36C24920R0019-002.docx

DOCX document Posted

Attached to
Urology Cryoblation Services 3/1/20 - 2/28/21 Base Plus 4 Ordering Periods
Solicitation number
36C24920R0019
Issued by

About this file

36C24920R0019 Attachment 2 - QASP- Cryoablation.docx

View the file

Other files

File Type Posted
36C24920R0019-001.doc DOC document
36C24920R0019-000.docx DOCX document
36C24920R0019-003.docx DOCX document
36C24920R0019-004.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2 - 36C24920R0019 - QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

For: Cryoablation Surgery Services

Contract Number: _____TBD_______________

Contract Description: Cryoablation Surgery services as described in the Statement of Work

Contractor’s name: TBD

(Hereafter referred to as the contractor).

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored?

· How monitoring will take place.

· Who will conduct the monitoring?

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: Alyson Allman, Contracting Officer Organization or Agency: Network Contracting Office 9 1639 Medical Center Parkway, Suite 400. Murfreesboro TN 37129

b. Contracting Officer Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: Collette Scott Administrative Officer/COR

1030 Jefferson Avenue Memphis TN 38104
(901) 523-8990 ext. 6523
Collette.Scott@va.gov
Department of Veterans Affairs

c. Other Key Government Personnel:

Nurse Liaison for Urology Section Robert Wake, M.D., Director, Stone Center/Lithotriper Unit Anthony L. Patterson, M.D., Chief, Urology Section Chief, Surgical Service Asst. Chief, Surgical Service

3. CONTRACTOR REPRESENTATIVES

The following employees of the contractor serve as the contractor’s program manager for this contract.

a. Program Manager/Project Manager:

b. Other Contractor Personnel:

4. PERFORMANCE STANDARDS

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL). Contractors must adhere to Joint Commission Standards.

Contractor must accept all patients assigned by the Memphis VA Medical Center. A standby fee of 50% of the total cost of the procedure will be charged for any case not cancelled within 24 hours of advanced notice. Exception shall apply when two cases are scheduled for the same day and one case requires cancelling, no standby charges will be assessed.

Task
ID
Indicator
Standard
AQL
Method of Surveillance
Disincentive
Incentive
Timely Delivery of supplies
B.3.3d pg. 8
Supplies and equipment used to aid physicians in performing surgeries must be received in a timely manner as agreed.
Supplies and equipment to be delivered, functioning and available on date as scheduled 100% of the time.
99%
Direct Observation
Unfavorable Contractor performance evaluation
Favorable Contractor performance evaluation

Qualified, Trained Technician

B.3 3 pg. 6
Qualified, trained technician to set up and monitor equipment during the entire scheduled procedure
Qualified trained Technician shall be available and in location as needed to properly perform task as specified in SOW 100% of the time.
99%
Direct Observation
Unfavorable Contractor performance evaluation
Favorable Contractor performance evaluation
Mandatory Training
B.3 12 pg. 23
Contractor - Technician completes all mandatory required training
Contractor will complete all required training per VAMC policy 100% of the time.
99%
Contractor to provide documented evidence
Suspension or termination of technician until such time as the training is complete
Favorable Contractor performance evaluation
Privacy, Confidentiality and HIPPA
B.3. 5d pg. 14

AND

B.3.9 pg. 20

Contractor is aware of all laws, regulations, policies and procedures relating to Privacy, Confidentiality and HIPPA and complies with all standards
Zero breaches of privacy or confidentiality
100%
Contractor to provide documented evidence (certificate of training) of annual training required by VAMC, reports violations per VA Directive 6500.6
Immediate removal from contract
Favorable Contractor performance evaluation

5. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

DIRECT OBSERVATION: For Performance ID number 1 & 2 above: Provide documented evidence ID number 3 & 4..

6. RATINGS:

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

The following ratings shall be used:

EXCEPTIONAL:
Performance meets contractual requirements and exceeds many to the

Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.

VERY GOOD:
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also there should have been NO significant weaknesses identified.

SATISFACTORY:
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also there should have been NO significant weaknesses identified.

MARGINAL:
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of thecontractual deficiency (e.g,. Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTORY:
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety orEnvironmental Deficiency Reports, or letters).

8. DOCUMENTING PERFORMANCE:

a. ACCEPTABLE PERFORMANCE:

The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.

b. UNACCEPTABLE PERFORMANCE:

When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

9. FREQUENCY OF MEASUREMENT:

a. Frequency of Measurement.

During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.

b. Frequency of Performance Assessment Meetings.

The COR shall meet with the contractor monthly to assess performance and shall provide a written assessment.

Signature – Contractor Program Manager

Signature – Contracting Officer Representative

File details come from the government source that posted it. Updated .