36C24926Q0091 0002.docx

DOCX document 19 KB Posted

Attached to
H342--RFQ Life Safety Statement of Conditions Inspection Services
Solicitation number
36C24926Q0091
Issued by

About this file

This is Amendment 0002 to Solicitation 36C24926Q0091, a Request for Quote (RFQ) for Life Safety Statement of Conditions Inspection Services issued by the Department of Veterans Affairs Network Contracting Office 9 (Murfreesboro, TN). The amendment clarifies conflicting schedule requirements found in the original solicitation and subsequent amendments. The contracting officer (Scott Dickey) confirms that the Period of Performance is subject to change based on the award date, with the requirement to be completed up to 90 days after contract award. Site visits should occur at least 60 days from the award date, with the final product due approximately 90 days after award. The amendment consolidates contractor questions and government responses addressing scheduling discrepancies that previously stated conflicting completion dates of March 30, 2026, June 30, 2026, and 12 weeks from contract issuance.

The scope involves conducting a complete Life Safety Statement of Conditions assessment and above-ceiling life safety assessment for two Lexington VA Health Care System campuses: Troy Bowling Campus (527,186 square feet) and Franklin R. Sousley Campus (465,575 square feet), encompassing 17 total buildings across two sites approximately five miles apart. The contractor must document fire and smoke barrier walls above accessible ceilings (excluding patient-occupied rooms) and provide redlined drawings denoting wall deficiencies. The amendment clarifies that the contractor may split site visits if needed but consecutive inspections are preferred, no pre-existing deviations require contractor correction before arrival, partial payments are not permitted (full payment upon completion and acceptance), and no specific reference requirements are mandated. Work shall not occur on federal holidays unless directed by the contracting office.

View the file

Other files

File Type Posted
36C24926Q0091 0001.docx DOCX document
36C24926Q0091_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 02-04-2026 596-26-1-5075-0017 Department of Veterans Affairs Network Contracting Office 9 (90C)

NCO 9

1639 Medical Center Parkway, Suite 204 Murfreesboro

TN

37129 90C Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 204 Murfreesboro

TN

37129 To all Offerors/Bidders

36C24926Q0091

X X X This amendment is set forth as follows:

1. Contractor Questions and the Government's Response to date are found on the attached paper.

2. The Questions submission period in the solicitation remains unchanged.

3. The Quotes submission period in the solicitation remains unchanged.

Scott Dickey Contracting Officer Questions & Answers

1. Can we have more detail and respectfully request clarification regarding the project schedule, as multiple sections appear to contain differing completion requirements. Section B.2.A.4 (pg. 5) states completion by March 30, 2026, or within 30 days of the site visit, whichever comes first. Site visits shall occur at least 60 days from Award Date and the Final Product shall be completed 90 days after Award Date.

2. Section F (pg. 8) states completion within 12 weeks of contract issuance or June 30, 2026, whichever comes first. See response from Question 1

3. Section B.3 (pg. 10) repeats the 12 weeks of contract issuance or June 30, 2026, whichever comes first requirement. See response from Question 1

4. Amendment – Section F (pg. 6) also states within 12 weeks of contract issuance or June 30, 2026, whichever comes first. See response from Question 1

5. Can you please clarify which schedule requirement governs? Additionally, please confirm whether the use of “whichever comes first” is intentional, as a late contract award could result in an extremely compressed or impractical performance period. Prefer to schedule a site visit within 2 months (60 days) from Award Date, and have the final product about a month out from that (90 days).

6. In Amendment 0001 Section A. General Information #4 Performance Period states "The contractor shall complete the work required under this SOW by March 30, 2026, or within 30 days of completion of site survey, whichever comes first. Work at the government site shall not take place on Federal holidays unless directed by the Contracting Office." However, the original solicitation states that the PoP is 03/01/2026-06/30/2026. Please confirm what the PoP is for this effort. Period of Performance (PoP) date is subject to change, pending award date. The requirement shall be completed up to 90 days after the Award Date.

7. Do any of the buildings have identified deviations without a current corrective action that the contractor will be required to take over before arriving on site? No, any deviations or deficiencies that are found should be documented, but corrective actions will be addressed by VA staff and/or a separate contract if appropriate.

8. Is the contractor permitted to split the effort into several site visits? Or should the contractor perform the inspection consecutively? Consecutive would be ideal, but we would allow for splitting up the work if needed depending on time constraints.

9. Please confirm the requirement for 10 references of similar projects. See Amendment 0001 SOW changes Section J.

10. Is the contract able to be modified for partial payments based upon an agreed payment schedule? This contract shall NOT provide partial payments. This contract will provide payment upon completion and acceptance of Service.

END OF AMENDMENT