REQUEST FOR INFORMATION (RFI)
36C25018B0461
PROJECT NUMBER: 610-16-105 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Upgrade Primary Loop
PROJECT LOCATION:
Department of Veterans Affairs VA Northern Indiana HCS 1700 E. 38th St.
Marion, IN 46953
TO:
Felecia Beamen, Contracting Officer Department of Veterans Affairs NCO10 West Contracting Office 8888 Keystone Crossing, Suite 1100 Indianapolis, IN 46240 Felecia.beamen@va.gov
RFI NO.: 5 DATE: 07 June 2018 SPEC/DWG. REFERENCE(s):
Sheet ED001, Note 7,8,9,10 and 11 Sheet 138.ED100, Notes 3,4,5,6
REPLY NEEDED BY:
INFORMATION NEEDED:
1. The prints call for the replacement breakers to be set using the existing Coordination Study. Will a new Coordination Study need to be performed due to the fact that the Existing Study will not have the data from the new breakers? Please advise.
REPLY:
RFIs will be answered by amendment(s).
REPLY FROM:
DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: Proven Techniques Applied, LLC CITY/STATE: Cantonment, Fl
PHONE: 850-791-1853
The replacement breakers will be set based on the existing coordination study and a new study may be done in the future, not in this contract.