36C24719Q0713-0002001.docx

DOCX document 218 KB Posted

Attached to
Boiler Plant Semi and Annual maintenacne
Solicitation number
36C24719Q0713
Issued by

About this file

36C24719Q0713 0002 Questions and answers.docx

View the file

Other files

File Type Posted
-17827.docx DOCX document
36C24719Q0713-0002000.docx DOCX document
36C24719Q0713-0001001.pdf PDF
36C24719Q0713-0001000.docx DOCX document
36C24719Q0713-005.pdf PDF
36C24719Q0713-004.pdf PDF
36C24719Q0713-003.pdf PDF
36C24719Q0713-002.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS:

After reviewing with my team, the only question I’d appreciate clarification on is: how many meters would you like to include the calibration services for? Would you like the meter calibration cost to be included within the bid, or would you prefer those to be on a cost plus basis through the SDVOSB?

Answer: Please include meter calibration cost with your quote or offer.

We have a question about the Charleston VA boiler plant semi and annual maintenance. When was the last time non-destructive testing done? We know that the VA requires the testing to be performed every six years, so if it has been completed last year we would not need to do another one during the period of performance of this contract. This is important information for the quote.

Answer: The DA Tank has never had non-destructive testing, it was installed approximately three (3) years ago, therefore ndt will be required during this contract.

Shows economizer for #6 boiler, approximately 12 feet above deck level. Will likely require scaffolding to reach

#4 economizer in the background, approximately 5 feet above deck level, #5 economizer in the foreground at deck level.