36C25018B0425-00001016.pdf
PDF 850 KB Posted
- Solicitation number
- 36C25018B0425
About this file
36C25018B0425 00001 A-201 - EXTERIOR ELEVATIONS.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25018B0425-00001017.pdf | ||
| 36C25018B0425-00001015.docx | DOCX document | |
| 36C25018B0425-00001019.docx | DOCX document | |
| 36C25018B0425-00001018.pdf | ||
| 36C25018B0425-006.docx | DOCX document | |
| 36C25018B0425-005.pdf | ||
| 36C25018B0425-007.docx | DOCX document | |
| 36C25018B0425-008.docx | DOCX document | |
| 36C25018B0425-004.pdf | ||
| 36C25018B0425-003.docx | DOCX document | |
| 36C25018B0425-009.pdf | ||
| 36C25018B0425-002.docx | DOCX document | |
| 36C25018B0425-001.docx | DOCX document | |
| 36C25018B0425-000.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
64-FIRST FLOOR
844' - 5"
64-BASEMENT
833' - 11"
64-THIRD FLOOR
867' - 4"
123456789101213151617181920212223
64-ROOF
878' - 9 1/2"
64-SECOND
FLOOR
855' - 10 1/2"
64-TO FOOTING
832' - 5"
64-MECH
BASEMENT
830' - 11"
142627 2930
L-W1 L-W2 L-W3 L-W5L-W4 L-W6 L-W7 L-W8 L-W9 L-W10
2 2
2 2 2 2 2 2
3 3 3 3 3
3 3
4 4
44 4
4 4
7 7 7 7 7 7 7 77
4 44
64-FIRST FLOOR
844' - 5"
64-BASEMENT
833' - 11"
64-THIRD FLOOR
867' - 4"
1 2 3 4 5 6 7 8 9 10 12 13 15 16 17 18 19 20 21 22 23
64-ROOF
878' - 9 1/2"
64-SECOND
FLOOR
855' - 10 1/2"
64-TO FOOTING
832' - 5"
64-MECH
BASEMENT
830' - 11"
14 26 2729 30
L-E1 L-E2 L-E3 L-E4 L-E5 L-E6 L-E7 L-E8 L-E9 L-E10 L-E11 L-E12 L-E13 L-E14 L-E15 L-E16 L-E17 L-E18 L-E19
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 33
4 4 4 4
7 7
Elevation Key Notes:
(All may not apply to this sheet)
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
PFB Architects,Inc.
9461 Kenwood Road
Cincinnati, Ohio 45242
(513) 861 3200
Heapy Engineering 1400 West Dorothy Lane Dayton OH 45409
(937) 224 0861
PFB Project No.CORRECT FCA DEFICIENCIES
- FTD EXTERIOR
DEFICIENCIES
10/27/2017
EXTERIOR ELEVATIONS
A-201
#539-19-203
Fort Thomas, KY
PFB PFB
Scale: 3/32" = 1'-0"2
WEST ELEVATION
Scale: 3/32" = 1'-0"1
EAST ELEVATION
1 REMOVE EXISTING DIRECT EXTERIOR FINISH SYSTEM AND REPLACE WITH NEW DIRECT
EXTERIOR FINISH SYSTEM TO MATCH EXISTING. SEE SPEC SECTION 07 24 00.
2 REMOVE EXISTING LOUVER BELOW FIRST FLOOR WINDOWS AND REPLACE WITH NEW
LOUVER TO MATCH EXISTING SIZE AND FREE AREA. COORDINATE SCHEDULING WITH VA
TO ALLOW ROOMS TO BE VACATED AS NEEDED FOR COMPLETION OF WORK.
CONTRACTOR TO NOTE: NUMBER OF ROOMSVACATED FOR THIS PURPOSE MAY BE AS
FEW AS ONE AT A TIME. PROVIDE EXTERNAL CONDENSATE DRAIN KIT (SIMILAR OR
EQUAL TO FRIEDRICH PXDR10) WITH PLASTIC TUBING AS NEEDED. LOUVER TO BE
DARK BRONZE FINISH.
3 REPAIRED DAMAGED SECTION OF DIRECT EXTERIOR FINISH SYSTEM. APPROXIMATE
TOTAL QUANTITY 150 SF.
4 AFTER COMPLETION OF DIRECT EXTERIOR FINISH SYSTEM REPAIRS AND REPLACEMENT,
PAINT ALL NEW AND EXISTING DIRECT EXTERIOR FINISH SYSTETM. PAINT TO BE EXTRIOR
LATEX, COLOR TO MATCH EXISTING.
7 EXISTING COPPER CONDUCTOR HEAD AND DOWNSPOUT TO BE REPAIRED, CLEANED,
AND COATED TO PROTECT FROM CORROSION. REPAIR AND SECURE ANY LOOSE
CONNECTIONS OR SEPARATED SEAMS AS NEEDED. CLEAN EXISTING PATINA FROM ALL
COPPER COMPONENTS TO RESTORE ORIGINAL FINISH. COAT WITH CORROSION
INHIBITOR TO PREVENT WEATHERING OF RESTORED COPPER. REFER TO SPECIFICATION
SECTION 05 01 70. NON-COPPER COMPONENTS AT BASE OF BUILDING TO BE
PAINTED TO MATCH ADJACENT WALL SURFACE.
9 EXISTING CAULK AT THIS LOUVER CONTAINS ASBESTOS. SEE SPECIFICATION SECTION
02 82 13.31.
Revision s
Date
2 Bid Clarification Items 5-16-2018
1 Revision 1 3-28-2018
| Sheets |
| A-201 - EXTERIOR ELEVATIONS |
| AS-101 - ARCHITECTURAL SITE PLAN |
File details come from the government source that posted it.