36C24420Q0099-005.pdf
PDF Posted
- Attached to
- CHILLER RENTAL Erie VAMC
- Solicitation number
- 36C24420Q0099
About this file
36C24420Q0099 Sow Attachment A Dry Cooler Close.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24420Q0099-0001002.docx | DOCX document | |
| 36C24420Q0099-0001000.docx | DOCX document | |
| 36C24420Q0099-0001001.docx | DOCX document | |
| 36C24420Q0099-009.pdf | ||
| 36C24420Q0099-001.docx | DOCX document | |
| 36C24420Q0099-003.docx | DOCX document | |
| 36C24420Q0099-008.pdf | ||
| 36C24420Q0099-002.pdf | ||
| 36C24420Q0099-000.docx | DOCX document | |
| 36C24420Q0099-010.pdf | ||
| 36C24420Q0099-004.xlsx | XLSX spreadsheet | |
| 36C24420Q0099-006.pdf | ||
| 36C24420Q0099-007.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
G001
COVER SHEET
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
WWW.AE-WORKS.COM
AE WORKS PROJECT #: 18017
REPLACE IT HVAC HEAT
EXCHANGER
135 East 38th Street, Erie, PA 16504
562-18-401
05/10/2019 CJC CJC
100% CONSTRUCTION
DOCUMENTS
ERIE VA MEDICAL CENTER
REPLACE IT HVAC HEAT EXCHANGER
135 EAST 38TH STREET
ERIE, PA 16504
VICINITY MAP
SITE
LOCATION MAP
SITE
PROJECT DIRECTORY
OWNER:
ERIE VA MEDICAL CENTER
135 EAST 38TH STREET
ERIE, PA 16504
CONTACTS:
COR: PHILIP TSANG - (814) 860-2207
CO: DONALD KALIVODA - (814) 860-2917
ARCHITECT/ENGINEER:
AE WORKS LTD.
209 SANDUSKY ST
PITTSBURGH, PA 15212
(412) 287-7333
CONTACTS:
PROJECT LEAD: CHRIS CHAMPAGNE, PE
PM: TIFFANY HAILE
VA PROJECT: 562-18-401
NORTH
NORTH
DRAWING INDEX
SHEET # SHEET NAME
GENERAL
G001 COVER SHEET
CIVIL
C101 UTILITY SITE DRAINAGE
MECHANICAL
M001 HVAC SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
MD10B BASEMENT MECHANICAL DEMOLITION PLAN
MD101 FIRST FLOOR MECHANICAL DEMOLITION PLAN
M10B BASEMENT MECHANICAL PLAN
M101 FIRST FLOOR MECHANICAL PLAN
M501 HVAC DETAILS
M502 HVAC DETAILS
M601 HVAC CONTROLS
M701 HVAC SCHEDULES
ELECTRICAL
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
E101 ELECTRICAL POWER PLAN - DEMOLITION AND NEW
E601 ELECTRICAL ONE-LINE DIAGRAM
E800 ELECTRICAL SCHEDULES
# Revisions Date
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
C101
UTILITY SITE DRAINAGE
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
WWW.AE-WORKS.COM
AE WORKS PROJECT #: 18017
REPLACE IT HVAC HEAT
EXCHANGER
135 East 38th Street, Erie, PA 16504
562-18-401
05/10/2019 TLP TLP
100% CONSTRUCTION
DOCUMENTS
NOT TO SCALE
SITE PLAN
L
J
PB
XX-1
K
O S
M C
T T D
D
J
P
P
J
R
OS
LS
P C
T C
H
T
W D
S S
V M
F F
F F
F F S
F
P Z
I F R
T
E S
M L
D C
C L
C R
M D
E B
D S
P 2
P 2
N
1P 1 POLE (2P, 3P, 4P, ETC.)
A AMPERE
AC ABOVE COUNTER OR AIR
CONDITIONER
ACLG ABOVE CEILING
ADO AUTOMATIC DOOR OPENER
AF AMP FRAME
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFI ARC FAULT CIRCUIT INTERRUPTER
AHU AIR HANDLING UNIT
AL ALUMINUM
ALT ALTERNATE
AMP AMPERE
AMPL AMPLIFIER
ANNUN ANNUNCIATOR
APPROX APPROXIMATELY
AQ-STAT AQUASTAT
ARCH ARCHITECT, ARCHITECTURAL
AS AMP SWITCH
AT AMP TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AWG AMERICAN WIRE GAUGE
BATT BATTERY
BD BOARD
BLDG BUILDING
BMS BUILDING MANAGEMENT SYSTEM
C CONDUIT
CAB CABINET
CAT CATALOG
CATV CABLE TELEVISION
CB CIRCUIT BREAKER
CCTV CLOSED CIRCUIT TELEVISION
CKT CIRCUIT
CLG CEILING
COMB COMBINATION
CMPR COMPRESSOR
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUATION OR CONTINUOUS
CONTR CONTRACTOR
CONV CONVECTOR
CP CIRCULATING PUMP
CRT CATHODE-RAY TUBE
CT CURRENT TRANSFORMER
CTR CENTER
CU COPPER
DCP DOMESTIC WATER CIRCULATING PUMP
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DISC DISCONNECT
DIST DISTRIBUTION
DN DOWN
DPR DAMPER
DS SAFETY DISCONNECT SWITCH
DT DOUBLE THROW
DWG DRAWING
EC ELECTRICAL CONTRACTOR
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATOR
EM EMERGENCY
EMS ENERGY MANAGEMENT SYSTEM
EMT ELECTRICAL METALLIC TUBING
EP ELECTRIC PNEUMATIC
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXH EXHAUST
EXP EXPLOSION PROOF
FA FIRE ALARM
FABP FIRE ALARM BOOSTER POWER
SUPPLY PANEL
FACP FIRE ALARM CONTROL PANEL
FCU FAN COIL UNIT
FIXT FIXTURE
FLR FLOOR
FLUOR FLUORESCENT
FU FUSE
FUDS FUSED SAFETY DISCONNECT SWITCH
GA GAUGE
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GFI GROUND FAULT CIRCUIT
INTERRUPTER
GFP GROUND FAULT PROTECTOR
GND GROUND
GRS GALVANIZED RIGID STEEL (CONDUIT)
GYP BD GYPSUM BOARD
HOA HANDS-OFF-AUTOMATIC SWITCH
HORIZ HORIZONTAL
HP HORSEPOWER
HPF HIGH POWER FACTOR
HT HEIGHT
HTG HEATING
HTR HEATER
HV HIGH VOLTAGE
HVAC HEATING, VENTILATING AND
AIR CONDITIONING
HWP HYDRONIC WATER PUMP
IC INTERRUPTING CAPACITY
IG ISOLATED GROUND
IMC INTERMEDIATE METAL CONDUIT
INCAND INCANDESCENT
IR INFRARED
I/W INTERLOCK WITH
J-BOX JUNCTION BOX
KV KILOVOLT
KVA KILOVOLT-AMPERE
KVAR KILOVOLT-AMPERE REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
LOC LOCATE OR LOCATION
LT LIGHT
LTG LIGHTING
LTNG LIGHTNING
LV LOW VOLTAGE
MAX MAXIMUM
MAG.S MAGNETIC STARTER
M/C MOMENTARY CONTACT
MC MECHANICAL CONTRACTOR
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDC MAIN DISTRIBUTION CENTER
MDP MAIN DISTRIBUTION PANEL
MFR MANUFACTURER
MFS MAIN FUSED DISCONNECT SWITCH
MH MANHOLE
MIC MICROPHONE
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MMS MANUAL MOTOR STARTER
MOA MULTIOUTLET ASSEMBLY
MSP MOTOR STARTER PANELBOARD
MSBD MAIN SWITCHBOARD
MT MOUNT
MT.C EMPTY CONDUIT
MTS MANUAL TRANSFER SWITCH
MTR MOTOR, MOTORIZED
N.C. NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURER'S ASSOCIATION
NFDS NON-FUSED SAFETY
DISCONNECT SWITCH
NIC NOT IN CONTRACT
NL NIGHT LIGHT
N.O. NORMALLY OPEN
NPF NORMAL POWER FACTOR
NTS NOT TO SCALE
OH OVERHEAD
OL OVERLOADS
PA PUBLIC ADDRESS
PB PULL BOX OR PUSHBUTTON
PE PNEUMATIC ELECTRIC
PED PEDESTAL
PF POWER FACTOR
PH PHASE
PIV POST INDICATING VALVE
PNL PANEL
PP POWER POLE
PR PAIR
PRI PRIMARY
PROJ PROJECTION
PRV POWER ROOF VENTILATOR
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE (CONDUIT)
PWR POWER
QUAN QUANTITY
RCPT RECEPTACLE
REQD REQUIRED
RM ROOM
RSC RIGID STEEL CONDUIT
RTU ROOF TOP UNIT
SC SURFACE CONDUIT
SEC SECONDARY
SHT SHEET
SIM SIMILAR
S/N SOLID NEUTRAL
SPEC SPECIFICATION
SPKR SPEAKER
SP SPARE
SR SURFACE RACEWAY
SS STAINLESS STEEL
SSW SELECTOR SWITCH
S/S STOP/START PUSHBUTTONS
STA STATION
STD STANDARD
SURF SURFACE MOUNTED
SW SWITCH
ELECTRICAL ABBREVIATIONS LIST
SWBD SWITCHBOARD
SYM SYMMETRICAL
SYS SYSTEM
TEL TELEPHONE
TERM TERMINAL
TL TWIST LOCK
TR TAMPER RESISTANT
T-STAT THERMOSTAT
TTC TELEPHONE TERMINAL CABINET
TV TELEVISION
TVTC TELEVISION TERMINAL CABINET
TYP TYPICAL
UC UNDER COUNTER
UE UNDERGROUND ELECTRICAL
UG UNDERGROUND
UH UNIT HEATER
UT UNDERGROUND TELEPHONE
UTIL UTILITY
UV UNIT VENTILATOR OR ULTRAVIOLET
V VOLT
VA VOLT-AMPERES
VDT VIDEO DISPLAY TERMINAL
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
W WATT
W/ WITH
WG WIRE GUARD
WH WATER HEATER
W/O WITHOUT
WP WEATHERPROOF
XFMR TRANSFORMER
XFR TRANSFER
@ AT
' FEET
" INCHES
# NUMBER
Ø PHASE
C CENTER LINE
P PLATE
NOTE: NOT ALL SYMBOLS ARE NECESSARILY USED IN DRAWINGS.
SYMBOL
RELAY
SYMBOL SYMBOL SYMBOL
ELECTRICAL SYMBOL LEGEND
J
2 POLE SINGLE THROW SW.
SINGLE POLE SW.
LIGHT ON CORD REEL (TYPE DENOTED)
LIGHTING CHANNEL WIRE (TYPE DENOTED)
DIMMER SWITCH
MOMENTARY CONTACT SWITCH
OCCUPANCY SENSOR SWITCH
PUSH BUTTON
SINGLE RECEPT.
TIME DELAY SWITCH
SPLIT DUPLEX RECEPT.
FOURPLEX RECEPT.
DUPLEX RECEPT.
RECEPT ON EMERGENCY CKT (DUPLEX SHOWN)
ISOLATED GROUND RECEPT (DUPLEX SHOWN)
240 VOLT RECEPT.
RECEPT ON DROP CORD (DUPLEX SHOWN)
RECEPT ON CORD REEL (DUPLEX SHOWN)
FLOOR RECEPT. (DUPLEX SHOWN)
TIMER SWITCH
KEYED SW.
SW. W/PILOT
3-WAY SW.
4-WAY SW.
DESCRIPTION
WALL MOUNTED FLOODLIGHT (TYPE DENOTED)
POLE MOUNTED LIGHT (TYPE DENOTED)
RECESSED LIGHT (TYPE DENOTED)
SURFACE LIGHT (TYPE DENOTED)
EXIT SIGN (TYPE DENOTED)
SUSPENDED OR PENDANT LIGHT (TYPE DENOTED)
TRACK AND TRACK LIGHT (TYPES DENOTED)
SURFACE LINEAR LIGHT (TYPE DENOTED)
STRIP LIGHT (TYPE DENOTED)
EMERGENCY BATTERY LIGHT (TYPE DENOTED)
RECESSED LINEAR LIGHT (TYPE DENOTED)
POLE MOUNTED FLOODLIGHT (TYPE DENOTED)
FOURPLEX RECEPTACLE ON EMERGENCY CIRCUIT
LIGHT FIXTURE ON (EM) LIFE SAFETY BRANCH
LIGHT FIXTURE ON (EM) CRITICAL BRANCH
CIRCUIT BREAKER PANEL
DASHED SYMBOL INDICATES REMOVED
HALFTONE SYMBOL INDICATES EXISTING
SOLENOID VALVE
BUS DUCT WITH PLUG IN DISCONNECT (FUSED)
LIGHT LEVEL SENSOR - TYPE DENOTED
TIME CONTROL SWITCH (TIME SWITCH)
HUMIDISTAT
THERMOSTAT
PHOTOCELL
ENCLOSED CIRCUIT BREAKER
PRESSURE SWITCH
SAFETY DISC. SW. (FUSED)
SAFETY DISC. SW. (NON-FUSED)
COMB. MOTOR STARTER (FUSED)
POWER OR DISTRIBUTION PANEL
MOTOR (SEE SCHEDULE)
TRANSFORMER (TYPE DENOTED)
STATIC GROUND RECEPTACLE (TYPE DENOTED)
SPECIAL RECEPT. OR CONN. (SEE SCHEDULE)
JUNCTION BOX
PULL BOX
GROUND ROD (PLAN VIEW)
LIGHTNING PROTECTION AIR TERMINAL
SURGERY SERVICE COLUMN
CLOCK (TYPE DENOTED)
POWER POLE (OPEN OFFICE STYLE)
MULTIOUTLET ASSEMBLY (TYPE DENOTED)
DESCRIPTION
LIGHTNING PROTECTION CONDUCTOR SPLICE
UTILITY SERVICE POWER POLE (SITE)
OCCUPANCY SENSOR - TYPE DENOTED
FLOAT SWITCH
ANTENNA
DOOR SIGNAL - APT. UNIT
SPEAKER (WALL OR CEILING MT.)
MICROPHONE OUTLET
HORN TYPE SPEAKER
VOLUME CONTROL
BUZZER
BELL
INFORMATION OUTLET (TYPE DENOTED)
WALL TELEPHONE OUTLET (TYPE DENOTED)
TELEPHONE OUTLET (TYPE DENOTED)
TELEVISION OUTLET
DESCRIPTION
CHIME
WIRELESS ACCESS POINT
DESCRIPTION
GAS DETECTOR (TYPE DENOTED)
F.A. PULLSTATION (TYPE DENOTED)
F.A. DOOR CLOSER
F.A. DOOR HOLDER
F.A. INDIVIDUAL ADDRESSABLE MODULE
FIRE ALARM SHUT DOWN RELAY
SPRINKLER VALVE TAMPER SWITCH
SPRINKLER FLOW SWITCH
F.A. ZONE ADDRESSABLE MODULE
SPRINKLER TEMPERATURE SWITCH
SPRINKLER LEVEL SWITCH
SPRINKLER PRESSURE SWITCH
HEAT DETECTOR (TYPE & TEMP DENOTED)
FIRE ALARM BELL
FIRE ALARM BELL W/STROBE (CANDELAS)
SMOKE DETECTOR (TYPE DENOTED)
FIRE ALARM STROBE (CANDELAS)
FIRE ALARM SPEAKER W/STROBE (CANDELAS)
FLAME DETECTOR (TYPE DENOTED)
DUCT SMOKE DETECTOR (TYPE DENOTED)
REMOTE TEST/STATUS STATION
LINEAR HEAT DETECTOR
FIRE ALARM CHIME W/STROBE (CANDELAS)
FIRE ALARM HORN W/STROBE (CANDELAS)
FIRE ALARM REMOTE ANNUNCIATOR
END OF LINE RESISTOR
CCTV CAMERA WITH PAN/TILT DRIVE
CCTV CAMERA
NURSE CALL DOME LIGHT (2 LAMP)
DOOR CONTACTS
CARD READER
ELECTRIC STRIKE
MOTION DETECTOR (TYPE DENOTED)
NURSE CALL EMERG. STATION
NURSE CALL DUTY STATION
NURSE CALL STAFF STATION
NURSE CALL CODE BLUE EMERG. STATION
NURSE CALL SINGLE PATIENT STATION
NURSE CALL DUAL PATIENT STATION
KEYPAD
MAGNETIC LOCK
COMBINATION LOCK
1 KEYED NOTE (SEE SCHEDULE)
NOTE: NOT ALL SYMBOLS ARE NECESSARILY USED IN DRAWINGS.
1. THE FOLLOWING GENERAL NOTES AS LISTED BELOW SHALL APPLY TO ALL ELECTRICAL REQUIREMENTS AS INDICATED ON ALL E
SERIES CONTRACT DRAWINGS.
2. THE CONTRACTOR IS RESPONSIBLE FOR THE ENTIRE DOCUMENT SET I.E. IF WORK IS SHOWN ON OTHER DRAWINGS AS "BY
CONTRACTOR" THE CONTRACTOR IS RESPONSIBLE FOR THAT WORK.
3. DRAWINGS FOR THIS WORK ARE DIAGRAMMATIC AND INTENDED TO CONVEY THE GENERAL EXTENT, ARRANGEMENT AND LOCATIONS OF THE WORK. BECAUSE OF THE SCALE OF THE DRAWINGS, CERTAIN BASIC ITEMS SUCH AS ACCESS PANELS, CONDUITS, CABINET SIZES, PENETRATION SLEEVES, PULL BOXES, BACKBOXES AND JUNCTION BOXES MAY NOT BE SHOWN.
INCLUDE ALL ITEMS WHERE REQUIRED BY CODE, MANUFACTURER AND RELATED SPECIFICATION SECTIONS FOR THE PROPER
INSTALLATION OF ALL WORK.
4. DUE TO SCALE OF THE DRAWINGS, ALL ELECTRICAL DEVICE SYMBOLS ARE SHOWN ON DRAWINGS AS CLOSE AS POSSIBLE TO THEIR INTENDED LOCATION. CONTRACTOR SHALL COORDINATE IN THE FIELD THE PROPER INSTALLATION OF ALL EQUIPMENT, DEVICES, CONTROLS AND CONDUITS. REFER TO RELATED SPECIFICATION SECTIONS FOR ADDITIONAL REQUIREMENTS.
5. COORDINATE WITH ALL TRADES AND SYSTEM INTEGRATORS ANY CONDITIONS RELATED TO THE INSTALLATION OF ALL SYSTEMS. THE CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE TRADE ALL INSTALLATION REQUIREMENTS IMPACTING THE PLACEMENT OF ALL SYSTEM COMPONENTS TO THE SATISFACTION OF ALL CONCERNED TRADES.
6. ALL CONDUITS SHALL BE SIZED AND INSTALLED IN ACCORDANCE WITH NFPA 70 AND PROJECT SPECIFICATIONS. ALL CONDUITS
SHALL BE A MINIMUM OF 3/4" UNLESS OTHERWISE NOTED.
7. PROVIDE ALL EQUIPMENT CLEARANCES IN ACCORDANCE WITH NEC REQUIREMENTS. ARRANGE EQUIPMENT TO FACILITATE UNRESTRICTED ACCESS FOR MAINTENANCE AND SERVICE AROUND ALL EQUIPMENT, COMPONENTS AND/OR CABLE
TERMINATIONS.
8. WHERE EQUIPMENT AND/OR JUNCTION BOXES ARE INSTALLED ABOVE FINISHED CEILINGS, THE CONTRACTOR SHALL PROVIDE ACCESS HATCHES LISTED FOR THE INTENDED APPLICATION. ACCESS HATCHES SHALL BE LOCATED SO THAT SERVICE ACCESS
TO THE EQUIPMENT AND/OR JUNCTION BOXES IS UNIMPEDED.
9. ALL PENETRATIONS OF WALLS AND/OR FLOORS SHALL BE FIRE STOPPED IN ACCORDANCE WITH THE ASTM AND NFPA REQUIREMENTS. REFER TO RELATED SPECIFICATION SECTIONS FOR ADDITIONAL INFORMATION. INSTALLATION OF FIRE-STOPS SHALL BE PERFORMED BY APPLICATOR/INSTALLER QUALIFIED AND TRAINED BY THE MANUFACTURER. INSTALLATION SHALL BE PERFORMED IN STRICT ACCORDANCE WITH MANUFACTURER'S DETAILED INSTALLATION PROCEDURES.
10. ALL EQUIPMENT ENCLOSURES LOCATED OUTSIDE OR IN ALL AREAS WITH HIGH MOISTURE OR A RELATIVE HUMIDITY OF 75% OR
GREATER SHALL BE NEMA 4X STAINLESS STEEL AND RATED FOR THAT APPLICATION.
11. ALL INTERIOR AND/OR EXTERIOR COMPONENTS, DEVICES OR SYSTEMS EQUIPMENT EXPOSED TO THE GENERAL POPULATION SHALL BE INSTALLED IN SECURED EQUIPMENT ENCLOSURES WITH TAMPER SWITCHES AND INSTALLED IN SUCH A MANNER THAT
RESISTS TAMPERING AND/OR REMOVAL WITHOUT THE USE OF SPECIALIZED TOOLS.
12. FOR EQUIPMENT INSTALLATIONS REQUIRING COORDINATION WITH OTHER TRADES THE CONTRACTOR SHALL PROVIDE ALL TEMPLATES, BACKBOXES AND EQUIPMENT ANCHOR BOLTS FOR MOUNTING OR FLUSH MOUNTING PREPARATION, (E.G.
PEDESTALS OR OTHER DEVICES REQUIRING MOUNTING ON WALLS, CONCRETE PADS OR OTHER MATERIALS). COORDINATE
DELIVERY OF TEMPLATES AND EQUIPMENT WITH ALL AFFECTED CONTRACTORS.
13. ALL ELECTRICAL WORK SHALL BE DONE IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE (LATEST VERSION BEING ENFORCED), AND ALL OTHER APPLICABLE CODES AND STANDARDS BEING ENFORCED BY THE AUTHORITY HAVING
JURISDICTION.
14. THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS OR INSTRUCTIONS FOR CONSTRUCTION SAFETY. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ANY WORKMAN'S OR TRANSIENT'S SAFETY, OR FOR THE ADEQUACY OF EQUIPMENT, BUILDING COMPONENTS, WORK AIDS, OR ANY NECESSITY TO WORK ON ENERGIZED ELECTRICAL COMPONENTS.
FURTHER, NO SUPERINTENDENCE IS INCLUDED OR IMPLIED.
15. ALL SYSTEMS AND EQUIPMENT SHALL BE INSTALLED AND WIRED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS.
16. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES, AND EQUIPMENT SHALL BE TESTED AND LISTED BY A NATIONALLY
RECOGNIZED TESTING LABORATORY.
17. THE CONTRACTOR SHALL COORDINATE CONDUIT ROUTING (PLAN AND ELEVATION) WITH THE LIGHTING (NEW AND EXISTING), CEILING ELEVATION, STRUCTURE, DUCTWORK, PIPING, ETC. REQUIRED FOR THE COMPLETION OF THE PROJECT, PRIOR TO
INSTALLATION.
18. THE CONTRACTOR SHALL SECURE AND PROTECT THE BUILDING AND/OR WORK AREA WITH FIRE RETARDANT TEMPORARY PLYWOOD PARTITIONS (WITH LOCKING DOORS), ETC. CLOSE ALL EXISTING OPENINGS AS REQUIRED. COORDINATE THIS WORK WITH THE VA COR PRIOR TO STARTING. IF TEMPORARY PARTITIONS IMPEDE THE FLOW OF EGRESS TO REQUIRED EGRESS DOORS AND STAIRS, THE CONTRACTOR SHALL PROVIDE EXIT SIGNS, AND SIGNAGE INDICATING SUCH.
19. THE CONTRACTOR SHALL CAULK ALL JOINTS BETWEEN METAL FRAMES AND EXISTING CONDITIONS. THIS APPLIES TO BOTH
INTERIOR AND EXTERIOR INSTALLATIONS.
20. THE DIMENSIONS SHOWN ON THE DRAWINGS ARE FOR THE CONVENIENCE OF THE CONTRACTOR ONLY. VERIFY ALL DIMENSIONS
IN THE FIELD PRIOR TO PERFORMING ANY WORK.
21. THE CONTRACTOR SHALL INSTALL ALL CONDUITS CONCEALED UNLESS NOTED OTHERWISE. EXPOSED CONDUIT SHALL ONLY BE INSTALLED IN CHASES, EXPOSED CEILING AREAS, JANITOR CLOSETS, AND MECHANICAL/ELECTRICAL ROOMS.
22. ALL ELECTRICAL EQUIPMENT SHALL BE GROUNDED AND/OR BONDED PER THE REQUIREMENTS OF THE NATIONAL ELECTRIC CODE. PROVIDE ALL GROUNDING AND/OR BONDING COMPONENTS NOT EXPLICITLY SHOWN ON THE DOCUMENTS.
23. THE CONTRACTOR SHALL PROVIDE UPDATED TYPED PANELBOARD DIRECTORIES, INDICATING THE LOADS SERVED BY THE RESPECTIVE PANELS. AMEND AS REQUIRED FOR AS-BUILT CONDITIONS. PROVIDE ELECTRONIC VERSIONS OF THE PANELBOARD
SCHEDULES FOR FUTURE USE BY THE OWNER.
24. THE CONTRACTOR SHALL REVIEW THE WORK REQUIRED WITH THE APPLICABLE UTILITY COMPANIES SERVING THE PROJECT.
ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE INDIVIDUAL UTILITY COMPANIES.
25. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE OWNER PRIOR TO STARTING ALL PHASES OF THE PROJECT. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER WHAT WORK, IF ANY, HAS TO BE COMPLETED DURING SECOND OR THIRD
SHIFT.
26. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY POWER CONNECTIONS TO KEEP AREAS UP AND OPERATIONAL DURING THE
CONSTRUCTION. THE CONTRACTOR SHALL COORDINATE THESE REQUIREMENTS WITH THE OWNER.
27. THE VERBIAGE ON THE DRAWINGS INDICATING TYPES OF MATERIALS TO BE ENCOUNTERED IS INTENDED TO AID THE ELECTRICAL CONTRACTOR IN UNDERSTANDING THE VARIOUS CONDITIONS LIKELY TO BE ENCOUNTERED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING QUANTITIES OF MATERIALS REQUIRED TO COMPLETE THE PROJECT.
28. THE LOCATIONS OF EXISTING UTILITIES, STRUCTURE AND OTHER CONDITIONS SHOWN ON THE PLANS ARE APPROXIMATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY AND REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR
TO BEGINNING ANY WORK.
29. FURNISH AND INSTALL ALL REQUIRED LINTELS AND SLEEVES. ALL CONDUITS SHALL HAVE SLEEVES INSTALLED. ALL SLEEVES
INSTALLED THROUGH EXTERIOR WALLS SHALL HAVE LINK SEALS INSTALLED.
30. THE CONTRACTOR SHALL GENERATE A DETAILED METHOD OF PROCEDURE (MOP) DOCUMENT INDICATING HOW HE/SHE INTENDS TO PERFORM EACH STEP IN THE PROJECT. THIS MOP SHALL BE PRESENTED TO THE OWNER AND ENGINEER PRIOR TO STARTING THE PROJECT, FOR SIGN OFF. THE MOP MAY BE REVISED BASED ON CHANGES IN THE PROJECT CONSTRUCTION, ETC.
AT ALL POINTS IN THE PROJECT THE OWNER SHALL BE MADE AWARE OF CHANGES TO THE MOP, AND A REVISED MOP SHALL BE
PRESENTED TO THE OWNER AND ENGINEER FOR SIGN OFF.
31. PROVIDE ALL JUNCTION BOXES, PULL BOXES AND OTHER PULL POINTS AS REQUIRED FOR EASE OF PULLING AND TO MEET THE MAXIMUM NUMBER OF BENDS PER NEC REQUIREMENTS FOR A CODE COMPLIANT INSTALLATION. NOT ALL CONDUITS, PULL BOXES AND OTHER RACEWAY ITEMS ARE INDICATED ON THE DOCUMENTS. THE CONTRACTOR SHALL PROVIDE A COMPLETE RACEWAY SYSTEM MEETING THE REQUIREMENTS OUTLINED IN THE DRAWINGS AND SPECIFICATIONS. ALL JUNCTION BOXES
AND OTHER PULL POINTS SHALL BE ACCESSABLE.
32. THESE DRAWINGS DO NOT INDICATE ALL CONDUITS INTERCONNECTING EQUIPMENT, AND WHERE CONDUITS ARE INDICATED, THE ROUTING IS APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR THE ROUTING AND INSTALLATION OF ALL CONDUIT IN
COORDINATION WITH OTHER TRADES AND EXISTING CONDITIONS.
33. MULTIWIRE BRANCH CIRCUITS ARE NOT PERMITTED, ALL SINGLE POLE BRANCH CIRCUITS SHALL HAVE A DEDICATED NEUTRAL.
SHARING OF NEUTRALS IS PROHIBITED. ALL CIRCUITS SHALL CONTAIN AN INDIVIDUAL GROUND WIRE. USE OF THE CONDUIT
SYSTEM FOR THE GROUND PATH IS PROHIBITED.
34. MULTIPLE SMALL 20A/1P BRANCH CIRCUITS MAY SHARE A SINGLE CONDUIT PROVIDED THE CONTRATOR UPSIZES THE WIRES, INCLUDING THE GROUND, AND CONDUIT AS REQUIRED PER NEC.
35. THE COMPLETE BRANCH WIRING SYSTEM IS NOT SHOWN ON THE DRAWINGS. AN ABBREVIATED FORMAT IS USED TO INDICATE WHICH FIXTURES/DEVICES ARE CONNECTED TO A COMMON CIRCUIT OR SWITCH. THIS IS PROVIDED AS A GUIDE TO THE CONTRACTOR TO ILLUSTRATE CIRCUITS AND CONTROL INTENT. ACTUAL WIRING MAY DIFFER DUE TO FIELD CONDITIONS.
COLOR CODING OF WIRES SHALL BE AS PER NEC.
36. DURING THE BIDDING PROCESS, THE ELECTRICAL CONTRACTOR SHALL REVIEW DRAWINGS AND SPECIFICATIONS OF ALL OTHER TRADES (ARCHITECTURAL, SITE/LANDSCAPING, HVAC, PLUMBING, AND SPECIALTY TRADES). ALL ITEMS REQUIRING POWER INDICATED ON THESE DRAWINGS BUT NOT INDICATED ON THE ELECTRICAL DRAWINGS SHALL BE CONSIDERED A PART OF THE ELECTRICAL CONTRACTOR’S WORK. THIS WORK SHALL BE INSTALLED AS PER NEC REQUIREMENTS AT NO ADDITIONAL COST TO
THE OWNER.
ELECTRICAL GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
E000
ELECTRICAL SYMBOLS AND
ABBREVIATIONS209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
WWW.AE-WORKS.COM
AE WORKS PROJECT #: 18017
REPLACE IT HVAC HEAT
EXCHANGER
135 East 38th Street, Erie, PA 16504
562-18-401
05/10/2019 BK ARD
100% CONSTRUCTION
DOCUMENTS
CLNG
J
C L N G
J
5A
A B CB5
8.5
10.2
D E F G
H J K L M N ONBK5
5A
A B
C
B5
8.5
10.2
D E F G
H J K L M N ONBK5
STORAGE
EB-11A
Room
NB-60-6
OFFICE
EB-28A
DINING ROOM
NB-60
ELEV
P-3
OFFICE
EB-28
V-TEL
CONFERENCE
ROOM
EB-26A
MECH. ROOM
EB-25
STAIRS 'A'
FB-1C
ELEV.
F-5
OFFICE
EB-26
BREAK ROOM
NB-60-8
MENS LOCKER-1
NB-60-9
MENS LOCKER-2
NB-60-10 AIR COND. EQUIP
ROOM
NB-60-11
ELECTRICAL
SWITCH GEAR
NB-60-12
STORAGE
NB-60-13
MED GAS STORAGE
NB-60-14
MAIL ROOM
NB-60-16
ELEVATOR LOBBY
NB-60-17
Room
NB-60-18
Space
NB-60-19
Space
NB-60-20
TOILET
NB-60-21
TOILET
NB-60-22
IT OFFICE
NB-60-23
TOILET
WB-40E
TRAINING ROOM
NB-60-24
R.O.L.
NB-60-25
OFFICE
B-06
OFFICE
B-11
LIBRARY STORAGE
B-12
IT STORAGE
NB-60-26
IT SERVER ROOM
NB-60-27
SALE STOR.
NB-60-28
Space
NB-60-30
DAV OFFICE
NB-60-31
AMERICAN LEGION
NB-51
CLOSET
NB-51A
HAC
WB-48
TOILET ROOM
NB-49
OFFICE
NB-60-33
OFFICE
B-10
TOILET ROOM
NB-50
OFFICE
B-07
STORAGE-2
EB-7A-2
TOILETS
NB-60-34
ELEV-2
P-2-2
ELEVATOR LOBBY
EB-23
Space
NB-60-35
PHARMACY
RESIDENTS
EB-31
Space
NB-60-36
BREAK ROOM
NB-60-37
STAIR C-2
NB-44-2
MACHINE ROOM
NB-60-39 STORAGE
EB-7
STORAGE
EB-6
CANTEEN STORE
NB-46
STORAGE-2
EB-5-2
WORKSHOP-2
EB-09A-2
MECHANICAL
ROOM
NB-59
ELEC
NB-59A
FE CLOSET-2
NB-59B-2
ELEV-2
S-4-2
CORRIDOR-2
EB-8-2
STORAGE
EB-3
STORAGE
BB15C
STORAGE
BB15A
STORAGE
NB-60-46
Space
NB-60-47
OFFICE
NB-60-48
PIV OFFICE
B-01
IT OFFICE
NB-60-49
Space
NB-60-50
OFFICE
NB-60-51
MEDICAL RECORDS
NB-60-52
STORAGE
NB-60-53
Space
NB-60-54
STORAGE
NB-60-55
CALL CENTER
NB-60-56
POLICE
NB-60-57
CORRIDOR
WB-36
STORAGE
BA07B
Space
NB-60-59
IT WORK ROOM
BA13A
LIBRARY
NB-60-61
COMPUTER ROOM
BA07A
IT CHIEF
NB-60-63
SHOWER
NB-60-64
WOMENS LOCKER
NB-60-65
SOCIAL WORKER
OFFICE
NB-60-66
CHIEF POLICE
NB-60-67
OFFICE
NB-60-68
MECHANICAL
ROOM
BA13C
Space
NB-60-69
STORAGE
NB-60-70
SERVER ROOM
BB14
STORAGE
BB15B
SIGN SHOP-2
EB-09B-2
MACHINE ROOM
EB-11
LAUNDRY
EB-22
UP TO IT
CLOSET
ABOVE FCU-L6
WB-H
FCU-L3
FCU-L4
EQA
E101
E101
DC-2 DC-1
ET-2
ET-1
PP-2
PP-1
EXISTING
CONDENSING UNIT
E101
E101
DC-2 DC-1
ET-1
PP-2
PP-1
ET-2
WB-H-14,16,18
WB-H-8,10,12
WB-H-7,9,11
WB-H-1,3,5
30A/30AF/3P
PP-2 (P-1)
DC-1 PP-1 (P-1)
DC-2
30A/30AF/3P 60A/35AF/3P
60A/35AF/3P
EXISTING
CONDENSING UNIT
WB-H-2,4,6
WB-H-19,21,23
60A/35AF/3P
60A/35AF/3P
PP-1 (P-2)
PP-2 (P-2)
EXISTING
EXPANSION TANK
EXISTING
DRYCOOLERS
EXISTING CONDENSING
UNIT TO BE RELOCATED
EXISTING PUMPS
EXISTING
CONDENSING UNIT
1. EXISTING DEVICES SHOWN ARE DIAGRAMMATIC AND BASED ON FIELD SURVEYS
AND/OR RECORD DRAWINGS PROVIDED BY THE OWNER AND DO NOT REPRESENT THE
FULL SCOPE OF DEMOLITION WORK. THE ACTUAL CONDITIONS MAY VARY. ALL
EXISTING CONDITIONS MUST BE VERIFIED PRIOR TO BID. THE PLANS ARE INTENDED TO
SHOW THE LOCATIONS OF EXISTING DEVICES AND IN NO WAY RELIEVE THE
CONTRACTOR FROM PROVIDING ANY AND ALL COORDINATION NECESSARY TO
COMPLETE THE NEW WORK. FIELD CONDITIONS SHALL GOVERN. FIELD VERIFY ALL
EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF WORK AND
OBTAIN CLARIFICATIONS FROM ARCHITECT/ENGINEER IF NECESSARY.
2. CONTRACTOR SHALL PROVIDE A MINIMUM TWO WEEKS WRITTEN NOTICE PRIOR TO
ANY SHUT DOWN. NOTICE IS TO INCLUDE BUT IS NOT LIMITED TO THE LOCATION,
PANELS AND DURATION OF SHUT DOWN.
3. OWNER SHALL HAVE RIGHT OF FIRST REFUSAL TO ANY EQUIPMENT, DEVICES, ETC.
DEMOLISHED FROM RENOVATION AREA PRIOR TO DISPOSAL.
4. MAINTAIN CONTINUITY OF SERVICE TO AREAS OUTSIDE THE PROJECT BOUNDARY.
PATCH AND REPAIR ALL CIRCUITS CUT OFF DURING DEMOLITION BY WIRING METHODS
COMPATIBLE WITH THE EXISTING INSTALLATION.
5. THE ELECTRICAL CONTRACTOR SHALL REVIEW THE DRAWING OF ALL OTHER TRADES
IN THIS CONTRACT. THE REMOVAL OF ELECTRICAL SERVICE TO ALL EQUIPMENT
IDENTIFIED ON OTHER TRADE DRAWINGS IS THE RESPONSIBILITY OF THE ELECTRICAL
CONTRACTOR.
6. EXERCISE EXTREME CAUTION WHEN REMOVING/ RELOCATING WIRING AND
EQUIPMENT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT OTHER
WIRING DEVICES AND EQUIPMENT THAT MAY BE CONNECTED TO THE SAME CIRCUIT
REMAIN OPERATIONAL AND ACTIVE.
7. PROTECT THE EXISTING EQUIPMENT THAT IS TO REMAIN IN PLACE FROM DIRT, DUST,
OR DAMAGE DURING THE COURSE OF DEMOLITION.
8. CONTRACTOR SHALL EXAMINE CONDITIONS AND TEST FUNCTIONALITIES OF ALL
EXISTING ELECTRICAL EQUIPMENT IDENTIFIED TO BE RE-USED AND/OR RELOCATED.
PROVIDE REPORT TO ENGINEER AND OWNER PRIOR TO
DEMOLITION.
ELECTRICAL DEMOLITION GENERAL NOTES
1. FINAL LOCATION OF ALL EQUIPMENT SHALL BE DETERMINED IN THE FIELD AND SHALL BE
INSTALLED AS DIRECTED BY THE ARCHITECT OR VA COR. WHERE STRUCTURAL OPENINGS
ARE NOT AVAILABLE, THE CONTRACTOR SHALL CORE DRILL WALLS AND FLOORS AS
REQUIRED TO PERMIT PASSAGE OF CONDUITS. THE ELECTRICAL CONTRACTOR SHALL
PROVIDE A MARKED-UP PLAN WITH LOCATION PENETRATIONS FOR REVIEW AND
APPROVAL OF THE VA COR BEFORE ROUGH-IN BEGINS.
2. DURING THE BIDDING PROCESS, THE ELECTRICAL CONTRACTOR SHALL REVIEW
DRAWINGS AND SPECIFICATIONS OF ALL OTHER TRADES (ARCHITECTURAL,
SITE/LANDSCAPING, HVAC, PLUMBING AND SPECIALTY TRADES). ALL ITEMS REQUIRING
POWER INDICATED ON THESE DRAWINGS BUT NOT INDICATED ON THE ELECTRICAL
DRAWINGS SHALL BE CONSIDERED A PART OF THE ELECTRICAL CONTRACTOR'S WORK.
THIS WORK SHALL BE INSTALLED AS PER NEC REQUIREMENTS AT NO ADDITIONAL COST
TO THE OWNER.
3. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO MAKE ALL FEEDER RUNS CONTINUOUS
(NO CABLE BREAKS). IF SPLICING CABLES IN BOXES BECOMES NECESSARY, USE O.Z.G.
TYPE "XW" CABLE TAPS, OR APPROVED EQUAL, AND TAPE EACH TAP IN APPROVED
MANNER.
4. REFER TO MECHANICAL DRAWINGS FOR EXACT LOCATION OF ALL MECHANICAL
EQUIPMENT.
5. PROVIDE CONDUIT AND WIRING AS REQUIRED TO MEET CIRCUITING SHOWN TO CONFORM
TO NEC REQUIREMENTS.
6. PROVIDE EQUIPMENT GROUND CONDUCTOR IN ALL RACEWAYS. REFER TO PANELBOARD
SCHEDULES.
7. ROUTE CONDUIT HIGH AGAINST STRUCTURE AND OFFSET UP BETWEEN JOISTS WHERE
NECESSARY TO AVOID DUCT WORK AND HVAC SYSTEM.
8. VERIFY AND COORDINATE EXACT ELECTRICAL REQUIREMENTS OF ALL EQUIPMENT WITH
MANUFACTURER'S RECOMMENDATIONS PRIOR TO INSTALLATION OF EQUIPMENT.
POWER PLAN GENERAL NOTES
DEDUCT ALTERNATE NO. 1
EXISTING 10 TON FCU INDOOR UNITS SHALL REMAIN. KEEP UNITS ON PANEL
WB-H. ALL WIRING AND CONDUIT ASSOCIATED WITH EQUIPMENT SHALL BE
EXISTING TO REMAIN.
THE NEW 10HP PUMPS SHALL BE 480V AND FED FROM PANEL EQA. PROVIDE A
20A/3P CIRCUIT BREAKER IN PANEL EQA FOR EACH PUMP (TOTAL 4). PROVIDE
A 30A/20AF/3P NEMA 3R LOCKABLE DISCONNECT SWITCH FOR EACH PUMP
LOCATED AT THE EQUIPMENT PAD. EXTEND (3) #12 & (1) #12 GRD IN 3/4”
CONDUIT FROM EQUIPMENT TO PANEL EQA LOCATED IN THE AMBULATORY
SURGERY CENTER PENTHOUSE.
THE NEW DRYCOOLERS SHALL BE 208V AND FED FROM PANEL WB-H. USE
EXISTING 30A/3P CIRCUIT BREAKERS IN PANEL WB-H TO POWER THE NEW
DRY COOLERS. PROVIDE A NEW 30A/30AF/3P NEMA 3R LOCKABLE
DISCONNECT SWITCH FOR EACH DRYCOOLER LOCATED AT THE EQUIPMENT
PAD. EXTEND (3) #10 & (1) #10 GRD IN 3/4” CONDUIT FROM EQUIPMENT TO
PANEL WB-H.
5A
5A
FCU-L3 (NEW)
FCU-L4 (NEW)
EQA-1,3,5
EQA-7,9,11
5A
5A
FCU-L3 (DEMOLITION)
FCU-L4 (DEMOLITION)
OVERHEAD
DOOR
OVERHEAD
DOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
KEYPLAN
E101
ELECTRICAL POWER PLAN -
DEMOLITION AND NEW209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
WWW.AE-WORKS.COM
AE WORKS PROJECT #: 18017
REPLACE IT HVAC HEAT
EXCHANGER
135 East 38th Street, Erie, PA 16504
562-18-401
05/10/2019 BK ARD
100% CONSTRUCTION
DOCUMENTS
KEYNOTES
1 REMOVE EXISTING DISCONNECT SWITCHES. REMOVE CONDUIT
AND WIRING BACK TO PANEL.
2 RELOCATE EXISTING ELECTRICAL TO NEW LOCATION OF
CONDENSING UNIT.
3 REUSE 30A CIRCUIT BREAKER IN PANEL WB-H FOR NEW DRY
COOLERS.
4 REMOVE EXISTING CONDUIT AND WIRING BACK TO PANEL. MAKE
CIRCUITS SPARE.
5 COORDINATE LOCATION OF DISCONNECT SWITCHES WITH
MECHANICAL OUTDOOR CONTROL ENCLOSURES ALONG THIS
WALL. PROVIDE POWER TO NEW CONTROLS FROM THE
EXISTING CONTROL CIRCUITS.
6 PROVIDE ALL NEW DISCONNECT SWITCHES FOR ALL NEW
EQUIPMENT. DISCONNECTS SHALL BE NEMA 3R LOCKABLE AND
FUSED.
1/16" = 1'-0"E101
1 OVERALL BASEMENT ELECTRICAL PLAN
SECOND LEVEL PENTHOUSE -
AMBULATORY SURGERY CENTER
FIRST LEVEL
EQUIPMENT PAD
1/8" = 1'-0"E101
4 FIRST FLOOR EQUIPMENT PAD (NEW) - POWER
1/8" = 1'-0"E101
5 FIRST FLOOR EQUIPMENT PAD (DEMOLITION) - POWER
1/8" = 1'-0"E101
6 INDOOR UNIT (NEW) - POWER
1/8" = 1'-0"E101
7 INDOOR UNIT (DEMOLITION) - POWER
5 6
NORTH
TRUE NORTH=
PLAN
150.0°
# Revisions Date
VHAERITSANGP
Text Box Approximate location for replacement dry cooler/cooling tower/chiller. This cooling unit will need emergency power connection or a backup generator and manual transfer switch
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
E601
ELECTRICAL ONE-LINE DIAGRAM
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
WWW.AE-WORKS.COM
AE WORKS PROJECT #: 18017
REPLACE IT HVAC HEAT
EXCHANGER
135 East 38th Street, Erie, PA 16504
562-18-401
05/10/2019 BK ARD
100% CONSTRUCTION
DOCUMENTS
NOT TO SCALEE601
1 ELECTRICAL ONE LINE DIAGRAM - FOR REFERENCE ONLY
KEYNOTES
1 REPLACE EXISTING 200A CIRCUIT BREAKER WITH NEW 100% RATED 200A CIRCUIT
BREAKER.
GROUND
PHASE
CONDUCTOR CONDUIT
BREAKER
SIZE
80A
NOTE:
PROVIDE A CONDUCTOR PER BREAKER POLE. THESE ARE THE MINIMUM SIZES REQUIRED
FOR EACH CIRCUIT. CONTRACTOR TO MAKE ALL THE NECESSARY FIELD ADJUSTMENTS TO
COMPENSATE FOR VOLTAGE DROP.
IN GENERAL, VOLTAGE DROP FOR ANY BRANCH CIRCUIT SHALL NOT EXCEED 3%. VOLTAGE
DROP FOR ANY FEEDER SHALL NOT EXCEED 2%. WHERE VOLTAGE DROP EXCEEDS THESE
REQUIREMENTS, THE CONTRACTOR SHALL INCREASE THE SIZE OF THE CONDUCTORS AND
RACEWAY AS REQUIRED.
BRANCH CIRCUIT WIRING SCHEDULE
NEUTRAL
CONDUCTOR
1.
2.
70A
60A
50A
45A
40A
35A
30A
20A
1-1/2"
1-1/4"
1-1/4"
1"
1"
1"
1"
3/4"
3/4"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
E800
ELECTRICAL SCHEDULES
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
WWW.AE-WORKS.COM
AE WORKS PROJECT #: 18017
REPLACE IT HVAC HEAT
EXCHANGER
135 East 38th Street, Erie, PA 16504
562-18-401
05/10/2019 BK ARD
100% CONSTRUCTION
DOCUMENTS
1. NEW FCU-L3 & FCU-L4 WILL NEVER BE RUNNING SIMULTANEOUSLY.
2. MAIN CIRCUIT BREAKER SHALL BE UPGRADED TO 100% RATED. SEE ONE LINE DIAGRAM.
NOTES:
EST. DEMAND CURRENT: 184.0 A
CONNECTED CURRENT: 184.0 A
ESTIMATED DEMAND: 152976 VA
CONNECTED LOAD: 152976 VA
Other 47415 VA 100.00% 47415 VA
LOAD CLASSIFICATION CONNECTED DEMAND ESTIMATED PANEL TOTALS
TOTAL AMPS: 184 A 184.1 A 184 A
TOTAL LOAD: 51 kVA 51 kVA 51 kVA
41 11.1 0.0 42 -- -- SPACE
39 11.1 0.0 40 -- -- SPACE
EXISTING STERILIZER
SUBSTERILE 2S335
50 A 3
37 11.1 0.0 38 -- -- SPACE
SPACE -- -- 35 0.0 0.0 36 -- -- SPACE
SPACE -- -- 33 0.0 0.0 34 -- -- SPACE
SPACE -- -- 31 0.0 0.0 32 -- -- SPACE
SPACE -- -- 29 0.0 0.0 30 -- -- SPACE
SPACE -- -- 27 0.0 0.0 28 -- -- SPACE
SPACE -- -- 25 0.0 0.0 26 -- -- SPACE
23 0.0 5.8 24
21 0.0 5.8 22SPARE 30 A 3
19 0.0 5.8 20
3 40 A EXISTING RF-AMB-1
SPACE -- -- 17 0.0 0.0 18
SPACE -- -- 15 0.0 0.0 16
SPACE -- -- 13 0.0 0.0 14
3 30 A SPARE
11 0.0 10.0 12
9 0.0 10.0 10NEW FCU-L4 80 A 3
7 0.0 10.0 8
3 50 A
EXISTING 30 KVA
TRANSFORMER/PANEL
EQB
5 15.8 9.4 6
3 15.8 9.4 4NEW FCU-L3 80 A 3
1 15.8 9.4 2
3 60 A EXISTING SF-AMB-1
LOAD DESCRIPTION BKR P CKT
PHASE A
kVA
PHASE B
kVA
PHASE C
kVA CKT P BKR LOAD DESCRIPTION
BUS AMPS: 400 AMPS
MAIN DEVICE: 200.0 A MAIN CB SPECIAL:
MOUNTING: SURFACE NEMA 1 A.I.C. RATING: 14,000 AMPS SYMMETRICAL
LOCATION: VOLTAGE: 480Y/277 V. 3 ø 4 W.
PANELBOARD: EQA
LOAD REMOVED: 130.9A
LOAD ADDED: 106.4A
NOTES:
EST. DEMAND CURRENT: 0.0 A
CONNECTED CURRENT: 0.0 A
ESTIMATED DEMAND: 0 VA
CONNECTED LOAD: 0 VA
Other 0 VA 0.00% 0 VA
LOAD CLASSIFICATION CONNECTED DEMAND ESTIMATED PANEL TOTALS
TOTAL AMPS: 0 A 0.0 A 0 A
TOTAL LOAD: 0 kVA 0 kVA 0 kVA
23 0.0 0.0 24 1 20 A EXHAUST FAN (CT RM.)
21 0.0 0.0 22 1 20 A EXHAUST FAN (CT RM.)NEW PP-1 (P-2) 40 A 3
19 0.0 0.0 20 1 20 A SPARE TO JB IN CEILING
17 0.0 0.0 18
15 0.0 0.0 16
EXISTING PANEL C -
WB-33 (MAIL ROOM)
20 A 3
13 0.0 0.0 14
3 30 A NEW DC-2
11 0.0 0.0 12
9 0.0 0.0 10NEW PP-2 (P-1) 40 A 3
7 0.0 0.0 8
3 30 A NEW DC-1
5 0.0 0.0 6
3 0.0 0.0 4NEW PP-1 (P-1) 40 A 3
1 0.0 0.0 2
3 40 A NEW PP-2 (P-2)
LOAD DESCRIPTION BKR P CKT
PHASE A
kVA
PHASE B
kVA
PHASE C
kVA CKT P BKR LOAD DESCRIPTION
BUS AMPS: 400 AMPS
MAIN DEVICE: 400.0 A MAIN CB SPECIAL:
MOUNTING: SURFACE NEMA 1 A.I.C. RATING: 10,000 AMPS SYMMETRICAL
LOCATION: ELECTRICAL SWITCH... VOLTAGE: 208Y/120 V. 3 ø 4 W.
PANELBOARD: WB-H
AMBULATORY PENTHOUSE
CO2
CO
H
HS
NO2
S
TH
TS
T
MS
CHWS
CD
CW
F-CW
H-CW
S-CW
PD
V
SS
SD
OSD
(E)
CHWR CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSATE DRAINAGE
DOMESTIC COLD WATER
FILTERED COLD WATER
HARD COLD WATER
SOFT COLD WATER
PUMP DISCHARGE
SANITARY VENT
SANITARY SEWER
STORM DRAINAGE
OVERFLOW STORM DRAINAGE
REF-L
REF-S
REFRIGERANT-LIQUID
REFRIGERANT-SUCTION
2"
PLUMBING AND PIPING SYMBOLS
KEYNOTE
CONTINUATION SYMBOL
REVISION NUMBER - SHOWN ON PLANS
GENERAL MECHANICAL SYMBOLS
ROOM NAME AND NUMBER
POINT WHERE NEW CONNECTS TO EXISTING
EXISTING PIPE TAG
ITEM TO BE DEMOLISHED
AREA NOT IN CONTRACT
PIPING BEING DEMOLISHED
ABOVE GROUND PIPING
PIPE SIZE TAG (DIAMETER)
DRAIN SIZE
PIPE RISEPIPE DROP
BELOW GROUND PIPING
PIPE INVERT ELEVATION TAG
PIPE SLOPE TAG
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS IN
THIS SET.THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT BE
USED IN THIS SET OF DRAWINGS.
TYPE (SEE SCHEDULE)
Room
INVERT: -10' - 1"
1/8" / 12" SLOPE
RO REVERSE OSMOSIS WATER
16"x8"
16"/8"
(E)
F
S
M
B
D
C
16"Ø
E/A
O/A
T/A
L/A
R/A
S/A
EXHAUST AIR
OUTSIDE AIR
RELIEF AIR
RETURN AIR
SUPPLY AIR
TRANSFER AIR
GRILLES, REGISTERS & DIFFUSERS TAG
CFM
THROW-150FPM/ 100FPM/ 50FPM
NECK SIZE / MODULE SIZE
EXISTING DUCT TAG
OVAL DUCT SIZE TAG (WIDTH / HEIGHT)
SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)
HVAC SYMBOLS
RECTANGULAR SUPPLY/OUTSIDE AIR DUCT RISE
RECTANGULAR RETURN/TRANSFER AIR DUCT RISE
MECHANICAL EQUIPMENT TAGS
ROUND DUCT SIZE TAG (DIAMETER)
LINEAR DIFFUSER TAG
CFM
TYPE (SEE SCHEDULE) NUMBER OF SLOTS /
ACTIVE SLOT LENGTH (PLENUM LENGTH) /
NECK SIZE
DUCT BEING DEMOLISHED
ELEVATION (CENTER OF FACE)
ROUND SUPPLY/OUTSIDE AIR DUCT RISE
ROUND RETURN/TRANSFER AIR DUCT RISE
RECTANGULAR EXHAUST/RELIEF AIR DUCT RISE
ROUND EXHAUST/RELIEF AIR DUCT RISE
DROP
DROP
DROP
DROP
DROP
DROP
GE/A GREASE EXHAUST AIR
SE/A SMOKE EXHAUST AIR
EQUIPMENT BY OTHERS
(REFER TO OTHER DISCIPLINE
FOR ADDITIONAL
INFORMATION)
EXISTING EQUIPMENT
TO REMAIN
FLUE EXHAUST GAS FLUE
C/A COMBUSTION AIR
S-O/A CONDITIONED OUTSIDE AIR
VAV-XX
10' - 0"
(E)VAV-XX
VAV-XX
4000 SF
6" SD-1
Ø ROUND
ABV ABOVE
AC AIR CONDITIONING
AD AREA DRAIN
ADD ADDENDUM
AFF ABOVE FINISHED FLOOR
AFUE ANNUAL FUEL UTILIZATION EFFICIENCY
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT/ARCHITECTURAL
BFF BELOW FINISHED FLOOR
BLW BELOW
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
CAP CAPACITY
CB CATCH BASIN
CFM CUBIC FEET PER MINUTE
CLG CEILING
CO CLEAN OUT
CW COLD WATER
D DEGREE
DB DRY BULB
DIA DIAMETER
DN DOWN
DW DISTILLED WATER
EA EACH
EAT ENTERING AIR TEMPERATURE
ELEC ELECTRICAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
E/A EXHAUST AIR
EXIST EXISTING
F DEGREES FAHRENHEIT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FD FIRE DAMPER
FDV FIRE DEPARTMENT VALVE
FL FLOOR
FO FUEL OIL
FOV FUEL OIL VENT
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPM FEET PER MINUTE
FS FLOOR SINK
FT FOOT/FEET
FTR FIN TUBE RADIATION
GAL GALLON
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GW GREASE WASTE
HB HOSE BIB
HP HORSE POWER
HTG HEATING
HTR HEATER
HW HOT WATER
HYD HYDRANT
ID INDIRECT
IN INCH
INV INVERT
LB POUND
LB/HR POUNDS PER HOUR
LAT LEAVING AIR TEMPERATURE
LP LOW PRESSURE
LPG LIQUEFIED PETROLEUM GAS
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M/A MIXED AIR
MAX MAXIMUM
MBH ONE THOUSAND BTU PER HOUR
MCF ONE THOUSAND CUBIC FEET
MD MOTORIZED DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTR MOTOR
MU/A MAKE-UP/AIR
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NUMBER
NO NORMALLY OPEN
NTS NOT TO SCALE
O OXYGEN
O/A OUTSIDE AIR
P&T PRESSURE AND TEMPERATURE
PD PRESSURE DROP
PIV POST INDICATOR VALVE
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PWR POWER
R DUCT RISER
R/A RETURN AIR
RCP RADIANT CEILING PANEL
RD ROOF DRAIN
REC RECESSED
RED REDUCER
RH RELATIVE HUMIDITY
RL/A RELIEF AIR
RM ROOM
RPM REVOLUTIONS PER MINUTE
RW RAIN WATER
SF SQUARE FOOT
S/A SUPPLY AIR
SAN SANITARY
SF SQUARE FOOT
SD SMOKE DAMPER
SM SURFACE MOUNT
SP STANDPIPE
SP STATIC PRESSURE
STM STEAM
T THERMOSTAT
TD TEMPERATURE DROP
TDR TRENCH DRAIN
TEMP TEMPERATURE
TYP TYPICAL
UG UNDERGROUND
VAC VACUUM
V VENT
VAV VARIABLE AIR VOLUME
VENT VENTILATION
VTR VENT THROUGH ROOF
W WASTE
WB WET BULB
WCO WALL CLEAN OUT
WH WALL HYDRANT
ABBREVIATIONS
AC AIR CONDITIONING UNIT
ACC AIR COOLED CONDENSER
ACCU AIR COOLING CONDENSING UNIT
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
CH CHILLER
CT COOLING TOWER
CUH CABINET UNIT HEATER
CWP CONDENSER WATER PUMP
CHWP CHILLED WATER PUMP
CRAC COMPUTER ROOM AIR CONDITIONING UNIT
DBP DOMESTIC WATER BOOSTER PUMP
DC DUCT MOUNTED COIL
DCP DOMESTIC WATER CIRCULATING PUMP
EF EXHAUST FAN
EDC ELECTRIC DUCT COIL
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
FCU FAN COIL UNIT
FP FIRE PUMP
GI GREASE INTERCEPTOR
GRV GRAVITY ROOF VENTILATOR
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
HRU HEAT RECOVERY UNIT
PRV POWER ROOF VENTILATOR
RE RETURN/EXHAUST FAN
RTU ROOFTOP UNIT
SEP SEWAGE EJECTOR PUMP
SF SUPPLY FAN
SP SUMP PUMP
UH UNIT HEATER
WH WATER HEATER
EQUIPMENT ABBREVIATIONS
48"x2 1/2"
400SLB3
8" / 24x24
300SD3
12" / ---
SD9
LINEAR BAR GRILLE
LINEAR SLOT DIFFUSER
PERFORATED DIFFUSER
WITH DEFLECTORS
ROUND DIFFUSER WITH
ADJUSTABLE PATTERNS
LOUVERED DOUBLE
DEFLECTION GRILLE
12"x10" / ---
500SG7
TYPE (SEE SCHEDULE)
10" / 24x24 H-5/7/1422
400SD1
3-CONE DIFFUSER
THROW PATTERN
MAX NC RATING
1 / 4' - 0" / 8"
200LSD1
8' - 0" AFF
1 / 4' - 0" / 8"
200LSD1
18' - 0"
1 / 4' - 0" / 8"
200LSD1
SECTION TOTAL TRACK LENGTH
12"x10" / 24x12
500RG9
LOUVERED GRILLE
12"x10" / 24x24
500RG2
EGGCRATE RETURN
GRILLE
BOTTOM OF EQUIPMENT
ELEVATION
505 lb
RTU-XX
RTU-XX
3.0 ton
115000 Btu/h
115 CFH
RTU-XX
Htg: 3.7 GPM
VAV-XX
HEATING COIL
FLOW
OPERATING WEIGHT
NOT INCLUDING CURB
FUEL INPUT
GAS PIPE FLOW
NOMINAL COOLING
CAPACITY
4" FD-1FLOOR DRAIN
VAV BOX
ROOFTOP UNIT
4" AD-6 AREA DRAIN
4" FS-4FLOOR SINK
4" SD-29 DECK DRAIN4" FD-3PFLOOR DRAIN
8 WFU
4" FD-13
HUB DRAIN
DRAIN TAGS
"P" - INDICATES
PRIMER CONNECTION
FIXTURE UNITS
FLOW CONTROL
DRAIN
4" SD-12
COMBINATION
DRAINS
STORM DRAIN4" SD-15
ROOF AREA
SERVED BY DRAIN
PIPE ACCESSORY TAGS
DOMESTIC WATER METER
BALANCING VALVE
1/4 TURN BALL VALVE
CHECK VALVE
3-WAY MIXING VALVE
MOTORIZED CONTROL VALVE
3 WAY MOTORIZED CONTROL
VALVE
PRESSURE REDUCING VALVE
REFRIGERANT SOLENOID VALVE
BUTTERFLY VALVE
DATA DEVICE TAGS
DAMPER TAGS
VAV-XX
RTU-XX
EQUIPMENT ID
SYMBOL
BBB
INLET COLLAR DAMPER
MANUAL BALANCING DAMPER
BACKDRAFT DAMPER
COMBINATION FIRE/SMOKE
DAMPER
FIRE DAMPER
SMOKE DAMPER
MOTORIZED DAMPER
SENSOR
MANUAL SWITCH
THERMOSTAT
TEMPERATURE SENSOR
TEMPERATURE & HUMIDITY SENSOR
HUMIDITY SENSOR
NITROGEN DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
CARBON DIOXIDE SENSOR
HUMIDISTAT
WATER CLOSET -
WALL HUNG - ADA WC-1
U-1
1 WFU
LAV-1A
1.5 CWFU
1.5 HWFU
LAV-1A
FIXTURE UNITS
4" WCO
PIPE ACCESORY
TAG
PLUMBING FIXTURE TAGS
4" WCO
TYPE (SEE SCHEDULE)
WC-1A
NUMBER OF SHEET WHERE DETAIL APPEARS
NUMBER OF DETAIL ON SHEET-
(40% PROPYLENE GLYCOL)
(40% PROPYLENE GLYCOL)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
M001
HVAC SYMBOLS, ABBREVIATIONS
AND GENERAL NOTES209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
WWW.AE-WORKS.COM
AE WORKS PROJECT #: 18017
REPLACE IT HVAC HEAT
EXCHANGER
135 East 38th Street, Erie, PA 16504
562-18-401
05/10/2019 CJC CJC
100% CONSTRUCTION
DOCUMENTS
PROJECT GENERAL NOTES
* REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.
* THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING, PRIOR TO FINAL BID, ALL
EXISTING CONDITIONS FOR PLUMBING AND MECHANICAL SYSTEMS WITHIN SPACE.
* THE CONTRACTOR SHALL VISIT THE SITE, PRIOR TO FINAL BIDDING, AND VERIFY ALL EXISTING
SITE CONDITIONS. PROVIDE ALL MATERIAL AND COMPONENTS AS NEEDED TO BRING THE
UNITS TO FULL COMPLIANCE OF THE VA’S REQUIREMENTS.
* WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION, PREVENT
CONSTRUCTION DEBRIS FROM ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR TO
START OF WORK.
* COORDINATE INSTALLATION OF PIPING, DUCTWORK, CONDUIT, LIGHTS, CABLE TRAY,
STRUCTURE, AND EQUIPMENT TO PREVENT CONFLICTS.
* THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS BOTH EXISTING AND THOSE
ILLUSTRATED BY THESE DOCUMENTS AS WELL AS THOSE WHICH CAN BE REASONABLY
ANTICIPATED INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL, ELECTRICAL, VENTILATION, PLUMBING, AND OTHER SYSTEMS INVOLVED ON THIS PROJECT.
* FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND SHALL CONFORM TO
ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE, AND LOCAL CODES, INCLUDING BUT NOT
LIMITED TO THE INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL CODE.
* LOCATE EQUIPMENT REQUIRING ACCESS 2'-0" MAXIMUM ABOVE CEILING.
* ALL ROOF MOUNTED EQUIPMENT SHALL BE A MINIMUM 10'-0" FROM EDGE OF ROOF.
* LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY FROM THE SPACE ABOVE
ELECTRICAL PANELS. TRANSFORMERS AND OTHER ELECTRICAL EQUIPMENT.
* FIRE SEAL AROUND DUCT AND PIPING PENETRATIONS OF FIRE RATED WALLS. REFER TO
SPECIFICATION.
* PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND DUCTS THROUGH FOUNDATIONS,
FLOORS, WALLS, AND ROOF.
* ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO MECHANICAL EQUIPMENT.
* REFER TO PLUMBING SERIES DRAWINGS FOR GAS AND A.C. CONDENSATE DRAIN PIPING.
* PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW UNTIL ANOTHER SIZE IS
SHOWN.
* FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN ON THE SEGMENTS,
REFER TO DETAILS, SCHEDULES, AND SPECIFICATIONS.
* INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE RESPECTIVE MANUFACTURER'S WRITTEN
INSTALLATION INSTRUCTIONS, AT A LEVEL OF QUALITY AND WORKMANSHIP CONSISTENT WITH
THE SPECIFICATIONS.
* LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS INDICATED ON THE DRAWING, ARE
APPROXIMATE AND SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD. WORK SHALL BE
COORDINATED WITH ALL OTHER TRADES TO AVOID INTERFERENCE IN THE FIELD.
* INSTALL EXPOSED PIPING AND DUCTWORK AS HIGH AS PRACTICAL IN ROOMS WITHOUT
CEILINGS.
HVAC PROJECT GENERAL NOTES
1 NOT ALL SYMBOLS ARE NECESSARILY USED.
2 COORDINATE FINAL LOCATIONS OF DIFFUSERS AND GRILLES WITH ARCHITECTURAL REFLECTED
CEILING PLANS.
3 DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY DUCT AND PIPE ROUTING AND
COORDINATE INTERFERENCE BETWEEN TRADES PRIOR TO INSTALLATION.
4 REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.
5 DUCTWORK TO BE INSTALLED TIGHT TO UNDERSIDE OF STRUCTURE ABOVE UNLESS NOTED
OTHERWISE.
6 PROVIDE ALL MATERIALS, EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL
COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS
SPECIFIED AND AS REQUIRED BY CODE.
7 CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE
INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. CONTRACTOR SHALL BE
RESPONSIBLE TO FIELD SURVEY ACTUAL SITE CONDITIONS AND ACCOMODATE ACTUAL SITE
CONDITIONS AS PART OF SCOPE OF WORK AT NO COST TO OWNER.
8 INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, APPLICABLE BUILDING, STATE
AND LOCAL CODES, SEISMIC REQUIREMENTS, ENERGY CODES AND INSURANCE UNDERWRITER
REQUIREMENTS.
9 COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL,
CIVIL AND ELECTRICAL WORK, ETC. SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.
10 MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS,
SUSPENDED EQUIPMENT, SUPPORTS, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL
ROOMS.
11 ALL TESTS SHALL BE COMPLETED AND ACCEPTED BY THE INSPECTOR BEFORE ANY
MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED.
12 LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN ACCESSIBLE
LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UPSTREAM AND DOWNSTREAM, AS
RECOMMENDED BY THE MANUFACTURER FOR ACCURACY.
13 TESTING ADJUSTING AND BALANCING (TAB) AGENCY SHALL BE A MEMBER OF THE ASSOCIATED
AIR BALANCING COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU
(NEBB). TAB FIRM SHALL HAVE A MINIMUM OF 5 YEARS EXPERIENCE ON SIMILAR PROJECTS.
PERFORM TAB IN ACCORDANCE WITH THE REQUIREMENTS OF THE TAB PROCEDURAL
STANDARD RECOMMENDED BY THE TAB TRADE ASSOCIATION THAT APPROVED THE TAB FIRM'S
QUALIFICATIONS.
14 WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE
PRODUCTS OF A SINGLE MANUFACTURER SHALL BE USED.
15 COORDINATE ALL FINAL EQUIPMENT CONNECTIONS WITH THE MANUFACTURERS' CERTIFIED
DRAWINGS. COORDINATE AND PROVIDE ALL DUCTWORK AND PIPING TRANSITIONS REQUIRED
FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND
COORDINATE ALL DUCTWORK AND PIPING DIMENSIONS BEFORE FABRICATION.
16 ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE,
DIVISION 26 OF THE SPECIFICATIONS, ALL LOCAL CODES, AND OWNER'S INSURANCE
UNDERWRITER REQUIREMENTS.
17 THE LOCATIONS AND SIZES OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE
SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY.
THE EXACT LOCATIONS AND SIZES NECESSARY TO SECURE THE BEST CONDITIONS AND
RESULTS SHALL BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE
APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.
18 PLAN DRAWINGS AND SECTIONS CUTS WHICH SPECIFICALLY IDENTIFY SERVICE ROUTE
OFFSETS, ELEVATION CHANGES, OBSTRUCTIONS, ACCESS DOORS, BALANCING DEVICES, ETC.
ARE SHOWN FOR CLARITY WHERE SPECIFIC KNOWN CONDITIONS EXIST. MECHANICAL
CONTRACTOR SHALL COORDINATE EQUIPMENT, DUCTWORK, AND PIPING ROUTINGS WITH ALL
OTHER TRADES. REQUIREMENTS NOT SPECIFICALLY IDENTIFIED SHALL NOT BE INTERPRETED
AS EXCLUSION FROM CONTRACTOR'S SCOPE OF WORK. CONTRACTOR SHALL BE RESPONSIBLE
FOR ACTUAL SITE CONDITIONS AND SHALL INCLUDE SUCH CONDITIONS IN SCOPE OF WORK AT
NO ADDITIONAL COST TO THE OWNER.
19 ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND SUPPORT OF
MECHANICAL WORK AS SHOWN IN DETAILS FOR PIPING, DUCTWORK AND EQUIPMENT (UNLESS
OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR
AT NO ADDITIONAL COST TO THE OWNER.
20 ALL EQUIPMENT, PIPING, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED, SPECIFIED AND
AS REQUIRED TO PROVIDE A VIBRATION FREE INSTALLATION.
21 ALL OPENINGS IN FIRE RATED WALLS AND SMOKE PARTITIONS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE STOPPED WITH APPROVED FIRESTOPPING MATERIALS.
22 REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING AND EQUIPMENT INSTALLATION.
23 WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION, PREVENT
CONSTRUCTION DEBRIS FROM ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR TO
START OF WORK.
24 LOCATE ALL MECHANICAL EQUIPMENT (VAV BOXES, CABINET HEATERS, UNIT HEATERS, ETC.,)
FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, FILTERS, CONTROLS AND VALVING. DO
NOT LOCATE FAN POWERED VAV BOXES ABOVE LIGHTING FIXTURES.
25 FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND SHALL CONFORM TO ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE, AND LOCAL CODES, INCLUDING BUT NOT
LIMITED TO THE INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL CODE.
26 LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY FROM THE SPACE ABOVE
ELECTRICAL PANELS. TRANSFORMERS AND OTHER ELECTRICAL EQUIPMENT.
27 PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH DROP IN HYDRONIC WATER PIPING
SYSTEMS. ALL PIPING SHALL SLOPE TO LOW POINTS. PROVIDE HOSE END DRAIN VALVES AT THE
BOTTOM OF ALL RISERS AND LOW POINTS.
28 INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES AND OTHER
APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.
29 ALL ISOLATION VALVES SHALL BE IN LOCATION AND ELEVATION WHICH ALLOWS FOR EQUIPMENT
AND BRANCH PIPING REMOVAL, WHILE MAINTAINING SERVICE UPSTREAM OF THE ISOLATION
VALVE.
30 ALL BALANCING VALVES AND ISOLATION VALVES USED TO ADJUST FLOW RATES SHALL BE
PROVIDED WITH POSITIONS INDICATORS AND MAXIMUM ADJUSTABLE STOPS (MEMORY STOPS).
31 ALL ISOLATION VALVES (EXCEPT CONTROL VALVES), STRAINERS, AND PIPING SPECIALTIES SHALL BE FULL LINE SIZE BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO EQUIPMENT AND
CONTROLS.
32 MECHANICAL JOINTS SUCH AS UNIONS, FLANGES, OR THREADED FITTINGS SHALL BE INSTALLED
AT EACH EQUIPMENT CONNECTION, IN BYPASSES, AT FLOOR PENETRATIONS, AT CONTROL
DEVICES, AND IN LONG PIPE RUNS (100 FEET OR MORE) TO PERMIT DISASSEMBLY FOR
ALTERATION AND REPAIRS.
33 MEASURE, CUT AND INSTALL PIPE LENGTH ACCURATELY TO MINIMALIZE MISALIGNMENT.
INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.
34 PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS AND OTHER
EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION (EXCEPT WATER COILS). FLEXIBLE
CONNECTIONS SHALL BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
35 PROVIDE VIBRATION INSULATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT VIBRATION
TRANSMISSION TO BUILDING STRUCTURE.
36 FIRE SEAL AROUND DUCT AND PIPING PENETRATIONS OF FIRE RATED WALLS. REFER TO
SPECIFICATION.
37 ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE
COORDINATED WITH GENERAL CONTRACTOR. ALL ATTACHEMENTS TO STEEL MEMBERS, BAR
JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE APPROVED BY STRUCTURAL ENGINEER.
WELDING TO STRUCTURAL MEMBERS SHALL NOT BE PERMITTED.
38 MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE SUPPORTED FROM ROOF OR
DECK ASSEMBLY. SUPPORTS SHALL ATTACH TO STRUCTURAL MEMBERS. COORDINATE WITH
STRUCTURAL DRAWINGS.
39 PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND DUCTS THROUGH FOUNDATIONS,
FLOORS, WALLS, AND ROOF.
40 UNLESS OTHERWISE NOTED, ALL PIPING AND DUCTWORK IF OVERHEAD, TIGHT TO UNDERSIDE
OF STRUCTURE OR SLAB, WITH SPACE FOR INSULATION.
41 PROVIDE CHAINWHEEL OPERATORS FOR ALL EXPOSED VALVES MOUNTED GREATER THAN 8'-0"
ABOVE FINISHED FLOOR LEVEL. CHAIN SHALL EXTEND UNOBSTRUCTED TO 7'-0" ABOVE FLOOR
LEVEL.
42 ALL PIPING AND DUCTWORK SHALL CLEAR DOORS, WINDOWS, EQUIPMENT CLEARANCES,
MAINTENANCE REQUIREMENTS, CODE SETBACKS, ETC. TO ASSURE PROPER OPERATION,
INSPECTION AND MAINTENANCE.
43 ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.
44 PROVIDE ALL 90 DEGREE SQUARE ELBOWS WITH DOUBLE RADIUS TURNING VANES UNLESS
OTHERWISE INDICATED OR SPECIFIED. PROVIDE ACCESS DOORS UPSTREAM OF ALL ELBOWS
CONTAINING TURNING VANES.
45 ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO…