36C25018B0461-0002022.pdf

PDF 85 KB Posted

Attached to
Upgrade Primary Loop 610-16-105 Federal contract opportunity
Solicitation number
36C25018B0461
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25018B0461 0002 RFI11-007 RFI Form TLS - VADi.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Primary Loop 610-16-105, newest first.
File Type Posted
36C25018B0461-0005000.docx DOCX document
36C25018B0461-0004003.pdf PDF
36C25018B0461-0004005.pdf PDF
36C25018B0461-0004002.pdf PDF
36C25018B0461-0004001.pdf PDF
36C25018B0461-0004007.doc DOC document
36C25018B0461-0004006.pdf PDF
36C25018B0461-0004000.docx DOCX document
36C25018B0461-0004004.pdf PDF
36C25018B0461-0003001.pdf PDF
36C25018B0461-0003000.docx DOCX document
36C25018B0461-0002019.pdf PDF
36C25018B0461-0002011.pdf PDF
36C25018B0461-0002006.pdf PDF
36C25018B0461-0002003.pdf PDF
36C25018B0461-0002004.pdf PDF
36C25018B0461-0002015.pdf PDF
36C25018B0461-0002020.pdf PDF
36C25018B0461-0002008.pdf PDF
36C25018B0461-0002007.pdf PDF
36C25018B0461-0002001.pdf PDF
36C25018B0461-0002012.pdf PDF
36C25018B0461-0002016.pdf PDF
36C25018B0461-0002017.pdf PDF
36C25018B0461-0002000.docx DOCX document
36C25018B0461-0002009.pdf PDF
36C25018B0461-0002021.pdf PDF
36C25018B0461-0002013.pdf PDF
36C25018B0461-0002014.pdf PDF
36C25018B0461-0002002.pdf PDF
36C25018B0461-0002010.pdf PDF
36C25018B0461-0002018.pdf PDF
36C25018B0461-0002005.pdf PDF
36C25018B0461-00001000.docx DOCX document
36C25018B0461-00001001.pdf PDF
36C25018B0461-00001002.pdf PDF
36C25018B0461-004.pdf PDF
36C25018B0461-003.pdf PDF
36C25018B0461-005.docx DOCX document
36C25018B0461-009.xlsx XLSX spreadsheet
36C25018B0461-007.doc DOC document
36C25018B0461-006.docx DOCX document
36C25018B0461-008.docx DOCX document
36C25018B0461-002.pdf PDF
36C25018B0461-000.docx DOCX document
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

36C25018B0461

PROJECT NUMBER: 610-16-105 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.

PROJECT TITLE: Upgrade Primary Loop

PROJECT LOCATION:

Department of Veterans Affairs VA Northern Indiana HCS 1700 E. 38th St.

Marion, IN 46953

TO:

Felecia Beamen, Contracting Officer Department of Veterans Affairs NCO10 West Contracting Office 8888 Keystone Crossing, Suite 1100 Indianapolis, IN 46240 Felecia.beamen@va.gov

RFI NO.:0001 RFI 11 DATE:6/7/2018

SPEC/DWG. REFERENCE(s):

Varies (see below)

REPLY NEEDED BY:

INFORMATION NEEDED:

1. On page GI‐003, Comment C5 states temporary power will be fed into DP1, DP2, DP3. What is the rating on these panels for sizing the generator for this building? Refer to partial single line diagram on sheet 138.ED100 for answer.

2. General Question: During the site visit, it was noted that several of the buildings had low occupancy or infrequent use such as the Church and theater. Which buildings can be schedule to do the work without using an emergency generator and how long will the shutdown be allowed for? Refer to phasing plan on sheet GI003 and coordinate all shutdowns with COR prior to construction.

3. General Question: Please confirm we should provide temporary fencing around the temporary generators. The contractor shall be responsible for all safety procedures and measurements pertaining to construction items, including temporary items.

4. General Question: Should sales tax be included in our bid?

5. General Question: Are there any PCB’s expected in any of the transformers? The AE is not aware of any PCB’s in the transformers being removed.

6. Drawing 138.ED100 ‐ Notes 3‐6 detail the breakers to fit existing, but they don't say who is the manufacturer for panel

EEDP (Note 3). Please advise. Note 3 on sheet 138.ED100 states the panel is manufactured by FPE

7. Drawing 138.ES100, Can the Main Gear Switchboard depth be increased to 36" as long as NEC clearance compliance is maintained in the room? Yes, but the recommendation would be to field verify all equipment in the room, prior to ordering equipment, to ensure NEC clearances will be met.

SUBMITTED BY: Daniel Powel, TL Services CITY/STATE: Waxhaw, NC

PHONE: 479 653 6332

8. Drawing 138.ES100, is it acceptable to mount the TVSS for the Main Gear Switchboard internally? This will lower the clamping voltage and increase performance of the TVSS. No, refer to specification section 26 43 13 for requirements.

9. Drawing 138.ES100, is it acceptable to provide the 80% rated 1600A breaker in section 2 of the Main Gear Switchboard as a 1200A 100% rated breaker, and help reduce the footprint of the lineup? No, provide the 1600A breaker as specified.

10. Safety ‐ 01 35 26, Section 1.7, site safety and Health officer (SSHO) and competent person (CP). Can the SSHO and CP be the same person? Contractor to coordinate with COR.

11. Safety ‐ 01 35 26, Section 1.7, If so, can they fill collateral duties as the site supervisor? Contractor to coordinate with

COR.

12. Safety ‐ 01 35 26, Section 1.7, Does the SSHO need to be present whenever work is being performed? Contractor to coordinate with COR.

13. Safety ‐ 01 35 26, Section 1.9, B. states monthly audits are to be performed by a third party “Certified Safety

Professional”. Can you confirm this requirement? Does it have to be a third party? Contractor to coordinate with

COR.

14. Safety ‐ 01 35 26, TB Screening. Please confirm TB screening is required. Contractor to coordinate with COR.

15.

REPLY:

RFIs will be answered by amendment(s).

REPLY FROM:

DATE:

ATTACHMENTS:

COPY TO: