TYPE SHUT-OFF VALVES WITH STAINLESS STEEL BALL & STEM
FOR SINK AND EMERGENCY TEMPERING VALVE BELOW SINK TO PROVIDE
TEPID WATER TO EMERGENCY EYEWASH. COORDINATE ALL WORK.
3. PROVIDE ICE MAKER FILTRATION SYSTEM WITH IN/ OUT CONNECTIONS OF 0.5",
IN/ OUT BALL VALVES, GUAGES, SEDIMENT FILTER, CARBON BLOCK FILTER,
POLYPHOSPHATE FILTER & FLUSH KIT SERVING POTABLE WATER INLET. MAXIMUM
FLOW RATE SHALL BE 2 GPM.
4. INDIRECT TO FLOOR DRAIN.
GENERAL NOTES:
A. PROVIDE ROUGH-IN.
B. INSTALL ALL "LOOSE" COMPONENTS.
C. PROVIDE ALL NECESSARY SUPPLIES, STOPS, TRAPS,
FIX. DRAINS, CONTINUOUS WASTE, & ALL INDIRECT WASTE.
D. MAKE ALL FINAL CONNECTIONS TO EXISTING/RELOCATED
EQUIPMENT. FINAL CONNECTIONS TO NEW EQUIPMENT SHALL BE
BY THE EQUIPMENT SUPPLIER.
E. SUPPLIES SHALL BE AS LISTED. TERMINAL OUTLETS ON EQUIPMENT
MAY BE SMALLER AND REDUCER FITTING REQUIRED.
LAB EQUIPMENT
MARK DESCRIPTION
SUPPLY WASTE & VENT
WASTE
SYS.
S E
E N
O T
E
D .C
.W
D .H
.W
L A
B A
IR
L A
B V
A C
U U
M
N
T U
R A
L G
A S
R O
D
I
F
IX
O
U T
L E
T
T R
A P
F
IX
D
R A
IN
W A
S T
E -M
IN
V E
N T
-M
IN
I N
D
IR
E C
T
A
IR
G A
P
A
IR
B R
E A
K
S A
N
IT
A R
Y
A C
ID
W
A S
T E
L1 LAB SINK/ EMERGENCY EYEWASH/ ACID WASTE TRAP 0.5" 0.5" - - - - 1.5" 1.5" 1.5" 1.5" 1.5" ● 1, 2
L2 LAB SINK/ EMERGENCY EYEWASH/ RO/DI OUTLET/ ACID WASTE TRAP 0.5" 0.5" - - - 0.5" 1.5" 1.5" 1.5" 1.5" 1.5" ● 1, 2
L3 LAB SINK/ TWO COMPARTMENT/ ACID WASTE TRAP 0.5" 0.5" - - - - (2)1.5" 1.5" 1.5" 1.5" 1.5" ● 1
L4 LAB SINK/ ACID WASTE TRAP 0.5" 0.5" - - - - 1.5" 1.5" 1.5" 1.5" 1.5" ● 1
L5 LAB SINK/ RO/DI OUTLET/ ACID WASTE TRAP 0.5" 0.5" - - - 0.5" 1.5" 1.5" 1.5" 1.5" 1.5" ● 1
M1 FUME HOOD/ ACID WASTE TRAP 0.5" - 0.5" 0.5" - 1.5" 1.5" 1.5" 1.5" 1.5" ● 1
M2 STEAM STERILIZER 0.75" 0.5" 0.5" - - (2)1.5" - (2) 1.5" (2) 1.5" - ● ● ● 4
M3 GLASS WASHER - 0.5" - - - 1.5" - 1.5" 1.5" - ● ● ● 4
M4 ICE MACHINE/ ICE MAKER FILTRATION SYSTEM (2) 0.5" - - - - (1)0.5"
(1)0.75"
- (1)0.5" (1)0.75"
(1)0.5" (1)0.75"
- ● ● ● 3,4
M5 BIO-SAFETY CABINET - - 0.5" 0.5" - - - - - - -
SCALE: 1/2" = 1'-0"
ENLARGED PLAN
H
SCALE: 1/2" = 1'-0"
DETAILS 4 & 5
I
0.5"
EMERGENCY
TEMPERING
VALVE (TMV)
T
EMERGENCY
EYEWASH BY
LAB EQUIPMENT
PROVIDER
LAB SINK & FAUCET
BY LAB EQUIPMENT
PROVIDER
0.5" DCW & DHW
PIPING OUT OF
WALL W/STOPS
0.5"0.5" 0.5"
0.5"
0.5"
CEILING
LAB BENCH CHASE RO/DI, DWC & DHW
DOWN IN LAB BENCH
CHASE TO SERVE LAB
SINK. (TYPICAL)
0.5"
EXTEND 0.5" G, 0.5" LA &
0.5" LV DOWN IN WALL
CEILING
EXTEND 0.5" G, 0.5" LA & 0.5" LV
ALONG LAB BENCH CASEWORK
TO SERVE (2) LA OUTLETS,
(2) LV OUTLETS & (2) G OUTLETS.
COORDINATE INSTALLATION WITH
LAB EQUIPMENT SUPPLIERS.
LAB BENCH CHASE
CEILING
RO/DI, DWC & DHW
DOWN IN LAB BENCH
CHASE TO SERVE LAB
SINK. (TYPICAL)
0.5" - DCW
0.5" - DHW
0.5" - RO/DI
0.5"
EXTEND 0.5" G, 0.5" LA &
0.5" LV DOWN IN WALL
CEILING
LAB BENCH
FD1
P418
P609
FD1
P418
P502 0.5"2"3"2"
2"
2"
0.5"
0.5"
2"
SUPPLY RISERS
TO 3RD FLOOR0.5"
0.75"
2.5"
0.75"
3"
VR
2" 1.5"
HAC
MEN
WOMEN
P103
P103
FD1
P420 P420
P420 P420
P201
FD1
FD1
SUPPLY RISERS UP
FROM 2ND FLOOR
1"
L A
1.
5"
L
V
OD2 RD2
3"VTR
4"SS
0.75"
WOMEN
WOMEN
MEN
CORRIDOR
4" - STM
4"
OD
1.
5"
G
0.
D H
W R
1.
5"
D
H W
2"
D C
W
P103
P103
P103
P502
FD1
4" - OD
4"
OD
1.5" - V
2 VALVE
ZONE VALVE
CABINET
(ZVC)
LV
LA
LA
LV
EMERGENCY GAS
SHUT-OFF VALVE
E ME R G. S T OP
MATTHEW S.
OH
A
T
S T
E
OF
I O
GRAHAM
E-72670
IEF
O
R P
A
SS
NOI GNEL
SIGER DERET
E
N
R E
01/18/2019
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. ofHeapy Projcet No.: 2018-05045 Firm License No.: 01528
/1
/2
:1
:2
A
M
ANIMAL RESEARCH FACILITY -
BLDG. 14
PHASE 3
01/18/2019
SECTIONS & ENLARGED PLANS
14PP202
KMBJMW
12030.01
539-327
Cincinnati, Ohio
Scale: 1/2" = 1'-0"3
EMERGENCY EYEWASH
Scale: 1/2" = 1'-0"5
LAB BENCH PIPING
Scale: 1/2" = 1'-0"4
LAB BENCH - END VIEW
Scale: 1/2" = 1'-0"1
ENLARGED PLAN - TOILET RMS 210 & 212
Scale: 1/2" = 1'-0"2
ENLARGED PLAN - TOILET RMS 331 & 332
Scale: 1/2" = 1'-0"6
ZONE VALVE CABINET
PLAN NOTES
1 BOX MOUNTED TRANSFORMER LOCATED ABOVE THE CEILING TO CONTROL SENSOR
OPERATED FLUSH VALVE ON FIXTURE(S) BELOW. 120V-1PH POWER WILL BE
LOCATED IN A WIRING BOX ABOVE THE CEILING PER DIVISION 26. A 0.75” CONDUIT (FOR
LOW VOLTAGE WIRING) STUBBED ABOVE THE CEILING AND EXTENDED DOWN TO AN
ELECTRICAL WALL BOX LOCATED ABOVE EACH WATER CLOSET WILL BE PROVIDED
PER DIVISION 26. THE TRANSFORMER AND LOW VOLTAGE WIRING SHALL BE PER
DIVISION 22. COORDINATE ALL WORK WITH THE DIVISION 26.
2 BOX MOUNTED TRANSFORMER LOCATED ABOVE THE CEILING TO CONTROL SENSOR
OPERATED FAUCET ON FIXTURE(S) BELOW. 120V-1PH POWER WILL BE LOCATED IN A
WIRING BOX ABOVE THE CEILING PER DIVISION 26. A 0.75” CONDUIT (FOR LOW VOLTAGE
WIRING) STUBBED ABOVE THE CEILING AND EXTENDED DOWN TO AN ELECTRICAL WALL
BOX LOCATED BELOW EACH LAVATORY WILL BE PROVIDED PER DIVISION 26. THE
TRANSFORMER AND LOW VOLTAGE WIRING SHALL BE PER DIVISION 22. COORDINATE ALL
WORK WITH DIVISION 26.
3 TRAP PRIMER. REFER TO DETAIL B/14PP201.
4 PROVIDE 2" FULL SIZE MANIFOLD AND SERVE EACH FIXTURE INDIVIDUALLY FROM
MANIFOLD. REFER TO FIXTURE SCHEDULE ON SHEET 14PP201 FOR INDIVIUAL FIXTURE
CONNECTIONS SIZES.
GENERAL NOTES
A REFER TO 14P001 FOR LEGEND, NOTES, SECTIONS, SCHEDULES AND INDEX.
FD2
CO
FD1 L3
L4
L5
FD2
2"
P707
L1
3"
1.
5"
1.
5"
2"
2"
2"
4"
1.
5"
1.5"
2"
1.
5"
1.5"
1.
5"
1.
5"
CO
1.5"
3"
3"VTR
4"SS
CO
2"
3"
P707
M1
L1
L2
L4
M1
L1
1.
5"
2"
1.5"
1.5"
4"
1.
5"
1.5"
1.5"
1.
5"
1.
5"
1.5"1.
5"
1.
5"
1.5"
1.5"
2"
4"
4"
4"
L1
L1
L1
L1
M1
M1
L4
1.5"
1.5"
CO
4"
3"
4"
CO
1.5"
CO
4"
CO1.5"
3"
1.
5"
1.
5"
CO
CO
L4
FD2
3" -
CRP
CRP
1.5" - CRP
4" -
CRP
1.5" - CRP
4" - CRP
1.5" - CRP
CRP
4" - CRP
3" -
CRP
3" - CRP
CO
CO
3"
FD3
CO
3"
3"
1.
5"
1.
5" 1.
5"
FD3
FD3
2" - CRP
CO
4"
1.
5"
1.
5"
1.
5"
3"
4"
3"
3"
3"
3"
CO
CO
3"
1.
5"
FD3
1.
5"
1.5"
1.
5"
4"
1.5" - CRP
3RD FLR
3RD FLR
2"
FD2
FD2
ROOF
3RD FLR
4"
3"
1.5"
1.
5"
3"
FD2
3"
3"
3"
4"
C R
P
2ND FLR
ROOF
FD2
2ND FLR
3"
3"
2"
4"
4"
3RD FLR
3RD FLR
ROOF
3RD FLR
3RD FLR
3RD FLR
2ND FLR
FD3
3"
2ND FLR
3"
1.5" - CRP
3" - CRP
3" - CRP
3"
4" -
CRP
3"
3"
1.5"
1.5"
1.5"
2"
1.5"
1.5" 1.5"
2"
4" -
CRP
3RD FLR
1.
5"
1.
5"
1.
5"
3"
1.5"
1.
5"
3"
3"
2"
3"VTR
ROOF
3"VTR
4"VTR
P420
P420
P420
P420
FD1
FD1
FD1
FD1
P103
P103
P103 P103
P103
FD1
P609
P502
ROOF
CO
1.5" - V
3RD FLR
1.5"
1.5"
3"
V
4"
S A
N
3"
4"
S A
N
P2013RD FLR3RD FLR
3"
4"
3"
4" 3"
3"1.5"
3"
2"
2"
2"2" 2"
1.5"1.5" 1.5"
1.5"
1.5"
2"
1.5"
1.5"
2"
2"
2"
2"
1.5"
3"
3"
3"
1.5"
4"
1.5"
1.5"
P418
P502
3"
3" - SAN
1.5"
1.5"
1.5"
2"
2"1.5"
1.5"
P418
4" - SAN
3"
4"
3"
3"
3"
4"
3"
FD1
3"
1.5"
1.5"
2"
1.5"
1.5"
2"
2"
P609
3RD FLR3RD FLR
2"
3"VTR
MATTHEW S.
OH
A
T
S T
E
OF
I O
GRAHAM
E-72670
IEF
O
R P
A
SS
NOI GNEL
SIGER DERET
E
N
R E
01/18/2019
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. ofHeapy Projcet No.: 2018-05045 Firm License No.: 01528
/1
/2
:1
:2
A
M
ANIMAL RESEARCH FACILITY -
BLDG. 14
PHASE 3
01/18/2019
SOIL, WASTE & VENT
14PP301
KMBJMW
12030.01
539-327
Cincinnati, Ohio
PLAN NOTES
1 EXISTING TO REMAIN.
GENERAL NOTES
A REFER TO 14P001 FOR LEGEND, NOTES, DETAILS, SCHEDULES AND INDEX.
SCALE: NONE
SOIL, WASTE & VENT
DUCT THERMOSTAT WITH AVERAGING ELEMENT
DUCT STATIC PRESSURE SENSOR
DUCT HUMIDITY SENSOR
ROOM SENSOR: TEMPERATURE, HUMIDITY
LENGTH IN DUCT WHEN SPACE PERMITS)
REMOTE BULB THERMOSTAT
ROOM CONTROL: THERMOSTAT, HUMIDISTAT
DIFFERENTIAL PRESSURE SWITCH
DUCT TEMPERATURE SENSOR WITH AVERAGING ELEMENT
SMOKE DETECTOR (SEE ELECTRICAL SPECIFICATIONS)
DUCT OR PIPE TEMP. SENSOR (SEE NOTE 1 ABOVE)
DUCT OR PIPE THERMOSTAT (NOTE 1: PROVIDE 12" MIN.
AFTER FILTER
CURRENT SENSING RELAY
AIR FOIL WHEEL (FAN)
AIR HANDLING UNIT
ANALOG INPUT
AIR PRESSURE DROP
ANALOG OUTPUT
AUTOMATIC TEMPERATURE CONTROLS
BACKWARD INCLINED WHEEL (FAN)
AIR FLOW MEASURING DEVICE
ABOVE FINISHED FLOOR
DIFFERENTIAL OR STATIC PRESSURE TRANSMITTER
COOLING COIL
CONVECTOR
CLEAN OUT
CEILING GRILLE
CENTRIFUGAL FAN
CEILING DIFFUSER
BOTTOM REGISTER (WALL TYPE)
BOTTOM GRILLE (WALL TYPE)
CEILING REGISTER
COLD WATER (POTABLE)
DIGITAL OUTPUT
DIGITAL INPUT
DIRECT DIGITAL CONTROLS
DRY BULB TEMPERATURE, DEG. F
AUTOMATIC CONTROL DAMPER
EXHAUST FAN
ENGINEERING CONTROL CENTER
DOUBLE WIDTH DOUBLE INLET (FAN)
DOOR UNDERCUT BY GENERAL CONTRACTOR
ITEM. (TO BE USED AS AN AID IN COORDINATING THE
LISTED SIZE OF DUCT, PIPE, DEVICE OR EQUIPMENT
APPROXIMATE ELEVATION FROM FLOOR TO MIDDLE OF
MANUAL VOLUME DAMPER
U/C
VARIOUS TRADES.)
FIRE DAMPER
BUTTERFLY VALVE
CIRCUIT SETTER
BALL VALVE
COMBINATION BALANCING/SHUT-OFF VALVE
MANUAL AIR VENT
AUTOMATIC FLOW CONTROL VALVE
TEST PLUG (PRESSURE/TEMPERATURE)
SAFETY VALVE OR PRESSURE RELIEF
PRESSURE REDUCING VALVE
STRAIGHT-THRU TWO-POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
STRAIGHT-THRU MODULATING CONTROL VALVE
EX.
EF
EXISTING
DWDI
ECC
DI
DO
DB
DDC
D
Db
DECIBELS
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
EQUIPMENT ABBREVIATION (SUPPLY FAN)
SUPPLY FAN NO.3 IN BUILDING NO.1
DRAWING NUMBER WHERE DRAWN
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
RETURN DUCT (UP & DOWN)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
EXHAUST OR RETURN TOP REGISTER OR GRILLE,
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE,
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
SUPPLY DUCT (UP & DOWN)
INCLINED RISE, IN DIRECTION OF AIR FLOW
NEW DUCT - WIDTH X DEPTH
RECTANGULAR ELBOWS WITH VANES EVEN IF
VANED ELBOW (PROVIDE ALL SQUARE OR
INCLINED DROP, IN DIRECTION OF AIR FLOW
ACOUSTICAL DUCT LINING
STANDARD RADIUS ELBOW
R
10/8
FC
D
SYMBOL IS MISSING)
FLEXIBLE CONNECTION
UP
(WALL TYPE)
(WALL TYPE)
DN
UP
2-2-01
1-SF3
AIR HANDLING UNIT NUMBER
BUILDING FLOOR
TYPICAL UNIT NO.
DN
SECTION LETTER
ECCENTRIC REDUCER
DIRECTION OF FLOW
CAPPED OUTLET
SIDE CONNECTION
EXISTING WORK.
ACCESSORIES (SEE STANDARD DETAIL)
INVERTED BUCKET TRAP SET INCLUDING PIPING
POINT OF CONNECTION BETWEEN NEW AND
RISE OR DROP IN PIPE
BOTTOM CONNECTION, 45 DEG. OR 90 DEG.
TOP CONNECTION, 45 DEG. OR 90 DEG.
REDUCER OR INCREASER
DIRECTION OF PIPE PITCH (DOWN)
THERMOMETER
THERMOSTATIC TRAP
STRAINER
GATE VALVE
PRESSURE GAGE
CHECK VALVE
GLOBE VALVE
PIPING ACCESSORIES (SEE STANDARD DETAIL)
FLOAT AND THERMOSTATIC TRAP SET INCLUDING
GATE VALVE WITH 3/4" HOSE END ADAPTER
EXISTING PIPE TO BE REMOVED
DRAIN LINE
UNION
D
CONV
CW
CR
CO
CG
CF
CD
CC
BR
BIW
BG
ATC
AFW
AI
APD
AO
AHU
AFM
AFF
AF
VENT LINE
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG & BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
NUMBER INDICATES STEAM PRESSURE
NUMBER INDICATES STEAM PRESSURE
LPR
V
HWS
HWR
LPS (5)
MPS (30)
MPR
HEATING
SP
S F
T
H
T
T H
WET BULB TEMPERATURE, DEG. FWb
ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE
CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.
THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE
SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.
ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS ARE REQUIRED
FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC.
ACCESS PANELS SHALL BE FURNISHED AND INSTALLED UNDER THE
ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATIONS WITH
TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT
SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.
FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO
EQUIPMENT, SEE STANDARD DETAILS AND PIPING SCHEMATICS. PROVIDE
DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE
NECK SIZES.
WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL
BE MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO
BE INSTALLED WITH BOTTOM OF REGISTERS SEVEN INCHES ABOVE
FINISHED FLOOR.
REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT
LOCATION OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.
ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE
NOTED.
ALL CUTTING AND PATCHING REQUIRED FOR THE HVAC WORK SHALL BE
INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE DISTURBED
UNDER THIS WORK TO MATCH EXISTING.
IN GENERAL, KEEP DUCT AND PIPING MAINS NEXT TO UNDERSIDE OF
STRUCTURE.
ANNULAR SPACE OF ALL PIPE, CONDUIT, DUCT & OTHER SIMILAR
PENETRATIONS OF FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED.
IN ADDITION, PENETRATIONS THROUGH 0-HOUR RATED WALLS &
FLOORS SHALL BE FIRESTOPPED TO RETARD PASSAGE OF FIRE &
SMOKE.
UPON THE DISCOVERY OF ANY ASBESTOS MATERIAL, STOP WORK
IMMEDIATELY AND REPORT IT TO THE COR. THE COR WILL NOTIFY
CONTRACTOR WHEN WORK IS SAFE TO PROCEED.
ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS
NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE PREMISES
AND DISPOSED OF PROPERLY BY THE CONTRACTOR.
REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL
OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY TO COMPLETE THE
SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND
REPORT IMMEDIATELY AND DIFFICULTIES WHICH CAN BE ANTICIPATED.
FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND
EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO PERFORMING WORK.
HEPA FILTERED EXHAUST IS REQUIRED TO MAINTAIN A MINIMUM OF
ALL ABANDONED EXTRANEOUS PIPING, DUCTWORK, SUPPORTS,
CONTROLS, ETC. SHALL BE REMOVED.
WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE
REMOVED BACK TO MAIN AND CAPPED.
WHERE DUCTS OR PIPES ARE REMOVED THRU WALL/FLOOR/ROOF THAT
IS TO REMAIN, PATCH WALL/FLOOR/ROOF OPENING TO MATCH EXISTING
WHERE OPENING IS NOT RE-USED.
MAXIMUM
OUTSIDE AIR
(16 PSIG THRU 59 PSIG)
PRE-FILTER
PUMPED CONDENSATE
PREHEAT COIL
RELATIVE HUMIDITY
SUPPLY FAN
STEAM HUMIDIFIER
TRANSFER GRILLE
UNIT HEATER
STATIC PRESSURE (INCHES OF WATER)
POWER OPERATED, PARALLEL BLADE DAMPER
POWER OPERATED, OPPOSED BLADE DAMPER
PRESSURE REDUCING VALVE
MEDIUM PRESSURE STEAM SUPPLY
MEDIUM PRESSURE STEAM CONDENSATE RETURN
PRESSURE DROP (FEET OF WATER)
TOP REGISTER (WALL TYPE)
VARIABLE FREQUENCY DRIVE
STATIC PRESSURE SENSOR
DOOR UNDERCUT BY GENERAL CONTRACTOR
SPS
TR
U/C
VFD
UH
V
TG
VALVE
S.P.
SH
SF
Rh
PD
PF
POD
PH
PRV
PPD
MPR
MAX
O.A.
NOM
MIN
PC
MPS
NOMINAL
MINIMUM
HEATING COIL
HORSEPOWER
FIN TUBE RADIATION
MIXING BOX
POUNDS PER HOUR
HIGH PRESSURE STEAM SUPPLY (60 PSIG & ABOVE)
LOW PRESSURE STEAM SUPPLY (15 PSIG & BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM CONDENSATE RETURN
LOCAL TEMPERATURE CONTROL PANEL
HYDRONIC RADIANT CEILING PANEL
HPR
HPS
HRP
LPR
LTCP
LBS/HR
MB
LPS
FLR.
FTR
HC
HP
FLOOR
BLOW UNLESS OTHERWISE NOTED)
CEILING DIFFUSERS (FOUR WAY
CHILLED WATER RETURN
CHILLED WATER SUPPLYCHS
CHR
AIR CONDITIONING
CONTROL CIRCUIT CONN.H1 N
ETCHED CLEAR LACQUERE.C.L.
WHITE BAKED ENAMELW.B.E.
BRAKE HORSEPOWERBHP
BRITISH THERMAL UNITBTU
BRITISH THERMAL UNIT PER HOURBTUH
CUBIC FEET PER MINUTECFM
CLEAN STEAM GENERATORCSG
DEGREEDEG
DIAMETERDIA
DIFFERENTIAL PRESSURE SENSORDPS
ENTERINGENT
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FPM FEET PER MINUTE
FT FEET
GALLONS PER MINUTEGPM
HEADHD
CHILLED WATER RETURNCHR
CHILLED WATER SUPPLYCHS
HEATING HOT WATER RETURNHWR
HEATING HOT WATER SUPPLYHWS
INCHESIN
INCHES WATER COLUMNIN WC
INCHES WATER GAUGEIN WG
LEAVING AIR TEMPERATURELAT
LEAVINGLVG
MBH 1000 BTUH
MERV MINIMUM EFFICIENCY REPORTING VALUE
NC NOISE CRITERIA
REVOLUTIONS PER MINUTERPM
SMOKE DAMPER (SUPPLY)SDS
SMOKE DAMPER (RETURN)SDR
STEAM PRESSURE REDUCING VALVESPRV
VARIABLE AIR VOLUMEVAV
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
NUMBER INDICATES STEAM PRESSURE
HPS (125)
HPR
PIPE UP
PIPE DOWN
IN-LINE CENTRIFUGAL FANICF
T
T
T
T
H dP
CS
DP SP
A
14M301
9'-6"
MV MANUAL AIR VENT
EXHAUST DUCT (UP & DOWN)UP DN
PUMPED CONDENSATE RETURNPC
ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING,
MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY
PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS,
WITHOUT THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT
ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND STRAINER, TRANSMITTERS,
CONTROL DEVICES.
EXPANSION TANK PIPEET
CONDENSATE PUMPCP
CABINET UNIT HEATERCUH
FCU FAN COIL UNIT
EXPANSION TANKET
PUMPP
PROPELLER UNIT HEATERPUH
RETURN FANRF
WATER FILTERWF
24 WHERE ROOFING WORK IS REQUIRED, THE EXISTING ROOFING MEMBRANE AND
INSULATION SHALL BE CUT, REMOVED AND RESTORED AS REQUIRED TO ATTAIN A
25 WHEN NEW SUPPLY AND RETURN AIR DUCTS ARE CONNECTED TO EXISTING
DUCTWORK, CLEAN BOTH NEW AND EXISTING DUCTWORK BY MOPPING AND VACUUM
CLEANING INSIDE AND OUTSIDE BEFORE OPERATION.
COTR
INTEGRAL FACE AND BYPASSIFB
0.01" W.G. NEGATIVE PRESSURE IN CONSTRUCTION AREAS. COORDINATE
WITH GENERAL CONTRACTOR AND COR
26 ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN DASHED
SHALL BE REMOVED. THE MAJORITY OF WORK TO BE REMOVED IS SHOWN. REMOVE
ALL INCIDENTAL DUCTWORK, PIPING, ETC., THAT MAY NOT BE SHOWN BUT IS
ASSOCIATED WITH THE REMOVAL WORK.
27 INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO
ARCHITECTURAL DRAWINGS AND GENERAL REQUIREMENTS SECTION 01 00 00.
28 REFER TO ARCHITECTURAL FIRE-RATED PARTITION PLAN, SHEET G002 THRU G004 FOR
LOCATIONS AND FIRE-RATINGS OF NEW AND EXISTING WALL ASSEMBLIES. ALL
PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/OR
FIRE-STOPPED AS REQUIRED TO MAINTAIN FIRE-RATINGS INDICATED. GC SHALL
COORDINATE ALL TRADES TO ENSURE FIRE-RATED PENETRATION REQUIREMENTS
WATERTIGHT CONDITION. THE ROOFING SUB-CONTRACTOR SHALL BE A CERTIFIED
INSTALLER FOR SUCH INSTALLATION TO MAINTAIN THE EXISTING WARRANTY ON THE
ROOF.
PROPELLER TYPE EXHAUST FANPEF
RETURN AIRR.A.
SUPPLY AIRS.A.
SINGLE WIDTH SINGLE INLET TOP GRILLE (WALL TYPE)SWSI
SPECIFIC GRAVITYSP. GR.
ACCESS DOORAD
FD FLOOR DRAIN
FCW FOWARD CURVED WHEEL
FC FLEXIBLE CONNECTION
FACP FIRE ALARM CONTROL PANEL
ENERGY EFFICIENCY RATIOEER
EXHAUST AIRE.A.
CONTRACTING OFFICERS TECHNICAL REPRESENTATIVE
CENTRIFUGAL OR HELICAL ROTARY SCREW CHILLER UNITCCU
BOTTOM GRILLE (WALL TYPE)BG
AIR SEPARATORAS
ANGLE GLOBE VALVE
PIPE GUIDE
PIPE ANCHOR
ORIFICE UNION
TREATED DOMESTIC MAKE-UP WATER
STAINLESS STEEL DUCT
MU
GMU GLYCOL MAKEUP WATER
GLYCOL HEAT RECOVERY WATER RETURN
GLYCOL HEAT RECOVERY WATER SUPPLYGHS
GHR
COMBINATION AXIAL/BACKWARD CURVED WHEELA/BCW
UTILITY SET FANUSF
DOMESTIC COLD WATERDCW
REFRIGERANT PIPINGR
GENERAL CONTRACTOR AND COR.
HEATING HOT WATER CONVERTERHWC
TERMINAL UNIT DESIGNATION
AIR COOLED CHILLERACCH
AND DETAILS ARE MET.
29 PROVIDE EXTENDERS ON VALVES AND DAMPERS SO ACTUATORS DO NOT INTERFERE
WITH DUCT OR PIPE INSULATION.
30 CONTRACTOR SHALL CAREFULLY COORDINATE REMOVALS AND RELOCATONS TO
MINIMIZE DOWNTIME OF EXISTING SYSTEMS. COORDINATE ALL SHUTDOWNS WITH
THE COR A MINIMUM OF 7 WORKING DAYS IN ADVANCE.
SMOKE DAMPER
SD
31 PROVIDE HEAT TRACING ON ALL EXTERIOR PIPING SUBJECT TO FREEZING
TEMPERATURES.
FINAL CONNECTIONS TO ALL EQUIPMENT, INCLUDING OWNER PROVIDED
EQUIPMENT, AS REQUIRED BY MANUFACTURER'S INSTALLATION REQUIREMENTS
GRAVITY HOODGH
ABBREVIATIONSCONTROLSPIPING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .