Replace_Porches,_Roof,_Woodwork_RFI_-_2.pdf

PDF 54 KB Posted

Attached to
Replace Porches, Roofs, Woodwork Bldgs. 10&11
Solicitation number
36C24219B0005
Issued by

About this file

36C24219B0005 0003 Replace Porches, Roof, Woodwork RFI - 2.pdf

View the file

Other files

File Type Posted
36C24219C0075-000.docx DOCX document
36C24219B0005-0004001.pdf PDF
36C24219B0005-0004000.docx DOCX document
36C24219B0005_0003.docx DOCX document
Bid_Sheet_-_Replace_Porches.pdf PDF
36C24219B0005_0002.docx DOCX document
VA_Porch___Roof_Design_E101_-_1-15-19.pdf PDF
VA_Porch___Roof_Design_A103_-_1-15-19.pdf PDF
Bid_RFI's_(With_Watson_Eng_comments).pdf PDF
561A4_13_110__VA_Porch__Roof_Design__STAMPED.pdf PDF
36C24219B0005_0001.docx DOCX document
36C24219B0005.docx DOCX document
VA_Porch___Roof_Design_9-24-18.pdf PDF
561A4-13-110_-_Specification_Package_(7_August_2018).pdf PDF
36C24219B0005-000.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. RFI and response no. 5a ‐‐ states "The independent IH noted only ACM as shown on dwgs G100 and HA 01" ‐‐ on these two dwgs it does not mention that main roof's fascia, flashing, trim or soffit has lead paint. RFI and response no.5e ‐‐ states " Abate lead paint... from main roof's fascia, flashing, trim or soffit.

The above responses conflict. Please clarify if main roof's ( bldgs. 10 and 11 ) fascia/flashing, trim and soffit contains lead paint and if this lead paint has to be abated.

The main roof's (building's 10 and 11) fascia/flashing, trim and soffit contain lead paint and this lead paint must be abated in accordance with the requirements of the lead paint specification.

Only the loose and peeling paint is to be removed so that the substrate can be primed and repainted.