This solicitation is for boiler plant stack pad repairs at the Togus, Maine VA Medical Center. The solicitation number is 36C24124B0034 and is set aside as a Service-Disabled Veteran-Owned Small Business opportunity. The statement of work and instructions to bidders provide further details on the required repairs to the boiler plant stack pad. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 is the contracting agency. Bidders should review all attached documents for full information on product and service requirements, response dates and other pertinent details.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work 402-21-724 Boiler Plant Stack Pad Repair Work to be completed for the VA Maine Healthcare System Campus located at 1 VA Center, Augusta, ME 04330. Contractor to provide complete construction services to repair the existing boiler plant stack pad as defined by the construction drawings and specifications.

This project addresses the cracked and spalling concrete that is supporting the 125ft boiler plant stack. Construction services will include, but are not limited to:

-Removal and replacement of damaged concrete

-Temporary Bracing for exhaust silencer as defined by the project drawings

-Removal of ductwork from boiler plant building and infilling existing building opening

- Services from a 3rd party testing agency for concrete and structural steel testing

-Project phasing to allow uninterrupted service for all operations of the Togus Boiler Plant .

This project will improve the structural integrity of the existing boiler plant stack pad and will prevent further deterioration of the concrete and reinforcing steel.

All construction work shall be certified contractors licensed in the State of Maine. The construction firm must follow all required building codes, standards, and guidelines. This is to include but is not limited to, VA Master Specifications, VA Barrier free design guide, VA Physical Security & Resiliency Design Manual (October 1, 2020), and the VA Sustainability Design book, as well as and applicable trade design manuals. After the A/E design is completed it is expected to be construction ready, and include all necessary details, drawings, specifications, construction scope, and cost estimate. The period of performance for this work to be completed is 120 days from the issuance of the Notice to Proceed by the contracting officer.

Period of performance is 120 calendar days.