36C24418B0072-002.pdf

PDF 40 MB Posted

Attached to
Renovate Building #2 West Project 542-16-114 Federal contract opportunity
Solicitation number
36C24418B0072
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

36C24418B0072 542-16-114 Building 2 West Bid Drawings -1.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Building #2 West Project 542-16-114, newest first.
File Type Posted
36C24418B0072-00008000.docx DOCX document
36C24418B0072-00007000.docx DOCX document
36C24418B0072-00006001.pdf PDF
36C24418B0072-00006000.docx DOCX document
36C24418B0072-00005000.docx DOCX document
36C24418B0072-00004003.pdf PDF
36C24418B0072-00004000.docx DOCX document
36C24418B0072-00004002.pdf PDF
36C24418B0072-00004001.pdf PDF
36C24418B0072-00003000.docx DOCX document
36C24418B0072-00002001.pdf PDF
36C24418B0072-00002000.docx DOCX document
36C24418B0072-00002002.pdf PDF
36C24418B0072-00001003.pdf PDF
36C24418B0072-00001001.pdf PDF
36C24418B0072-00001000.docx DOCX document
36C24418B0072-00001002.pdf PDF
36C24418B0072-005.pdf PDF
36C24418B0072-006.pdf PDF
36C24418B0072-004.pdf PDF
36C24418B0072-007.pdf PDF
36C24418B0072-001.docx DOCX document
36C24418B0072-003.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

P lo t D at e: Date

Location

ARCHITECTS + ENGINEERS: Drawing Title:

Approved: Project Director

Project Title

Checked Drawn

Drawing Number

Building Number

Date:Revisions:

VA FORM 08-6231 1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot on e qu a rte r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu a rte rs in ch o ne fo ot on e in ch o ne fo ot on e a nd o ne h a lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6"

6"

COATESVILLE, PENNSYLVANIA

Fi le

ISSUED FOR BID - NOT FOR CONSTRUCTION

F

G

/2

7/

1:

:2

A M

C :\U se rs

\d bi bb s\

D oc um en ts \5

-1

6-

4_ C oa ts vi lle

_C E

N

TR

A L_

D B ib bs

.rv t

COVER SHEET

G-000

542-16-114

PK

COATESVILLE VAMC

RENOVATE BUILDING 2 WEST

10-13-2017

DTB

RENOVATE BUILDING 2 WEST

COATESVILLE VA MEDICAL CENTER

1400 BLACKHORSE HILL ROAD

COATESVILLE, PENNSYLVANIA 19320

CONTRACT NO. VA224-16-C-0178

VA STATION PROJECT NO. 542-16-114

BANCROFT PROJECT NO. 16-109

ISSUED FOR BID

OCTOBER 13, 2017

BUILDING 2

NORTH

COATESVILLE VAMC

PENNSYLVANIA

SCHEMATIC DESIGN SUBMISSION 10-14-2016

50% DESIGN DEVELOPMENT SUBMISSION 12-08-2016

95% DESIGN DEVELOPMENT SUBMISSION 01-23-2017

100% CONSTRUCTION DOCUMENTS 09-14-2017

ISSUED FOR BID 10-13-2017

lo t D at e: Date

Location

ARCHITECTS + ENGINEERS: Drawing Title:

Approved: Project Director

Project Title

Checked Drawn

Drawing Number

Building Number

Date:Revisions:

VA FORM 08-6231 1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot on e qu a rte r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu a rte rs in ch o ne fo ot on e in ch o ne fo ot on e a nd o ne h a lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6"

6"

COATESVILLE, PENNSYLVANIA

Fi le

ISSUED FOR BID - NOT FOR CONSTRUCTION

F

G

/2

7/

1:

:2

A M

C :\U se rs

\d bi bb s\

D oc um en ts \5

-1

6-

4_ C oa ts vi lle

_C E

N

TR

A L_

D B ib bs

.rv t

SHEET INDEX AND PROJECT DATA

G-001

542-16-114

PK

COATESVILLE VAMC

RENOVATE BUILDING 2 WEST

10-13-2017

DTB

FIRE RESISTIVE RATINGS

ROOF CONSTRUCTION

EXTERIOR NON-BEARING WALLS

SUPPORTING ROOF ONLY

SUPPORTING MORE THAN ONE FLOOR

COLUMNS & BEAMS

FLOOR CONSTRUCTION 0-HOUR

1-HOUR

BOILER AND FUEL - FIRED EQUIPMENT

2-HOURS

0-HOUR

39.3.2.2

* NOTE - IF BUILDING PROTECTED THROUGHOUT BY APPROVED AUTOMATIC SPRINKLER

SYSTEM IN ACCORDANCE WITH (NFPA 101) 9.7.1.1(1) OR (IBC)903.3.1

SHAFT ENCLOSURES 1-HOUR

TABLE 509

713.4

1. CONSTRUCTION CLASSIFICATIONS: TYPE 3B

2. AUTOMATIC FIRE SUPPRESSION: ALL AREAS IN ACCORDANCE WITH NFPA 13

3. OCCUPANCY CLASSIFICATIONS: IBC GROUP B, NFPA 101 EXISTING BUSINESS OCCUPANCY

4. AREA OF WORK: RENOVATION OF EXISTING OUTPATIENT CLINIC SPACE INTO PACT

MODULE TYPE OUTPATIENT CLINIC.

PROJECT AREA APPROXIMATELY 14,000 SF.

5. BUILDING: EXISTING STAND-ALONE CONCRETE AND MASONRY STRUCTURE

WAS BUILT IN 1929. THE BUILDING IS CURRENTLY USED AS

OUTPATIENT CLINIC. THE BUILDING HAS (3) OCCUPIED FLOORS

(GROUND, FIRST, AND SECOND FLOORS) AND AN ATTIC SPACE

USED AS A MECHANICAL PENTHOUSE.

BUILDING 2 CODE REVIEW

ALL WORK SHALL COMPLY WITH THE FOLLOWING CODES:

1. VA DIRECTORIES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER

GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/)

2. INTERNATIONAL BUILDING CODE (IBC) 2015 (ONLY PERTAINING TO ITEMS NOT ADDRESSED BY NFPA 101)

3. NFPA 101 LIFE SAFETY CODE 2015

4. NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900

5. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

6. VA SEISMIC DESIGN REQUIREMENTS, H-18-8

7. NATIONAL ELECTRICAL CODE (NEC) 2014

8. INTERNATIONAL PLUMBING CODE (IPC) 2015

9. ASME BOILER AND PRESSURE VESSEL CODE 2015

10. ASME CODE FOR PRESSURE PIPING

11. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT,

12. BARRIER FREE DESIGN GUIDE (PG-18-13)

13. BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

14. INTERNATIONAL MECHANICAL CODE

APPLICABLE CODES

EGRESS REQUIREMENTS

AREA SEPARATION PROTECTION

SECTION IBC, 2015 SECTION NFPA 101, 2015APPLICABLE CODE

(FOR BUSINESS OCCUPANCIES)

1- HR PARTITION

-OR-

AUTOMATIC SPRINKLER*

CONSTRUCTION DESCRIPTION RATING

FIXTURE REQUIREMENTS

SECTION IBC, 2015 SECTION NFPA 101, 2015

GROUND FLOOR PLAN: FACTOR OF 100 =

FIRST FLOOR PLAN: FACTOR OF 100 =

EXIT TRAVEL DISTANCE

300 FEET WITH

AUTOMATIC SPRINKLER

39.2.6.3 300 FEET WITH

AUTOMATIC SPRINKLER

CORRIDOR SEPARATION 0 HR. W/ SPRINKLERS

CORRIDOR WIDTH (MIN.) 44 INCH MINIMUM > 50 OCC

DEAD END CORRIDORS: 50' W/ SPRINKLERS 50'

TABLE 1004.1.2

1020.4.2

TABLE 1020.1

TABLE 1018.2

160 (OCC. LOAD)

160 (OCC. LOAD)

160 (0CC. LOAD)

EMERGENCY EGRESS ILLUMINATION: AVERAGE OF 1.0 FOOT CANDLES AT EGRESS PATHS WITH A MIN. OF 0.1 CANDLE AT ANY POINT.

POWER SUPPLY: MEANS OF EGRESS ILLUMINATION NORMAL POWER IS TO BE PROVIDED BY PREMISE'S ELECTRICAL SYSTEM.

a. EGRESS ILLUMINATION: EITHER BATTERIES, SECOND PRIMARY SOURCE OR GENERATOR WITH A MIN. OF A 1 1/2 HOUR DURATION.

b. EXIT SIGNS: ILLUMINATED AT ALL TIME, EMERGENCY POWER REQ. WITH 1 1/2 HOUR DURATION.

39.2.3.2 and 7.3.4.1

(TABLE 2902.1)

LAVATORY DRINKING FOUNTAINS

SERVICE SINK

1 PER 40 FOR FIRST 80,

THEN 1 PER 80

LEVEL

7.3.1.2.

160 (OCC. LOAD)

160 (OCC. LOAD)

160 (0CC. LOAD)

ELECTRICAL ROOM, WITH DRY TYPE

TRANSFORMER >112.5 kVA

NFPA 70

(NEC) 450-21

1-HOUR8.6.5 (3)

N/A

PROVIDED

APPROVED AUTOMATIC

SPRINKLER SYSTEM

1-HOUR

WATER CLOSET

GROUND FLOOR

FIRST FLOOR

1- HR PARTITION

-OR-

AUTOMATIC SPRINKLER*

STORAGE (INCINDENTAL USE)

WHERE DEGREE OF HAZARD IS GREATER

THAN GENERAL OCCUPANCY

1- HR PARTITION

-OR-

AUTOMATIC SPRINKLER*

APPROVED AUTOMATIC

SPRINKLER SYSTEM39.3.2.2NO REQUIREMENT

TABLE 1017.2

SECOND FLOOR PLAN: FACTOR OF 100 =

36 INCH MINIMUM < 50 OCC

44 INCH MINIMUM > 50 OCC

36 INCH MINIMUM < 50 OCC

COMMON PATH OF EGRESS TRAVEL: 100' W/ SPRINKLERS 100' W/ SPRINKLERSTABLE 1006.2.1

39.2.5.2

39.2.5.3.1

STAIR ENCLOSURE 713.6

2-HR >4 STORIES

1-HR <4 STORIES 7.1.3.2.1 (3)(b) 1 HR W/ SPRINKLER 2-HOUR

MINIMUM CEILING HEIGHT 7'-6" 7'-0"1208.2 7.1.5.1 (1)

BUSINESS:

160 PERSONS

OCCUPANT LOAD

REQ. PROVIDED*

BUSINESS:

160 PERSONS

5 6

SECOND FLOOR BUSINESS:

160 PERSONS

REQ. PROVIDED*

1 PER 25 FOR FIRST 50,

THEN 1 PER 50

1 PER 100

REQ. PROVIDED*

2 5

REQ. PROVIDED

1 2

* NOTE - PROVIDED FIXTURE COUNT DOES NOT INCLUDE FIXTURES DESIGNATED FOR EXAM

PURPOSES, SUCH AS EXAM TOILET ROOMS AND HANDWASH LAVATORIES

BUILDING DATA

ALLOWABLE AREA/FLOOR (SQ.FT.)

AUTOMATIC SPRINKLER INCREASE

ACTUAL AREA (BUILDING FOOTPRINT)

CONSTRUCTION TYPE

APPLICABLE CODE

3B

75' 48'

TABLE (601)

TABLE (506.2)

OCCUPANCY

NFPA 220

MAXIMUM ALLOWABLE HEIGHT

ACTUAL HEIGHT

BUSINESS: OUTPATIENT CLINIC

SECTION IBC, 2015 SECTION NFPA 101, 2015

TABLE (504.3)

57,000 SQ. FT.

16,000 SQ. FT.

75' 48'

TYPE III (200)

57,000 SF

16,000 SF

TERRA COTTA TILE +

FACEBRICK

REINFORCED POURED CONCRETE

RIBBED CONCRETE SLAB

WOOD FRAME

WOOD FRAMING

0-HOUR

2-HOURS

AUTHORITY HAVING JURISDICTION: VISN 4 SAFETY OFFICER

PROJECT TEAM

THE DEPARTMENT OF VETERANS AFFAIRS

COATESVILLE VAMC - VISN 4

1400 BLACKHORSE HILL ROAD

COATESVILLE, PENNSYLVANIA 19320

BANCROFT ARCHITECTS + ENGINEERS

700 NICHOLAS BLVD.

SUITE 300

ELK GROVE VILLAGE, IL 60007

P: 847-952-9362 www.bancroft-ae.com

JOHNSON WILBUR ADAMS, INC

174 N. WASHINGTON ST.

WHEATON, IL

P: 630-653-9060 F: 630-653-9059

BANCROFT ARCHITECTS + ENGINEERS

700 NICHOLAS BLVD.

SUITE 300

ELK GROVE VILLAGE, IL 60007

P: 847-952-9362

BANCROFT ARCHITECTS + ENGINEERS

700 NICHOLAS BLVD.

SUITE 300

ELK GROVE VILLAGE, IL 60007

P: 847-952-9362

BANCROFT ARCHITECTS + ENGINEERS

700 NICHOLAS BLVD.

SUITE 300

ELK GROVE VILLAGE, IL 60007

P: 847-952-9362

BANCROFT ARCHITECTS + ENGINEERS

700 NICHOLAS BLVD.

SUITE 300

ELK GROVE VILLAGE, IL 60007

P: 847-952-9362

BANCROFT ARCHITECTS + ENGINEERS

700 NICHOLAS BLVD.

SUITE 300

ELK GROVE VILLAGE, IL 60007

P: 847-952-9362

CIVIL ENGINEER

ARCHITECT

STRUCTURAL ENGINEER

FIRE PROTECTION ENGINEER

PLUMBING ENGINEER

MECHANICAL ENGINEER

ELECTRICAL ENGINEER

BANCROFT ARCHITECTS + ENGINEERS

700 NICHOLAS BLVD.

SUITE 300

ELK GROVE VILLAGE, IL 60007

P: 847-952-9362

SHEET INDEX

SHEET

NUMBER SHEET NAME

Designed By 35% 50% 95% 100%

P-100U.2 UNDERGROUND PLUMBING PLAN ZONE B BAE ● ● ●

P-100.1 GROUND FLOOR DOMESTIC WATER PLUMBING PLAN ZONE A BAE ● ● ●

P-100.2 GROUND FLOOR DOMESTIC WATER PLUMBING PLAN ZONE B BAE ● ● ●

P-100.3 GROUND FLOOR SANITARY PLUMBING PLAN ZONE A BAE ● ● ●

P-100.4 GROUND FLOOR SANITARY PLUMBING PLAN ZONE B BAE ● ● ●

P-101.1 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN ZONE A BAE ● ● ●

P-101.2 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN ZONE B BAE ● ● ●

P-101.3 FIRST FLOOR SANITARY PLUMBING PLAN ZONE A BAE ● ● ●

P-101.4 FIRST FLOOR SANITARY PLUMBING PLAN ZONE B BAE ● ● ●

P-102.1 SECOND FLOOR PLUMBING PLAN ZONE A BAE ● ● ●

P-102.2 SECOND FLOOR PLUMBING PLAN ZONE B BAE ● ● ●

P-103.1 ATTIC PLUMBING PLAN ZONE A BAE ● ● ●

P-103.2 ATTIC PLUMBING PLAN ZONE B BAE ● ● ●

P-600 DOMESTIC WATER RISER DIAGRAMS BAE ● ● ●

P-601 SANITARY AND VENT RISER DIAGRAMS BAE ● ● ●

P-700 PLUMBING MATERIAL LIST BAE ● ●

MECHANICAL

M-001 MECHANICAL SYMBOLS, ABBREVIATIONS, AND NOTES BAE ●

MHD-100.1 GROUND FLOOR DEMOLITION PIPING PLAN ZONE A BAE ● ● ●

MHD-100.2 GROUND FLOOR DEMOLITION PIPING PLAN ZONE B BAE ● ● ●

MHD-100.3 GROUND FLOOR DEMOLITION STEAM PIPING PLAN ZONE A BAE ● ● ●

MHD-100.4 GROUND FLOOR DEMOLITION STEAM PIPING PLAN ZONE B BAE ● ● ●

MHD-101.1 FIRST FLOOR DEMOLITION PIPING PLAN ZONE A BAE ● ● ●

MHD-101.2 FIRST FLOOR DEMOLITION PIPING PLAN ZONE B BAE ● ● ●

MHD-103.1 ATTIC FLOOR DEMOLITION PIPING PLAN ZONE A BAE ● ● ●

MVD-100.1 GROUND FLOOR DEMOLITION MECHANICAL PLAN ZONE A BAE ● ● ●

MVD-100.2 GROUND FLOOR DEMOLITION MECHANICAL PLAN ZONE B BAE ● ● ●

MVD-101.1 FIRST FLOOR DEMOLITION MECHANICAL PLAN ZONE A BAE ● ● ●

MVD-101.2 FIRST FLOOR DEMOLITION MECHANICAL PLAN ZONE B BAE ● ● ●

MVD-103.1 ATTIC DEMOLITION MECHANICAL PLAN ZONE A BAE ● ● ●

MH-100.1 GROUND FLOOR PIPING PLAN ZONE A BAE ● ● ●

MH-100.2 GROUND FLOOR PIPING PLAN ZONE B BAE ● ● ●

MH-101.1 FIRST FLOOR PIPING PLAN ZONE A BAE ● ● ●

MH-101.2 FIRST FLOOR PIPING PLAN ZONE B BAE ● ● ●

MH-102.1 SECOND FLOOR PIPING PLAN ZONE A BAE ● ● ●

MH-102.2 SECOND FLOOR PIPING PLAN ZONE B BAE ● ● ●

MH-103.1 ATTIC PIPING PLAN ZONE A BAE ● ● ●

MV-100.1 GROUND FLOOR MECHANICAL PLAN ZONE A BAE ● ● ●

MV-100.2 GROUND FLOOR MECHANICAL PLAN ZONE B BAE ● ● ●

MV-101.1 FIRST FLOOR MECHANICAL PLAN ZONE A BAE ● ● ●

MV-101.2 FIRST FLOOR MECHANICAL PLAN ZONE B BAE ● ● ●

MV-102.1 SECOND FLOOR MECHANICAL PLAN ZONE A BAE ● ● ●

MV-102.2 SECOND FLOOR MECHANICAL PLAN ZONE B BAE ● ● ●

MV-103.1 ATTIC MECHANICAL PLAN ZONE A BAE ● ● ●

MV-103.2 ATTIC MECHANICAL PLAN ZONE B BAE ● ● ●

M-500 MECHANICAL DETAILS BAE ● ● ●

M-501 MECHANICAL DETAILS BAE ● ●

M-502 MECHANICAL DETAILS BAE ● ●

M-600 DUCT RISER AIR FLOW DIAGRAM BAE ● ● ● ●

M-700 MECHANICAL SCHEDULES BAE ● ● ●

M-701 MECHANICAL SCHEDULES BAE ● ● ●

M-702 MECHANICAL SCHEDULES BAE ●

M-800 MECHANICAL CONTROLS BAE ● ●

M-801 MECHANICAL CONTROLS BAE ●

ELECTRICAL

E-001 ELECTRICAL SYMBOLS AND ABBREVIATIONS BAE ● ● ● ●

E-002 ELECTRICAL NOTES AND TABLES BAE ● ● ● ●

EPD-100 GROUND FLOOR ELECTRICAL POWER DEMOLITION PLAN BAE ● ● ● ●

EPD-101 FIRST FLOOR ELECTRICAL POWER DEMOLITION PLAN BAE ● ● ● ●

EPD-102 GROUND FLOOR ELECTRICAL HVAC DEMOLITION PLAN BAE ● ● ● ●

EPD-103 FIRST FLOOR ELECTRICAL HVAC DEMOLITION PLAN BAE ● ● ● ●

EPD-104 ATTIC FLOOR ELECTRICAL HVAC POWER DEMOLITION PLAN BAE ● ● ●

ELD-100 GROUND FLOOR - LIGHTING DEMOLITION PLAN BAE ● ● ●

ELD-101 FIRST FLOOR LIGHTING DEMOLITION PLAN BAE ● ● ●

ELD-102 ATTIC FLOOR LIGHTING DEMOLITION PLAN BAE ● ● ●

EFD-100 GROUND FLOOR ELECTRICAL FIRE ALARM DEMOLITION PLAN BAE ● ● ●

EFD-101 FIRST FLOOR ELECTRICAL FIRE ALARM DEMOLITION PLAN BAE ● ● ●

ED-501 EXISTING ELECTRICAL ONE-LINE DIAGRAM BAE ● ● ● ●

EP-100 GROUND FLOOR ELECTRICAL POWER PLAN BAE ● ● ● ●

EP-101 FIRST FLOOR ELECTRICAL POWER PLAN BAE ● ● ● ●

EP-102 SECOND FLOOR ELECTRICAL POWER PLAN BAE ● ● ●

EP-103 GROUND FLOOR ELECTRICAL HVAC POWER PLAN BAE ● ● ●

EP-104 FIRST FLOOR ELECTRICAL HVAC POWER PLAN BAE ● ● ●

EP-105 ATTIC FLOOR ELECTRICAL HVAC POWER PLAN BAE ● ● ●

EL-100 GROUND FLOOR LIGHTING PLAN BAE ● ● ●

EL-101 FIRST FLOOR LIGHTING PLAN BAE ● ● ●

EL-102 ATTIC FLOOR LIGHTING PLAN BAE ● ● ●

ESL-100 ELECTRICAL SITE LIGHTING PLAN BAE ● ●

EF-100 GROUND FLOOR ELECTRICAL FIRE ALARM PLAN BAE ● ● ●

EF-101 FIRST FLOOR ELECTRICAL FIRE ALARM PLAN BAE ● ● ●

EN-100 ELECTRICAL GROUND FLOOR NURSE CALL PLAN BAE ● ●

EN-101 ELECTRICAL FIRST FLOOR NURSE CALL PLAN BAE ● ●

ET-100 GROUND FLOOR COMMUNICATION AND TECHNOLOGY PLAN BAE ● ● ●

ET-101 FIRST FLOOR COMMUNICATION AND TECHNOLOGY PLAN BAE ● ● ●

E-501 ELECTRICAL ONE-LINE DIAGRAM BAE ● ● ●

E-502 MISCELLANEOUS RISER BLOCK DIAGRAM BAE ●

E-701 ELECTRICAL PANEL SCHEDULES BAE ● ● ● ●

E-702 LIGHTING FIXTURE SCHEDULE AND ELECTRICAL PANEL SCHEDULE BAE ● ● ● ●

E-703 MOTOR AND EQUIPMENT SCHEDULE BAE ●

E-801 ELECTRICAL DETAIL BAE ● ● ●

T-801 DATA DETAIL BAE ● ● ●

SHEET

NUMBER SHEET NAME

Designed By 35% 50% 95% 100%

GENERAL

G-000 COVER SHEET BAE ● ● ● ●

G-001 SHEET INDEX AND PROJECT DATA BAE ● ● ● ●

G-002 GENERAL NOTES AND STANDARD MOUNTING HEIGHTS BAE ● ●

G-003 GENERAL NOTES & DEDUCTIVE ALTERNATES SUMMARY BAE ●

G-100 GROUND FLOOR LIFE SAFETY PLAN BAE ● ● ● ●

G-101 FIRST FLOOR LIFE SAFETY PLAN BAE ● ● ● ●

G-400 INFECTION CONTROL NOTES & DETAILS BAE ● ●

G-401A GROUND FLOOR - INFECTION CONTROL PLAN - PHASE 1 BAE ● ●

G-401B GROUND FLOOR - INFECTION CONTROL PLAN - PHASE 2 BAE ● ●

G-402 FIRST FLOOR - INFECTION CONTROL PLAN BAE ● ●

G-500 GROUND FLOOR - PHASING PLAN BAE ● ●

G-501 FIRST FLOOR - PHASING PLAN BAE ● ●

HA-100 GROUND FLOOR HAZARDOUS MATERIALS PLAN 1SOURCE ● ● ●

HA-101 FIRST FLOOR HAZARDOUS MATERIALS PLAN 1SOURCE ● ● ●

CIVIL

C-101 EXISTING CONDITIONS AND DEMOLITION PLAN PTE ● ● ●

C-102 LAYOUT PLAN PTE ● ● ●

C-103 GRADING AND UTILITY PLAN PTE ● ● ●

C-501 CONSTRUCTION DETAILS PTE ● ● ●

STRUCTURAL

S-010 STRUCTURAL GENERAL NOTES JWA ●

S-100 STRUCTURAL PLANS AND DETAILS JWA ●

ARCHITECTURAL

A-001 ARCHITECTURAL ABBREVIATIONS, SYMBOLS & MATERIAL INDICATIONS BAE ● ● ●

AD-100 GROUND FLOOR DEMOLITION ARCHITECTURAL PLAN BAE ● ● ● ●

AD-101 FIRST FLOOR DEMOLITION ARCHITECTURAL PLAN BAE ● ● ● ●

AD-130 GROUND FLOOR DEMOLITION REFLECTED CEILING PLAN BAE ● ● ●

AD-130A GROUND FLOOR ABOVE CEILING DEMOLITION PLASTER PLAN BAE ● ● ●

AD-131 FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN BAE ● ● ●

AD-131A FIRST FLOOR ABOVE CEILING DEMOLITION PLASTER PLAN BAE ● ● ●

AD-301 DEMOLITION ARCHITECTURAL SECTIONS BAE ● ● ● ●

A-010 GROUND FLOOR GENERAL ARRANGEMENT PLAN BAE ● ● ● ●

A-011 FIRST FLOOR GENERAL ARRANGEMENT PLAN BAE ● ● ● ●

A-100.1 GROUND FLOOR ARCHITECTURAL PLAN A BAE ● ● ●

A-100.2 GROUND FLOOR ARCHITECTURAL PLAN B BAE ● ● ●

A-101.1 FIRST FLOOR ARCHITECTURAL PLAN A BAE ● ● ●

A-101.2 FIRST FLOOR ARCHITECTURAL PLAN B BAE ● ● ●

A-102 SECOND FLOOR ARCHITECTURAL PLAN BAE ● ● ● ●

A-103 ATTIC ARCHITECTURAL PLAN BAE ● ● ●

A-120.1 GROUND FLOOR EQUIPMENT PLAN ZONE A BAE ● ● ●

A-120.2 GROUND FLOOR EQUIPMENT PLAN ZONE B BAE ● ● ●

A-121.1 FIRST FLOOR EQUIPMENT PLAN ZONE A BAE ● ● ●

A-121.2 FIRST FLOOR EQUIPMENT PLAN ZONE B BAE ● ● ●

A-130.1 GROUND FLOOR REFLECTED CEILING PLAN ZONE A BAE ● ● ●

A-130.2 GROUND FLOOR REFLECTED CEILING PLAN ZONE B BAE ●

A-131.1 FIRST FLOOR REFLECTED CEILING PLAN ZONE A BAE ● ● ●

A-131.2 FIRST FLOOR REFLECTED CEILING PLAN ZONE B BAE ●

A-150 REFLECTED CEILING PLAN DETAILS BAE ● ●

A-201 EXTERIOR ELEVATIONS BAE ● ● ● ●

A-202 EXTERIOR ELEVATIONS BAE ●

A-301 SECTIONS BAE ● ● ● ●

A-302 SECTIONS BAE ● ●

A-303 SECTIONS BAE ●

A-320 GROUND FLOOR VESTIBULE PLANS BAE ● ●

A-321 GROUND FLOOR VESTIBULE SECTIONS BAE ●

A-322 GROUND FLOOR VESTIBULE DETAILS BAE ●

A-401 ENLARGED TOILET PLANS BAE ● ● ●

A-402 TOILET INTERIOR ELEVATIONS BAE ●

A-403 TOILET INTERIOR ELEVATIONS BAE ●

A-404 TOILET INTERIOR ELEVATIONS BAE ●

A-421 INTERIOR ELEVATIONS BAE ● ● ● ●

A-422 INTERIOR ELEVATIONS BAE ● ●

A-501 PARTITION TYPES BAE ● ● ●

A-520 MILLWORK DETAILS BAE ● ●

A-521 MILLWORK DETAILS BAE ● ●

A-601 DOOR SCHEDULE AND DETAILS BAE ● ● ●

A-621 EQUIPMENT SCHEDULE BAE ● ● ● ●

I-300.1 GROUND FLOOR - PARTIAL SIGNAGE PLAN A BAE ●

I-300.2 GROUND FLOOR - PARTIAL SIGNAGE PLAN B BAE ●

I-301.1 FIRST FLOOR - PARTIAL SIGNAGE PLAN A BAE ●

I-301.2 FIRST FLOOR - PARTIAL SIGNAGE PLAN B BAE ●

I-310 SIGN TYPES BAE ● ●

I-311 SIGN TYPES BAE ● ●

I-600 GROUND FLOOR FINISH PLAN BAE ● ●

I-601 FIRST FLOOR FINISH PLAN BAE ● ●

I-602 FINISH SCHEDULE AND LEGEND BAE ● ● ●

FIRE PROTECTION

FPD-100 GROUND FLOOR DEMOLITION FIRE PROTECTION PLAN BAE ● ● ●

FPD-101 FIRST FLOOR DEMOLITION FIRE PROTECTION PLAN BAE ● ● ●

FP-100 GROUND FLOOR FIRE PROTECTION PLAN BAE ● ● ●

FP-101 FIRST FLOOR FIRE PROTECTION PLAN BAE ● ● ●

PLUMBING

PD-100U.1 UNDERGROUND DEMOLITION PLUMBING PLAN ZONE A BAE ● ● ●

PD-100U.2 UNDERGROUND DEMOLITION PLUMBING PLAN ZONE B BAE ● ● ●

PD-100.1 GROUND FLOOR DEMOLITION DOMESTIC WATER PLUMBING PLAN ZONE A BAE ● ● ●

PD-100.2 GROUND FLOOR DEMOLITION DOMESTIC WATER PLUMBING PLAN ZONE B BAE ● ● ●

PD-100.3 GROUND FLOOR DEMOLITION SANITARY PLUMBING PLAN ZONE A BAE ● ● ●

PD-100.4 GROUND FLOOR DEMOLITION SANITARY PLUMBING PLAN ZONE B BAE ● ● ●

PD-101.1 FIRST FLOOR DEMOLITION DOMESTIC WATER PLUMBING PLAN BAE ● ● ●

PD-101.2 FIRST FLOOR DEMOLITION DOMESTIC WATER PLUMBING PLAN ZONE B BAE ● ● ●

PD-101.3 FIRST FLOOR DEMOLITION SANITARY PLUMBING PLAN ZONE A BAE ● ● ●

PD-101.4 FIRST FLOOR DEMOLITION SANITARY PLUMBING PLAN ZONE B BAE ● ● ●

P-100U.1 UNDERGROUND PLUMBING PLAN ZONE A BAE ● ● ●

PENNTERRA ENGINEERING INC.

3904 B ABEL DRIVE

COLUMBIA, PA 17512

P: (717) 522-5031 F: (717) 522-5046

1SOURCE SAFETY AND HEALTH, INC

140 SOUTH VILLAGE AVE

SUITE 130

EXTON, PA 19341

P: 610-524-5525

OWNER

COST ESTIMATOR

INTERIORS

HAZARDOUS MATERIALS

SCHEMATIC DESIGN SUBMISSION 10-14-2016

50% DESIGN DEVELOPMENT SUBMISSION 12-08-2016

95% DESIGN DEVELOPMENT SUBMISSION 01-23-2017

LC LC

LC

LC

LC

LC

LC

& TYPE A

ACCESSIBLE WATER CLOSET

TYPE A

NOTES:

1. MOUNTING DIMENSIONS SHOW ACCESSIBLE AND NON-ACCESSIBLE CONDITIONS. WHEN ONLY ONE OPTION IS SHOWN - ALL ITEMS IN PROJECT SHALL BE ACCESSIBLE. WHEN ITEMS CAN

BE ACCESSIBLE OR NON ACCESSIBLE DRAWINGS SHALL INDICATE LOCATION OF ACCESSIBLE ITEMS BY THIS SYMBOL:

2. COORDINATE ITEMS SHOWN ON THIS DRAWING WITH PLANS AND SPECIFICATIONS FOR ACTUAL ITEMS USED ON THIS PROJECT.

EVERY ITEM SHOWN ON THIS DRAWING MAY NOT BE USED ON THIS PROJECT.

TYPE B

S O

A P

D

IS

H

TO

W

E L

B A

R

H O

O K

S

S H

E

LF

S A

N

IT

A R

Y N

A P

K

IN

V E

N D

O R

H A

N D

D R

Y E

R

FA

C

IA

L

TI

S

S U

E D

IS

P

E N

S E

R

P A

P E

R

TO

W E

L D

IS

P

E N

S E

R

R E

C E

P

TA

C

LE

W A

S

TE

R E

C E

P

TA

C L E

U R

IN

A

L

E W

C O

R D

R

IN

K

IN

G

FO

U N

TA

IN

H A

N D

D R

Y E

R

TO

W

E L

B A

R

S H

E

LF

S E

A T

C O

V E

R D

IS

P

E N

S E

R

P A

P E

R

TO

W E

L D

IS

P

E N

S E

R O

R M

U

LT

I- P

U R

P O

S E

U N

IT

M O

P S

TR

IP

S

H E

LF

H A

N D

D R

Y E

R

M

IR

R O

R

O R

M

IR

R O

R

S H

E

LF

P U

S H

B U

TT

O

N

S W

IT

C

H O

R W

A

LL

O U

TL

E

T A

B O

V E

C O

U N

TE

R

H O

O K

S

M

IR

R O

R

O R

M

IR

R O

R

S H

E

LF

O R

M E

D

IC

IN

E

C A

B

IN

E T

IN

TE

R

IO

R W

A

LL

M

TD

R O

O M

S

IG

N A

G E

HALL

LANTERN

G R

A B

B A

R

U R

IN

A

L

E W

C O

R D

R

IN

K

IN

G

FO

U N

TA

IN

S P

E A

K E

R O

R F

IR

E

A

LA

R M

D E

V

IC

E

C

LO

C K

O U

TL

E

T

W A

LL

A

N D

A

LL

E M

E R

G E

N C

Y P

H O

N E

S

E

LE

C

TR

IC

, O

U

TL

E T

TE

LE

P H

O N

E O

R C

A B

LE

J

A C

K

FI

R

E A

LA

R

M P

U

LL

S

TA

TI

O

N

G R

A B

B A

R

H

IG

H /L

O W

E W

C O

R D

R

IN

K

IN

G

FO

U N

TA

IN

S

TD

W A

TE

R

C

LO

S E

T W

A

LL

M

TD

S

TD

W A

TE

R

C

LO

S E

T

FL

O O

R M

TD

G R

A B

B A

R

FL

O

O R

M

TD

W A

TE

R

C

LO

S E

T

W A

LL

M

TD

W

A

TE

R C

LO

S

E T

G R

A B

B A

R

G R

A B

B A

R

E

LE

V A

TO

R

E N

TR

A

N C

E

S A

N

IT

A R

Y N

A P

K

IN

D

IS

P O

S A

L

W A

TE

R

C

LO

S E

T (W

/ D

IV

E R

TE

R

FL

U

S H

C O

N

TR

O L)

S A

N

IT

A R

Y N

A P

K

IN

D

IS

P O

S A

L

Accessible Single-Occupancy Toilet Room Minimum Clearances

U

TI

LI

TY

S H

E

LF

W A

LL

M

O U

N

TE

D S

O A

P D

IS

P

E N

S E

R

TI

LT

M

IR

R O

R

TO

IL

E T

P A

P E

R H

O

LD

E R

TO

IL

E T

P A

P E

R H

O

LD

E R

E D

G E

O F

O U

TL

E

T O

R W

A

LL

W / O

U

TL

E T

NOTE:

IN-SWINGING DOOR CANNOT

INFRINGE ON THE MINIMUM

AREA

TO ACCOMMODATE A PERSON

IN A WHEEL CHAIR (ANSI 603.2.3)

BUT MAY SWING INTO THE

REQUIRED TURNING AREA.

MINIMUM AREA (30" x 48") TO

ACCOMMODATE A PERSON

IN A WHEEL CHAIR (ANSI

603.2.3)

TURNING

AREA

(304 ANSI)

M O

TO

R

S

TA

R

TE

R S

S A

FE

TY

S W

IT

C

H

TH

E

R M

O S

TA

T

H V

A C

C O

N

TR

O

LS

M

IN

. K N

E E

S

A

C E

M A

X .T

O

R

IF

IC

E

M

IN

IF

IC

E

MOUNTING DIMENSIONS (NOTE: THIS IS A "UNIVERSAL SHEET", ITEMS SHOWN MAY NOT ALL BE APPLICABLE TO THIS PROJECT)

IS

O

LA

TE

D G

R O

U N

D P

A N

E

LS

H A

N D

R A

IL

C U

P D

IS

P

E N

S E

R

COIN SLOT

ROBE HOOK,

CENTER ON

DOOR

INSULATE PIPES

36" GRAB BAR, PROVIDE

1/8" MIN FROM WALL TO

FACE OF ESCUTCHEON

42" LONG GRAB

BAR AT ALL

ACCESSIBLE UNITS

RECESSED

TOILET

PAPER

HOLDER

TOILET

GRAB BAR, PROVIDE

1/8" MIN FROM WALL

TO

FACE OF ESCUTCHEON

RECESSED

TOILET

PAPER

HOLDER

TOILET

PROVIDE BLOCKING FOR

FUTURE GRAB BARS IN

ALL

ADAPT. UNIT BATHROOMS.

FORWARD &

PARALLEL

APPROACH

FORWARD

APPROACH

TOILET

FRONT

OF W.C.

FRONT

OF W.C.

FLOOR

DESIGNATION

(BOTH JAMBS)

CALL

BUTTONS

TOWEL BAR,

CENTER ABOVE

TOILET, MOUNT

AT

48" A.F.F.

GRAB BAR, PROVIDE

1/8" MIN FROM WALL

TO

FACE OF ESCUTCHEON

RECESSED

TOILET

PAPER

HOLDER

PROVIDE BLOCKING FOR

FUTURE GRAB BARS IN

ALL

ADAPT. UNIT BATHROOMS.

COUNTER

FI

R

E H

O S

E

E X

TI

N

G U

IS

H

E R

O R

C O

M B

IN

A

TI

O

N C

A B

IN

E

T

E

LE

C

TR

IC

P

A N

E L

O R

C A

B

IN

E T

FI

R

E H

O S

E R

A C

K O

R V

A

LV

E

FI

R

E E

X

TI

N G

U

IS

H E

R

P O

W E

R P

A N

E L

V A

LV

E

C A

B

IN

E T

E

LE

C

TR

IC

P

A N

E L

O R

C A

B

IN

E T

A

B

BA

M

IN

IF

IC

E

M A

X

IF

IC

E

7'-1" MIN. W/ 20" W. SINK

M

IN

. C

LE

A R

42"

MIN. CLEAR

18" (4.17.1)

32"

MIN. CLEAR

" 36

" 48

1'-3"

PREFERRED

6' -8

" T O

B / O

F D

E V

IC

E

P E

R N

FP

A

6' -8

" T O

B

O F

C

LO

C K

EQ. EQ.

4' -0

M E

N

" W

O M

E N

4"

18"

MIN.

" 72

" M

IN

M A

X

24" MAX - 15" MIN

LA

V 29

M

IN 34

M A

X

" T O

18" MIN

8" MIN

36" MIN

CLEAR

" M

A X

" M

A X

6"

18"

7"-9"

12" MAX 42"

MIN

39"-41"

M

IN

" M

IN

" M

A X

60" MIN.

CLEAR

18"

" M

IN

60" MIN.

CLEAR

18"18"

" M

IN

. W

/L A

V

6"

18"

24" OR 36"

" M

IN

" M

A X

12" MAX 42"

MIN

7"-9"

18"15"

MIN

60" MIN.

CLEAR

48" MIN

" M

IN

W /L

A V

M

FG

S

TA

N D

M

FG

S

TA

N D

U .O

.N

6" 36"

18"

7"-9"

4"

" M

A X

20"

M

IN

42" 12" 39"-41"

6" 36"

18"

7"-9"

4"

" M

A X

20"

M

IN

42" 12" 39"-41"

" 33

6" 36"

18"

3' -1

"5" MAX

" M

IN

" 60

12" MAX 18" OR 42"

MIN

24" OR 36"

4' -0

B

E H

IN

D

T

LT

18"

8"

" M

IN

" M

A X

TO

P

O F

C A

B

N U

R S

E C

A

LL

C O

R R

ID

O

R L

IG

H

T

EQ EQ

5"

N U

R S

E C

A

LL

C O

R R

ID

O

R

LI

G H

T

(>8'-0"+ CEILING

LOCATION)

(<8'-0" CEILING

LOCATION)

6"

ALIGN

R E

FE

R

T O

S C

H E

D U

LE

N

U R

S E

C A

LL

P

U

LL

S

TA

TI

O

N

MAX.

32" O.C.

N U

R S

E C

A

LL

S

TA

FF

T

E R

M

IN

A L

N U

R S

E C

A

LL

D U

TY

S

TA

TI

O N

N U

R S

E C

A

LL

S

TA

FF

R

E G

IS

TR

A

TI

O N

S

TA

TI

O

N

SPECIAL SAFETY NOTICEGENERAL NOTES TO CONTRACTOR(S)

SPECIAL NOTES

THE USE OF THESE DRAWINGS BY THE VA OR ANY CONTRACTOR, SUBCONTRACTOR,

BUILDER, TRADESMAN OR WORKMAN SHALL CONSTITUTE A HOLD HARMLESS AGREEMENT

BETWEEN THE DRAWING USER, THE VA, THE ARCHITECT, AND THE ENGINEERS.

THE USER SHALL IN FACT AGREE TO HOLD THE ARCHITECT AND ENGINEERS HARMLESS

FOR ANY RESPONSIBILITY IN REGARD TO THE CONSTRUCTION MEANS, METHODS,

TECHNIQUES, SEQUENCES OR PROCEDURES & FOR ANY SAFETY PRECAUTIONS OR

PROGRAMS IN CONNECTION WITH THE WORK. FURTHER, THE ARCHITECT AND ENGINEERS

SHALL BE HELD HARMLESS FOR ANY RESPONSIBILITY IN REGARD TO ANY COSTS OR

PROBLEMS ARISING FROM THE NEGLIGENCE OF THE CONTRACTOR, SUBCONTR., BUILDER,

TRADESMAN, MATERIALS SUPPLIER, OR WORKMAN, OR FOR THEIR FAILURE TO COMPLY WITH

AND ADHERE TO THESE PLANS AND SPECIFICATIONS.

THE USE OF THESE PLANS IN OBTAINING THE BUILDING APPROVAL SHALL CONSTITUTE THE

ACCEPTANCE AND APPROVAL OF ALL REQUIREMENTS CONTAINED THEREIN.

ALL CONTRACTORS, SUBCONTRACTORS AND THEIR REPRESENTATIVES WORKING ON THIS

PROJECT SHALL AT ALL TIMES PRIOR AND DURING THE COURSE OF THEIR ACTIVITY BE

RESPONSIBLE FOR THE SAFETY OF THEIR EMPLOYEES AS WELL AS ALL OTHERS AND SHALL

BE RESPONSIBLE FOR THE CARE OF THE PROPERTY.

EACH CONTRACTOR OR SUBCONTRACTOR, AS REPRESENTATIVES OF THEIR EMPLOYEES,

SHALL ASCERTAIN THAT THE CONDITIONS UNDER WHICH THEY WILL BE REQUIRED TO

ACCOMPLISH THEIR WORK ARE SAFE AND MEET ALL REGULATIONS OF THE OCCUPATIONAL

SAFETY AND HAZARD ACT OR OTHER GOVERNING REGULATIONS, INCLUDING ALL OF THE VA'S

REQUIREMENTS AND PROTOCOLS. THE BEGINNING OF WORK BY A CONTRACTOR OR

SUBCONTRACTOR SHALL INDICATE SATISFACTION CONCERNING SAFETY AND FULL RESPONSIBILITY

IF UNSATISFIED, THE CONTRACTOR OR SUBCONTRACTOR SHALL INDICATE THE ACTIONS

AND/OR DEVICES NECESSARY TO RENDER THE JOB-SITE SAFE. IF THE WORK OF OTHER

PARTIES IS, UPON INSPECTION, FOUND AT ANY TIME TO BE UNSAFE THE CONTRACTOR OR

SUBCONTRACTOR SHALL IMMEDIATELY STOP ALL WORK AND NOTIFY THE GENERAL

CONTRACTOR, WHO IN TURN SHALL NOTIFY THE VA/COR. THE BID SUBMISSIONS

AND BEGINNING OF WORK SHALL INDICATE ACKNOWLEDGMENT AND ACCEPTANCE OF

A. ALL WORK SHALL BE COMPLETED ACCORDING TO ALL PUBLISHED APPLICABLE LOCAL STATE FEDERAL AND

NATIONAL CODES, ORDINANCES, AND REGULATIONS ALONG WITH ALL VA REQUIREMENTS.

B. EACH CONTRACTOR SHALL HAVE PUBLIC LIABILITY, PROPERTY DAMAGE, WORKMAN'S COMPENSATION, AND ALL OTHER INSURANCE AS REQUIRED BY THE CONTRACT DOCUMENTS. CONSULT VA FOR EXACT COVERAGE REQUIRED.

C. EACH CONTRACTOR SHALL COORDINATE WITH ALL OTHER CONTRACTORS AND CHECK, PRIOR TO COMMENCEMENT OF WORK, FOR SPACE REQUIREMENTS WITH ALL OTHER TRADES, AND COORDINATE THESE

D. RELOCATION OF DUCTS, PIPING, CONDUIT, ELECTRICAL BOXES WHICH MAY ALTER THE ARCHITECTURAL OR

STRUCTURAL CONSTRUCTION MUST BE APPROVED BY THE COR, PRIOR TO RELOCATION.

E. MECHANICAL CONTRACT DRAWINGS SHALL BE TAKEN IN A SENSE AS DIAGRAMMATIC. SIZE & MEANS OF RUNNING PIPING ARE SHOWN BUT IT IS NOT INTENDED TO SHOW EVERY FITTING AND OFFSET, NOR EVERY STRUCTURAL DIFFICULTY THAT CAN BE ENCOUNTERED DURING THE INSTALLATION OF THE WORK.

F. EXAMINATION OF THE DRAWINGS, SPECIFICATIONS AND SITE: BEFORE SUBMITTING A BID, THE BIDDERS SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS SO AS TO BE THOROUGHLY FAMILIAR WITH ALL THE REQUIREMENTS. THE BIDDER SHALL VISIT THE SITE OF THE WORK TO BECOME ACQUAINTED WITH ALL THE CONDITIONS AFFECTING THE CONTRACT, OBSTACLES WHICH MAY BE ENCOUNTERED AND ALL OTHER

CONDITIONS RELATIVE TO THE WORK TO BE PERFORMED: ALONG WITH ANY OBSTACLES WHICH

THE BIDDER COULD HAVE DISCOVERED OR REASONABLY ANTICIPATED PRIOR TO THE BUILDING. SHOULD ANY DISCREPANCIES, ERRORS, CONFLICT OR ITEMS NEEDING CLARIFICATION BE DISCOVERED IN THE PLANS AND/OR SPECIFICATIONS, THE CONTRACTOR SHALL NOTIFY THE VA/CO PRIOR TO SUBMITTING A BID AND BEFORE STARTING

G. CONTRACTOR'S SUPERVISION: EACH CONTRACTOR SHALL MAINTAIN A COMPETENT FOREMAN OR DIRECT REPRESENTATIVE ON THE JOB AT ALL TIMES. THE CONTRACTOR SHALL COOPERATE WITH THE SUPERINTENDENT AND FOREMEN OF OTHER TRADES IN ORDER THAT THERE MAY NOT BE A DELAY IN THE ERECTION AND

REQUIREMENTS WITH THE VA/COR FOR APPROVAL.

COMPLETION OF THE PROJECT.

FOR ACCIDENTS, INJURIES, AND/OR DAMAGES.

THESE REQUIREMENTS.

Project Number

P lo t D at e: Date

Location

ARCHITECTS + ENGINEERS: Drawing Title:

Approved: Project Director

Project Title

Checked Drawn

Drawing Number

Building Number

Date:Revisions:

VA FORM 08-6231 1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot on e qu a rte r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu a rte rs in ch o ne fo ot on e in ch o ne fo ot on e a nd o ne h a lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6"

6"

COATESVILLE, PENNSYLVANIA

Fi le

ISSUED FOR BID - NOT FOR CONSTRUCTION

F

G

/2

7/

1:

:2

A M

C :\U se rs

\d bi bb s\

D oc um en ts \5

-1

6-

4_ C oa ts vi lle

_C E

N

TR

A L_

D B ib bs

.rv t

GENERAL NOTES AND STANDARD MOUNTING

HEIGHTS

G-002

542-16-114

PK

COATESVILLE VAMC

RENOVATE BUILDING 2 WEST

10-13-2017

DTB95% DESIGN DEVELOPMENT SUBMISSION 01-23-2017

lo t D at e: Date

Location

ARCHITECTS + ENGINEERS: Drawing Title:

Approved: Project Director

Project Title

Checked Drawn

Drawing Number

Building Number

Date:Revisions:

VA FORM 08-6231 1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot on e qu a rte r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu a rte rs in ch o ne fo ot on e in ch o ne fo ot on e a nd o ne h a lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6"

6"

COATESVILLE, PENNSYLVANIA

Fi le

ISSUED FOR BID - NOT FOR CONSTRUCTION

F

G

/2

7/

1:

:2

A M

C :\U se rs

\d bi bb s\

D oc um en ts \5

-1

6-

4_ C oa ts vi lle

_C E

N

TR

A L_

D B ib bs

.rv t

GENERAL NOTES & DEDUCTIVE ALTERNATES

SUMMARY

G-003

542-16-114

PK

COATESVILLE VAMC

RENOVATE BUILDING 2 WEST

10-13-2017

DTB

OCCUPIED AREA & AFTER HOURS PROTECTION PROTOCOLS

THE BASIS OF DESIGN (BOD) PROTOCOLS APPLY TO ALL SPECIFIED

EQUIPMENT, CONSTRUCTION MATERIALS INDICATED AND ALL ASSEMBLY

DETAILS CONTAINED WITHIN THE DRAWINGS / DOCUMENTS OR AS

SPECIFICALLY REFERENCED BY SAME. SPECIAL ATTENTION NEEDS TO

BE PAID TO EQUIPMENT AND MATERIAL PERFORMANCE CHARACTERISTICS

ALONG WITH ALL DIMENSIONAL LOGISTICS FEATURES THAT AFFECT SIZE,

PLACEMENT, REQUIRED CLEARANCES, SPACING, SERVICE ACCESS,

DETAILING, CONNECTION VARIANCES, UTILITIES IMPACTS, WEIGHT,

FINISHING (IF REQUIRED), AVAILABILITY, ETC., ALL OF WHICH WOULD NEED

TO BE IDENTIFIED TO THE VA/COR AND ALL AFFECTED SUBCONTRACTORS

ALONG WITH BEING FULLY COORDINATED BY THE PRIME CONTRACTOR IF

DIFFERENT FROM THE BID / CONSTRUCTION DOCUMENTS.

BASIS OF DESIGN COMPLIANCE:

1. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY AND CERTIFY

THAT THE CHARACTERISTICS OF THE EQUIPMENT OR MATERIAL

HE/SHE WILL BE SUBMITTING FOR REVIEW MEETS OR EXCEEDS

THE CAPACITY AND DUTY REQUIREMENTS AS SPECIFIED IN ANY

OF THE “BASIS OF DESIGN” SPECIFICATIONS.

2. IF THE EQUIPMENT OR MATERIAL BEING SUBMITTED FOR REVIEW

WILL REQUIRE THAT MODIFICATIONS NEED TO BE MADE, TO THE

WORK OF THE PROVIDING CONTRACTOR, THE WORK OF OTHER

CONTRACTORS, OR THE WORK OF THE VA THE SUBMITTING

CONTRACTOR SHALL BE FULLY RESPONSIBLE TO ADVISE/INFORM

THE PRIME CONTRACTOR OF ANY AND ALL SUCH NECESSARY

IMPACTS AND POSSIBLE DELAYS AND/OR COSTS AS A PART OF

THEIR BID AND CONSTRUCTION SCOPE OF WORK

RESPONSIBILITIES.

3. THE SUBMITTING CONTRACTOR WILL BE FULLY RESPONSIBLE TO

COORDINATE ALL DEVIATIONS FROM THE “BASIS OF DESIGN”

INTENT WITH THE GENERAL CONTRACTOR AND ALL AFFECTED

SUB-CONTRACTORS. THE FINAL INSTALLATION SHALL NOT

COMPROMISE ANY OF THE “BASIS OF DESIGN” PERFORMANCE

CHARACTERISTICS NOR SHALL IT ENCUMBER ANY OF THE

DESIGN LAYOUT LOGISTICAL NECESSITIES.

4. THE FINAL INSTALLATION SHALL ALSO COMPLY WITH ALL

APPLICABLE BUILDING CODES, REGULATIONS, VA

REQUIREMENTS PLUS ALLOW THE EQUIPMENT AND/OR

MATERIALS TO FUNCTION PROPERLY AND SAFELY.

5. ALL MATERIALS OR EQUIPMENT EQUIVALENT SUBSTITUTIONS

SHALL BE PROVIDED ON A CONTRACTOR PREPARED ITEMIZED

LISTING PER SUBSTITUTION WITH A FULL AND DETAILED

DESCRIPTION OF ALL SPECIFICATIONS AND KNOWN DEVIATIONS

FROM THE ORIGINAL BOD.

6. THE PRIME/GENERAL CONTRACTOR SHALL NOTIFY AND

COORDINATE WITH THE VA/COR AT THE BEGINNING OF THE

PROJECT, ALL SUCH KNOWN DEVIATIONS AND IMPACTS FROM

THE SPECIFIC BASIS OF DESIGN SPECIFICATIONS BEFORE

STARTING THE PROJECT AND/OR THE SHOP DRAWING

SUBMITTALS.

7. IF ANY UNKNOWN DEVIATIONS FROM THE BOD REQUIREMENTS

SURFACE DURING THE CONSTRUCTION PHASE, NOTIFY THE

VA/COR IMMEDIATELY AND IDENTIFY ALL IMPACTS FOR THE

VA/COR'S EVALUATION AND POSSIBLE AUTHORIZATION.

8. IDENTIFY, VERIFY, COORDINATE AND SOLVE ALL IMPACTS TO

BUILDING STRUCTURE, SURROUNDING ELEMENTS, AND SYSTEMS

RESULTING FROM WEIGHT DIFFERENTIALS, REVISED LOADING

CHARACTERISTICS, CONNECTION/MOUNTING VARIANCES,

INSTALLATION CONFLICTS, DETAILING MODIFICATIONS, TIME

DELAYS, ETC. CAUSED BY A BOD EQUIVALENT SUBSTITUTION.

WHEN PERFORMING WORK (DEMOLITION OR NEW) IN OCCUPIED SPACES, THE FOLLOWING

PROTECTION PROTOCOLS WILL BE FOLLOWED ON A DAILY BASIS UNLESS MODIFIED IN

WRITING BY THE VA/COR ON A CASE BY CASE BASIS:

CAREFULLY MOVE/RELOCATE ANY SIGNAGE, WALL HUNG ITEMS, BLINDS, CURTAINS, ETC.

THAT ARE IN THE AREA/ZONE WHERE THE WORK IS TO BE ACCOMPLISHED AND IN DANGER

OF BEING DAMAGED BY THE PERFORMANCE OF THE WORK, INCLUDING DAMAGE THAT CAN

BE CAUSED BY FALLING OBJECTS, DUST OR MOISTURE NOTE: THIS ALSO APPLIES TO THE

DIRECT ACCESS ROUTE THRU THE OCCUPIED AREA TO AND FROM THE ACTUAL WORK

AREA/ZONE. NOTE: THE VA WILL BE RESPONSIBLE TO MOVE/RELOCATE ANY FURNITURE,

EQUIPMENT, BOXES, FILES, USER BELONGINGS, ETC. THAT WOULD BE IN THE AREA OF

WORK AND OBSTRUCT/INTERFERE WITH THE PERFORMANCE OF THE CONTRACTOR'S

WORK. COORDINATE ALL REQUIRED VA RELOCATIONS WITH VA/COR.

CAREFULLY PROVIDE FULL PROTECTIVE DUST, MOISTURE AND DAMAGE PREVENTION

BARRIERS/COVERS FOR ALL SUCH ITEMS ADDRESSED ABOVE INCLUDING THE ADDITIONAL

PROTECTION OF ALL WALL SURFACES/FINISHES, WINDOWS/GLAZING, DOORS, FRAMES,

HARDWARE, CARPETING, FLOOR COVERINGS, WALL BASE, CEILING CONSTRUCTION, TILE,

GRID, WALL ANGLES, LIGHT FIXTURES, DIFFUSERS, GRILLES, ETC.

FLOOR FINISHES SHALL BE PROTECTED THROUGHOUT THE AREA WITH A 6 MIL HEAVY DUTY

REINFORCED POLY SHEETING (VISQUEEN) TEMPORARY TARPAULIN(S)/DROP CLOTH(S) AS A

MINIMUM FOR DUST, MOISTURE AND VERY LIGHT FOOT TRAFFIC PROTECTION

ALL MAIN TRAFFIC AREAS TO AND FROM ALONG WITH INSIDE THE WORK ZONE/AREAS

SHALL HAVE ADDITIONAL PROTECTION PROVIDED OVER THE 6 MIL HEAVY DUTY

REINFORCED POLY SHEETING (VISQUEEN), IN THE FORM OF FULL SHEETS OF 3/16“

TEMPERED HARDBOARD (MASONITE) 4'X8' PANELS. ALL MASONITE PANELS SHALL BE

FIRMLY HELD TOGETHER AND SECURED IN PLACE VIA THE USE OF AN INDUSTRY APPROVED

2” HEAVY DUTY CONSTRUCTION ADHESIVE TAPE, INTENDED FOR THIS APPLICATION NOTE:

ALL BOARD TO BOARD JOINTS WILL BE FULLY TAPED THE LENGTH OF THE JOINT AND ALL

BOARD TO VISQUEEN JOINTS WILL BE TAPED AT 4' ON CENTER WITH A MINIMUM 8” LENGTH

OF TAPE. PAINTERS TAPE AND/OR MASKING TAPE ARE NOT CONSIDERED EQUIVALENTS TO

THE HD CONSTRUCTION ADHESIVE TAPE BEING SPECIFIED.

CONSTRUCT A TEMPORARY FULL HEIGHT, FULLY SEALED, CONTAINMENT ENCLOSURE

AROUND ALL CONSTRUCTION AREAS/ZONES IN ORDER TO CONTAIN AS MUCH DUST AND

DEBRIS AS POSSIBLE DURING THE PERFORMANCE OF ANY DEMOLITION, CONSTRUCTION

AND CLEAN-UP WORK

THE TEMPORARY FULL HEIGHT CONTAINMENT ENCLOSURES SHOULD BE CONSTRUCTED OF

A MINIMUM 6 MIL HEAVY DUTY REINFORCED POLY SHEETING (VISQUEEN) WITH THE USE OF

THE APPROPRIATE TELESCOPICALLY ADJUSTABLE ALUMINUM OR METAL VERTICAL SPRING

LOADED SUPPORT STUDS/POLES. FULL HEIGHT FOAM PADDED RAILS, PRESSURE FIT AT ALL

PERIMETER WALL/PARTITION CONNECTION CONDITIONS ARE TO BE UTILIZED IN ORDER TO

MINIMIZE THE USE OF TAPE SEALS ON ALL FINISHED WALL SURFACES

WHEN ALL WORK IS COMPLETED FOR THE PREARRANGED SPECIFIC LOCATION(S),

SCHEDULED TASKING AND IDENTIFIED PERIOD OF TIME THE ENTIRE AREA IS TO BE FULLY

CLEANED-UP, ALL TEMPORARY CONTAINMENT ENCLOSURES AND PROTECTION REMOVED.

NOTE: FULLY CLEANED-UP MEANS COMMERCIALLY VACUUM CLEANED WITH ALL SURFACES

BEING FULLY WIPED DOWN AND DUST FREE AS ACCEPTED PRIOR TO THE CONTRACTORS

WORK

ALL SPACES WILL BE RETURNED TO THE USER, BY THE CONTRACTOR, AS A COMMERCIALLY

CLEAN ENVIRONMENT WITH ALL OPEN CONSTRUCTION SURFACES SEALED WITH

TEMPORARY CONSTRUCTION MATERIALS INCLUDING THE USE OF 6 MIL HEAVY DUTY

REINFORCED POLY SHEETING (VISQUEEN), IN ORDER TO AVOID DUST PARTICLES FROM THE

CONSTRUCTION AREA MIGRATING INTO THE OCCUPIED USERS AREA/SPACE/ROOM(S)

UNLESS DIRECTLY SPECIFIED AND CONFIRMED BY THE VA/COR, ALL TEMPORARY

PROTECTION AND ENCLOSURES ARE TO BE SET-UP AND KNOCKED-DOWN ON A DAILY BASIS

SUCH THAT THE USERS OF THE OCCUPIED AREAS ARE NOT TO BE INCONVENIENCED AND

PREVENTED FROM FUNCTIONING WITHIN THEIR SPACE/AREA/ROOM(S) DURING THEIR

NORMAL BUSINESS HOURS OF OPERATION

BASIS OF DESIGN (BOD) PROTOCOLS

1.

2.

3.

4.

5.

6.

7.

8.

9.

100% CONSTRUCTION DOCUMENTS 09-14-2017

ISSUED FOR BID 10-13-2017

DEDUCTIVE ALTERNATES SUMMARY

ALT 1.

ALT 2.

ALT 3.

ALT 4.

DELETE LANDSCAPING AT NEW VESTIBULE.

Remove any landscaping shown on the drawings and called for in the specifications in its entirety.

DELETE NURSE CALL SYSTEM.

Remove the nurse call system as shown on the drawings and called for in the specifications in its entirety.

DELETE TRANSPORTATION OFFICE.

Remove any and all work associated with the transportation area located on the ground floor as shown on the drawings in its entirety.

DELETE FIRST FLOOR EXAM ROOMS.

Remove any and all new work associated with the construction of PACT Teamlet in the northwest wing of the First Floor as shown on the drawings; area is comprised of Patient Hallway C105, Staff Work Area 120, Quiet Room 120A, Exam Rooms 121, 123 and 124 and, Exam Toilet 123A. Contractor shall provide demolition of area as shown in the demolition drawings, and shall provide a one-hour rated finished barrier with rated door to separate the area from finished occupied spaces.

Contractor shall complete all work required to construct IT Closet 122 and render it operational for areas outside of the alternate area.

UP

1 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 25 26 27 28 2923 24 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

S

A

B

C

D

E

F

G

H J

K

L

M

N

O

P

Q

R

STORAGE

B23D

EMERGENCY

DISPENSING

B23A

SECURE

CORRIDOR

B23

ACTIVE

STORAGE

B23B

STOCK

CLERK

B23C

STAFF

COAT

LOCKERS

B25

OFFICE

B26E OFFICE

B26F

OFFICE

B26C SECRETARY

B26

OFFICE

B26A

CRASH

CART

SERVICE

STORAGE

B26B

STAIR

B29

WOMEN'S

TOILET

B28

MEN'S

TOILET

B27

ELECTRICAL

EQUIPMENT

ROOM

B24

STORAGE

B26D

TRANSFORMER

VAULT

B32

CLOSET

B31

ELECTRICAL

PANELS

B29A

ENTRY

PANELS

B33

CONFERENCE

B20

ROOM

B21

ROOM

B22

STAFF

LOUNGE

B30

STAIR

B37

MECHANICAL

ROOM

B34A

MECHANICAL

ROOM

B34B

STAIR

B34

EXAM

B16

CONSULTATION

B12

OFFICE

B40

OFFICE

B41

OFFICE

B42

VESTIBULE

B07

STORAGE

B23D

EMERGENCY

DISPENSING

B23A

SECURE

CORRIDOR

B23

ACTIVE

STORAGE

B23B

STOCK

CLERK

B23C

STAFF

COAT

LOCKERS

B25

OFFICE

B26E OFFICE

B26F

OFFICE

B26C SECRETARY

B26

OFFICE

B26A

CRASH

CART

SERVICE

STORAGE

B26B

STAIR

B29

WOMEN'S

TOILET

B28

MEN'S

TOILET

B27

ELECTRICAL

EQUIPMENT

ROOM

B24

STORAGE

B26D

TRANSFORMER

VAULT

B32

CLOSET

B31

ELECTRICAL

PANELS

B29A

ENTRY

PANELS

B33

CONFERENCE

B20

ROOM

B21

ROOM

B22

STAFF

LOUNGE

B30

STAIR

B37

MECHANICAL

ROOM

B34A

MECHANICAL

ROOM

B34B

STAIR

B34

SUPPLY

B11B

STAFF

LOUNGE

B11

STAFF

WORK

AREA

B18

EXAM

B17

EXAM

B16

EXAM

B15

CRASH

CART

B14

CONSULTATION

B13

CONSULTATION

B12

MEDS

B09

STAFF

WORK

AREA

B10

RECEPTION

B08

WAITING

B06

EXAM

B05

EXAM

B04

EXAM

B03

TOILET

B02

EDUCATION

B35

ELECTRICAL

B19

STAFF

TOILET

B11A

OFFICE

B40

OFFICE

B41

OFFICE

B42

TRANSPORTATION

OFFICE

B38

EXAM

TOILET

B17A

HAC

B14A

VESTIBULE

B01

TOILET

B36

EGRESS PATH =

129ft

PATIENT

HALLWAY

CB03

COMMON PATH OF

EGRESS = 88 FT

EGRESS PATH = 55ft

FEC

FE

C

641' - 0"

640' - 0"

UP

FEC

1 HOUR FIRE & SMOKE SEPERATION

2 HOUR FIRE & SMOKE SEPERATION

PATH OF EGRESS

1 HOUR FIRE / SMOKE SEPARATION

AREA NOT IN CONTRACT

FIRE EXTINGUISHER CABINETFEC

BUILDING 2

ORIGINAL CONSTRUCTION: 1929

CONSTRUCTION TYPE: 3

*AUTOMATIC SPRINKLER SYSTEM*

BUSINESS OCCUPANCY / GROUP B: GROSS 100 SF/ PERSON

MINIMUM CLEAR EGRESS WIDTH > 50 PERSONS: 44 INCHES

MINIMUM CLEAR EGRESS WIDTH < 50 PERSONS 36 INCHES

MAXIMUM TRAVEL DISTANCE: 300 FEET

MAXIMUM DEAD END CORRIDOR: 50 FEET

COMMON PATH OF EGRESS TRAVEL: 100 FEET

NFPA 101 LIFE SAFETY CODE 2015

INTERNATIONAL BUILDING CODE (IBC) 2015

Project Number

P lo t D at e: Date

Location

ARCHITECTS + ENGINEERS: Drawing Title:

Approved: Project Director

Project Title

Checked Drawn

Drawing Number

Building Number

Date:Revisions:

VA FORM 08-6231 1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot on e qu a rte r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu a rte rs in ch o ne fo ot on e in ch o ne fo ot on e a nd o ne h a lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6"

6"

COATESVILLE, PENNSYLVANIA

Fi le

ISSUED FOR BID - NOT FOR CONSTRUCTION

F

G

/2

7/

1:

:2

A M

C :\U se rs

\d bi bb s\

D oc um en ts \5

-1

6-

4_ C oa ts vi lle

_C E

N

TR

A L_

D B ib bs

.rv t

GROUND FLOOR LIFE SAFETY PLAN

G-100

542-16-114

PK

COATESVILLE VAMC

RENOVATE BUILDING 2 WEST

10-13-2017

DTB

NORTH

1/8" = 1'-0"1 GROUND FLOOR - LIFE SAFETY

LIFE SAFETY LEGEND

BUILDING DATA

APPLICABLE CODES

4'0 8' 16'

SCHEMATIC DESIGN SUBMISSION 10-14-2016

50% DESIGN DEVELOPMENT SUBMISSION 12-08-2016

95% DESIGN DEVELOPMENT SUBMISSION 01-23-2017

UPUP

1 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 25 26 27 28 2923 24 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

S

A

B

C

D

E

F

G

H J

K

L

M

N

O

P

Q

R

CONSULT

137 CONSULT

CONSULT

BREAK

ROOM

STAIR

EXAM

ROOM

EXAM

ROOM

160 CONSULT

STORAGE

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

SUPPORT

OFFICE

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

ELECTRICAL

CLOSET

MAIL/STORAGE

ROOM

SHOWER/

STORAGE

151A

UNISEX

BATHROOM

CUBICLE/

WAITING

ROOM

BUSINESS

MANAGER

OFFICE

ACOS

OFFICE

DIR PC

OFFICE

5'

0"

5' - 3 5/16"

4' - 9 5/8"

5' - 9 3/8"

10' - 0" 5' - 0"

3' - 3 3/4"

5'

0"

UNISEX

TOILET

135 NSA

STAIR

EXAM

ROOM

EXAM

ROOM

160 CONSULT

STAIR

STORAGE

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

SUPPORT

OFFICE

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

ELECTRICAL

CLOSET

MAIL/STORAGE

ROOM

SHOWER/

STORAGE

151A

UNISEX

BATHROOM

CUBICLE/

WAITING

ROOM

BUSINESS

MANAGER

OFFICE

ACOS

OFFICE

DIR PC

OFFICE

STAIR

VESTIBULE

CLERK

SUPERVISOR

WAITING

RECEPTION

STAFF

TOILET

EXAM

EXAM

EXAM

EXAM

EXAM

(SPINAL)

EXAM

EXAM

CONSULT

STAFF

WORK

AREA

STAFF

WORK

AREA

EXAM

TOILET

131A

SOILED

HOLDING

EXAM

EXAM

EXAM

EXAM

EXAM

TOILET

110A

STAFF

CONFERENCE/

LOUNGE

TOILET

STAFF

TOILET

EXAM

MEDS

ELEC

EXAM

EXAM

EXAM

EXAM

TOILET

123A

QUIET

ROOM

120A

STAFF

WORK

AREA

STAFF

WORK

AREA

EQUIPMENT

ALCOVE

EXAM

TOILET

104A

SUPPLY

IT

HAC

PATIENT

HALLWAY

C105

EGRESS PATH = 161ft

EGRESS PATH = 80ft

EGRESS PATH = 90ft

FECFE

C

FE

C

1 HOUR FIRE & SMOKE SEPERATION

2 HOUR FIRE & SMOKE SEPERATION

PATH OF EGRESS

1 HOUR FIRE / SMOKE SEPARATION

AREA NOT IN CONTRACT

FIRE EXTINGUISHER CABINETFEC

NFPA 101 LIFE SAFETY CODE 2015

INTERNATIONAL BUILDING CODE (IBC) 2015

BUILDING 2

ORIGINAL CONSTRUCTION: 1929

CONSTRUCTION TYPE: 3

*AUTOMATIC SPRINKLER SYSTEM*

BUSINESS OCCUPANCY / GROUP B: GROSS 100 SF/ PERSON

MINIMUM CLEAR EGRESS WIDTH > 50 PERSONS: 44 INCHES

MINIMUM CLEAR EGRESS WIDTH < 50 PERSONS 36 INCHES

MAXIMUM TRAVEL DISTANCE: 300 FEET

MAXIMUM DEAD END CORRIDOR: 50 FEET

COMMON PATH OF EGRESS TRAVEL: 100 FEET

Project Number

P lo t D at e: Date

Location

ARCHITECTS + ENGINEERS: Drawing Title:

Approved: Project Director

Project Title

Checked Drawn

Drawing Number

Building Number

Date:Revisions:

VA FORM 08-6231 1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot on e qu a rte r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu a rte rs in ch o ne fo ot on e in ch o ne fo ot on e a nd o ne h a lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6"

6"

COATESVILLE, PENNSYLVANIA

Fi le

ISSUED FOR BID - NOT FOR CONSTRUCTION

F

G

/2

7/

1:

:3

A M

C :\U se rs

\d bi bb s\

D oc um en ts \5

-1

6-

4_ C oa ts vi lle

_C E

N

TR

A L_

D B ib bs

.rv t

FIRST FLOOR LIFE SAFETY PLAN

G-101

542-16-114

PK

COATESVILLE VAMC

RENOVATE BUILDING 2 WEST

10-13-2017

DTB

NORTH

1/8" = 1'-0"1 FIRST FLOOR LIFE SAFETY

LIFE SAFETY LEGEND

BUILDING DATA

APPLICABLE LIFE SAFETY CODES

4'0 8' 16'

SCHEMATIC DESIGN SUBMISSION 10-14-2016

50% DESIGN DEVELOPMENT SUBMISSION 12-08-2016

95% DESIGN DEVELOPMENT SUBMISSION 01-23-2017

PARTITION TAG

ROOM NAME

AND NUMBER

DOOR TAG

GENERAL KEY NOTES GENERAL FLOOR PLAN LEGEND INFECTION CONTROL REQUIRED BY CLASS INFECTION CONTROL NOTES

PROJECT 542-16-114 IDENTIFIED AS MEDIUM PATIENT RISK GROUP, WITH A CLASS

IV(4) LEVEL OF IC PRECUATIONS - REFER TO SPECIFICATIONS.

HVAC CONNECTIONS TO EXISTING SYSTEM TO BE DISCONECTED DURING CONSTRUCTION.

G.C. TO SUPPLY A NEGATIVE PRESSURE MACHINE OF SUFFICIENT SIZE & QUANTITY TO

ADEQUATELY HANDLE CONSTRUCTION AREAS.

ALL AREAS OF NEGATIVE AIR WILL BE MONITORED BY A TRIATEK MONITOR PER

VA GUIDELINES.

CONTRACTOR WILL VERIFY AND TEST NEGATIVE AIR FLOW.*

CONTRACTOR TO MAINTAIN A NEGATIVE AIR PRESSURE LOG.*

CONSTRUCTION BARRIER DETAILS TO FOLLOW DETAIL 2 & 3 ON THIS SHEET.*

ALL TEMPORARY CONSTRUCTION DOORS TO BE METAL, 1 HR. FIRE RATED, W/METAL

FRAMES, CLOSERS AND SEALS.*

ALL TEMPORARY CONSTRUCTION DOORS ACCESSING CONSTRUCTION WORK ZONE FROM

EXISTING HOSPITAL TO BE EQUIPPED WITH CARD READER SECURITY PADS.*

ALL CONSTRUCTION ENTRANCES TO BE PROPERLY LABELED TO COMPLY WITH VA AND

OSHA REQUIREMENTS.*

CONTRACTOR TO PROVIDE 24" X 36" WALK OFF MATS AND CHANGE THEM AS NEEDED

AT EACH ENTRANCE POINT.*

CONTRACTOR TO PROVIDE HAND SANITIZERS AT ALL ENTRANCE POINTS.*

CONTRACTOR TO SUPPLY SPILL KIT, TO INCLUDE SHOP VAC, MULTI PURPOSE SPILL

CONTROL SORBENTS TO ABSORB NON AGGRESSIVE LIQUIDS UP TO 30 GALLONS.*

ALL NEW CONSTRUCTION MATERIALS, TOOLS AND EQUIPMENT PASSING THROUGH

HOSPITAL TO BE COVERED WITH 4 MIL. POLY SHEETS.*

THE CONTRACTOR SHALL NOT BLOCK OR HINDER THE USE OF THE BUILDINGS BY

PATIENTS, STAFF & VISITORS.*

ALL MATERIALS AND EQUIPMENT MUST BE PROPERLY STORED IN DESIGNATED AREAS.*

ALL DEBRIS AND GARBAGE THAT IS TO BE REMOVED THROUGH THE HOSPITAL MUST BE

CONTAINED IN DUMP CARTS DESIGNED FOR THAT PURPOSE AND MUST BE COVERED

WITH A FULL COVER OR LID.

FLAMMABLE MATERIALS MAY NOT BE STORED IN BUILDINGS.*

COORDINATE DEBRIS REMOVAL W/ POSTED TIMES FOR ELEVATOR AVAILABILITY. ALL

DEBRIS REMOVAL ON DESIGNATED ELEVATOR ONLY.*

CONTRACTOR TO PROVIDE WALK OFF MAT(S) 24"X36" (MIN.). SEE

PROJECT MANUAL SECTION 01 01 10 IC FOR ADDITIONAL INFORMATION.

CHANGE MATS AS NECESSARY TO KEEP FROM TRACKING CONSTRUCTION

DUST PAST THE WALK OFF MAT(S).

CONSTRUCTION BARRIER (1 HOUR WALL), SEE DETAIL 3 SHEET G-400.

SEE PROJECT MANUAL SECTION 01 01 10 IC FOR BARRIER AND

INFECTION CONTROL REQUIREMENTS.

AREA NOT

IN CONTRACT

INSTALL CONSTRUCTION DOORS WITH SELF CLOSING DEVICES.

GENERAL CONTRACTOR TO PROVIDE THE CONSTRUCTION DOORS FOR

THE PROJECT. SEE PROJECT MANUAL SECTION 01 01 10 IC FOR

BARRIER AND INFECTION CONTROL REQUIREMENTS.

G.C. TO PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY

EXCHANGE REGULATED AIR VOLUME 4 ACTIVE TIMES PER HOUR.

PROVIDE HEPA FILTER AT FINAL STAGE FOR EXHAUST.

PROVIDE TEMPORARY VISQUEEN TO COVER ANY EXPOSED FIXED OPEN

SHELVING & MISC. EQUIPMENT, CARTS, ETC.

EXISTING

PARTITION

NEW

PARTITION

EXISTING DOOR

NEW DOOR

PROVIDE TEMPORARY PROTECTION OF EXTERIOR WEATHERPROOF

WALL CONSISTING OF EXISTING CURTAIN WALL SYSTEM FRAME WITH

WITH 3/4" EXTERIOR GRADE PLYWOOD SHEATHING COVERED BY

WEATHER RESISTANT BUILDING WRAP INSERTED INTO FRAME AT

OPERABLE WINDOW SECTION. EXISTING WINDOW TO BE HELD IN THE

OPEN POSITION. REMOVE AND STORE EXISTING INNER GLAZING FOR

REINSTALLATION.

XXXX

XXXX

X

XXX

MATERIAL DELIVERY/DEBRIS REMOVAL:

ROUTE FROM CONSTRUCTION

AREA TO SERVICE ELEVATORS REMOVE OR ISOLATE HVAC SYSTEM

IN AREA WHERE WORK IS BEING

DONE TO PREVENT CONTAMINATION

OF DUCT SYSTEM.

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

COMPLETE ALL CRITICAL BARRIERS

I.E. SHEETROCK, PLYWOOD, PLASTIC,

TO SEAL AREA FROM NON WORK

AREA OR IMPLEMENT CONTROL CUBE

METHOD (CART W/PLASTIC COVERING

AND SEALED CONNECTION TO WORK

SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS. BARRIERS

OR BE ERECTED AFTER 6:00PM M-F

OR ANYTIME ON WEEKENDS.

1.

2.

MAINTAIN NEGATIVE AIR PRESSURE

WITHIN WORK SITE UTILIZING HEPA

EQUIPPED AIR FILTRATION UNITS.

3.

CONTAIN CONSTRUCTION WASTE

BEFORE TRANSPORT IN TIGHTLY

COVERED CONTAINERS.

7.

COVER TRANSPORT RECEPTACLES

OR CARTS. TAPE COVERING UNLESS

SOLID LID.

8.

USE OPERABLE WINDOW WHEN ACCESSIBLE FOR HEPA AIR EXHAUST. OBTAIN VA C.O.R.

APPROVAL FOR EXHAUSTING IN EXISTING DUCTWORK. SEE PLAN FOR PROPOSED

LOCATION OF HEPA EXHAUST.

2.

3.

4.

5.

DO NOT REMOVE BARRIERS FROM WORK

AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY THE C.O.R., VA'S

SAFETY DEPARTMENT, AND INFECTION

CONTROL DEPARTMENT, AND

THOROUGHLY CLEANED BY THE VA'S

ENVIRONMENTAL SERVICES DEPARTMENT.

REMOVE BARRIER MATERIALS CAREFULLY

TO MINIMIZE SPREADING OF DIRT AND

DEBRIS ASSOCIATED WITH CONSTRUCTION.

BARRIERS TO BE REMOVED AFTER 6:00PM

M-F OR ANYTIME ON WEEKENDS.

VACUUM WORK AREA WITH HEPA

FILTERED VACUUMS.

WET MOP AREA WITH DISINFECTANT

6. REMOVE ISOLATION OF HVAC SYSTEM

IN AREAS WHERE WORK IS BEING

PERFORMED.

SEAL HOLES, PIPES, CONDUITS,

AND PUNCTURES APPROPRIATELY.

4.

CONSTRUCT ANTEROOM AND

REQUIRE ALL PERONNEL TO PASS

THROUGH THIS ROOM SO THEY CAN

BE VACUUMED USING A HEPA

VACUUM CLEANER BEFORE

LEAVING WORK SITE, OR THEY CAN

WEAR CLOTH OR PAPER OVERALLS

THAT ARE REMOVED EACH TIME

THEY LEAVE THE WORK SITE.

5.

ALL PERSONNEL ENTERING WORK

SITE ARE REQUIRED TO WEAR

SHOE COVERS. SHOE COVERS

MUST BE CHANGED EACH TIME THE

WORKER EXISTS THE WORK AREA.

6.

1. DO NOT REMOVE BARRIERS FROM WORK

AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY THE VA SAFETY

DEPARTMENT AND INFECTION CONTROL

DEPARTMENT, AND THOROUGHLY

CLEANED BY THE VA ENVIRONMENTAL

SERVICES DEPARTMENT.

G-401

T/FLOOR

ELEV.= +0'-0"

B/CEILING

ELEV.= EXIST.

TRILOGY BRAND LEVER

LOCKSET W/ REMOVABLE

CORE - STOREROOM

FUNCTION W/ KEYPAD

DOOR CLOSER

ZONE

DIGITAL PRESSURE

DIFFERENTIAL

MONITOR (TRIATEK OR

APPROVED EQUAL)

HAND SANITIZER

42" x 84" H.M. DOOR IN H.M.

FRAME, 1 HR. RATED W/

SEALS (PAINTED YELLOW)

EXTEND DEMISING

PARTITION TO BOTTOM

OF STRUCTURE ABOVE

TYPICAL FOR (1) OUTER ENTRANCE

SIMILAR FOR (1) INNER ENTRANCE (NO SIGN, SANITZER, LOCK, OR MONITOR)

CAUTION

CONSTRUCTION

CONT. FIRESAFING

SEALANT TOP &

BOTTOM BOTH SIDES

3 5/8" MTL. RUNNER

CHANNELS TOP &

BOTTOM

3 5/8" MTL. STUDS

@ 16" O.C.

FULL DEPTH SOUND

BLANKET

1 HR. CONSTRUCTION-

UL 465

CORRIDOR SIDE

5/8" GYP. BD. TYPE

'X' EA. SIDE

EXIST'G FLOOR

TAPE VISQUINE TO

FLOOR W/ PAINTERS

TAPE

PROJECT SIDE

6 MM. (MIN.) FIRE

RETARDANT

VISQUINE

TAPE VISQUINE TO

UNDERSIDE OF

STRUCTURE W/

DUCT TAPE

UNDERSIDE OF

STRUCTURE ABOVE

INFECTION CONTROL RISK ASSESSMENT

Project Number

P lo t D at e: Date

Location

ARCHITECTS + ENGINEERS: Drawing Title:

Approved: Project Director

Project Title

Checked Drawn

Drawing Number

Building Number

Date:Revisions:

VA FORM 08-6231 1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot on e qu a rte r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu a rte rs in ch o ne fo ot on e in ch o ne fo ot on e a nd o ne h a lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6"

6"

COATESVILLE, PENNSYLVANIA

Fi le

ISSUED FOR BID - NOT FOR CONSTRUCTION

F

G

/2

7/

1:

:3

A M

C :\U se rs

\d bi bb s\

D oc um en ts \5

-1

6-

4_ C oa ts vi lle

_C E

N

TR

A L_

D B ib bs

.rv t

INFECTION CONTROL NOTES & DETAILS

G-400

542-16-114

PK

COATESVILLE VAMC

RENOVATE BUILDING 2 WEST

10-13-2017

DTB

3/8" = 1'-0"2 ELEVATION - TEMPORARY PROTECTION ENTRY

1 1/2" = 1'-0"3 DETAIL - CONSTRUCTION BARRIER

95% DESIGN DEVELOPMENT SUBMISSION 01-23-2017

AREA NOT IN CONTRACT

LEGEND

MATERIAL DELIVERY/DEBRIS REMOVAL:

ROUTE FROM CONSTRUCTION

AREA TO SERVICE ELEVATORS

EGRESS PATH:

ROUTE FROM CONSTRUCTION

AREA TO EXIT DISCHARGE

INFECTION CONTROL PLAN KEY NOTES

1. INSTALL 42" CONSTRUCTION DOORS WITH SELF CLOSING

DEVICES WITH RATED STOREROOM FUNCTION DOOR

HARDWARE. GENERAL CONTRACTOR TO PROVIDE THE

CONSTRUCTION DOORS FOR THE PROJECT. SEE PROJECT

MANUAL SECTION 01 35 26, CH. 1.12 FOR BARRIER AND

INFECTION CONTROL PROCEDURES.

2. REMOVE EXISTING DOOR AND FRAME - PROVIDE NEW 42"

RATED ROOR.

3. CONSTRUCTION BARRIER (1HR), SEE DETAIL #3/G-400.

4. CONTRACTOR TO PROVIDE TACKY WALK-OFF MAT,

24" X 36" MINIMUM. CHANGE MATS AS NECESSARY.

5. GENERAL CONTRACTOR TO PROVIDE PORTABLE NEGATIVE

AIR MACHINES WITH HEPA FILTERS EXHAUSTING TO

EXTERIOR TO COMPLETELY EXCHANGE REGULATED AIR

VOLUME 4 ACTIVE TIMES PER HOUR.

6. TEMPORARY CLOSURE OF MAIN ENTRY.

INFECTION CONTROL PLAN GENERAL NOTES

1. PHASE 1 INFECTION CONTROL / DEMOLITION REQUIRED

TO BUILD 1 HR. CORRIDOR (CB05) WALL TO ALLOW FOR

BUILDING CIRCULATION TO BUILDING 3; DURING PHASE 2 &

PHASE 3 OF CONSTRUCTION.

1 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 25 26 27 28 2923 24 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

S

A

B

C

D

E

F

G

H J

K

L

M

N

O

P

Q

R

VESTIBULE

TYP.

5 1

EXAM

ROOM

B06A

EXAM

ROOM

B06B

MED

ROOM

B06C

EXAM

ROOM

B06D

TRIAGE

ROOM

B05

EXAM

ROOM

B03 OFFICE

B01

PA

OFFICE

B06J

WAITING

ROOM

B06K

OFFICE

B06L

OFFICE

B10A

ELIGIBILITY

OFFICE

B10B

ELIGIBILITY

OFFICE

B10C

BENEFITS

OFFICE

B10D

WAITING

ROOM

B10

STAIR

B-1 STORAGE

B11A

STORAGE

B11

ELECTRICAL

B11C

MECHANICAL

ROOM

B14C

MECHANICAL

ROOM

B14B

WAITING

ROOM

B06

UTILITY

ROOM

B02

TRANSFORMER

VAULT

B17

CLOSET

B18A

STAFF

LOUNGE

B18

STORAGE

B14

ENTRY

PANELS

B16

STORAGE

B24

SECURE

CORRIDOR

B23

ACTIVE

STORAGE

B25

STOCK

CLERK

B26

CONFERENCE

B34

ROOM

B33

ROOM

B32STAFF

LOUNGE

B35

OFFICE

B19E OFFICE

B19F

OFFICE

B19C SECRETARY

B19

O…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.