2019_01_03_-_responses.pdf
PDF 51 KB Posted
- Attached to
- Replace SICU Curtainwall (VA-18-00160141) 541-19-501 Federal contract opportunity
- Solicitation number
- 36C25019B0002
About this file
36C25019B0002 0003 2019 01 03 - responses.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25019B0002_0003.docx | DOCX document | |
| Photo_2110.jpg | JPG image | |
| Attachment_1_-_VA_responses_-_bidding_RFIs.pdf | ||
| Photo_2115.jpg | JPG image | |
| 36C25019B0002_0002.docx | DOCX document | |
| Attachment_2_-_Addendum_01.pdf | ||
| 2nd_Floor_SICU_Stone_Sill_3_IMG_0143.jpg | JPG image | |
| Site_Visit_Sign_In_Sheet.pdf | ||
| 2nd_Floor_SICU_Stone_Sill_2_IMG_0144.jpg | JPG image | |
| 36C25019B0002_0001.docx | DOCX document | |
| 2nd_Floor_SICU_Stone_Sill_IMG_0142.jpg | JPG image | |
| 36C25019B0002-004.pdf | ||
| 36C25019B0002-005.pdf | ||
| 36C25019B0002-001.docx | DOCX document | |
| 36C25019B0002-006.docx | DOCX document | |
| 36C25019B0002-002.pdf | ||
| 36C25019B0002-003.pdf | ||
| 36C25019B0002-000.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Surgery Curtainwall Project 541-19-501 Bidding RFI’s
1. Should the contractor be required to remove all existing safing and start with a new UL System Design in order to achieve the specified fire-rating? What is the fire-rating of the existing floor?
VA Response: The fire rating of the existing floor-ceiling assembly is 2 hour, as indicated on Drawing X.1. Contractor shall provide a rated assembly that attains the 2 hour rating. During the submittal process, contractor is to submit a UL Design specific to their curtain wall assembly, for review by the Architect. Contractor shall include in their bid all work necessary to achieve the required 2 hour rating.
2. Is the roof assembly fire rated? If so, should there be a fire-rated UL System installed at the top of the curtainwall at the roof assembly?
VA RESPONSE: The fire rating of the roof assembly is 1 hour, as indicated on Drawing X.1.
Contractor shall provide a rated assembly that attains the 1 hour rating. (see also the response to question 1 above regarding the UL Design.)