36C24220Q0367-002.docx
DOCX document Posted
- Attached to
- Z1DA--528-20-116 ROOF REPLACEMENT BUILDING 2
- Solicitation number
- 36C24220Q0367
About this file
36C24220Q0367 528-20-116 - Building 2 Roof SOW rev1 - 29_01_2020.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24220Q0367-001.docx | DOCX document | |
| 36C24220Q0367-003.pdf | ||
| 36C24220Q0367-006.docx | DOCX document | |
| 36C24220Q0367-004.zip | ZIP file | |
| 36C24220Q0367-005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construction Scope of Work Roof Replacement BLDG 2 Project 528-20-116
1 General Information
1.1 Location
Work performed under this scope will be for and conducted within VA Western New York Healthcare System (VAWNYHS) at the Buffalo VA Medical Center (VAMC) located at 3495 Bailey Avenue Buffalo, NY 14215 under VA Project Number 528-20-116.
1.2 Background
The Buffalo VAMC was originally constructed in 1947 and is comprised of 25 buildings and structures totaling 1.1 million square feet. Several roof leaks have been reported in the recent weeks in Building 2. Emergency leak repairs have been completed on the roof, but further investigation of the roof has identified significant failure points. To completely solve the issues associated with this roof, approximately 1,330 square feet of roofing must be completely removed and replaced (1,050 square feet on the second floor or main roof and an additional 280 square feet on the first-floor overhang, or secondary roof). Asbestos testing has been completed for both roofs, and approximately 2 square feet of non-friable ACM was identified on the second-floor roof around the chimney.
1.3 Purpose
The purpose of this project is to perform a Class II asbestos abatement of roughly 2 ft2 of non- friable flashing sealant and caulk on the chimney, along with a roof replacement in-kind of approximately 1,330 ft2 of the ethylene propylene diene monomer (EPDM) rubber roof system on Building 2 at the Buffalo VAMC campus. The VAWNYHS requires a Contractor to perform construction work to accomplish this goal.
1.4 Scope
Complete a Class II asbestos abatement of approximately 2 ft2 of non-friable ACM on the upper roof chimney.
Fully remove and replace approximately 1,330 ft2 of EPDM rubber roofing and recovery board on Building 2 to make an integrated and fully weather tight roofing system. There are two separate roofs of the building that make up the total square footage. The second floor or main building roof is approximately 1,050 ft2 and the first-floor overhang roof (referred to as secondary roof) is approximately 280 ft2 .
528-20-116 Roof Replacement BLDG of 6 1/29/2020 Abatement Portion:
· Complete Class II roof abatement of 1 ft2 of non-friable black flashing sealant around the chimney.
· Complete Class II roof abatement of 1 ft2 of non-friable grey caulk around the chimney grate.
· Abatement to be completed following OSHA regulations and VA construction specification 02 82 13.21.
Re-Roofing Portion:
· Remove and replace 3 individual flashing boots (approximately 4-inch diameter each) for various plumbing vents.
· Remove and replace of 2 individual flashing boots (approximately 2-inch diameter each) for various vents.
· Remove and replace 3 roof drains covers and flanges.
· Remove any other non-integral material on the roof to allow unimpeded access to the base layers.
· Remove and replace, in accordance with manufacturer instructions, approximately 1,330 ft2 of EPDM rubber membrane.
· Remove and replace approximately 1330 ft2 of recovery board material (Spec 07 01
50.19 – Preparation for re-roofing).
· Repair and/or replace approximately 260 linear feet of flashing connecting the EPDM roofing material to the concrete wall. See ‘AE104 – BLDG 2 – EXPLODED PLAN VIEWS’ drawing for more details.
· Replace approximately 20 linear feet of flashing around chimney. Material and finish to match existing.
· Repair/replace approximately 20 linear feet of termination bar that secures the chimney flashing to the chimney
1.4.1 Hazardous Materials
An asbestos survey has been completed on the Buffalo VAMC building 2 roof materials and positively identified 3 different areas totaling approximately 3 ft2 of ACM. Only two of the areas with positively identified ACM will be included in the scope of this project, and both are located on the chimney of the upper roof. These two areas total approximately two square feet of non- friable ACM. Based on OSHA regulations, the abatement of the 2 ft2 of ACM will be completed under Class II abatement conditions for a roof.
1.4.2 Personal Protective Equipment (PPE)
The Contractor is responsible for obtaining/providing, inspecting, and maintaining any required Personal Protective Equipment (PPE) and access equipment (lifts, scaffolding, etc...) necessary to perform services identified in this SOW.
1.5 Site Information
1.5.1 Safety
All Contractor personnel working onsite at the Medical Center will be required to provide proof of OSHA 10-hour training.
1.5.2 Access
Although the VAWNYHS campuses are public facilities, access to facility maintenance areas, electrical areas, mechanical areas, roof access, and certain other portions of the medical facility are restricted from the general public. Accessing these areas may require advance notice, pre- approval, and scheduling to gain entry.
All visits and access requests to the VAWNYHS under this scope of work shall be coordinated through the Contracting Officer Representative (COR) or the Technical POC.
2 Applicable Documents The following documents are applicable to this Scope of Work (SOW) to the extent specified herein. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in this SOW, whether or not they are listed here.
2.1 Government Documents
The following directives, guides, handbooks, and drawings form a part of this document to the extent specified herein. Unless otherwise specified, the latest revisions available shall be used.
Copies of construction related Department of Veterans Affairs directives, guides, and handbooks are available from the Office of Construction and Facilities Management website:
http://www.cfm.va.gov/til/index.asp
2.2 Veterans Health Administration Western New York Documents The following drawings and documents form a part of this document to the extent specified herein.
Documents identified as “AS MODIFIED BY VHA WNY” are base VA documents that have been tailored to the needs of the Veterans Health Administration Western New York (VHA WNY) or this specific effort. While the base VA documents are available on the Office of Construction and Facilities Management website listed above, the Contractor shall use the modified version listed below, NOT the base document. Copies of these documents are available from the CO, COR, or Technical POC.
VA WESTERN NEW YORK HEALTHCARE SYSTEM, BUFFALO VA MEDICAL CENTER
CONSTRUCTION SPECIFICATIONS (AS MODIFIED BY VHA WNY)
01 00 00 01 32 16.15 01 33 23
GENERAL REQUIREMENTS
PROJECT SCHEDULES (SMALL PROJECTS)
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
| 01 35 26 |
| SAFETY REQUIREMENTS |
| 01 74 19 |
| CONSTRUCTION WASTE MANAGEMENT |
| 02 41 00 |
| DEMOLITION |
| 02 82 13.21 |
| ASBESTOS ROOFING ABATEMENT |
| 06 10 00 |
| ROUGH CARPENTRY |
| 07 01 50.19 |
| PREPARATION FOR RE-ROOFING |
| 07 53 23 |
| EPDM ROOFING |
| 07 60 00 |
| FLASHING AND SHEET METAL |
| 22 14 00 |
| FACILITY STORM DRAINAGE |
2.3 Non-Government Publications
All work shall be accomplished in strict accordance with the latest codes and standards. The Contractor shall follow any/all applicable standards and codes, including, but not limited to applicable NFPA standards, NEC, JCAHO, OSHA, ANSI, ASHRAE, and any other codes.
2.4 Order of Precedence
In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.
3 Requirements The Contractor shall provide personnel, material, services, and facilities to perform, accomplish, and deliver the required services detailed in this scope of work.
3.1 Status Updates
The Contractor shall provide the following status reports:
· Abatement updates, as required by construction specification 02 82 13.21
· A status report shall be issued immediately from the contractor to the COR if any deficiencies are identified that would affect re-roofing that are not covered in the base contract for replacement. No report on deficiencies if none are encountered.
· A completion/status report at the end of the project verifying completion of all required contract items Additional submittals are still required as outlined in section 3.2 of this document.
3.2 Submittals
In accordance with the terms of PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS; SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES, the contractor shall provide submittals and shop drawings for review prior to starting work.
4 Delivery
4.1 Technical POC
The Contractor shall coordinate all visits and meetings with and provide the required quantity of submittals to
Andrew Tarasek
VA Western New York Healthcare System
Buffalo VA Medical Center
3495 Bailey Avenue
Buffalo, NY 14215
| Phone: |
| (716) 834-9200 ext. 5508 |
| Fax: |
| (716) 862-8618 |
| Email: |
| andrew.tarasek@va.gov |
4.2 Schedule
The Period of Performance for the total effort shall not extend past April 15, 2020, with the construction portion including both abatement and re-roofing taking no more than 14 days.
5 Government Furnished Information, Materials, & Equipment The government shall supply the following information:
· All Buffalo VAMC drawings and modified program guides and specifications from section 2.2.
Government Furnished Materials (GFM) and Government Furnished Equipment (GFE) are not required and will not be provided for this effort.