RFI Responses 14 - 19.pdf
PDF 166 KB Posted
- Attached to
- C1JZ--Central Region AE IDIQ Federal contract opportunity
- Solicitation number
- 36C10F21R0041
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI Response 34.pdf | ||
| 36C10F21R0041_10.docx | DOCX document | |
| RFI Responses 30 - 33.pdf | ||
| 36C10F21R0041_9.docx | DOCX document | |
| RFI Responses 24 - 29.pdf | ||
| 36C10F21R0041_8.docx | DOCX document | |
| RFI Responses 20 - 23.pdf | ||
| 36C10F21R0041_7.docx | DOCX document | |
| 36C10F21R0041_6.docx | DOCX document | |
| RFI Responses 6 - 13.pdf | ||
| 36C10F21R0041_5.docx | DOCX document | |
| RFI Responses 4 -5.pdf | ||
| ATTACHMENT 1 -Minimum In House Primary Key Personnel and Consultant Qualifications 02.pdf | ||
| 36C10F21R0041_4.docx | DOCX document | |
| 36C10F21R0041_3.docx | DOCX document | |
| 36C10F21R0041_2.docx | DOCX document | |
| 36C10F21R0041_1.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The purpose of this modification is to provide RFI responses 14 – 19.
36C10F21R0041 RFI RESPONSE SHEET
RFI NUMBER RFI RESPONSE
This solicitation is posted under the 541330 NAICS and set aside for SDVOSB firms which by small business definition cannot be awarded projects above $20 million in construction value but the request is looking for us to feature projects over $20 million. It would be a challenge for any small business to show this work as Prime. We were wondering if projects under $20 million in construction value will be given a lower rating or will still be evaluated equally to the larger projects?
The question is confusing task order value (value of services to be provided) with project size. The small business size standard for a NAICS code refers to a businesses’ average annual receipts, not the overall size of projects that firm has experience with. For a simple illustrative example, consider that the Brooks Act limitation is 6% for design fees. Thus, conceivably, if a firm only performed design services in a given year and their total revenues don’t exceed that 6% limit for all the work they performed, they could conceivably have experience with projects totaling $275M (or more) in value in any given year and not have exceeded the size standard because their revenues would not have exceeded the $16.5M limit.
Could you please clarify the project requirements? In factor 2 Specialized Experience it mentions 5 relevant projects but then in the Past Performance section it mentioned a minimum of 5 and no more than 10 projects. How many project sheets are you looking for in section F and how many additional projects are you looking for us to feature in the Section H narrative Past Performance section. Could you also please also clarify how many projects you would like CPARS or PPQs for?
Provide 5 examples in section
F as described for Factor 2. As described for Factor 3, in Part 1
Section H, provide past performance information for a minimum of 5, but no more than
10 projects which must be accompanied by a completed and customer signed PPQ or a
CPARS report.
In regards to Attachment 2, Past Performance Questionnaire, under B Agency Information the original stated, “Work to be performed:
design/build projects such as new construction, renovation, alteration and repair, with multiple disciplines.” Even though “design/build” is not a standard presentation of “Design‐Build,” I had a concern that it would be mistaken for that. So, I changed it to “Work to be performed:
design/build projects, new construction, renovation, alteration and repair, with multiple disciplines.”
This change is acceptable. All firms be advised that the Section
B to the Past Performance questionnaire has been changed to read, “Work to be performed:
design/build projects, new construction, renovation, alteration and repair, with multiple disciplines.”
In regards to Attachment 2, Past Performance Questionnaire, the grid with the rating factors was not in the same order that the rating factors are presented in the survey section. (This is something I learned in a previous position.) I merely moved items around in that table so that they matched.
This is acceptable.
What are the maximum number of projects we are permitted to include in Section F of the SF330 for the OCFM Central A/E lDlQ Services —36C10F21R0041?
I saw this in the RFQ and wasn’t sure if it meant we are limited to five (5) projects in Section F.
Factor 2 Specialized Experience and technical competence: Using the A/E IDIQ Tasks included in this presolicitation notice, provide a description of five relevant, recent projects, with clients, for which the team members provided a significant technical contribution. Work on these projects must have been in the last five years (2016– 2021). Indicate how each project is relevant to the A/E IDIQ
See RFI Response #15.
Tasks described. Specialized experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates is included as evaluation criterion.
This upcoming solicitation appears to be similar but aimed at Major Projects ($20M and up) versus the Minor Projects one we are currently on. Are there going to be two different IDIQs for Minor and Major projects? It seems very unlikely that many SDVOSB firms will have more than one Major project, if any, as a prime contractor.
This IDIQ is for the CFM
Central Region which manages construction projects over $20 million. There will not be two different IDIQs issued from this office. Firm should show experience for the AE IDIQ tasks that are outlined in the announcement.
File details come from the government source that posted it. Updated .