About this file

This combined synopsis and solicitation requests quotes for fire suppression system and associated equipment maintenance, repair, and testing services at two Department of Veterans Affairs locations. The solicitation seeks monthly firm fixed price quotes for base and option years for servicing systems at the Brooklyn and St. Albans campuses, which include fire pumps, sprinklers, kitchen systems, and devices. Quotes are due by March 2, 2021 and the award is set aside for service-disabled veteran-owned small businesses. The solicitation will result in a fixed-price contract including standard clauses for commercial services.

View the file

Other files

File Type Posted
BK-SA_Fire Suppression System SOW (002).docx DOCX document
Site Visit Attendance.pdf PDF
36C24221Q0496 0002.docx DOCX document
36C24221Q0496 0001.docx DOCX document
36C24221Q0496.docx DOCX document
Bronx-NY-BK WD 12-21-2020.docx DOCX document
P09 PWS Fire Pump- Sprinkler -Suppression Systems Maintenance - Inspection - Testing and Repair.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answer Fire Suppression System and Associated Equipment - Maintenance, Repair and Testing

RFQ/Solicitation No: 36C24221Q0496

1. Q: Can you provide us with riser diagrams and device counts/descriptions for each location?

A: BROOKLYN CAMPUS

1-Fire Pump.

1-Jockey (Booster) Pump.

5-Pre-Action (dry) Sprinkler Systems.

All Waterflow devices (Several Buildings Approximately 200) and Tamper Switches (Approximately 200).

5- Kitchen Fire Suppression Systems

ST. ALBANS COMMUNITY LIVING CENTER

1- Fire Pump.

1- Jockey (Booster) Pump.

3- Pre-Action (dry) Sprinkler Systems.

All Waterflow devices (Several Buildings Approximately 150) and Tamper Switches (Approximately 150).

5 - Kitchen Fire Suppression Systems.

2. Minimum Staffing – The Contractor will maintain minimum staffing requirements on a 24/7/365 basis to respond to emergencies. The Contractor is encouraged to perform maintenance that affects the normal operations of the healthcare facility during “off hours” to the fullest extent possible to reduce patient care interruption.

Contractor’s Capabilities:

a. Contractor will have resources (employees, supervisors, material and equipment) dedicated specifically to the performance of this contract. A P.O.C. will be at each site Five

(5) days a week for Eight (8) hours a day.

Q: The two statements above are contained in the RFP documents. Is it expected that the awarded contractor have personnel on each site for 5 days a week for 8 hours a day or on site as the inspections, repairs or services are as needed or due?

A: The PWS has been revised. Refer to new PWS attached.

3. Parts and Materials - The Contractor shall obtain all parts, materials, and supplies for individual scheduled and unscheduled maintenance actions for the systems under Service Contract, which shall be included in the Contractor’s firm fixed price. All costs under Scheduled and Unscheduled Service shall be borne by the Contractor.

For individuals unscheduled maintenance actions, the work will be performed in accordance with a Government-approved technical instruction, and the Contractor shall obtain all parts, materials, supplies and labor for individual unscheduled maintenance actions and repairs which cost less than or equal to $2500. Labor is not calculated into the $2,500 threshold if performed by on-site contractor personnel during normal duty hours. Labor obtained via sub- contract can be included in the cost determination, however the CMM must demonstrate to the COR that the repair is beyond the capabilities of on-site maintenance mechanics to execute in- house.

Q: Per the above statement in the RFP, is this reflective of items used for the inspection or is it expected that we are to carry the cost of repair parts, materials and supplies in our firm fixed price? Statement 1.5.2 states we are responsible for items of less than $2500, so would any item above $2500 be the responsibility of the government?

4. The Contractor shall provide complete maintenance service, safety inspections, and tests on system(s) for the period required under the contract. Work shall be performed by only trained, and certified technicians on facility’s fire alarm specific systems, such as:

a. Notifier Fire Alarm System at Brooklyn and New York VA Medical Centers.

b. Edwards Fire Alarm System at St. Albans CLC.

Q: The RFP currently excludes fire alarm systems in the scope of work, but yet 1.3.2 states we shall provide trained and certified technicians for fire alarm specific systems. When is it required of the vendor to provide these technicians if fire alarm is excluded from scope of work?