36C24219B0007-0007001.pdf
PDF 114 KB Posted
- Attached to
- INSTALL EXTERIOR SECURITY CAMERAS Federal contract opportunity
- Solicitation number
- 36C24219B0007
About this file
36C24219B0007 0007 S02 - 17 Security Cameras ICRA.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24219B0007-0007000.docx | DOCX document | |
| 36C24219B0007-0006000.docx | DOCX document | |
| 36C24219B0007-0006001.pdf | ||
| 36C24219B0007-0005000.docx | DOCX document | |
| 36C24219B0007-0004028.docx | DOCX document | |
| 36C24219B0007-0004030.pdf | ||
| 36C24219B0007-0004033.pdf | ||
| 36C24219B0007-0004031.pdf | ||
| 36C24219B0007-0004032.pdf | ||
| 36C24219B0007-0004029.pdf | ||
| 36C24219B0007-0004034.pdf | ||
| 36C24219B0007-0003000.docx | DOCX document | |
| 36C24219B0007-0003001.pdf | ||
| 36C24219B0007-0002001.pdf | ||
| 36C24219B0007-0002000.docx | DOCX document | |
| 36C24219B0007-0001001.pdf | ||
| 36C24219B0007-0001000.docx | DOCX document | |
| 36C24219B0007-003.pdf | ||
| 36C24219B0007-000.docx | DOCX document | |
| 36C24219B0007-001.pdf | ||
| 36C24219B0007-002.pdf | ||
| 36C24219B0007-004.pdf | ||
| 36C24219B0007.docx | DOCX document |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BATH/CANANDAIGUA VA MEDICAL CENTER APPENDIX A
PRE- CONSTRUCTION RISK ASSESSMENT
Project: ______________________________Date: ______________________
Step 1
TYPE A
Inspection and Non-Invasive Activities.
Includes, but is not limited to:
removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet painting (but not sanding) wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
TYPE B
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
installation of telephone and computer cabling access to chase spaces cutting of walls or ceiling where dust migration can be controlled.
TYPE C
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
sanding of walls for painting or wall covering removal of floorcoverings, ceiling tiles and casework new wall construction minor duct work or electrical work above ceilings major cabling activities any activity that cannot be completed within a single work shift.
TYPE D
Major demolition and construction projects
Includes, but is not limited to:
activities which require consecutive work shifts requires heavy demolition or removal of a complete cabling system new construction.
Step 2
Patient Risk Groups Low Risk Medium Risk High Risk Highest Risk
Office areas
Auditorium Meeting rooms Elevators Warehouse Laundry Chapel
Cardiology Echocardiography Physical Therapy Radiology Respiratory
Therapy
Laboratories (specimen)
Ambulatory care ( MVAC/ Specialty)
Pharmacy Domiciliary BVAC clinic
Any area caring for immunocompromised patients
Sterile processing department
Community living center units
If more than one risk group will be affected, select the higher risk group
Step 3
Safety Matrix - Class of Precautions: Construction Project by Patient Risk & Project Type
Patient Risk Group TYPE A TYPE B TYPE C TYPE D
LOW Risk Group I II II III/IV
MEDIUM Risk Group I II III IV
HIGH Risk Group I II III/IV IV
HIGHEST Risk Group II III/IV III/IV IV
Description of Infection Prevention Precautions by Class –Select applicable actions: CLASS __
During Construction Project Upon Completion of Project
C L
A S
S I
Execute work by methods to minimize raising dust from construction operations.
Immediately replace a ceiling tile displaced for visual inspection
Coordinate work with on-site staff to prevent noise or vibration issues
C L
A S
S
II
Provide active means to prevent airborne dust from dispersing into atmosphere.
Water mist work surfaces to control dust while cutting.
Seal unused doors with duct tape.
Block off and seal air vents.
Place dust mat at entrance and exit of work area Remove or isolate HVAC system in areas where work is being performed.
Coordinate work with on-site staff to prevent noise or vibration issues
Wipe work surfaces with disinfectant.
Contain construction waste before transport in tightly covered containers.
Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
Remove isolation of HVAC system in areas where work is being performed.
C L
A S
S
II
I
Remove or Isolate HVAC system in area where work is being done to prevent contamination of duct system.
Complete all critical barriers i.e.
sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
Contain construction waste before transport in tightly covered containers.
Cover transport receptacles or carts.
Tape covering unless solid lid.
Establish times that demo work would be most appropriate for the area, and adjacent areas if applicable, with Care/Service Line in which the work is being performed
Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department and thoroughly cleaned by the owner’s Environmental Services Department.
Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
Vacuum work area with HEPA filtered vacuums.
Wet mop area with disinfectant.
Remove isolation of HVAC system in areas where work is being performed.
Clean work area upon completion of task(s).
VHACANBERGMR
Highlight
C
L A
S S
IV
Remove or Isolate HVAC system in area where work is being done to prevent contamination of duct system.
Complete all critical barriers i.e.
sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
Seal holes, pipes, conduits, and punctures appropriately.
Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.
All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Prevention Department and thoroughly cleaned by the owner’s Environmental Services Department.
Establish times that demo work would be most appropriate for the area, and adjacent areas if applicable, with Care/Service Line in which the work is being performed
Supervisor prepared to meet with IC, Safety, and/or on-site staff to review problems with dust, noise, or vibration.
Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
Contain construction waste before transport in tightly covered containers.
Cover transport receptacles or carts. Tape covering unless solid lid
Vacuum work area with HEPA filtered vacuums.
Wet mop area with disinfectant.
Remove isolation of HVAC system in areas where work is being performed.
Step 4: Identify the areas surrounding the project area, assessing potential impact.
Unit Below Unit Above Lateral Lateral Behind Front
Risk Group Risk Group Risk Group Risk Group Risk Group Risk Group
Step 5: Identify specific site of activity e.g. patient rooms, medication rooms, clinics, etc.
Step 6: Identify any issues related to: ventilation, plumbing, electrical in terms of the occurrence of probable outages.
Step 7: Identify Containment measures, using prior assessment. What types of barriers (e.g. solid wall barriers); will HEPA filtration be required?
Step 8: Consider potential risk of water damage. Is there a risk due to compromising structural integrity? (E.g. wall, ceiling roof)
Step 9: Work hours: Can or will the work be done during off shifts- evenings, nights, weekends?
A Tuberculosis Risk Assessment is completed for Bath/Canandaigua VAMC annually. Our current risk assessment identifies Bath/Canandaigua VAMC as a _____ risk facility.
TB screening for contractors working on this project is not indicated
TB screening for contractor working on this project is indicated
We have reviewed this project and specified Contractor/facility actions to reduce safety and health issues associated with the project to patients, visitors, and personnel.
Infection Prevention Coordinator: _______________________________ Date:_________
| Project: 528A-15-504, Exterior Security Cameras |
| Unit Below: B1,3,5,6,10,11,16,20,33,34,36,37 |
| Unit Above: B1,3,5,6,10,11,16,20,33,34,36,37 |
| Lateral: B1,3,5,6,10,11,16,20,33,34,36,37 |
| Behind: B1,3,5,6,10,11,16,20,33,34,36,37 |
| Front: B1,3,5,6,10,11,16,20,33,34,36,37 |
| Step 5: Overhead cabling in corridoors, perimeter camera mounting, IT Closets and Server Rooms |
| Step 6: None |
| Step 7: Barriers and HEPA air filtration as directed by Infection Prevention Coordinator and Safety Officer, prior to completion of contract documents. |
| Step 8: None |
| Date: Sept. 25, 2018 |
| Check Box4: Off |
| Check Box5: Yes |
| Text6: II |
| Step 9: Off tour work may be required per COR discretion |
| TB: Low |
| Check Box1: Off |
| Check Box2: Yes |
| Check Box3: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Yes |
| Check Box10: Off |
| Text1: |
| Lateral 2: B1,3,5,6,10,11,16,20,33,34,36,37 |