36C24221B0010 0002.docx

DOCX document 28 KB Posted

Attached to
Y1DA--Relocate & Upgrade ANGIO Suite Federal contract opportunity
Solicitation number
36C24221B0010
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document contains an amendment to a federal solicitation and responses to bidder questions. The solicitation is for relocating and upgrading an angiography suite at the VA New Jersey Healthcare System campus in East Orange, New Jersey.

The amendment extends the bid due date to February 2, 2021 at 1:00 PM EST, provides responses to bidder questions, and instructs that bids must be submitted electronically due to COVID-19 precautions. The estimated value of the project is between $2-5 million. The scope of work includes construction services, asbestos abatement, HVAC, plumbing and electrical work to renovate areas on the first floor for the new angiography suite. The completion period is 365 calendar days. The opportunity is set aside for Service-Disabled Veteran Owned Small Businesses.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--Relocate & Upgrade ANGIO Suite, newest first.
File Type Posted
36C24221B0010 0004.docx DOCX document
36C24221B0010 0003.docx DOCX document
Physicist Recommendations.pdf PDF
RFI-3_A-6 RED CLINIC A-LEVEL.pdf PDF
Interior Signage Standard.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
RFI-3_ST9 1ST FLOOR FRAMING (WINGS).pdf PDF
RFI-13_A34 LONGITUDINAL SECTION X-X.pdf PDF
Rev.1 _ Scope Clarification.pdf PDF
Door Hardware Specs.pdf PDF
36C24221B0010 0001.docx DOCX document
ISSUE FOR BID Spec.pdf PDF
Arch-Abate Drawing.pdf PDF
FP Drawing.pdf PDF
PLUMB Drawing.pdf PDF
ELEC Drawing.pdf PDF
MECH Drawing.pdf PDF
Struct Drawing.pdf PDF
36C24221B0010_1.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 01-21-2021 561-21-1-5821-0002

561-CSI-181

36C242 Department of Veterans Affairs Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx

NY

10468-3904 36C242 Department of Veterans Affairs James J. Peters VA Medical Center Network Contracting Office 2 130 West Kingsbridge Road Bronx

NY

10468-3904 To all Offerors/Bidders

36C24221B0010 01-21-2021

X X X

Tuesday, February 2, 2021.

632-3600162-2314-854200-3223 23NRNR000

X AMENDMENT 0002 to solicitation 36C24221B0010, Relocate and Upgrade the ANGIO Suite at VA NJ Healthcare System, East Orange Campus, New Jersey.

The purpose of this amendment is as follows:

(1) Extend the date specified for the receipt of bids. The new date and time for the receipt of bids is Tuesday, February 2, 2021 at 1:00 PM EST.

(2) Respond to inquiries received by the Administrative Contracting Officer. Refer to Request for Information (RFI) section below.

(3) Change Bid Opening Method. Refer to Virtual Bid Opening Instruction below for details.

Christina M. Katz Contracting Officer, NCO2

CONTINUATION PAGE

Responses to Request for Information (RFI) for Solicitation 36C24221B0010

1. Referencing Drawing 1-AS601- “Equipment Schedule”. The “Supplied By” / “Installed By” columns reference an “A” , “V” and “C”. We can find no reference defining who these entities are. Please advise.

RESPONSE:“A” represents Vendor (GE Supplied).
“V” represents Veterans Affairs
“C” represents Contractor

2. Referencing Drawing 1-AS301- Partition Types – Types 1 & 2.

These partitions call for a lead lined 5/8” gyp bd, and the note states the lead thickness and height are TBD. Further, the specifications for Gyp Board (09 29 00) states the lead lined wallboard can be found in specification 13 49 00 Radiation Protection, however we could not locate this spec section. Please advise.

The thickness and height need to be provided prior to bid. There are a lot of variables that determine the characteristics of the type of lead shielding that needs to be installed, types of radiation, duration, and distances from radiation. To provide pricing more information is required.

RESPONSE: Refer to Physicist Recommendations attachment for details.

3. Regarding the structural support for the floor (ceiling of 1st floor below the work area). There are no plans or information showing the existing condition of the area below the work area. Please advise. Is it an occupied space? How will coordination work with occupants if area is occupied? What are the existing ceiling materials, typically there is an acoustical ceiling below a wire lath and plaster upper ceiling before you can access the deck, is this the case here? Is there MEP (duct work, conduit, lights, etc.) in the way that needs to be removed and replaced to install the structural members? If yes, please elaborate on MEP that needs to be disconnected and replaced to perform the work. For all contractors to provide fair pricing, a scope of this work needs to be outlined, it will be difficult to assume the scope of this work.

RESPONSE: Contractor is to coordinate phasing of 1st Floor work with VA. Refer also to 1-AS201 and 1-SS100. Spaces impacted on the 1st Floor are offices/exam room (refer to attached existing drawings for additional information, A-6 and 32-01-ST9, C-Wing).

4. Division 05 – Metals appears to be omitted from the specifications. Since there is structural metal involved in this project, a specification is required. Please advise.

RESPONSE: Refer to drawing 1-AS201 for notes and specs.

5. Referencing Drawing 1-AS301- Door Schedule- “Hardware Sets” The hardware sets referenced in the schedule ex “HW-3E” etc. cannot be located in the specifications. Please advise.

RESPONSE:

Hardware Set HW-3E is as noted:

Each Door to Have: NON-RATED Stainless Steel Hinges QUANTITY & TYPE AS REQUIRED 1 Office Lock F04 1 Kick Plate J102 1 Wall-mounted Door Stop L52101 1 Set Self-Adhesive Seals R0Y154 1 Coat Hook L03121

OMIT COAT HOOK WHERE GLASS LITE PREVENTS INSTALLATION.

Hardware Set HW-4L is as noted:

Each Door to Have: NON-RATED Stainless Steel Hinges QUANTITY & TYPE AS REQUIRED 1 Classroom Lock F05 1 Kick Plate J102 1 Edge Guard (@ Wood Doors) J208M / J211 (VERIFY), CUT: HARDWARE 1 Wall-mounted Door Stop L52101 1 Threshold J32300 x 57 MM WIDTH (2-1/4 INCHES) 1 Auto Door Bottom R0Y346 – HEAVY DUTY 1 Set Sound/Light Seals R0Y264/R0Y255

Hardware Set HW-4V is as noted:

Each Lead-Lined Door to Have: NON-RATED Stainless Steel Hinges QUANTITY & TYPE AS REQUIRED – ASSUME

454KG (1000 LBS) WEIGHT CAPACITY

1 Utility Hospital Lock F09 x LEAD-LINED x PADDLES POINTING DOWN 1 Closer CO2011/CO2021 x METAL

LEAD-LINED COVER

1 Armor Plate J101 x 1.275 MM (0.050 INCH) THICKNESS 2 Edge Guard (@ Wood Doors) J208M / J211 (VERIFY), CUT: HARDWARE 1 Overhead Holder-Stop C01541-ADJUSTABLE 1 Set Self-Adhesive Seal R0Y154 Hardware Set HW-10D is as noted:

Each Pair to Have: NON-RATED Hinges QUANTITY & TYPE AS REQUIRED 1 Set Auto Flush Bolts TYPE 25 LESS BOTTOM BOLT 1 Classroom Lock F05 1 Overlapping Astragal with R0Y634 x R0Y154 x THRU-BOLTS Self-Adhesive Seal 1 Overhead Hold-Open/Stop C01511 / C01541-ADJUSTABLE 2 Kick Plates J102 1 Set Self-Adhesive Seals R0Y154

Hardware Set HW-10E is as noted:

Each Lead Lined Pair to Have: NON-RATED Stainless Steel Hinges QUANTITY & TYPE AS REQUIRED – ASSUME

454KG (1000 LBS) WEIGHT CAPACITY

1 Set Auto Flush Bolts TYPE 25 LESS BOTTOM BOLT x LEAD-LINED 1 Classroom Lock F05 x LEAD-LINED x PADDLES POINTING DOWN 1 Overlapping Astragal with R0Y634 x R0Y154 x THRU-BOLTS X LEAD-LINED Self-Adhesive Seal 1 Overhead Hold-Open/Stop C01511 / C01541-ADJUSTABLE 2 Armor Plates J101 x 1.275 MM (0.050 INCH) THICKNESS 4 Edge Guard (@ Wood Doors) J208M / J211 (VERIFY), CUT: HARDWARE 1 Set Self-Adhesive Seals R0Y154

6. The General Requirements states: “” B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges.

Please advise if the contractor will be responsible to install and monitor an electrical or water meter for the duration of the work.

RESPONSE: No monitor is required.

7. The General Requirements State: “A limit of 28 weeks is allowed for completion of the Angio Suite of rooms (including the adjacent Control Room, Mechanical Equipment Closet, the IR Prep Room, and limited scope in the existing Scrub Room.”

This room involves the specialty equipment which is supplied “A” “V” and “C” (not yet defined- see previous RFI) on the equipment schedule, the timing and production of these entities may be out of the contractors control, please advise if considerations will be made for the timeliness of completion effected by either equipment supplied/installed by others, or other delays caused by the VA, such as: delays in vacating the work area (Angio Suite & area below to install structural support), etc.

RESPONSE: The Contractor is allowed 28 weeks to complete work associated with preparing the room for delivery of GE’s equipment. The Contractor is provided with GE Healthcare documents for the INNOVA IGS 5 equipment and should coordinate their work with the VA and GE for a seamless installation of the equipment. VA has stated that equipment is ready for delivery and installation, only GC needs to schedule accordingly to work with vendor no down time.

8. Drawing AD100 includes the demo of surfaces in “Utility Closet 1-227F” in the scope, however subsequent drawings exclude it from the scope of work. Please advise if this area is included or excluded from scope. If included, please advise on finishes. + RESPONSE: There is no scheduled/keyed demolition in the Utility Closet 1-227F.

9. Referencing AD100- Demolition Notes- We can only find one reference to Note 9 (masonry wall to be demo’d) in Corridor 1-225. Please confirm this is the only masonry wall to be demolished.

RESPONSE: As many of the existing corridor walls are masonry – for the purposes of this contract, Contractor is to assume all corridor walls to be masonry. Also, walls around 1-243 Mechanical, 1-242C Mech/Elec, 1-242 CAT Scan.

10. Referencing AD100- Temp Construction Barrier Note 3- Please advise what is “Graphics” the partition is to be decorated with, who is responsible for supplying/installing.

RESPONSE: Graphics to be vinyl wall covering supplied and installed by GC. GC is to Spackle and paint walls and door white on Temp Construction Barrier.

11. Referencing AD100- Hall 1-234 to toilets 235 and 236. This area is outside the scope of work, but within the construction area. Please advise protection measures for this area. Can the contractor utilize these restrooms during construction (if properly maintained and protected)?

RESPONSE: The only work to be performed by the Contractor in this area is framing out and finishing around the panel boxes across from the entries to the two toilets. Bathrooms are for patients visiting the Hospital, but the Contractor will be allowed to use the toilet if needed.

12. Referencing AD100- Demolition Note 12- There appears to be 10 windows within the work area while only 9 are marked with note 12 (remove existing windowsill for replacement). However, drawing AS100 only references 5 windows with “Note 2” (provide new extended windowsill). Please advise if contractor is to remove and replace all 10 windows within work area.

RESPONSE: All 10 windows should be marked with keyed demo Note 12, and all 10 windows should receive new solid surface window sills.

13. Please advise slab to slab height in work area and floor below work area. What is above existing ceilings in work area? Is there a wire lath plaster ceiling above ACT ceilings in work area?

RESPONSE: Floor to floor dimension below (A Level) and at the 1st Floor is 13’-4” (see attached existing building section).

14. Regarding fire protection smoke/fire barrier- is the contractor responsible for firestopping / closing existing openings in existing partitions prior to the start of work. If yes, please provide quantities or extent of this scope of work.

RESPONSE: To conform to ICRA requirements in containing the work areas, existing walls that are to be utilized as part of the containment barrier should extend to structure above. GC to extend wall framing up as required, apply 5/8” Type X GWB to both sides of new framing and seal to create the continuous barrier.

15. On drawing 1-AS201 details 1,2,3 there is a Class A Wainscot indicated. The corridor wainscot is not referenced on the finish schedule as to the product required. It is not mentioned in specification either. Please provide the name of the desired product to be used in corridors 231 and 241.

RESPONSE: Wainscot used in these corridors is Nevamar Tawny Satinwood WZ0003T

16. Please confirm if Fire Extinguishers are to be provided with the Fire Extinguisher Cabinets. If so, please provide a specification.

RESPONSE: The VA construction specifications do not provide new fire extinguishers. Construction projects typically only provide the fire extinguisher cabinet, signage and its installation. The VA (safety office/VA Fire department) in-turn installs the facility fire extinguisher prior to staff/patients occupying the new space.

Please note: VA is not referring to the fire extinguishers needed during construction. The contractor is to provide their own extinguishers needed to protect the construction site while construction is on-going.

Section 104413, Fire Extinguisher Cabinets was issued with the Bid Documents. The Basis of Design manufacturer and model number is also included in 090600 under paragraph 2.10, Division 10 – Specialties.

17. Please confirm if the curtains are to be provided with the ceiling mounted cubicle track. If so, please provide specification.

RESPONSE: VA will provide curtains but GC to provide curtain tracks.

18. Please advise if there is any interior signage required for this project RESPONSE: Signage to be supplied and installed by GC. See Interior Signage Standard attachment for spec and vendor information.

19. During the site visit, it was mentioned that the work in corridor 1-241 had just been completed. Can you please confirm the scope in the corridor?

RESPONSE: Refer to Revision 1 documents issued to bidders by the VA.

20. Please confirm the ICRA Certification requirements for contractors on site.

RESPONSE: IRCA partition is to be build as per drawing, the COTR and safety certifies it

21. Is it acceptable for the abatement work to take place during normal work hours?

RESPONSE: During the week after 6pm to 6am, Sat & Sunday during normal working hours.

22. When containment is set up for the corridor tile and mastic, what is the route for folks to access the areas cut off due to the containment? Is egress sufficient in the event of an emergency?

RESPONSE: Refer to Revision 1 documents issued to bidders by the VA.

23. What is the construction of the existing walls that are being removed in the location of the waiting room?

RESPONSE: CMU adjacent to the Corridor. Metal framed within the waiting room.

24. Please advise what the lead requirements are for WT-1&2. The drawings still say TBD.

RESPONSE: Refer to attachment Physicist Recommendations

25. Is a construction office trailer required for this project, or will the site superintendent be given a spot inside the building?

RESPONSE: No office trailer requires, or Superintendent space given, Superintendent could use the existing construction site as his or her office.

26. What documentation is required to be submitted with the bid?

RESPONSE: Please review the entire solicitation for required documents.

27. Specification section 02 82 13.19 1.5.12.E calls for a 24-hour security system at the entrance to the regulated area. Is this required for the containment?

RESPONSE: NO

28. Please confirm if the contractor is to supply their own Industrial Hygienist for abatement tasks.

RESPONSE: Yes

29. Specification section 01 45 00 3.4.C, CQC Personnel: Can the specialized personnel be subcontractor foremen, or do they need to be employed by the GC?

RESPONSE: Employed by GC

30. Are electronic submission of bids acceptable?

RESPONSE: In accordance with FAR 14.202-8, the government is authorizing electronic bids on this solicitation due to the COVID-19 pandemic. Refer to Virtual Bid Opening section for instructions.

31. On similar projects renovating similar spaces, the work included the removal of the monitor boom, ceiling mounted lead shield, monitor, tracks, and leaded windows, etc. Is any of this included in the scope of the demolition?

RESPONSE: Contractor is to remove all finishes and residual equipment and embeds and prepare for all new finishes.

32. The project involves the installation of medical gas lines which are to be run outside the work area, in the ceiling of the floor below, in multiple locations. There is no drawings indicating the existing conditions, or layout of these areas. Please advise.

· This work will require the removal of ceiling tiles to install the new lines, down the corridor and in other areas, some runs being up to 80 LF in length, please advise if the ceiling tiles need to be replaced at the end of each shift?

· Please confirm if there is sufficient space in the ceiling to allow for the installation and brazing of the new lines.

· Will the work in the floor below be after hours?

· Since brazing is involved, at other VA locations fire watch protocol is that work must end two hours prior to the end of shift to allow for a 2 hr fire watch observation period, please advise if this project will utilize the same protocol.

RESPONSE: All VA health and safety protocols are to be followed throughout duration of construction. The Contractor is to prepare shop drawings showing the path of all medical gas lines within the scope of the project for A/E review and approval during the shop drawing process.

33. Drawing 1-AA100 shows Scrubs room 1-227E out of scope and the smoke barrier on the wall in between Room 1-000 and scrubs room 1-227E, however subsequent drawings indicate the smoke barrier is to be on wall in between 1-227E and Control room 1-226A. Please advise, if two separate smoke barriers will be needed or if the smoke barrier will be on scrubs East wall between scrubs and control.

RESPONSE: There is no smoke barrier in the Scrubs Room 1-227E.

34. The floor finishes on drawing 1-AS203 seem to disagree with the finish schedule, for example the drawing shows reception is hatched as SVT-1 however the finish schedule shows T-1/T-2.

· Please confirm if the mention of SVT is meant to be LVT.

· The floor finish drawing only depicts the reception area and the upper (northern) corridor adjacent to the reception room, does the pattern and same material carry down to the rest of the corridor? (there are no floor finish drawings showing the area south of the reception room).

· Office 124C has a hatching of SVT-1, however, finish schedule shows WL-1, Please advise.

· Waiting room shows T-2 on drawing, however, WL-1 on the finish schedule. Please Advise.

RESPONSE: Contractor is to comply with the Finish Schedule on 1-AS301.

35. Spec section 09 06 00 – 9 there are a few finish schedules that are blank, and the plans do not indicate which materials are called for; Wainscot Cap, Hospital cubicle curtains and IV support, wall and corner guards, and interior signage. Please advise.

RESPONSE: Not all materials are required for this project (see response to Question 17). Colors/finishes not provided in 09 06 00 will require submission of full range of available colors or submission of material samples as per each individual specification section.

36. Can you clarify the “installed by” and “supplied by” symbols on drawing 1-AS601? I assume “V” means VA, “C” means contractor, but what does “A” mean?

RESPONSE: See response to Question 1.

37. It appeared at site visit that some of the asbestos floor tile shown on plans to be abated has already been performed on an earlier project. Please confirm quantities.

RESPONSE: Refer to Revision 1 documents issued to bidders by the VA.

38. Can you please post the pre-bid site visit sign in sheet?

RESPONSE: Yes, see Site Visit Sign-in Sheet attachment.

39. Will there be an in person bid opening or a virtual due to the pandemic?

RESPONSE: In accordance with FAR 14.202-8, the government is authorizing electronic bids on this solicitation due to the COVID-19 pandemic. Refer to Virtual Bid Opening section for instructions.

40. The top of page 1 of the Door Hardware specification states – Acute Mental Health Unit 12B Renovation and the hardware set #’s within the specification do not coincide with the set #’s listed at the respective door openings on the schedule. Please provide correct spec for this project.

RESPONSE: Attached is the missing Spec Section for Door Hardware.

Virtual Bid Opening Instruction Project Number 561-CSI-181 is to Relocate and Upgrade the ANGIO Suite In accordance with FAR 14.202-8, the government is authorizing electronic bids on this solicitation due to the COVID-19 pandemic. ALL bids shall be emailed to Delfo Saco-mizhquiri, Administrative Contracting Officer, at Delfo.Saco-mizhquiri@va.gov prior to the bid opening time. EMAIL SUBJECT LINE: Solicitation 36C24221B0010 – COMPANY NAME. The bids shall include copies of a bid bond. The bid opening shall take place on Tuesday, February 2, 2021 at 1:00 PM EST. No hand-carried or mailed bids will be accepted.

“Original copies of bids to include original bid bonds with wet signatures as well as other non-pricing related information shall be mailed to Delfo Saco-mizhquiri, Saint Albans VA Medical Center, Network Contracting Office Room D-202, 179-00 Linden Blvd, Jamaica, NY 11425, as soon as practicably possible but no later than 2 weeks from bid opening. Failure to provide hard copies may result in rejection of bid.

The bid opening will take place on Microsoft Teams. To access the conference:

Dial In: +1 872-701-0185 Phone Conference ID: 727044711#

ATTACHMENTS INCLUDED TO THIS AMENDMENT

See attached document: Door Hardware Specs.

See attached document: Physicist Recommendations.

See attached document: Interior Signage Standard.

See attached document: Rev.1 _ Scope Clarification.

See attached document: RFI-13_A34 LONGITUDINAL SECTION X-X.

See attached document: RFI-3_A-6 RED CLINIC A-LEVEL.

See attached document: RFI-3_ST9 1ST FLOOR FRAMING (WINGS).

See attached document: Site Visit Sign-in Sheet.