36C24918R0223-A00001000.docx
DOCX document 27 KB Posted
- Attached to
- 621-16-144 - Replace AHU 3 for SPD, Bldg. 77 Federal contract opportunity
- Solicitation number
- 36C24918R0223
About this file
36C24918R0223 A00001 36C24918R0223 A00001.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24918R0223-A00002001.pdf | ||
| 36C24918R0223-A00002000.docx | DOCX document | |
| 36C24918R0223-A00001002.jpg | JPG image | |
| 36C24918R0223-A00001001.jpg | JPG image | |
| 36C24918R0223-A00001003.jpg | JPG image | |
| 36C24918R0223-002.docx | DOCX document | |
| 36C24918R0223-007.pdf | ||
| 36C24918R0223-003.pdf | ||
| 36C24918R0223-004.pdf | ||
| 36C24918R0223-006.pdf | ||
| 36C24918R0223-005.xlsx | XLSX spreadsheet | |
| 36C24918R0223-001.docx | DOCX document | |
| 36C24918R0223-000.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) A00001 3-30-2018 621-18-2-5063-0009 621-16-144 90C Department of Veterans Affairs Network Contracting Office 9 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129 90C Department of Veterans Affairs Network Contracting Office - 9 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129 To all Offerors/Bidders
36C24918R0223
X x x
626 36X0162 4237 854200 3220 23NR5JC14
x The purpose of this amendment is to answer all questions submitted. See attached for questions and answers. There are pictures attached for reference. This Request for Proposal is not extended. The due date remains as April 5, 2018 at 3:00 Central Time.
Diana K. Grube Contracting Officer
CONTINUATION PAGE
Questions and Answers:
Question 1: Much of the work on this project is called out as night and weekend work. What time are we allotted specifically for nights? For weekends?
Answer 1: Any work performed in Phases 2, 3B, 4C, 6 and 8B can be performed on week nights from the hours of 9:00 p.m. thru 5:00 a.m. Work performed in 7A or 7B or any work in Room GA108 can only be Friday nights 12:00 a.m. thru 5:00 a.m. and Saturday and Sunday from 4:00 p.m. thru 5:00 a.m. the following morning. In the event of an emergency surgery these hours are subject to change.
Question 2: Is the VA providing the daily terminal clean in the sterile areas? If yes, how much time at the end of our shift do we need to allot for this?
Answer 2: Yes, contractor will clean area before leaving area but must allow 2 hours for terminal cleaning in sterile areas.
Question 3: Welding stub ups for roof top eqp. on SF101. Will we have access to the spaces below during normal working hours (for fire watch)?
Answer 3: Spaces are occupied. Work to be performed after 4:00 p.m.
Question 4: Where can we set the crane?
Answer 4: Crane setup shall be staged in front of Building 69 only between the hours of 5:00 p.m. Friday afternoon through Sunday 7:00 p.m.
Question 5: Are there any restricted areas for the crane set (Tunnels etc.)?
Answer 5: The crane shall not be parked/staged on the top of the tunnel between Building 69 and Building 8 or the tunnel between Building 69 and Building 160
Question 6: In AD100 general notes, it says that flooring is to be stripped there is no new waxable flooring shown. Does this note apply and if yes, do we need to reapply wax?
Answer 6: Only would occur where existing VCT to remain in construction area (for example, outside of new ante room and outside of new locker room extension).
Question 7: For the chase on col EE 6, can you please provide as-builds for all floors.
Answer 7: There are no as-builts for the existing chase. Please see attached pictures.
Question 8: Is the chase on col. EE 6 straight or does it have offsets? If offset, can you please provide cuts/details?
Answer 8: Please see attached pictures, the chase does not have offsets but the pipes inside do.
Question 9: Detail 2/S501 shows new dunnage beams on existing steel posts. SF112 shows new steel beams sitting on existing beams. Which of these is correct?
Answer 9: SF112 shows the condition for Deduct Alternate #1. All existing steel remains as part of Deduct Alternate #1 Question 10: Section 23 81 00 Part 1.4 F in the Specifications calls out Completed System Readiness Checklists provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS. However, Section 23 08 00 is not included in the specifications. Is commissioning of HVAC included in the Scope of Work? If yes, can you please provide specs/requirements?
Answer 10: Section 23 81 00 is not part of this specification. Commissioning is not part of this project. References to commissioning in the specifications are to be ignored/deleted Question 11: Where will material laydown area be located?
Answer 11: Behind the Warehouse Building #205, there will be an area provided near the Grounds Building. In addition, the VA does not have any office space to offer. The contractor will need to provide their own office space if needed. There is wireless access in the atrium of Building 200 if internet connectivity is necessary.
Question 12: Where will parking for contractors working on site be located?
Answer 12: To be discussed/determined at NTP. The VA will provide minimum parking near site. If necessary, parking will be at the water tower.
Question 13: To the VA’s knowledge, are there any asbestos containing materials or lead based paints? If yes, can you identify the type and locations?
`Answer 13: There is asbestos flooring but none will be disrupted.
Question 14: The crane operator is not to carry a load over an occupied building unless the top two floors are evacuated, as stated in the specifications 01 35 26 -33. What days and hours will we be able to lift material over the building?
Answer 14: Please see answer 4 Question 15: The specifications call for a Duct Air Leakage test report. A large portion of the duct work that is currently installed is to remain and reuse. If testing of all ductwork is required, the entire system will need to be shut down for a significant amount of time and access will be needed above ceiling in all areas served by AHU3. Does the test requirement only apply to newly installed work?
Answer 15: Leak testing required for new ductwork shown on Drawings M-102 (Shaft/Mechanical room) and M-103 (Roof/Shaft) only. No duct leak testing for new ductwork on Drawing M101. No duct leak testing for existing ductwork required. Refer to question #16 Question 16: If duct leakage testing applies to existing duct to remain, is remediation of the existing duct within the scope of work?
Answer 16: No duct leak testing for existing ductwork required, refer to question #15 Question 17: Please supply the location of the PACS control panel in Detail 4, E101.
Answer 17: Control panel to be located in room GA106, next to HAC closet GA105. Network connection to data closet FA125 directly above GA106 Question 18: Are we required to remaster the entire lightning protection system, or is it simply an extension of the current protection system?
Answer 18: An extension of current protection system Question 19: Is the existing lightning protection system mastered and up to date with current codes?
Answer 19: Current system’s code compliance is unknown Question 20: The chase on drawings AD100 Partial Demo. Plan 2nd floor and A400 New Work 2nd floor does not represent current field conditions. Per drawing M-102 notes 3 and 4, possible work is required in these locations. Can you please supply drawings that represent the current field conditions?
Answer 20: Please see attached images. Area is currently under construction, contractor to coordinate with area contractor for access to chases Question 21: Who is the current controls contractor at the facility?
Answer 21: Computrol/ASI, this is the facilities standard Question 22: Who is the current fire alarm contractor at the facility?
Answer 22: Simplex, this is the facilities standard Question 23: Is the small business size standard correct?
Answer 23: The small business size standard should be $15M for 238220.
Question 24: Since the magnitude of construction projects is between $2,000,000 and $5,000,000 is factor 3 correct? Factor 3 – Past performance for project dollar magnitude was $3,000,000.00 or greater Answer 24: Change that to read:
FACTOR 3 - Past Performance: Offeror shall list three (3) only prior clients for completed projects of new construction or new addition of hospital/healthcare facility, medical clinics where the projects dollar magnitude was $2,000,000 or greater within the last five (5) years on the VA Past Performance questionnaire (attached to this solicitation) and ask the client to forward directly to the CO via email at diana.grube@ va.gov by 4:00PM, Eastern Time on April 5, 2018.
Question 25: What are the liquidated damage costs?
Answer 25: FAR 52.211-12 should read as follows:
4.3 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $401.26 for the first day and $329.46 for each calendar day of delay after until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of Clause)