36C24626Q0158 0002.docx
DOCX document 19 KB Posted
- Attached to
- R425--Construction Program Management and Related Services Federal contract opportunity
- Solicitation number
- 36C24626Q0158
About this file
This is Amendment 0002 to a Request for Quotation (RFQ) for Construction Program Management and Related Services issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 6, Network Contracting Office 6 in Hampton, Virginia. The amendment extends the deadline for quote submission from January 23, 2026 at 12:00 PM ET to January 27, 2026 at 12:00 PM ET. The amendment provides government responses to four contractor questions and updates the Instructions to Offerors, with no other changes to the original solicitation requirements.
The government clarified key operational parameters for the contract: (1) beyond the required Senior Project Manager and Project Manager, additional labor categories will be mobilized based on resume quality and facility needs within the first 30 days of award; (2) hybrid staffing models utilizing off-site technical personnel are permissible for design review, estimating, reporting, and specification development, provided on-site PM, inspection, and commissioning personnel are maintained, with compensation based on actual hours worked; (3) the Charles George VAMC facility anticipates substantial construction projects including electrical distribution, HVAC, emergency generation, exterior building envelopes, roofing, renovations, a parking deck project, and a Fisher House with utility extensions under a newly awarded Recapitalization Program, though the total program budget has not been finalized; and (4) resumes for the Senior Project Manager and Project Manager are required with the initial quotation, while resumes for other funded labor categories are expected to arrive within 30 days of award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Instruction to offerors p0002.docx | DOCX document | |
| 36C24626Q0158 0001.docx | DOCX document | |
| Attachment A-36C24626Q0158 LineItems.xlsx | XLSX spreadsheet | |
| Instruction to offerors.docx | DOCX document | |
| 36C24626Q0158.docx | DOCX document | |
| 36C24626Q0158 LineItems.xlsx | XLSX spreadsheet | |
| P07--Wage Detrmination Asheville.pdf | ||
| C12--QASP.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 01-21-2026 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667 To all Offerors/Bidders
36C24626Q0158
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 01-27-2026 12pm EST See CONTINUATION Page X The purpose of this amendment is to provide government answers to contractor questions, extend the deadline for quote submission from 1/23/2026 12pm et to 1/27/2026 12pm et and update the instructions to offerors.
a. Government answers to contractor questions are on page 2 of this amendment.
b. The deadline to submit quotes is hereby extended from 1/23/2026 12pm et to 1/27/2026 12pm et.
c. Please review the attached updated Instructions to Offerors.
There are no other changes to the solicitation as a result of this amendment.
Harold McQuillia Contracting Officer
CONTINUATION PAGE
36C24626Q0158 RFQ Questions and Government Answers
1. Initial Staffing and Ramp-Up Beyond the required Senior Project Manager and Project Manager, does the Government anticipate that any additional funded labor categories in Attachment A (e.g., Engineer, Architect, CADD, Estimator, Scheduler) will be required to be mobilized during the first 30–60 days following award, or may these resources be phased in as task orders are issued?
The facility will want to start receiving resumes for other positions identified with hours in the posting within the first 30 days. The timing of the positions being filled will be based on the quality of resumes being submitted for consideration. The facility already has need for all the positions with hours identified in the posting.
2. Hybrid Performance Model The Government’s amendment responses indicate certain functions may be performed off-site (e.g., design review, estimating, reporting, and specification development). Please confirm that offerors may propose a hybrid staffing model utilizing off-site technical personnel for these functions while maintaining required on-site PM, inspection, and commissioning personnel.
The facility will review any hybrid staffing models for off-site staffing. The key is to have reach back staff available for quick responses to critical issues. Compensation for off-site personnel will be based on actual hours spent on assigned tasks. The determination of on-site and off-site will be discussed as each Memorandum of Understanding for each task is developed.
3. Expected Program Volume For planning and surge-capacity purposes, is the Government able to provide an estimated annual construction program value or approximate number of projects typically supported at the Charles George VAMC under similar contracts?
Specific size of the program is dependent on funding from the Capital Asset Manager who establishes the annual Op Plan. The facility was recently selected for the Recapitalization Program which is a substantial infrastructure program addressing large projects involving Electrical Distribution, HVAC, Emergency Generation, Exterior Building Envelopes, Roofs, and other critical infrastructure. The total budget for this program at the facility has not been fully developed but will be substantial. In addition, the facility has numerous renovation projects and a parking deck project pending. Finally, the facility has been selected for a Fisher House, so the extension of utilities to the Fisher House Site will also be a project.
4. Resume Submission Requirements We understand that resumes for the Senior Project Manager and Project Manager are required with the initial quotation and that resumes for other funded labor categories will be required upon award or prior to personnel commencing work. Please confirm that resumes for positions other than PM and APM are not required with the initial submission.
The PM and APM will be included in the initial offering. The other resumes would be expected to start arriving for review within 30 days of award.
See attached document: Instruction to offerors p0002.
WATER WELL PLANT SERVICES
File details come from the government source that posted it. Updated .