36C24719Q0713-004.pdf

PDF 80 KB Posted

Attached to
Boiler Plant Semi and Annual maintenacne
Solicitation number
36C24719Q0713
Issued by

About this file

36C24719Q0713 SCHEDULE.pdf

View the file

Other files

File Type Posted
-17827.docx DOCX document
36C24719Q0713-0002001.docx DOCX document
36C24719Q0713-0002000.docx DOCX document
36C24719Q0713-0001001.pdf PDF
36C24719Q0713-0001000.docx DOCX document
36C24719Q0713-005.pdf PDF
36C24719Q0713-003.pdf PDF
36C24719Q0713-002.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1.00 JB __________________ __________________

TESTING & CALIBRATION FOR BOILER PLANT SAFETY DEVICES

CONTRACTOR SHALL PROVIDE SEMI-ANNUAL AND ANNUAL INSPECTION,

TESTING AND CALIBRATION SERVICES FOR BOILER PLANT SAFETY DEVICES

IN ACCORDANCE WITH REQUIREMENTS OF STATEMENT OF WORK. BASE

PLUS FOUR (4) OPTION YEAR CONTRACT

Contract Period: Base POP Begin: 08-12-2019 POP End: 08-11-2020

CONTRACTOR SHALL PROVIDE SEMI-ANNUAL AND ANNUAL INSPECTION,

TESTING AND CALIBRATION SERVICES FOR BOILER PLANT SAFETY DEVICES

IN ACCORDANCE WITH REQUIREMENTS OF STATEMENT OF WORK. BASE

PLUS FOUR (4) OPTION YEAR CONTRACT

Contract Period: Option 1 POP Begin: 08-12-2020 POP End: 08-11-2021

CONTRACTOR SHALL PROVIDE SEMI-ANNUAL AND ANNUAL INSPECTION,

TESTING AND CALIBRATION SERVICES FOR BOILER PLANT SAFETY DEVICES

IN ACCORDANCE WITH REQUIREMENTS OF STATEMENT OF WORK. BASE

PLUS FOUR (4) OPTION YEAR CONTRACT

Contract Period: Option 2 POP Begin: 08-12-2021 POP End: 08-11-2022

CONTRACTOR SHALL PROVIDE SEMI-ANNUAL AND ANNUAL INSPECTION,

TESTING AND CALIBRATION SERVICES FOR BOILER PLANT SAFETY DEVICES

IN ACCORDANCE WITH REQUIREMENTS OF STATEMENT OF WORK. BASE

PLUS FOUR (4) OPTION YEAR CONTRACT

Contract Period: Option 3 POP Begin: 08-12-2022

POP End: 08-11-2023

CONTRACTOR SHALL PROVIDE SEMI-ANNUAL AND ANNUAL INSPECTION,

TESTING AND CALIBRATION SERVICES FOR BOILER PLANT SAFETY DEVICES

IN ACCORDANCE WITH REQUIREMENTS OF STATEMENT OF WORK. BASE

PLUS FOUR (4) OPTION YEAR CONTRACT

Contract Period: Option 4 POP Begin: 08-12-2023 POP End: 08-11-2024

GRAND TOTAL __________________

File details come from the government source that posted it.