36C10F19R0010-0004063.pdf

PDF 13 MB Posted

Attached to
Presolicitation Notice - Great Lakes Construction Updated 5/15/2019 Federal contract opportunity
Solicitation number
36C10F19R0010
Issued by
Department of Veterans Affairs Office of Construction and Facilities Management

About this file

36C10F19R0010 0004 GLNC Phase II Development - 923PC2006 - BID - Plans - Part 63 Pages 146-150.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Presolicitation Notice - Great Lakes Construction Updated 5/15/2019, newest first.
File Type Posted
36C10F19R0010-0005007.pdf PDF
36C10F19R0010-0004023.pdf PDF
36C10F19R0010-0004031.pdf PDF
36C10F19R0010-0004077.pdf PDF
36C10F19R0010-0004018.pdf PDF
36C10F19R0010-0004070.pdf PDF
36C10F19R0010-0004036.pdf PDF
36C10F19R0010-0004064.pdf PDF
36C10F19R0010-0004067.pdf PDF
36C10F19R0010-0004078.pdf PDF
36C10F19R0010-0004066.pdf PDF
36C10F19R0010-0004069.pdf PDF
36C10F19R0010-0004003.pdf PDF
36C10F19R0010-0004009.pdf PDF
36C10F19R0010-0004024.pdf PDF
36C10F19R0010-0004022.pdf PDF
36C10F19R0010-0004051.pdf PDF
36C10F19R0010-0004071.pdf PDF
36C10F19R0010-0004001.pdf PDF
36C10F19R0010-0004004.pdf PDF
36C10F19R0010-0004013.pdf PDF
36C10F19R0010-0004054.pdf PDF
36C10F19R0010-0004062.pdf PDF
36C10F19R0010-0004006.pdf PDF
36C10F19R0010-0004087.pdf PDF
36C10F19R0010-0004034.pdf PDF
36C10F19R0010-0004015.pdf PDF
36C10F19R0010-0004038.pdf PDF
36C10F19R0010-0004061.pdf PDF
36C10F19R0010-0004082.pdf PDF
36C10F19R0010-0004076.pdf PDF
36C10F19R0010-0004039.pdf PDF
36C10F19R0010-0004016.pdf PDF
36C10F19R0010-0004017.pdf PDF
36C10F19R0010-0004027.pdf PDF
36C10F19R0010-0004030.pdf PDF
36C10F19R0010-0004088.docx DOCX document
36C10F19R0010-0004048.pdf PDF
36C10F19R0010-0004007.pdf PDF
36C10F19R0010-0004021.pdf PDF
36C10F19R0010-0004008.pdf PDF
36C10F19R0010-0004041.pdf PDF
36C10F19R0010-0004081.pdf PDF
36C10F19R0010-0004086.dwg DWG drawing
36C10F19R0010-0001006.pdf PDF
36C10F19R0010-0001004.pdf PDF
36C10F19R0010-0001007.dwg DWG drawing
36C10F19R0010-012.docx DOCX document
36C10F19R0010-010.docx DOCX document
36C10F19R0010-006.docx DOCX document
Show all 50

Presolicitation Notice - Great Lakes Construction Updated 5/15/2019 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

T

S

T

S

T

S

T

4"

8"

3"

3"

1"

3"

3"

3"

2"

2"

1.5"

2"

1.5"

2.5"

2"

1.5"

3"

1.5"

2.5"

2"

1.5"

1.5"

3"

1.5"

2"

1.5"

1.5"

2.5"

2"

1.5"

3"

1.5"

2.5"

1.5"

2"

1.5"

3"

2"

2"

2"

1.5"

2"

1.5"

3"

3"

2.5"

2.5"

2"

1.5"

1.5"

2.5"

2"

1.5"

1.5"

1.5"

1.5"

1.5"

3"

2.5"

2"

1.5"

3"

2.5"

1.5"

2"

1.5"

2"

2.5"

2"

3"

3"

1.5"

2.5"

1.5"

2"

2"

1.5"

1.5"

2"

1.5"

3"

2"

2"

1.5"

2"

1.5"

2"

1.5"

1.5"

1.5"

4"

4"

4"

2"

3"

4"

4"

4"

4"

4"

SEE DETAIL 4/I-501FOR

ACTUAL MANIFOLD PLUMBING

Q

Q

Q

Q

Q

Q

Q

8-15

2"

8-14

2"

8-13

1.5"

8-12

2"

8-11

2"

8-10

2"

8-9

2"

8-8

2"

8-7

2"

8-6

2"

8-5

2"

8-1

1.5"

8-2

2"

8-3

1.5"

8-4

2"

8-16

1.5"

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

OAKLAND COUNTY, MICHIGAN

923PC2006

MAY 10, 2019

Gordon PROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 238

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

GREAT LAKES NATIONAL

CEMETERY

PHASE II DEVELOPMENT

The LA Group

(518) 587-8100

Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032

Miller-Remick LLC.

(856) 429-4000

MEGA

(517) 223-3512

The Onyx Group

(703) 548-6699

ECS Midwest LLC.

847-279-0366

GIS, Inc.

(205) 941-0442 JDL CCT

I-110

C e r t i f i e d

I r r i g at io n

D e s i g n e r

I

R

R

I

G

A

T

I

O

N

A S

S

O

C

I

A

T

I

O

N

CID

J

O

H

N

D

LE

O

N

A

R

D

5/10/2019

IRRIGATION PLAN

1" =

30' 0' 15' 30' 60'

30'

LEGEND

Q

3 3

2"

7 8

MATCHLINE SEE PAGE I-107

M A

T C

H L I N

E

S

E E

P

A G

E

I

CONSTRUCTION NOTES

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

OAKLAND COUNTY, MICHIGAN

923PC2006

MAY 10, 2019

Gordon PROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 238

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

GREAT LAKES NATIONAL

CEMETERY

PHASE II DEVELOPMENT

The LA Group

(518) 587-8100

Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032

Miller-Remick LLC.

(856) 429-4000

MEGA

(517) 223-3512

The Onyx Group

(703) 548-6699

ECS Midwest LLC.

847-279-0366

GIS, Inc.

(205) 941-0442 JDL CCT

I-501

C e r t i f i e d

I r r i g at io n

D e s i g n e r

I

R

R

I

G

A

T

I

O

N

A S

S

O

C

I

A

T

I

O

N

CID

J

O

H

N

D

LE

O

N

A

R

D

5/10/2019

IRRIGATION DETAILS

N.T.S

AIR/VACUUM RELIEF VALVE ASSEMBLY

N.T.S

ISOLATION GATE VALVE ASSEMBLY

N.T.S

QUICK COUPLER VALVE ASSEMBLY

N.T.S

REMOTE CONTROL VALVE ASSEMBLY

MAINLINE PIPE

REMOTE CONTROL VALVE

ASSEMBLY

SOLVENT

WELD TEE

ISOLATION ANGLE VALVE

ON SERVICE TEE

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

OAKLAND COUNTY, MICHIGAN

923PC2006

MAY 10, 2019

Gordon PROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 238

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

GREAT LAKES NATIONAL

CEMETERY

PHASE II DEVELOPMENT

The LA Group

(518) 587-8100

Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032

Miller-Remick LLC.

(856) 429-4000

MEGA

(517) 223-3512

The Onyx Group

(703) 548-6699

ECS Midwest LLC.

847-279-0366

GIS, Inc.

(205) 941-0442 JDL CCT

I-502

C e r t i f i e d

I r r i g at io n

D e s i g n e r

I

R

R

I

G

A

T

I

O

N

A S

S

O

C

I

A

T

I

O

N

CID

J

O

H

N

D

LE

O

N

A

R

D

5/10/2019

IRRIGATION DETAILS

N.T.S

PRE-PLACED CRYPT SPRINKLER PLACEMENT DETAIL

N.T.S

IN-GROUND CREMAINS SPRINKLER PLACEMENT DETAIL

N.T.S

PIPE FITTINGS AND SLEEVE DETAILS

N.T.S

TRENCH SCHEMATIC

IRRIGATION

AISLE BOUNDARY

8"

4'

PIPE FITTING WITH JOINT RESTRAINT AT ALL CHANGES OF DIRECTION, TYPICAL

11.25° BEND (IPS)

(PJ x PJ)

TEE w/ REDUCER IN

BRANCH & RUN (IPS)

(PJ x PJ x PJ)

45° BEND (IPS)

(PJ x PJ)

22.5° BEND (IPS)

(PJ x PJ)

TEE (IPS)

(PJ x PJ x PJ)

90° BEND (IPS)

(PJ x PJ)

REDUCER (IPS)

(PJ x PJ)

PIPE BELL

N.T.S

POP-UP SPRAY ASSEMBLY

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

OAKLAND COUNTY, MICHIGAN

923PC2006

MAY 10, 2019

Gordon PROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 238

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

GREAT LAKES NATIONAL

CEMETERY

PHASE II DEVELOPMENT

The LA Group

(518) 587-8100

Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032

Miller-Remick LLC.

(856) 429-4000

MEGA

(517) 223-3512

The Onyx Group

(703) 548-6699

ECS Midwest LLC.

847-279-0366

GIS, Inc.

(205) 941-0442 JDL CCT

I-503

C e r t i f i e d

I r r i g at io n

D e s i g n e r

I

R

R

I

G

A

T

I

O

N

A S

S

O

C

I

A

T

I

O

N

CID

J

O

H

N

D

LE

O

N

A

R

D

5/10/2019

IRRIGATION DETAILS

N.T.S

POP-UP ROTOR ASSEMBLY

N.T.S

FLOWER WATER STATION

ENCAPSULATED IN WATER PROOF

SPLICE CAP. DBR/Y-6

Turf-4" or top

3 root zone

12" WIRE BURY OR PER NEC

LAWN OR SURFACE TREATMENT

FINISHED GRADE

SENSOR - SET LENGTH HORIZONTALLY AND BLADE IN

VERTICAL POSITION WITH SLEEVED WIRES OUT OF BOTTOM

SLEEVED WIRES FROM SENSOR

SUPPORT BLOCK - 2 REQUIRED

BURY DEPTH

CABLE TO CONTROLLER

N.T.S

SOIL MOISTURE SENSOR ASSEMBLY

N.T.S

CONTROLLER ASSEMBLY

N.T.S

POP-UP ROTOR ASSEMBLY FOR PPC IRRIGATION AISLE

N.T.S

CONTROLLER GROUNDING ASSEMBLY

S

M

A s

AREA REQUIRING DETAIL

SHEET NUMBER WHERE DETAIL IS DRAWN

DETAIL NUMBER

SECTION INDICATOR

DOOR TAG

ROOM TAG

DRAWING SYMBOLS

ALIGN

THESE 2

ITEMS

WALL / DETAIL SECTION

ENLARGED PLAN CALLOUT INDICATOR

DRAWING STANDARDS

CENTERLINE

SHEET NUMBER WHERE DETAIL IS REFERENCED

PLAN DETAIL INDICATOR

DETAIL NUMBER

TITLE OF DRAWING

SCALE OF INDICATED DRAWING

A-103

SIM

A-101

ROOM

NAME

SCALE:6A View Name 1/8" = 1'-0"

DETAIL SECTION

ELEVATION INDICATOR

NORTH ARROW

ALIGN SYMBOL

DEMOLISH DOOR

EXISTING DOOR

NEW DOOR

DEMOLITION

NEW WORK

EXISTING

DIRECTION OF VIEW

ELEVATION NUMBER

SHEET NUMBER WHERE

ELEVATION IS DRAWN

INTERIOR

A-101

SECTION NUMBER

SHEET NUMBER WHERE

SECTION IS DRAWN

DIRECTION OF VIEW

SECTION NUMBER

SHEET NUMBER WHERE

SECTION IS DRAWN

DIRECTION OF VIEW

6" TO WALL

NEW WALL

DEMO WALL

EXISTING WALL

TO REMAIN

R101 A101

SIM

DETAIL CALLOUT

XXXXX

*SEE WALL

CONSTRUCTION &

TYPE LEGEND FOR

FURTHER DETAIL

1'-0" Ceiling Type Ceiling Finish

CEILING TAG

A101

SIM

SECTION CALLOUT

1t WINDOW TAG

WALL TAG

GL

1 MATERIAL KEYNOTE

1 ELEVATION KEYNOTE

1 PLAN KEYNOTE

GBXXX

A101

SIM

R101 A101

SIM

REFERENCE SHEET

ELEVATION NUMBER

EXTERIOR

R-0000

A-0000

SHEET NUMBER

TOILET PARTITION DOOR

1' X 4' FLUORESCENT PENDENT

LIGHT FIXTURE

EXIT SIGN

2' x 2' FLUORESCENT LIGHT FIXTURE

RETURN DIFFUSER

SUPPLY DIFFUSER

FLUORESCENT RECESSED

DOWNLIGHT LIGHT FIXTURE

2' x 2' ACOUSTICAL CEILING GRID (NEW)

GYPSUM BOARD CEILING/BULKHEAD

FLUORESCENT RECESSED

WALL WASH LIGHT FIXTURE

2' x 2' FLUORESCENT VIDEO

CONFERENCE LIGHT FIXTURE

SUPPLY DIFFUSER

SPEAKERWALL WASH LIGHT FIXTURE

EXISTING 2' x 4' FLUORESCENT LIGHT

FIXTURE

STROBE

2' x 2' ACOUSTICAL CEILING GRID (EXISTING)

M

MOTION SENSOR

MICROPHONE

REFLECTED CEILING PLAN LEGEND

REUSED/ RELOCATED OR NEW 2' x 4'

FLUORESCENT LIGHT FIXTURER

REUSED/ RELOCATED OR NEW 1' X 4'

FLUORESCENT PENDENT LIGHT FIXTURER

SWITCH (DESIGNATION A OR B INDICATES

ALTERNATING SWITCH)

D

DIMMER

4' TWO LAMP FLOURESCENT FIXTURE

E

NEW 2' x 4' FLUORESCENT LIGHT

FIXTURE

DUPLEX ELECTRICAL OUTLET

TELEPHONE/DATA PORT

QUADRAPLEX ELECTRICAL OUTLET

JUNCTION BOX FOR FURNITURE WHIP

AND COMMUNICATION OUTLETS

POWER / COMMUNICATION SYMBOLS

J

MATERIAL SYMBOLS

ACCOUSTICAL CEILING

PLASTER AND GYPSUM

BOARD

ALUMINUM

BRICK

CONCRETE MASONRY

UNIT

EARTH

CONCRETE OR

PRECAST

BATT INSULATION

PLYWOOD

FINISHED WOOD

RIGID INSULATION

STEEL OR IRON

WOOD BLOCKING

1. VERIFY FIELD CONDITIONS PRIOR TO START OF DEMOLITION/ CONSTRUCTION, AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES.

2. ANY AND ALL ASBESTOS AND/OR LEAD PAINT DISCOVERED DURING DEMOLITION OR CONSTRUCTION MUST BE REPORTED TO ARCHITECT AND OWNER IMMEDIATELY. SEE ASBESTOS INSPECTION SURVEY AND SPECIFICATION FOR REMOVAL PRIOR TO ABATEMENT WORK.

3. CONFORM TO ALL BUILDING CODES AND EXECUTE WORK ONLY WHICH IS IN CONFORMANCE.

4. DASHED LINES INDICATE ITEMS TO BE REMOVED.

5. PROTECT ALL PORTIONS OF EXISTING BUILDING TO REMAIN DURING DEMOLITION/CONSTRUCTION. THE GENERAL CONTRATOR IS RESPONSIBLE

FOR ANY AND ALL DAMAGES CAUSED BY CONTRACTOR & SUBCONTRACTORS.

6. KEEP ALL EXISTING ADJACENT SPACES AND PROPERTIES CLEAN DURING DEMOLITION AND CONSTRUCTION. ANY DEBRIS SHALL BE REMOVED FROM WORK AREAS DAILY. IF REQUIRED, CLOSE OFF EXISTING SUPPLY/RETURN PIPES FEEDING EXISTING ROOMS TO PREVENT DUST/DEBRIS ENTRY.

7. WHERE DEMOLITION IS REQUIRED, THE CONTRACTOR SHALL REMOVE ITEMS COMPLETE WITH FASTENERS, ANCHORS, SEALANTS, CAULKING, ADHESIVES, ETC. ADJACENT REMAINING CONSTRUCTION SHALL BE PATCH/REPAIRED IN WORKMANLIKE CONDITION AND PREPAIRED TO RECIEVE NEW

FINISH AS PER ROOM FINISH SCHEDULE.

8. DEMOLITION SHALL BE CAREFULLY COORDINATED WITH THE PLANS, SECTIONS, SCHEDULES AND DETAILS OF THE CONTRACT DOCUMENTS. IT IS THE INTENT OF THE DEMOLITION DRAWINGS TO DELINEATE CONSTRUCTION OR ITEMS TO BE REMOVED/ REWORKED. NEW CONSTRUCTION REQUIRED, AND EXTENT OF DEMOLITION REQUIRED IS DELINEATED FURTHER IN CONTRACT DOCUMENTS.

9. DEMOLITION WORK TO BE COMPLETED BY OTHER TRADES IS SHOWN ON OTHER SHEETS OF THIS SET OF CONTRACT DOCUMENTS. THIS CONTRACTOR SHALL REVIEW THE DEMOLITION WORK OF OTHER TRADES TO ASCERTAIN WHERE SUCH WORK COULD EFFECT THEIR OWN WORK. THE

CONTRACTOR SHOULD ALSO COORDINATE HIS THEIR WORK WITH THE WORK OF OTHER TRADES.

10. PROVIDE ADEQUATE BRACING AND SHORING OF EXISTING MASONRY AND CONCRETE WALLS ( BEARING AND NON BEARING) TO RECEIVE NEW

MASONRY OPENINGS (TYP.) AND PATCH EXISTING FINISHES TO REMAIN.

11. PROTECT ANY NEW OPENING CREATED BY DEMOLITION PRIOR TO CONSTRUCTION OF NEW DOORS, MASONRY INFILL, FIRE RATED PARTITIONS, ETC. (SEE FLOOR PLANS)

12. OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT REMOVED. COORDINATE WITH OWNER AS TO WHAT EQUIPMENT WILL BE

SALVAGED. DELIVER EQUIPMENT TO LOCATION ON SITE AS DIRECTED BY OWNER.

GENERAL NOTES - DEMOLITION

Location

Issue Date

Project Number

Drawing Number

Project Title

Checked Drawn

OAKLAND COUNTY, MICHIGAN

923PC2006

Dwg. of

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

GREAT LAKES NATIONAL

CEMETERY

PHASE II DEVELOPMENT

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Gordon PROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

CONSULTANT

The LA Group

(518) 587-8100

Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032

Miller-Remick LLC.

(856) 429-4000

MEGA

(517) 223-3512

The Onyx Group

(703) 548-6699

ECS Mid Atlantic LLC.

(412) 260-1470

GIS, Inc.

(205) 941-0442

A-001

ARCHITECTURAL SYMBOLS &

ABBREVIATIONS

AEKSMAY 10, 2019

BID DOCUMENTS

150 238

ABBREVIATIONS - ARCHITECTURAL

MER MECH. EQUIPMENT ROOM

MIN MINIMUM

mm MILLIMETER

MO MASONRY OPENING

MPa MEGA PASCAL

MTD MOUNTED

MTL METAL

MULL MULLION

N NORTH

NEC NATIONAL ELECTRIC CODE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O.C. ON CENTER

OFD OVERFLOW DRAIN

OH OVERHEAD

OPG OPENING

OPP OPPOSITE

PAC PUBLIC ACCESS CONTROL

PART PARTITION

PED PEDESTRIAN

PKG PACKAGE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PT PRESSURE TREATED

PTD PAINTED

PVMT PAVEMENT

QT QUARRY TILE

R RADIUS

R.O. ROUGH OPENING

RB RUBBER BASE

RCP REFLECTIVE CEILING PLAN

RD ROOF DRAIN

REF REFER, REFERENCE

REFL REFLECTED

REINF REINFORCED

REV REVISION

RM ROOM

SIM SIMILAR

SPM SINGLE PLY MEMBRANE

SSM SOLID SURFACE MATERIAL

SST STAINLESS STEEL

STC SOUND TRANSMISSION COEFFICIENT

STL STEEL

STOR STORAGE

SUSP SUSPENDED

T.O. TOP OF

THK THICK(NESS)

TLO TOTAL LENGTH OPENING

TOS TOP OF SLAB

TP TOILET PARTITION

TYP TYPICAL

U/S UNDERSIDE

UON UNLESS OTHERWISE NOTED

V/O VISION OPENING

VCT VINYL COMPOSITE TILE

VERT VERTICAL(LY)

VIF VERIFY IN FIELD

W WIDE, WIDTH, WEST

W/ WITH

WD WOOD

WR WATER RESISTANT

ABBREVIATIONS - ARCHITECTURAL

A/C AIR CONDITIONER

ACCU AIR CONDITIONING CONDENSING UNIT

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

ALUM ALUMINUM

ANOD ANODIZED

ARCH ARCHITECT(URE,URAL)

BLDG BUILDING

BOT BOTTOM

BRD BOARD

CFL COMPACT FLUORESCENT

CI CAST IRON

CJ CONTROL JOINT

CLG CEILING

CLO CLOSET

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CO COMPANY

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

CONTR CONTRACTOR

COR CONTRACTING OFFICER REPRESENTATIVE

CPT CARPET

CT CERAMIC TILE

CTR CENTER

DBL DOUBLE

DEMO DEMOLISH

DET DETAIL

DIA DIAMETER

DIM DIMENSION

DN DOWN

DR DOOR

DS DOWN SPOUT

DTL DETAIL

DWG(S) DRAWING(S)

E EAST

EA EACH

EIFS EXTERIOR INSULATED FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ENCL ENCLOSURE

EQ EQUAL

EQMT EQUIPMENT

EW EACH WAY

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

FAB FABRIC

FD FLOOR DRAIN

FEC FIRE EXTINGUISHER CABINET

FF FINISHED FLOOR

FIN FINISH(ED)

FLR FLOOR

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FOP FACE OF PARTITION

GALV GALVANIZED

GEN GENERAL

GR GUARD RAILING

GRAN GRANITE

GWB GYPSUM WALL BOARD

GYP BD GYPSUM BOARD

HD HAND

HM HOLLOW METAL

HP HIGH POINT

HR HAND RAILING

Hr HOUR

HRS HEAT RESISTANT STEEL

HT HEIGHT

INFO INFORMATION

JAN JANITOR

L LENGTH

LAV LAVATORY

LP LOW POINT

MATL MATERIAL

MAX MAXIMUM

MC METAL CEILING

MECH MECHANICAL

*GENERAL NOTES

0 ENSURE THAT ALL PENETRATIONS THROUGH STC RATED WALLS MEET STC REQUIREMENTS AND MAINTAIN WALL STC RATING.

1 CONSTRUCTION SHALL COMPLY TO COMPLY WITH CODES NOTED ON SHEET A-001.

2 CONSTRUCTION OF WORK INDICATED ON THE DRAWINGS AS (N.I.C.) IS NOT IN CONTRACT.

3 ALL WORK SHALL BE OF BEST PRACTICE OF EACH TRADE.

4 DETAILS NOT SHOWN ARE SIMILAR IN NATURE TO THOSE DETAILED. WHERE SPECIFIC DIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BE DETERMINED, CONSULT COR BEFORE PROCEEDING WITH THE WORK. TYPICAL DETAILS APPLY AT ALL SIMILAR CONDITIONS WHETHER CROSS REFERENCED OR NOT.

5 DIMENSIONS SHOWN ON FLOOR PLANS ARE TO THE FACE OF GYPSUM WALL BOARD, FACE OF MASONRY (FOM), FACE OF CONCRETE (FOC), FRAME DOOR

OPENING AND COLUMN GRID LINES UNLESS NOTED OTHERWISE. REFER TO INTERIOR ELEVATIONS AND DETAILS FOR ADDITIONAL LAYERS OF FINISH

GYPSUM, BOARD, TILE, WOOD, OR OTHER SCHEDULED FINISH MATERIALS.

6 VERIFY DIMENSIONS IN FIELD BEFORE PROCEEDING WITH THE WORK. NOTIFY COR OF DISCREPANCIES, CONFLICTS, AND MODIFICATIONS.

7 DO NOT SCALE DRAWINGS. WHERE DIMENSIONS OR EXACT LOCATIONS ARE REQUIRED AND NOT INCLUDED ON THE DRAWINGS, REQUEST INFORMATION

FROM COR.

8 WHERE GYPSUM BOARD LAYERS DIFFER BETWEEN TWO ADJOINING WALLS, MAINTAIN A CONTINUOUS FINISH OF WALL.

9 ELECTROLYTIC PROTECTION SHALL BE PROVIDED BETWEEN DISSIMILAR METALS WHENEVER THE TWO ARE IN CONTACT.

10 OPEN EXTERIOR JOINTS AROUND DOOR FRAMES, BETWEEN WALLS AND FOUNDATIONS, BETWEEN WALLS AND ROOF, BETWEEN WALL PANELS, AT

PENETRATIONS OF UTILITIES THROUGH THE BUILDING ENVELOPE SHALL BE SEALED, FLASHED OR WEATHER-STRIPPED AS REQUIRED FOR COMPATIBILITY

WITH ADJACENT MATERIALS TO ELIMINATE AIR LEAKAGE & WATER INFILTRATION.

11 CEILING HEIGHT DIMENSIONS ARE FROM DESIGNATED FINISHED FLOOR SURFACE TO FINISHED CEILING SURFACES UNLESS NOTED OTHERWISE.

12 PROVIDE PROPER ANCHORAGE OF ESSENTIAL EQUIPMENT IN ACCORDANCE WITH APPLICABLE CODES.

13 PROVIDE ACCESS PANELS FOR MECHANICAL AND ELECTRICAL EQUIPMENT AS REQUIRED BY APPLICABLE CODES.

14 PROVIDE AND INSTALL ALL STIFFENERS, BRACINGS, BACK-UP PLATES AND SUPPORTING BRACKETS REQUIRED FOR THE BEST POSSIBLE INSTALLATION AND

REQUIRED MINIMUM LATERAL FORCE OF ALL TOILET/RESTROOM ACCESSORIES AND PARTITIONS AND ALL WALL MOUNTED OR SUSPENDED MECHANICAL, ELECTRICAL OR MISCELLANEOUS EQUIPMENT IN ACCORDANCE WITH APPLICABLE CODES.

DOORS

1 ALL DOOR SIZES ARE JAMB OPENING SIZES.

2 VERIFY ALL CONCRETE AND MASONRY OPENINGS IN THE FIELD PRIOR TO FABRICATION OF DOORS AND FRAMES.

3 ALL UNDERCUT DOOR REQUIREMENTS FOR VARYING CARPET THICKNESS; TILE FLOORING ETC. SHALL BE VERIFIED AND PROPERLY COORDINATED.

4 ALL NEW DOOR OPENINGS, DOOR FRAMES AND HARDWARE SHALL COMPLY WITH ALL APPLICABLE CODES AND U.L. REQUIREMENTS.

5 TYPICAL DOOR BEVEL TO BE 1/8” IN 2” U.N.O. BY THE HARDWARE TEMPLATE REQUIREMENTS.

6 ALL LABELED DOORS AND DOORS IN RATED WALLS SHALL BE SELF CLOSING AND HAVE SIMILAR LABELED FRAMES.

7 HAND ACTIVATED DOOR OPENING HARDWARE SHALL BE CENTERED AT 38” ABOVE THE FINISHED FLOOR.

8 ALL FLOOR PIVOTS AND CLOSER PLATES ARE TO BE INSTALLED FLUSH TO SLAB BELOW FLOORING. PROVIDE ADJUSTMENT ACCESS AS REQUIRED.

9 ALL STEEL DOORS & FRAMES TO BE PAINTED UNLESS NOTED OTHERWISE. COLOR AS SHOWN ON DRAWINGS.

10 DOOR OPENINGS NOT LOCATED BY DIMENSION SHALL BE CENTERED IN THE WALL SHOWN OR LOCATED 6” FROM FINISH WALL TO FINISH JAMB. ALL DOOR

WIDTH DIMENSIONS ON FLOOR PLANS ARE FOR SIZE OF DOOR ONLY, AND DO NOT INCLUDE DOOR FRAME OR SHIM SPACE.

FIRE PROTECTION

1 ALL INTERIOR FINISHES SHALL COMPLY WITH THE REQUIREMENTS OF APPLICABLE CODES.

2 FIRE DAMPERS USED SHALL BE PROVIDED WHERE AIR DUCTS PENETRATE FIRE RATED WALLS AND CEILINGS PRIOR TO INSTALLATION VERIFY THAT

ADEQUATE ACCESS IS AVAILABLE IN ORDER TO RESET FUSIBLE LINKS.

3 EXIT DOORS TO OPEN FROM INSIDE WITHOUT USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT 4 EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED BY TWO (2) ELECTRIC LAMPS.

5 ALL EXITS SHALL BE PROVIDED WITH ILLUMINATED EXIT SIGNS AND IN ACCORDANCE WITH APPLICABLE CODES.

6 PROVIDE TWO SEPARATE SOURCES OF POWER FOR EXIT SIGNS.

7 THE INSTALLATION OF AUTOMATIC FIRE SPRINKLER SYSTEMS SHALL COMPLY WITH APPLICABLE CODES.

8 ALL SPACERS, FILLERS, BLOCKING, ETC. SHALL BE FIRE TREATED.

9 EMERGENCY LIGHTING SHALL BE IN ACCORDANCE WITH APPLICABLE CODES.

10 FIRE SEPARATIONS AND CONSTRUCTION REQUIREMENT SHALL BE IN ACCORDANCE WITH APPLICABLE CODES.

11 ENSURE THAT ALL PENETRATIONS THROUGH FIRE RATED WALLS MEET CODE REQUIREMENTS AND MAINTAIN WALL FIRE RATING.

98_CS401-402 - Columbarium Site Plan Enlargement-CS401
98_CS401-402 - Columbarium Site Plan Enlargement-CS402
100_CG401-402 - Columbarium Grading Enlargement-CG401
100_CG401-402 - Columbarium Grading Enlargement-CG402
102_CG403-404 - Columbarium Drainage Enlargement Plans-CG403
102_CG403-404 - Columbarium Drainage Enlargement Plans-CG404
104_CI700- Columbarium Numbering Plan-CI700
105_CI701-703 Columbarium Elevations-CI701
105_CI701-703 Columbarium Elevations-CI702
105_CI701-703 Columbarium Elevations-CI703
108_CI704-708 Columbarium Details-CI705
108_CI704-708 Columbarium Details-CI704
108_CI704-708 Columbarium Details-CI706
108_CI704-708 Columbarium Details-CI707
108_CI704-708 Columbarium Details-CI708
113_CI709-710 - Base Stone Location Plan-CI709
113_CI709-710 - Base Stone Location Plan-CI710
115_CI711 - Base Stone Details-CI711
116_CI712-713 - Capstone Location Plan-CI712
116_CI712-713 - Capstone Location Plan-CI713
118_CI714-CI715 - Capstone Details-CI714
118_CI714-CI715 - Capstone Details-CI715
120_CI750 CSS Service Emblem Details-CI750
120_CI750 CSS Service Emblem Details-CI751
122_CI760 Assembly Wall Cap Details-CI760
L-100
L-101
L-102
L-103
L-104
L-105
L-106
L-107
L-108
L-109
L-501
L-502
P-GreatLakesPh2-dd-I-001
Sheets and Views
I-001
P-GreatLakesPh2-dd-I-100
Sheets and Views
I-100
P-GreatLakesPh2-dd-I-101
Sheets and Views
I-101
P-GreatLakesPh2-dd-I-102
Sheets and Views
I-102
P-GreatLakesPh2-dd-I-103
Sheets and Views
I-103
P-GreatLakesPh2-dd-I-104
Sheets and Views
I-104
P-GreatLakesPh2-dd-I-105
Sheets and Views
I-105
P-GreatLakesPh2-dd-I-106
Sheets and Views
I-106
P-GreatLakesPh2-dd-I-107
Sheets and Views
I-107
P-GreatLakesPh2-dd-I-108
Sheets and Views
I-108
P-GreatLakesPh2-dd-I-109
Sheets and Views
I-109
P-GreatLakesPh2-dd-I-110
Sheets and Views
I-110
P-GreatLakesPh2-dd-I-501
Sheets and Views
I-501
P-GreatLakesPh2-dd-I-502
Sheets and Views
I-502
P-GreatLakesPh2-dd-I-503
Sheets and Views
I-503
GLNC_DD Drawings_Bathrooms_onyx-autodesk
Sheets
A-002 - LIFE SAFETY PLAN
AA101 - PIC/ ADMIN BLDG - DEMOLITION PLAN
AA102 - PIC/ ADMIN BLDG - DEMOLITION RCP
AA103 - PIC/ ADMIN BLDG - DEMOLITION ROOF PLAN
AA104 - PIC/ ADMIN BLDG - FLOOR PLAN
AA105 - PIC/ADMIN BLDG - REFLECTED CEILING PLAN
AA106 - PIC/ ADMIN BLDG - ROOF PLAN
AA201 - PIC/ADMIN BLDG – BLDG ELEVATIONS
AA301 - PIC/ADMIN BLDG – BLDG SECTIONS
AA401 - PIC/ADMIN BLDG – BLDG DETAILS
AA402 - PIC/ADMIN BLDG - MEN'S & FAMILY RESTROOM
AA403 - PIC/ADMIN BLDG - WOMEN'S RESTROOM
AA404 - PIC/ ADMIN BLDG - FIXTURE HEIGHTS & SCHEDULE
AA405 - PIC/ ADMIN INTERIOR ELEVATIONS
AA501 - PIC/ ADMIN BLDG - DETAILS
AA502 - PIC/ ADMIN BLDG - WALL DETAILS
AA601 - PIC/ADMIN BLDG - DOOR AND WINDOW SCHEDULE
AA602 - PIC/ADMIN PARTITION TYPES
AA603 - PIC/ADMIN BLDG – INTERIOR FINISH PLAN
AA604 - PIC/ADMIN BLDG – FIXTURE SCHEDULE
GLNC_CD_16_onyx-autodesk
Sheets
A-001 - ARCHITECTURAL SYMBOLS & ABBREVIATIONS
AB101 - BULK STORAGE BLDG - FLOOR PLAN & ROOF PLAN
AB201 - BULK STORAGE BLDG - BLDG ELEVATIONS & SECTION
AB501 - BULK STORAGE BLDG - DETAILS
AC101 - COMMITTAL SHELTER - FLOOR PLAN (ADD ALTERNATE NO.1)
AC102 - COMMITTAL SHELTER - REFLECTED CEILING PLAN & ROOF PLAN (ADD ALTERNATE NO.1)
AC201 - COMMITTAL SHELTER – BLDG ELEVATIONS & SECTIONS (ADD ALTERNATE NO.1)
AC401 - COMMITTAL SHELTER – DETAILS (ADD ALTERNATE NO.1)
AE101 - EQUIPMENT VEHICLE STORAGE - DEMOLITION PLAN
AE102 - EQUIPMENT VEHICLE STORAGE - FLOOR PLAN
AE103 - EQUIPMENT VEHICLE STORAGE - MEZZANINE FLOOR PLAN
AE104 - EQUIPMENT VEHICLE STORAGE - ROOF PLAN
AE105 - EQUIPMENT VEHICLE STORAGE- REFLECTED CEILING PLANS
AE301 - MEZZANINE - SECTIONS
AE501 - MEZZANINE - DETAILS
AF101 - COVERED STORAGE - PLANS (ADD ALTERNATE NO.4)
AF102 - COVERED STORAGE - SECTIONS & DETAILS (ADD ALTERNATE NO.4)
AG101 - MAINTENANCE GARAGE - TRENCH REPLACEMENT
AT101 - PROPOSED TEMPORARY TRAILER & RESTROOM LAYOUT
P-001
P-001
P-001
PD101
PD101
PD101
PP100 - Admin site utilities
PP100 - Admin site utilities
PP100
PP101
PP101
PP101
PP501
PP501
PP501
P-601
P-601
P-601
P-701
P-701
P-701
M-001
M-001
M-001
MD101
MD101
MD101
M-101
M-101
M-101
M-501
M-501
M-501
M-701
M-701
M-701
E-001
E-001
E-001
E-002
E-002
E-002
ED101
ED101
ED101
ES001
ES001
ES001
EL101
EL101
EL-101
EL102
EL102
EL102
EL103
EL103
EL103
EP101
EP101
EP-101
EY101
EY101
EY-101
EL201
EL201
EL-201
EP201
EP201
EP-201
EL301
EL301
EL-301
EL302
EL302
EL302
EL303
EL303
EL303
EL304
EL304
EL304
EP301
EP301
EP-301
EY301
EY301
EY-301
EL401
EL401
EL401
E-501
E-501
E-501
E-502
E-502
E-502
E-601
E-601
E-601
E-602
E-602
E-602
E-701
E-701
E-701
E-702
E-702
E-702
S-001
S-001
S-001
SF101
SF101
SF101
SF111
SF111
SF111
SF112
SF112
SF112
SF121
SF121
SF121
SF131
SF131
SF131
S-501
S-501
S-501
S-502
S-502
S-502
S-503
S-503
S-503
S-504
S-504
S-504
S-505
S-505
S-505
S-506
S-506
S-506
SS301
SS301
SS301
SS302
SS302
SS302

File details come from the government source that posted it.