36C25019B0002-004.pdf
PDF 5 MB Posted
- Attached to
- Replace SICU Curtainwall (VA-18-00160141) 541-19-501 Federal contract opportunity
- Solicitation number
- 36C25019B0002
About this file
36C25019B0002 Attachment - Drawings.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25019B0002_0003.docx | DOCX document | |
| 2019_01_03_-_responses.pdf | ||
| Photo_2110.jpg | JPG image | |
| Photo_2115.jpg | JPG image | |
| 36C25019B0002_0002.docx | DOCX document | |
| Attachment_1_-_VA_responses_-_bidding_RFIs.pdf | ||
| Attachment_2_-_Addendum_01.pdf | ||
| 2nd_Floor_SICU_Stone_Sill_3_IMG_0143.jpg | JPG image | |
| Site_Visit_Sign_In_Sheet.pdf | ||
| 2nd_Floor_SICU_Stone_Sill_2_IMG_0144.jpg | JPG image | |
| 36C25019B0002_0001.docx | DOCX document | |
| 2nd_Floor_SICU_Stone_Sill_IMG_0142.jpg | JPG image | |
| 36C25019B0002-001.docx | DOCX document | |
| 36C25019B0002-006.docx | DOCX document | |
| 36C25019B0002-005.pdf | ||
| 36C25019B0002-002.pdf | ||
| 36C25019B0002-003.pdf | ||
| 36C25019B0002-000.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B-AC-3
B-AC-2B-B2
B-B3
B-B4
B-B5
B-C2
B-C3
B-C4
B-C5
B-D2
B-D3
B-D4
B-E3
B-E4
B-E2
B-F3
B-F4 B-C4
PROJECT
LOCATION
EAST BLVD.
E . 1
S
T.
EA
ST
B
LV
D
MAGNOLIA DR.
HA
ZE
L
DR
E. 108 ST.
MT. SINAI DR.
MARTIN LUTHER KING DR.
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2019
Drawing Title
Approved: Division Chief
Location
Project Title Date
Checked Drawn DRAWING NO.Building Number
Project No.
Office of Facilities
Management
Dwg. of on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
VA FORM 08-6231, OCT 1978 1
2 3 4 5 6 7 8 9
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A B
C D
E F
6"
6"
6"
6"
FACILITY MANAGER
DATE
SHOP FOREMAN 138
APPROVALS
CHIEF Planning and Construction
DATE
CHIEF, Occupational Health & Safety
APPROVALS
DIRECTOR 00
DATE
ASSOCIATE DIRECTOR 00A (B)
APPROVALS
Approved: Service Director
CHIEF, IRMCHIEF, ENGINEERING 138
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK
10701 EAST BLVD. CLEVELAND, OH. 44106
PROJECT NO.
PROJECT AREA:
Existing curtainwall replacement +/-3,718sf Existing roof replacement +/-1,225sf
DESIGN CODES:
VAMC Design Guide 2018 Life Safety Code (Precedence)
2018 IBC
OCCUPANCY,USE GROUP:
First Floor: Ambulatory Healthcare Second Floor: Healthcare
TYPE OF CONSTRUCTION: (LSC A.8.2.1.2)
Type II (222)
FIRE SUPPRESSION:
Fully Sprinklered, Existing to Remain
FIRE ALARM SYSTEM:
Existing to Remain
EXTERIOR BEARING WALLS: (LSC A.8.2.1.2)
2 Hours
INTERIOR BEARING WALLS: (LSC A.8.2.1.2)
2 Hours
STRUCTURAL FRAME / COLUMNS: (LSCA.8.2.1.2)
2 Hours (Supporting more than 1 floor)
FLOOR - CEILING ASSEMBLIES: (LSC A.8.2.1.2)
2 Hours
ROOF - CEILING ASSEMBLIES: (LSC A.8.2.1.2)
1 Hour
WEATHER PROTECTION:
IBC, Section 1503
PERFORMANCE REQUIREMENTS:
IBC, Section 1504
INTERNAL FIRE CLASSIFICATION:
Class 1
EXTERIOR FIRE CLASSIFICATION:
Class A
BASIC WIND SPEED (WIND DESIGN)
IBC, Chapter 16: 120mph
a. Exposure Category B
b. Risk Category IV
SURFACE ROUGHNESS:
B
HAIL RATING:
SH
WIND UPLIFT PRESSURES:
FIELD 40psf PERIMETER 56psf CORNERS 75psf
WIND UPLIFT DESIGN RATINGS:
FIELD 1-90
PERIMETER 1-120
CORNERS 1-150
THERMAL INSULATION
International Energy Conservation Code (IECC): R-30ci
GUARDRAILS:
IBC Section 1015.6 (Where equipment is being serviced within 10' of roof edge.)
INTERIOR NONBEARING WALLS: (LSC A.8.2.1.2)
0 Hour
EXTERIOR NONBEARING WALLS: (LSC A.8.2.1.2)
0 Hour
EXIT ENCLOSURES (LSC 7.1.3.2.1)
Existing: 1 Hour New: 1 Hour (Less than 4 stories)
SHAFT ENCLOSURES (LSC 8.6.5)
4 Stories or more: 2 Hours Less than 4 stories: 1 Hour
DRAWING INDEX
GENERAL
X.1 COVER SHEET
ARCHITECTURAL
A0.0 ABBREVIATIONS, SYMBOLS, GENERAL NOTES AND SITE PLAN
A0.1 WORK SEQUENCING AND TEMPORARY PARTITION DETAILS
A1.0 PARTIAL DEMOLITION PLANS
A1.1 PARTIAL DEMOLITION ELEVATIONS
A2.0 PARTIAL FLOOR, ROOF AND LIFE SAFETY PLANS
A3.0 PARTIAL REFLECTED CEILING PLANS
A4.0 PARTIAL EXTERIOR ELEVATIONS
A5.0 CURTAINWALL SECTIONS
A5.1 CURTAINWALL DETAILS
A5.2 CURTAINWALL DETAILS
A6.0 ROOF DETAILS
U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285
ARCH JOB NO.:
FULLY SPRINKLERED
SITE PLAN
Scale = None
True North
Stephen J. Sebesta & Associates Asbestos Abatement 17830 Enelwood Drive, Suite 16, Cleveland, Ohio 44130
Plan North
CODE INFORMATION
Perspectus Architecture LLC Architect 13212 Shaker Square Cleveland, Ohio 44120
SMOKE BARRIERS: (LSC 18.3.7.3)
1 Hour
EXIT ACCESS CORRIDORS: (LSC 18.3.6.2)
0 Hour, Smoke Partitions (Healthcare)
SUITE WALLS: (LSC 18.2.5.7.1.2)
0 Hour, Smoke Partitions (Healthcare)
HAZARDOUS AREA PROTECTION (LSC 18.3.2.1)
Labs, non-severe hazard materials: 0 Hour Labs, severe hazard materials: 1 Hour Soiled linen rooms: 1 Hour Storage room larger than 100 sf: 1 Hour
Replace Surgery Curtainwall
541-19-501
DRRN
Cover Sheet
X.1
541-19-501
FINAL CONSTRUCTION DOCUMENT SUBMISSION
AUGUST 10, 2018
AUGUST 10, 2018
Replace Surgery Curtainwall
18-056
10701 EAST BLVD. CLEVELAND, OHIO
KEY PLAN
Scale = None
Plan North
10 OFF
7 7
SYMBOLS
Building, wall and detail section mark
Interior/exterior elevation reference
Enlarged plan or detail reference
Column reference grids
Revision reference number
Wall type
Window type
New level line, control point, or datum
New door
Indicates drawing sheet on which plan/detail is shown.
Indicates detail number
Indicates drawing sheet on which elevation is shown
Indicates elevation number
Indicates drawing sheet on which section is shown
Indicates section number
Door number46
XX
A
A2-1
A2-1
A2-1
A
Crown typeXX
Wall finish
A
New Existing
XX
Floor Plan Coded Note
Demolition Coded Note anchor bolt above air conditioning acoustic(al) acoustical ceiling tile adjacent above finish floor alternate aluminum anodized approximate architect(ural) automatic
AB
ABV
A/C
ACOUS
ACT
ADJ
AFF
ALT
ALUM
ANOD
APPROX
ARCH
AUTO
board between building block(ing) bulkhead beam bottom bridging bearing brick basement built-up roofing
BD
BETW
BLDG
BLK
BLKHD
BM
BOT
BRDG
BRG
BRK
BSMT
BUR
CFM
CG
CI
CJ
CLG
CL
CLR
CLL
CNTR
CMU
CO
COL
CONC
CONN
CONST
CONT
COORD
CORR
CS
CTR
CL
cubic feet per minute corner guard cast iron control joint ceiling closet clear contract limit line counter concrete masonry unit cased opening/clean out column concrete connection construction continuous coordinate corridor course center
D
DBL
DEG
DEMO
DIA
DIM
DISP
DN
DR
DS
DET
DWG
DWR
DW
depth double degrees demolition diameter dimension dispenser down door down spout detail drawing drawer drywall each electrical contractor exterior insulation and finish system expansion joint electric elevator/elevation emergency equal equipment exposed structure existing to remain each way electric water cooler exhaust existing expansion exposed exterior
EA
EC
EIFS
EJ
ELEC
ELEV
EMERG
EQ
EQUIP
ES
ETR
EW
EWC
EXH
EXIST
EXP
EXP'D
EXT
fire alarm face brick fan coil unit face to face floor drain foundation fire extinguisher fire extinguisher cabinet fire hose cabinet finish floor fluorescent fire resistant
FA
FB
FCU
F/F
FD
FDN
FE
FEC
FHC
FIN
FLR
FLUOR
FR
FRT
GA
GALV
GC
GL
GR
GYP BD
gauge galvanized general contractor glass grade gypsum board
H
HB
HC
HDBD
HDCPD
HDWR
HDWD
HM
HORIZ
HPDL
HR
HT
HTG
HTR
HVAC
HW
HWH
high hose bibb hollow core hardboard handicapped hardware hardwood hollow metal horizontal high pressure decorative laminate hour height heating heater heating, ventilation air conditioning hot water hot water heater
ID
IN
INCL
INSUL
INT
inside diameter inch include (inclusive) insulation interior janitor joist
JAN
JST
knock down knock out
KD
KO
L
LAM
LAV
LB
LF
LIM
LT
LTG
LVR
length (long) laminate(d) lavatory pound linear feet (foot) limited light lighting louver
MARB
MAS
MAT
MAX
MECH
MEMB
MFR
MH
MIN
marble masonry material maximum mechanical membrane manufacturer manhole minimum not applicable not in contract number nominal not to scale
N/A
NIC
NO
NOM
NTS
overall on center on center above finish floor outside diameter overhead door opposite hand overflow roof drain out to out opening opposite optional
OA
OC
OCAFF
OD
OHDR
OPH
OVRD
O/O
OP'G
OPP
OPT
PLBG
PMLD
PNL
PLYWD
POL
PP
PR
PREFIN
PREFAB
PROJ
PSC
PSF
PSI
PT
PTD
PTN
PVC
PVMT
plumbing premoulded panel plywood polished push plate pair prefinished prefabricated projection pre-stress concrete pounds per square foot pounds per square inch point painted partition polyvinylchloride pavement
QTY quantity
R
RA
RAD
RAG
RD
REC
REF
REG
REINF
riser return air radius return air grille roof drain receptacle refrigerator register reinforcement solid core schedule smoke detector saddle section sheet similar stand pipe specifications speaker sprinkler single ply roofing square square inch square yard stainless steel/ slop sink standard steel storage structure(al) suspended systems
SC
SCHED
SD
SDL
SECT
SHT
SIM
SP
SPEC
SPKR
SPKLR
SPR
SQ
SQ IN
SY
SS
STD
STL
STOR
STRUC
SUCP
SYS
T T/G or T&G
TG
TD
TEL
TEMP
TEMP'D
TERR
THK
THLD
TOC
TOS
TOD
TOM
TOJ
TOP
TOW
TYP
thread tongue and groove tempered glass trench drain telephose temporary tempered terrazzo thick threshold top of concrete (top of curb) top of steel top of deck top of masonry top of joist top of parapet top of wall typical undercut underground unfinished unlimited unless noted otherwise urinal
UC
UG
UNFIN
UNLIM
UNO
UR
VERT
VEST
VIF
vertical vestibule verify in field
W W/ W/O W/W
WC
WD
WH
WIN
WG
WT
WWF
width with without wall to wall water closet wood water heater window wire glass weight welded wire fabric
YD yard
ABBREVIATIONS
C/C
CAB'T
CAD
CB
CEM
CL or center to center cabinet cadmium catch basin cement center line fire-retardant treated fire-retardant treated wood feet footing furring fire valve cabinet
FRT
FRTWD
FT
FTG
FURR
FVC
MISC
MO
MTD
MTG
MTL
MULL
miscellaneous masonry opening mounted mounting metal mullion
PBD
PCF
PERIM
PG BD
PL
PLAS
PLAM
particle board pounds per cubic foot perimeter peg board plate plastic plastic laminate
REINF
REQ'D
RES
RET
REV
RM
RO
RVS
reinforcement (reinforcing) required resilient return revised (revision) room rough opening reverse
P A R K I N G G A R A G E
S E R V I C E C O U R T
M A G N O L I A D R I V E
E A
S T
T
H
S
R E
E T
E A S T B O U L E V A R D
E A
S T
H
S
R E
E T
M A R T I N L U T H E R K I N G J R D R I V E
C L E V E L A N D M U S E U M O F N A T U R A L H I S T O R Y
C R A W F O R D A U T O A V I A T I O N M U S E U M
L O U I S S T O K E S C L E V E L A N D V A M E D I C A L C E N T E R
PROJECT
LOCATION
W A D E P A R K V A A D M I N I S T R A T I O N
B L D G M T Z I O N
C O N G R E G A T I O N A L C H U R C H
See Site Plan General Note 3
Adjacent project staging area may occur
Do not block emergency exits
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2019
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/10/18
Replace Surgery Curtainwall
541-19-501
DRRN
ABBREVIATIONS, SYMBOLS,
GENERAL NOTES AND SITE PLAN
A0.0 08/10/18
SITE PLAN GENERAL NOTES
1. Contractor to obtain, and include in their bid, all necessary approvals and permits from all authorities having jurisdiction for crane location.
2. Contractor shall restore, to it's original condition, any landscaping or other site elements damaged as a result of any contractor activities.
3. Contractor dumpster,staging and portable toilet area shall be secured to deter unauthorized access to project area. Coordinate with VA and adjacent project contractor.
Scale
40' 80' 160' 1" = 80'-0"
Site Plan
GENERAL NOTES
UP
B-AC-3
B-AC-2B-B2
B-B3
B-B4
B-B5
B-C2
B-C3
B-C4
B-C5
B-D2
B-D3
B-D4
B-E3
B-E4
B-E2
B-F3
B-F4 B-C4
PROJECT
LOCATION
9A 11B 12A 14C 15C 16C 18E 20A 21E
21F
RR RR
ssss
A
B
C
27dd
P R O J E C T S C O P E .
P R O J E C T S C O P E .
Office/Exam Rm.
S111
Office/Exam Rm.
S110
Office/Exam Rm.
S109
Stair
Office/Exam Rm.
S105
Office/Exam Rm.
S104
Tl.
S102
Office/Exam Rm.
S103
Office/Exam Rm.
S106
Office/Exam Rm.
S107
Conference S108
Office/Exam Rm.
S112
Firm B Waiting Room S101
Director's Office S129D
Office S129A
Office S129B
Office S129C
Corridor S100B
Corridor S100A to be determined by Contractor Length of Work Zone
Work Start
Provide Temporary Partitions on interior of BLDG @ Work Zone
Scaffolding @ Work Zone
9A 11B 12A 14C 15C 16C 18E 20A 21E
21D 21F
RR RR
ssss
A
B
C
27dd
P R O J E C T S C O P E .
P R O J E C T S C O P E .
Clean Utility 2D117
Meds 2D123
EXIST.
EMS
2D110
Patient Rm.
#9
2D116
Patient Rm.
#8
2D115
Patient Rm.
#7
2D114 Patient Rm.
#6 2D113
Patient Rm.
#5
2D112
Patient Rm.
#4
2D111
Scrub 2C360b
Corridor 2C360
Equip.
2C366a
Or No. 3 2C366
Stair 13 2D101
Anesthesia Office
Anesthesia Office to be determined by Contractor Length of Work Zone
Work Start
Provide Temporary Partitions on interior of BLDG @ Work Zone
Scaffolding @ Work Zone
FIRST FLOOR
666' - 11 5/8"
6" 2'
-4
6" 2'
-8
/8
6" 2'
-7
/8
6"
VI
F
3/ 4"
TEMP full HT clear FRT visqueen - Install after removal of EXIST glazing and prior to removal of EXIST ALUM curtainwall.
Remove prior to installation of new glazing
Remove EXIST window sill, discard UNO.
Temporary Partition - 3 5/8" MTL studs w/ Batt
INSUL (R-13) and finished INT panel.
EXIST raiant panel and ACT may occur, and to remain.
EXIST knee wall to remain.
EXIST bulkhead to remain.
SECOND FLOOR
679' - 4 7/8"
6" 2'
-4
6" 2'
-4
6" 2'
-4
6" 2'
-4
6"
TEMP full HT clear FRT visqueen - Install after removal of EXIST glazing and prior to removal of EXIST ALUM curtainwall.
Remove prior to installation of new glazing
Remove EXIST window sill, salvage for reinstallation
Temporary Partition - 3 5/8" MTL studs w/ Batt
INSUL (R-13)and finished INT panel.
EXIST radiant panel and ACT may occur, and to remain.
EXIST Patient headwall may occur - See plan for locations.
EXIST bulkhead to remain.
SECOND FLOOR
679' - 4 7/8"
FIRST FLOOR
666' - 11 5/8"
ROOF
691' - 11 1/4"
RR
Scaffolding @ work zone.
Existing grade (varies).
Temporary partition - See Temporary Partition
Details this sheet.
Temporary partition - See Temporary Partition
Details this sheet.
Provide weather resistant barrier @ work zone.
Secure barrier to coping.
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2019
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/10/18
Replace Surgery Curtainwall
541-19-501
DRRN
Work Sequencing and Temporary Partition Details
A0.1 07/09/18
SEQUENCING GENERAL NOTES
1. Coordinate all work sequencing and temporary partitions with the entire set of documents and with the Owners operation of facility.
2. Where off-hour work occurs or work beyond temporary partitions, ceilings shall be removed and replaced daily.
3. The construction schedule is to include days for inclement weather at no additional cost to the Owner.
4. Work shall commence at east end of curtainwall and progress to the west. Work to occur simultaneously at first and second floors.
5. Size and location of work zone is shown on the Work Sequencing Plans for illustrative purposes only.
6. Contractor shall perform all demolition and the installation of the new aluminum curtainwall, including glazing in each work zone, for a weathertight condition prior to moving to the next work zone.
7. Refurbishing of existing landscaped areas and refinishing of existing interior surfaces (gypsum board, window sills, ETC.) and removal of temporary partitions may occur after Contractor has moved to the following adjacent work zone, but is to occur as expediously as practical.
8. All work associated with the roof replacement, removal of existing curatinwall and the installation of new aluminum curtainwall shall occur from the exterior of the building.
9. All work, after the installation of temporary partitions, shall be from the exterior of the building.
Scale
4' 8' 16' 1/8" = 1'-0"
Partial First Floor Work Sequencing Plan1
Scale
4' 8' 16' 1/8" = 1'-0"
Partial Second Floor Work Sequencing Plan2
PROJECT DURATION
Duration in Days for Calendar Days Notice to Proceed
Pre-construction 120 1 - 120
Construction 120 121 - 270
TEMPORARY PARTITION NOTES
A. Contractor shall at all times provide and/or maintain seperation between Owner-occupied areas and areas under construction or partially constructed.
B. Contractor shall contruct and maintain at all times temporary partitions in accordance with Details A and B, this drawing. Temporary partitions shall be located to seperate all Owner occupied areas from construction areas, and shall not interfere with Owner's operation of facility.
C. Temporary construction partitions at contractor's work zone are to be constructed in their entirety prior to the start of demolition.
D. Additional or modifications to the temporary partitions shown may be required due to sequencing of the work. Contractor shall determine location and quantity of all temporary partitions in accordance with ICRA and VA requirements prior to submittal of bid.
E. Remove tempoary partitions completely after completion of work in each work zone and when approved by COR. Patch all surfaces damaged by the installation or removal of partitions.
F. Temporary partitions shall be constructed with metal studs @ 16" OC with full height batt insulation with 5/8" gypsum board on the room side. Partition shall be painted and perimeter joints shall be sealed. Contractor may, at contractors's sole option, utilize 10MM polywall with joints and screw heads taped, in lieu of painted gypsum board.
Scale
1' 2' 4' 1/2" = 1'-0"
Section - Temporary Partition A (Typical)3 Scale
1' 2' 4' 1/2" = 1'-0"
Section - Temporary Partition B (SICU)4
Scale
2' 4' 8' 1/4" = 1'-0"
Wall Section - Work Sequencing5
KEY PLAN
NTS
B-AC-3
B-AC-2B-B2
B-B3
B-B4
B-B5
B-C2
B-C3
B-C4
B-C5
B-D2
B-D3
B-D4
B-E3
B-E4
B-E2
B-F3
B-F4 B-C4
PROJECT
LOCATION
A1.1
A1.1 2
9A 11B
12A 14C 15C
16C 18E 20A 21E
21F
RR RR
ssss
A
B
C
27dd
P R O J E C T S C O P E .
P R O J E C T S C O P E .
32 32 32 32
Office/Exam Rm.
S111
Office/Exam Rm.
S110
Office/Exam Rm.
S109
Stair
Office/Exam Rm.
S105
Office/Exam Rm.
S104
Tl.
S102
Office/Exam Rm.
S103
Office/Exam Rm.
S106Office/Exam
Rm.
S107
Conference S108
Office/Exam Rm.
S112
Firm B Waiting Room S101
Director's Office S129D
Office S129A
Office S129B
Office S129C
Corridor S100B
Corridor S100A
TYP
TYP
A1.1
A1.1 2
9A 11B
12A 14C 15C
16C 18E 20A 21E
21D
RR RR
ssss
A
B
C
27dd
P R O J E C T S C O P E .
P R O J E C T S C O P E .
2 33
Clean Utility 2D117
Meds 2D123
EXIST.
EMS
2D110
Patient Rm.
#9
2D116 Patient Rm.
#8 2D115
Patient Rm.
#7
2D114 Patient Rm.
#6
2D113
Patient Rm.
#5
2D112
Patient Rm.
#4
2D111
Scrub 2C360b
Corridor 2C360
Equip.
2C366a
Or No. 3 2C366
Stair 13 2D101
2 3 2 3
Anesthesia Office
Anesthesia Office
TYP
TYP
A1.1
A1.1 2
9A 11B
12A 14C 15C
16C 18E 20A 21E
21D 21F
RR RR
ssss
A
B
C
27dd
P R O J E C T S C O P E .
P R O J E C T S C O P E .
Existing upper roof to remainExisting roof hatch to remain
Existing upper stone parapet to remain
4 7
DEMOLITION PLAN LEGEND
Existing construction to remain
Construction to be demolished
# Number represents coded demolition note
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2019
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/10/18
Replace Surgery Curtainwall
541-19-501
AuthorChecker
Partial Demolition Plans
A1.0 08/10/18
Scale
4' 8' 16' 1/8" = 1'-0"
Partial First Floor Demolition Plan1
Scale
4' 8' 16' 1/8" = 1'-0"
Partial Second Floor Demolition Plan2
Scale
4' 8' 16' 1/8" = 1'-0"
Partial Roof Demolition Plan3
DEMOLITION GENERAL NOTES
A Refer to specifications section 02 41 00 - Demolition for additional requirements and information.
B The Facility's EXIST smoke and fire suppression system shall remain in operation during the entire construction phase.
C All demolition work being done outside of temporary partitions is to be appropriately sealed off to prevent the transmission of dust and debris and minimize disruption to visitors, residents, and staff. COORD location of temporary partitions with Owner.
D Some items may be indicated in the demolition drawings and demolition notes which are not necessarily demolition work but are included to describe the overall scope of the project and to aid in the demolition COORD. The contractor is responsible for all work required to complete the intended work of the overall project.
E Existing roof demolition shall include, but not be limited to, removal of existing roof membrane, insulation, cover board (where present), flashing, base flashing, counterflashing, wood blocking, walkway pads (where present) and other features to bare concrete, including the coping, edge metal and any residual adhesive. Inspect the deck for damages. Make repairs as specified, clean and repair deck, apply primer, install blocking and specified vapor retarder / temporary roof system to ensure a weathertight system at the end of each work day.
F Existing curtainwall demolition shall include, but not be limited to, removal of glazing, vertical and horizontal aluminum mullions, anchor clips, flashing, insulation and wood blocking. Prepare existing remaining surfaces for new work.
G Remove MISC items within limits of demolition. COORD with Owner any items to be salvaged.
H After removal of existing roof membrane and curtainwall, the COR must inspect substrates, such as concrete structure, decks, blocking, cant strips, etc.. The COR will determine if these concealed items must be repaired or replaced. This applies to all concealed items.
I Contractor to include as a seperate line item in Contractors Schedule of Values, the leveling of a total of 200SF of concrete roof deck. See also specification 07 55 20.
J The contractor shall keep sufficient materials available on the project site to cover work in progress in the event of an unanticipated rain event.
K Dispose of all demolition debris in accordance with the specifications and all federal, state and local codes and ordinances.
DEMOLITION CODED NOTES
1 Carefully remove existing aluminum curtainwall system, including all associated flashing and blocking, in it's entirety, so as to cause as little damage to the existing interior space as possible. Remove existing sill material and discard, UNO. Contractor to repair/restore any damage caused by the demolition. Prepare remaining surfaces to accept new construction.
2 Carefully remove portion of existing ceiling system if required by new construction.
Contractor to verify extent of additional demolition not indicated on the demolition plans prior to commencing work. Restore disturbed ceilings to their original condition.
3 Remove portion of existing partition if required by new construction. Contractor shall verify extent of additional demolition not indicated on the demolition plans prior to commencing work. Restore disturbed partitions to their original condition.
4 Remove existing roof system in it's entirety, including metal coping and all associated blocking and flashing. See also Demolition General Note E.
5 Existing roof drain to remain.
6 Existing patient headwall to remain.
7 Remove existing lightning protection system in it's entirety, including connection mounts.
8 Carefully remove EXIST sill, salvage, clean/PREP for re-installation.
9 Location of hazardous material sampling. See specification 00 31 26, samples 12981-12 and 12981-13. (No asbestos detected)
Scale
4" 8" 16" 1/4" = 1'-0"
Coping Detail4
B-B3
B-B4
B-B5
B-C2
B-C3
B-C4
B-C5
B-D2
B-D3
B-D4
B-E3
B-E4
B-E2
B-F3
B-F4 B-C4
PROJECT
LOCATION
SECOND FLOOR
679' - 4 7/8"
FIRST FLOOR
666' - 11 5/8"
PENTHOUSE
696' - 5 1/4"
PENTHOUSE ROOF
718' - 7 3/16"
ROOF
691' - 11 1/4"
ADDITION ROOF
695' - 8 7/8"
11B 12A 14C 15C 16C 18E 20A 24C21E 21F
EXIST Penthouse beyond to remain
5225 222
SECOND FLOOR
679' - 4 7/8"
FIRST FLOOR
666' - 11 5/8"
PENTHOUSE
696' - 5 1/4"
PENTHOUSE ROOF
718' - 7 3/16"
ROOF
691' - 11 1/4"
ADDITION ROOF
695' - 8 7/8"
UU RRss A B C DTTVV
EXIST Surgery Addition beyond to remain
5 22
DEMOLITION PLAN LEGEND
Existing construction to remain
Construction to be demolished
# Number represents coded demolition note
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2019
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/10/18
Replace Surgery Curtainwall
541-19-501
DRRN
Partial Demolition Elevations
A1.1 08/10/18
Scale
4' 8' 16' 1/8" = 1'-0"
South Elevation - Demolition1
Scale
4' 8' 16' 1/8" = 1'-0"
West Elevation - Demolition2
DEMOLITION ELEVATION CODED NOTES
1 Carefully remove existing aluminum curtainwall system, including all associated flashing and blocking, in it's entirety, so as to cause as little damage to the existing interior space as possible. Contractor to repair/restore any damage caused by the demolition. Prepare remaining surfaces to accept new construction.
2 Existing masonry control joint, with asbestos containing caulk, to remain. DO NOT DISTURB CAULK. See also specification 00 31 26 for complete report. (Report #13081)
3 Existing stone fascade to remain.
4 Existing aluminum curtainwall system to remain.
5 Existing face brick wall/base to remain.
B-AC-3
B-AC-2B-B2
B-B3
B-B4
B-B5
B-C2
B-C3
B-C4
B-C5
B-D2
B-D3
B-D4
B-E3
B-E4
B-E2
B-F3
B-F4 B-C4
PROJECT
LOCATION
9A 11B
12A 14C 15C
16C 18E 20A 21E
21D 21F
RR RR
ssss
A
B
C
27dd
A4.0
A4.0 2
A5.0
P R O J E C T S C O P E .
P R O J E C T S C O P E .
Clean Utility 2D117
Meds 2D123
EXIST.
EMS
2D110
Patient Rm.
#9
2D116
Patient Rm.
#8
2D115
Patient Rm.
#7
2D114 Patient Rm.
#6 2D113
Patient Rm.
#5
2D112
Patient Rm.
#4
2D111
Scrub 2C360b
Corridor 2C360
Equip.
2C366a
Or No. 3 2C366
Stair 13 2D101
5 5
Anesthesia Office
Anesthesia Office
TYP
TYP
TYP
Type II VERT Mullion (8)
A5.2
A5.2
TYP
A5.2
9A 11B
12A 14C 15C
16C 18E 20A 21E
21F
RR RR
ssss
A
B
C
27dd
A4.0
A4.0 2
A5.0
A5.0
P R O J E C T S C O P E .
P R O J E C T S C O P E .
Office/Exam Rm.
S111
Office/Exam Rm.
S110
Office/Exam Rm.
S109
Stair
Office/Exam Rm.
S105
Office/Exam Rm.
S104
Tl.
S102
Office/Exam Rm.
S103
Office/Exam Rm.
S106
Office/Exam Rm.
S107
Conference S108
Office/Exam Rm.
S112
Firm B Waiting Room S101
Director's Office S129D
Office S129A
Office S129B
Office S129C
Corridor S100B
Corridor S100A
50'-4" +/- (17 EQ)
38'-10 5/8" +/- (13 EQ)
27'-4 3/8" +/- (9 EQ)
24'-3" +/- (8 EQ)
21'-9 3/8" +/- (8 EQ)
TYP
TYP
TYP
5 5 5 5
Type II VERT Mullion (8)
A5.2
TYP
A5.2
A5.2
WALL LEGEND
Existing construction to remain
New construction
Number represents coded plan note#
9A 11B
12A 14C 15C
16C 18E 20A 21E
21D 21F
RR RR
ssss
A
B
C
27dd
A4.0
A4.0 2
A5.0
P R O J E C T S C O P E .
P R O J E C T S C O P E .
Existing upper roof to remainExisting roof hatch to remain
Existing upper stone parapet to remain
A6.0
LIFE SAFETY LEGEND
2 HR Fire Barrier
1 HR Fire Barrier
1 HR Fire & Smoke Barrier
0 HR Smoke Partition
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2019
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/10/18
Replace Surgery Curtainwall
541-19-501
DRRN
Partial Floor, Roof and Life Safety Plans
A2.0 08/10/18
Scale
4' 8' 16' 1/8" = 1'-0"
Partial Second Floor Plan2
Scale
4' 8' 16' 1/8" = 1'-0"
Partial First Floor Plan1
FLOOR AND ROOF PLAN GENERAL NOTES
A Refer to Floor Plans for rated wall locations.
B Contractor to verify all dimensions and conditions in the field prior to commencement of work. If drawings conflict with actual field conditions, contact COR before proceeding with work.
C All dimensions are to finish face of wall unless noted otherwise.
FLOOR AND ROOF PLAN CODED NOTES
1 08 44 13 - New glazed ALUM curtainwall system to match existing and align with existing banding.
2 07 52 16 .13 - New protected roof membrane assembly roof (PRMA) Provide leveling of EXIST concrete deck, per specification 07 55 20.
3 07 60 00 - New clear anodized ALUM gravel stop, to match existing.
4 Existing roof drain to remain. See also General Note #20 on drawing A0.0 5 Rework / replace portion of existing interior gypsum board and/or sill. Contractor to verify extent of interior finish work.
6 Existing patient headwall to remain.
7 Existing temporary partition from adjacent project may occur, VIF.
Scale
4' 8' 16' 1/8" = 1'-0"
Partial Roof Plan3
THIS DRAWING SHALL BE PRINTED IN FULL COLOR FOR CLARITY
BLACK AND WHITE FACSIMILES ARE NOT CONSIDERED PART OF THE CONSTRUCTION
DOCUMENT SET.
KEY PLAN
NTS
LIFE SAFETY GENERAL NOTES
1. See Cover Sheet for applicable code information.
2. No revisions to existing rated walls, paths of egress travel distances are anticipated as a result of this project. Contractor shall preserve all fire resistant ratings of existing walls, unless otherwise noted.
3. See plans for location of rated walls. When rated walls are encountered during the course of construction, contractor shall maintain indicated ratings by firestopping, or patching with materials or shall perform other work necessary which will maintain indicated rating.
4. The fire rating indicated on a wall shall mean the entire length and height of wall.
B-B3
B-B4
B-B5
B-C2
B-C3
B-C4
B-C5
B-D2
B-D3
B-D4
B-E3
B-E4
B-E2
B-F3
B-F4 B-C4
PROJECT
LOCATION
9A 11B
12A 14C 15C
16C 18E 20A 21E
21F
RR RR
ssss
A
B
C
27dd
P R O J E C T S C O P E .
P R O J E C T S C O P E .
Office/Exam Rm.
S111
Office/Exam Rm.
S110
Office/Exam Rm.
S109
Stair
Office/Exam Rm.
S105
Office/Exam Rm.
S104
Tl.
S102
Office/Exam Rm.
S103
Office/Exam Rm.
S106
Office/Exam Rm.
S107
Conference S108
Office/Exam Rm.
S112
Firm B Waiting Room S101
Director's Office S129D
Office S129A
Office S129B
Office S129C
Corridor S100B
Corridor S100A
2 222
9A 11B
12A 14C 15C
16C 18E 20A 21E
21D 21F
RR RR
ssss
A
B
C
Clean Utility 2D117
Meds 2D123
EXIST.
EMS
2D110
Patient Rm.
#9
2D116
Patient Rm.
#8
2D115
Patient Rm.
#7
2D114 Patient Rm.
#6 2D113
Patient Rm.
#5
2D112
Patient Rm.
#4
2D111
Administrative Center 2D118
Pump Room 2C373
Scrub 2C360b
Corridor 2C360
Equip.
2C366a
Or No. 3 2C366
27dd
P R O J E C T S C O P E .
P R O J E C T S C O P E .
Anesthesia office
Anesthesia Office
REFLECTED CEILING PLAN LEGEND
EXIST Suspended Acoustical Ceiling Panel System to remain
Number represents coded reflected ceiling plan note#
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2019
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/10/18
Replace Surgery Curtainwall
541-19-501
DRRN
Partial Reflected Ceiling Plans
A3.0 08/10/18
Scale
4' 8' 16' 1/8" = 1'-0"
Partial First Floor Reflected Ceiling Plan1
Scale
4' 8' 16' 1/8" = 1'-0"
Partial Second Floor Reflected Ceiling Plan2
REFLECTED CEILING PLAN GENERAL NOTES
A All existing ceilings, soffits and bulkheads to remain. Patch to match where existing ceilings, soffits and/or bulkheads are removed to facilitate the work.
B For clarity, existing ceiling devices, such as light fixtures, radiant panels, sprinkler heads, ETC. are not shown. All existing ceilings, including fixtures and devices are to remain, repair if damaged during the work. Reinstall if removed to facilitate the work.
REFLECTED CEILING PLAN CODED NOTES
1 08 44 13 - New glazed ALUM curtainwall system, to match existing and align with existing banding
2 Rework / replace portion of existing interior gypsum board and / or soffit. Protect existing radiant panel where required. Restore damaged surfaces to their original condition, including painting of gypsum board surfaces.
B-B3
B-B4
B-B5
B-C2
B-C3
B-C4
B-C5
B-D2
B-D3
B-D4
B-E3
B-E4
B-E2
B-F3
B-F4 B-C4
PROJECT
LOCATION
SECOND FLOOR
679' - 4 7/8"
FIRST FLOOR
666' - 11 5/8"
PENTHOUSE
696' - 5 1/4"
PENTHOUSE ROOF
718' - 7 3/16"
ROOF
691' - 11 1/4"
ADDITION ROOF
695' - 8 7/8"
11B 12A 14C 15C 16C 18E 20A 24C21E 21F
A5.0
A5.0
EXIST Penthouse beyond to remain
TYPE A
TYPE A
TYPE A
TYPE A
TYPE A
TYPE A
TYPE B
TYPE B
.1
TYPE A
TYPE A
SECOND FLOOR
679' - 4 7/8"
FIRST FLOOR
666' - 11 5/8"
PENTHOUSE
696' - 5 1/4"
PENTHOUSE ROOF
718' - 7 3/16"
ROOF
691' - 11 1/4"
ADDITION ROOF
695' - 8 7/8"
RRss A B C DTT
EXIST Surgery Addition beyond to remain
TYPE A
TYPE A
TYPE B
TYPE A
TYPE A
TYPE A
TYPE B
TYPE A
.1
Beyond
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2019
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/10/18
Replace Surgery Curtainwall
541-19-501
DRRN
Partial Exterior Elevations
A4.0 08/10/18
Scale
4' 8' 16' 1/8" = 1'-0"
South Elevation1
Scale
4' 8' 16' 1/8" = 1'-0"
West Elevation2
GLAZING SCHEDULE
A 08 80 00 - Insulated Spandrel Glass
B 08 80 00 - Insulated Vision Glass
EXTERIOR ELEVATION CODED NOTES
1 08 44 13 - New glazed ALUM curtainwall system, to match existing and align with existing banding
2 07 60 00 - New clear anodized ALUM gravel stop.
3 Existing stone fascade to remain 4 Existing aluminum curtainwall system to remain.
5 Existing face brick wall/base to remain. See also drawing A1.1 for locations of asbestos containing caulk.
B-B3
B-B4
B-B5
B-C2
B-C3
B-C4
B-C5
B-D2
B-D3
B-D4
B-E3
B-E4
B-E2
B-F3
B-F4 B-C4
PROJECT
LOCATION
SECOND FLOOR
679' - 4 7/8"
FIRST FLOOR
666' - 11 5/8"
ROOF
691' - 11 1/4"
RR
6"
IN
SU
L
Sp an dr el
G la s s 2'
-4
6"
IN
SU
L
Sp an dr el
G la s s 2'
-4
6"
IN
SU
L
Vi si on G la ss
2' -4
6"
IN
SU
L Sp an dr el G la s s
2' -4
6"
IN
SU
L Sp an dr el G la s s
2' -4
6"
IN
SU
L Sp an dr el G la s s
2' -4
6"
IN
SU
L Vi si on
G la ss 2'
-8
/8
6"
IN
SU
L
Sp an dr e l
G la s s 2'
-7
/8
6"
VI
F
3/ 4"
'-9
/2
Patient Rm.
#8
2D115
Office/Exam Rm.
S107
07 60 00 - ALUM gravel stop
07 22 00 - Composite PRMA paver PNL roof system.
EXIST radiant panel and SUSP CLG system to remain
EXIST GYP BD o/ MTL studs to remain
EXIST CONC slab to remain
08 44 13 - New curtainwall anchors in EXIST anchor inserts
EXIST radiant panel and SUSP CLG system to remain
EXIST GYP BD on MTL studs to remain
EXIST CONC slab to remain
EXIST Stone panel w/ CMU backup parapet to remain.
08 44 13 - Anodized ALUM curtainwall system
08 44 13 - Anodized ALUM curtainwall system
EXIST Face brick wall / base to remain
EXIST grade (Varies)
08 44 13 - Anodized ALUM curtainwall system
A5.1
A5.1
A5.1
A5.1
A6.0
A6.0
08 44 13 - New curtainwall anchors in EXIST anchor inserts
EXIST GYP BD o/ MTL studs to remain
EXIST GYP BD on MTL studs to remain
Reinstall EXIST salvaged sill, UNO
09 75 20 - New quartz sill
TEMP Partition, see DWG A0.1
TEMP Partition, see DWG A0.1
09 75 20 - New quartz sill
FIRST FLOOR
666' - 11 5/8"
RR
6"
VI
F 3'
-7
/8
Office S129B
EXIST Face brick wall / base to remain
EXIST grade (Varies)
08 44 13 - Anodized ALUM curtainwall system
A5.1
Sim TEMP Partition, see DWG A0.1
EXIST GYP BD on MTL studs to remain.
EXIST CMU to remain.
EXIST 2" rigid INSUL to remain.
Replace if damaged or deteriorating
09 75 20 - New quartz sill
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2019
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/10/18
Replace Surgery Curtainwall
541-19-501
DRRN
Curtainwall Sections
A5.0 08/10/18
Scale
8" 16" 32" 3/4" = 1'-0"
Wall Section1 Scale
8" 16" 32" 3/4" = 1'-0"
Wall Section2
27dd
FIRST FLOOR
666' - 11 5/8"
EXIST Solid CMU to remain
EXIST STL angle to remain
EXIST GYP BD
o/ MTL studs w/ BATT
INSUL to remain. Repaint GYP BD to match EXIST color and sheen.
EXIST face brick to remain
07 60 00 - Stainless STL flashing w/ drip edge
07 92 00 - Sealant w/ backer rod
08 80 00 - INSUL spandrel glass
08 44 13 - Anodized ALUM curtainwall system
7 1/2"
Varies
1" MAX
6"
EXIST GYP BD
o/ MTL studs w/ BATT
INSUL to remain. Repaint GYP BD to match EXIST color and sheen.
06 40 23 - Quartz o/ 3/4" particle BD sill, UNO.
(MANUF: Cambria, Color: TBD)
08 80 00 - INSUL vision glass
08 44 13 - Anodized ALUM curtainwall system
08 80 00 - INSUL spandrel glass
Scribe quartz to ALUM curtainwall and apply
07 92 00 - Sealant
1"
1/
2"
VIF
9 1/4" +/- 1/4"
EXIST WD BLKG to remain
6"
7 1/2"
Front edge of quartz sill to conform to radius of EXIST GYP BD below
EXIST GYP BD o/ MTL studs w/ BATT INSUL to remain. Repaint GYP BD to match EXIST color and sheen. (patch if needed)
08 80 00 - INSUL vision glass
08 44 13 - Anodized ALUM curtainwall system
08 80 00 - INSUL spandrel glass
07 92 00 - Sealant
VIF
4" +/-
1/4"
7 1/2"
6"
SECOND FLOOR
679' - 4 7/8"
EXIST GYP BD
o/ MTL studs w/ BATT
INSUL to remain. Repaint GYP BD to match EXIST color and sheen.
08 80 00 - INSUL spandrel glass
08 44 13 - Anodized ALUM curtainwall system
EXIST 16ga MTL closure, reattach to new ALUM curtainwall system..
08 80 00 - INSUL spandrel glass
EXIST curtainwall anchor to remain, reattach to new VERT mullion.
EXIST CONC floor slab edge.
EXIST fire safing to remain.
Provide new where missing, damaged or deteriorating..
7 1/2"
6"
08 44 13 - Anodized ALUM curtainwall system
6"
6 1/2" 1"
1/
2" 1"
1/
2" 08 44 13 - ALUM closure, to match curtainwall finish
08 44 13 - Anodized ALUM curtainwall system
6 1/2" 1"
3" 3"
6"
5/ 8"
3/
8"
1/ 2"
1/
2"
2 1/2"
Note:
Typical vertical mullion for standard 90° installation and minor concave and convex curves.
Face of HORIZ anodized ALUM mullion.
89.50° +/-
5/ 8"
3/
8"
1/ 2"
1/
2"
2 1/2"
Note:
Vertical mullion @ curve, special shape required.
See plans for location.
Face of HORIZ anodized ALUM mullion.
4°-40'
85°-20'
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2019
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/10/18
Replace Surgery Curtainwall
541-19-501
DRRN
Curtainwall Details
A5.1 08/10/18
Scale
2" 4" 8" 3" = 1'-0"
Section Detail @ base1
Scale
2" 4" 8" 3" = 1'-0"
TYP Section Detail @ Sill2
Scale
2" 4" 8" 3" = 1'-0"
TYP Section Detail @ Header3
Scale
2" 4" 8" 3" = 1'-0"
TYP Section Detail @ 2nd Floor Slab4
Scale
2" 4" 8" 3" = 1'-0"
TYP Horizontal Mullion5
Scale
2" 4" 8" 3" = 1'-0"
Optional TYP Horizontal Mullion6
Scale
2" 4" 8" 6" = 1'-0"
Type I Vertical Mullion7
Scale
2" 4" 8" 6" = 1'-0"
Type II Vertical Mullion8
07 92 00 - Backer rod and sealant
EXIST ALUM C set in sealant.
Retain if compatible w/ new
ALUM curtainwall system
EXIST EXT stone wall makeup
Face of HORIZ mullion below
09 75 20 - New quartz sill
Face of EXIST wall below
08 44 13 - ALUM curtainwall, TYPE I VERT mullion
EXIST foil vapor barrier to be maintained
EXIST curtainwall frame anchor, retain if compatible w/ new ALUM curtainwall system
EXIST 5/8" GYP BD may occur.
Repair as needed after installation of new curtainwall.
08 80 00 - Glazing
1/
2"
1/ 4"
Face of HORIZ anodized ALUM mullion.
08 44 13 - Anodized ALUM curtainwall, VERT mullion
Face of EXIST wall below to remain
EXIST plaster on CONC COL may occur
EXIST ALUM PNL
EXIST 1 1/2"x1" ALUM C
VI
F
Face of new or EXIST quartz sill
EXIST sound attenuation
INSUL
08 80 00 - Glazing6 1/
2"
Face of HORIZ anodized ALUM mullion.
08 44 13 - Anodized ALUM curtainwall, VERT mullion
Face of EXIST wall below to remain
EXIST 5/8" GYP BD on 3 5/8" MTL studs. Repair as needed after installation of new curtainwall. Maintain life safety rating at rated walls.
EXIST ALUM PNL
EXIST 1 1/2"x1" ALUM CVI F
Face of new or EXIST quartz sill
EXIST sound attenuation
INSUL
Furred out partition may occur
ALUM closure may occur.
Repair EXIST sealant if damaged, both sides
08 80 00 - Glazing
Face of HORIZ mullion below
Face of EXIST brick below
08 44 13 - ALUM curtainwall, TYPE I VERT mullion
EXIST ALUM curtainwall to remain
08 80 00 - Glazing
07 92 00 - Backer rod w/ sealant
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2019
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/10/18
Replace Surgery Curtainwall
541-19-501 drrn
Curtainwall Details
A5.2 08/10/18
Scale
2" 4" 8" 3" = 1'-0"
Plan Detail @ Stone Wall1 Scale
2" 4" 8" 3" = 1'-0"
Plan Detail @ COL2 Scale
2" 4" 8" 3" = 1'-0"
Plan Detail @ GYP BD Partition3 Scale
2" 4" 8" 3" = 1'-0"
Plan Detail @ Stone Wall4
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2019
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/10/18
Replace Surgery Curtainwall
541-19-501
DRRN
Roof Details
A6.0 08/10/18
| 1 - X.1 |
| Sheets |
| X.1 - Cover Sheet |
| 2 - A0.0 |
| Sheets |
| A0.0 - ABBREVIATIONS, SYMBOLS, GENERAL NOTES AND SITE PLAN |
| 3 - A0.1 |
| Sheets |
| A0.1 - Work Sequencing and Temporary Partition Details |
| 4 - A1.0 |
| Sheets |
| A1.0 - Partial Demolition Plans |
| 5 - A1.1 |
| Sheets |
| A1.1 - Partial Demolition Elevations |
| 6 - A2.0 |
| Sheets |
| A2.0 - Partial Floor, Roof and Life Safety Plans |
| 7 - A3.0 |
| Sheets |
| A3.0 - Partial Reflected Ceiling Plans |
| 8 - A4.0 |
| Sheets |
| A4.0 - Partial Exterior Elevations |
| 9 - A5.0 |
| Sheets |
| A5.0 - Curtainwall Sections |
| 10 - A5.1 |
| Sheets |
| A5.1 - Curtainwall Details |
| 11 - A5.2 |
| Sheets |
| A5.2 - Curtainwall Details |
| 12 - A6.0 |
| Sheets |
| A6.0 - Roof Details |
File details come from the government source that posted it.