Attachment_2_-_Addendum_01.pdf

PDF 33 KB Posted

Attached to
Replace SICU Curtainwall (VA-18-00160141) 541-19-501 Federal contract opportunity
Solicitation number
36C25019B0002
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25019B0002 0002 Attachment 2 - Addendum 01.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace SICU Curtainwall (VA-18-00160141) 541-19-501, newest first.
File Type Posted
2019_01_03_-_responses.pdf PDF
36C25019B0002_0003.docx DOCX document
Photo_2110.jpg JPG image
Attachment_1_-_VA_responses_-_bidding_RFIs.pdf PDF
Photo_2115.jpg JPG image
36C25019B0002_0002.docx DOCX document
2nd_Floor_SICU_Stone_Sill_IMG_0142.jpg JPG image
2nd_Floor_SICU_Stone_Sill_3_IMG_0143.jpg JPG image
Site_Visit_Sign_In_Sheet.pdf PDF
2nd_Floor_SICU_Stone_Sill_2_IMG_0144.jpg JPG image
36C25019B0002_0001.docx DOCX document
36C25019B0002-002.pdf PDF
36C25019B0002-003.pdf PDF
36C25019B0002-004.pdf PDF
36C25019B0002-005.pdf PDF
36C25019B0002-001.docx DOCX document
36C25019B0002-006.docx DOCX document
36C25019B0002-000.docx DOCX document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 01

Date: December 17, 2018

Project: Replace Surgery Curtainwall, Project No. 541-19-501

Location: VAMC Wade Park, 10701 East Blvd., Cleveland, OH 44106

Documents: September 24, 2018

This Addendum hereby modifies, supplements, and amends the bidding documents, as prepared by Perspectus Architecture, for all labor, material, and equipment of every nature and required for the execution of the entire work for the above referenced project. Wherein this Addendum varies or is in conflict with the Bidding Documents, the requirements of this Addendum shall govern. In all other particulars, the requirements of the original Specifications and Bidding Documents, including any previous Addenda, shall govern.

This Addendum includes the following Item:

Item 1 Project Duration

Revise Drawing A0.1 to indicate that Project Duration during construction is to be 150 calendar days. Total project duration for pre-construction and construction shall remain at 270 days.

END OF ADDENDUM NO. 01