36C24626Q0329 0003.docx
DOCX document 28 KB Posted
- Attached to
- Z1DA--658-26-105 Repair Fuel Storage Tanks
- Solicitation number
- 36C24626Q0329
About this file
This is Amendment 0003 to Solicitation 36C24626Q0329, issued by the Department of Veterans Affairs Network Contracting Office 6 on March 2, 2026, and effective February 5, 2026. The amendment provides additional clarifications to questions raised by offerors regarding the Repair Underground Fuel Storage Tanks (USTs) project at Salem VAMC (Project 658-26-105). The amendment addresses government dissatisfaction with responses provided in Amendment 0002.
Key technical clarifications provided include: tanks are assumed to be 5 feet by 15 feet circular with two-foot clearance on each side, resulting in 1,239 cubic feet (45 cubic yards) of total excavation, with 20 percent (9 cubic yards) assumed to be contaminated soil requiring removal. All piping within the excavation area must be removed, and fuel piping outside the excavation shall be capped; no piping larger than 3 inches is expected to be encountered. Offerors should base their bids on these assumptions, as the government has directed contractors to use best professional judgment and include measurable quantities (cubic yards, linear feet, square feet) for pricing adjustments. The amendment requires offerors to acknowledge receipt prior to the deadline specified in the solicitation through completion of items 8 and 15, acknowledgment on offer copies, or separate written/electronic communication referencing the solicitation and amendment numbers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24626Q0329 0002.docx | DOCX document | |
| 36C24626Q0329 0001.docx | DOCX document | |
| 658-26-105_Specs.pdf | ||
| 658-26-105_Drawing.pdf | ||
| DBA WD VA20260172 MOD 0 20260102.pdf | ||
| 36C24626Q0329.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 03-02-2026 658-26-105 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 To all Offerors/Bidders
36C24626Q0329 02-05-2026
X X X See CONTINUATION Page The purpose of this amendment is to provide additional answers to questions. The answers under this amendment address disatisfaction with the Government's responses to certain questions under Amendment 0002.
Daniel Spaulding Contracting Officer, NCO 6
CONTINUATION PAGE
ADDITIONAL QUESTIONS & ANSWERS (AMENDMENT 0003) — Project 658‑26‑105 Repair Underground Fuel Storage Tanks (USTs), Salem VAMC Note: Where existing documents do not provide definitive data, the government has directed offerors to use best professional judgment and include measurable quantities (e.g., cubic yards, linear feet, square feet) so any adjustments can be clearly priced.
1) The contaminated soil needs to be quantified by the VA and the 1442 amended to add a CLIN for that pricing. We also need clarification on the piping removal or abandonment.
Answer:
· Assume tanks are 5 foot by 15 feet circular with two foot clearance on each side for excavation. Volume of excavation: 9x9x19 – Tank (300 CF) = 1239 CF = 45 CY.
For bidding purposes assume 20% is contaminated, therefore, 9 CY of contaminated soil to remove.
· All piping within excavation to be removed, fuel piping to be abandoned shall be capped. It is not expected to encounter piping 3” or larger.
2) If larger than 3" needs to be grouted or less than 3" needs to be removed, we need to be able to quantify that it needs to be shown on the plans. Removal and restoration can’t be guessed at.
Answer: See comment above, no 3” piping, all piping in excavation to be removed.
3) The depth of the excavation can’t be guessed at. It could cost a significant amount of money to shore the excavations based on depth.
Answer: See comment above, bid should be based on assumptions above.
See SF30 Amendment 0003.