This document contains a federal solicitation and related opportunity for an advanced utility metering system project. The solicitation seeks proposals to install a centralized utility metering system at the James J. Peters VA Medical Center in Bronx, New York to monitor energy and utilities including electric, natural gas, steam, water and chilled water. The project has a cost estimate range of $5 to $10 million and must be completed within 547 calendar days. The solicitation will be posted on SAM.gov on November 16, 2020 with responses due on the specified date in the solicitation. The opportunity is set aside for Service-Disabled Veteran Owned Small Businesses. The selected contractor will be required to provide labor, materials, software and supervision to deliver a fully functional advanced metering solution compatible with the facility's existing energy management systems and software.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24221R0010 0005.docx | DOCX document | |
| 36C24221R0010 0004.docx | DOCX document | |
| 36C24221R0010 0003.docx | DOCX document | |
| 36C24221R0010 0002_1.docx | DOCX document | |
| 36C24221R0010 0001.docx | DOCX document | |
| 2nd SITE VISIT SIGN IN SHEET.10.21-2PM.pdf | ||
| 1st-SITE VISIT SIGN IN SHEET_3.10.21-9AM.pdf | ||
| 36C24221R0010.docx | DOCX document | |
| 526-14-111 ADVANCED METERING SYSTEMDWG SET - Copy.pdf | ||
| 526-14-111 Spec 9-1-15 - Copy.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 04-27-2021 526-14-111 36C242 Department of Veterans Affairs Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx
NY
10468-3904 36C242 Department of Veterans Affairs James J. Peters VA Medical Center Network Contracting Office 2 130 West Kingsbridge Road Bronx
NY
10468-3904 To all Offerors/Bidders
36C24221R0010 02-26-2021
X X x x Amendment No. 6 to Solicitation 36C24221R0010 - Advanced Metering, Phase II at the James J. Peters VAMC This amendment is issued to address all RFI's following previous issuance of amendments.
See attached for RFI responses.
This amendment confirms that NO further RFI's will be accepted. Contractors shall bid accordingly.
The Solicitation due date remains April 30, 2021 at 2PM. Submit proposals directly to michael.giaquinto2@va.gov.
The submission of electronic proposal package in PDF is acceptable.
See Continuation page attached.
Michael Giaquinto Contracting Officer Continuation of Amendment No.6 to 36C24221R0010
1) Request clarification of the amendment #4, specifically with regard to the paragraph about BACnet communications. It is our understanding that the basis of design of the metering system utilizes Modbus-RTU and Modbus/TCP protocol. A fully functional Advanced Utility Metering System as described by the drawings does not require BACnet protocol. Is the VA now requiring BACNet communications capability for planned compatibility of real time data readings from the meters with existing/new BMS system integration?” Yes, VA is requiring BACnet now not only for future BMS integration but because that is the new VA standard protocol for all control devices. Contractor is still expected to supply the front end (web client software for virtual server) for this metering system so it can function independently (view real-time data, run reports, send alerts) without our BMS.
2. Also if BACnet communications is what VA wants then please advise if there will be changes in the electrical scope of the work and accordingly issue the revised electrical drawings. .
BACnet IP devices are normally Power over Ethernet (POE) and should not require additional power, but contractor to confirm meters are available in BACnet IP using POE. If supplement power is required for certain meters, contractor is responsible for supply it, while the VA (through the A/E) will locate a source for the contractor.
3. We have, for two of the meter types we are offering, two ways to address the BACNET IP requirement of the Amendment #4. All devices must work with BACnet IP and virtual servers.
4. If any systems are obsolete or no longer offered then Contractors should provide equivalent system based on performance characteristics equal to design is required in that case. All devices must work with BACnet IP and virtual servers
5. I would wish to know whether the VA would consider the use of a self-tested BACNET IP metering product? Contractor can submit during submittal process following award and it will be reviewed by engineering to determine acceptability.
6. Please clarify if each network switch is required for each meter? One switch has multiple ports. VA IT is supplying the switches.