Elevated Storage Tank Construction Drawings.pdf

PDF 21 MB Posted

Attached to
Z1NE--Project # 512A5-22-005 Elevated Storage Tank Painting
Solicitation number
36C24522R0079
Issued by

About this file

This solicitation is for surface preparation and repainting of an elevated water storage tank located at a VA medical center. Key requirements include preparation and painting of all exterior tank surfaces to a total dry film thickness of 6.5 mils using an OCS-5 coating system. Interior surfaces, excluding the water storage section, must be prepared and coated to a total of 4.5 mils with one coat of zinc-rich primer and one coat of two-component epoxy. Additional work includes installation of fall protection systems, replacement of access ladders, addition of an air gap in the overflow piping, installation of a mixer in the water storage section, and removal and reinstallation of insulation on piping. The contractor must have extensive experience painting steel water tanks and hold required licenses. Work must be completed within 180 days of notice to proceed. Payment will be made monthly based on progress inspections, with final payment processed after approval of all work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Water Tower CS_1980

1 of 10_Erection Drawing
2 of 10_Base Cone Details
3 of 10_30ft x 60ft Doorway
4 of 10_Support Details
5 of 10_Transition and Reducting Cone Sections
6 of 10_Upper Cone Assembly
7 of 10_Bowl Knuckle Details
8 of 10_Roof Details
9 of 10_Piping Details
10 of 10_Ladder Details

File details come from the government source that posted it. Updated .