36C10A19R0011-0002000.docx

DOCX document 56 KB Posted

Attached to
V19 RTLS Asset Tracking Expansion
Solicitation number
36C10A19R0011
Issued by

About this file

36C10A19R0011 0002 36C10A19R0011 0002.docx

View the file

Other files

File Type Posted
36C10A19D0010-001.pdf PDF
36C10A19D0010-000.docx DOCX document
36C10A19R0011-0002001.xlsx XLSX spreadsheet
36C10A19R0011-0001002.docx DOCX document
36C10A19R0011-006.docx DOCX document
36C10A19R0011-008.xlsx XLSX spreadsheet
36C10A19R0011-004.docx DOCX document
36C10A19R0011-007.xlsx XLSX spreadsheet
36C10A19R0011-005.xlsx XLSX spreadsheet
36C10A19R0011-000.docx DOCX document
36C10A19R0011-001.pdf PDF
36C10A19R0011-003.xlsx XLSX spreadsheet
36C10A19R0011-002.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) TAC-Austin 09-04-2019

TAC-19-55806

Department of Veterans Affairs Technology Acquisition Center - Austin 1701 Directors Blvd, Suite 600 Austin

TX

78744 Y Department of Veterans Affairs Technology Acquisition Center - Austin 1701 Directors Blvd, Suite 600 Austin

TX

78744 To all Offerors/Bidders

36C10A19R0011

X X X

See continuation Page

A. The purpose of this amendment is the following::

· Provide answers to industry submitted questions.

Q: May the contractor use the existing interface that is already being utilized in VISN 19 and others across the country, or is the VA intending to replace the existing National RTLS interface and thus asking for a new interface to be developed?

A: The contractor may use the existing interface developed by VA with the Intelligent Insites platform. If the CenTrak Asset Viewer was selected, an interface would need to be developed Q: Regarding CLIN 0004F, is the Contractor responsible for providing the cable in addition to installing the cabling per Star?

A: Yes Q: What is the difference between CLINs 0006K & 0006L? Is there a different expectation for each?

A: 006L has been deleted.

· To remove CLIN 0006L “Intelligent InSites Deployment Services per room” and all corresponding CLINS in following ordering periods. See attached updated Technical Exhibit B – Sample Pricing Spreadsheet. The updated price schedule is as follows is as follows:

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 PRICE SCHEDULE

Ordering Period One: 12 months from date of award

Specific requirements are detailed in Section D, Attachment 1, Performance Work Statement (PWS) titled "VISN 19 Real Time Location System (RTLS) Asset Tracking Expansion" dated August 22, 2019.

Ordering shall be conducted through the process described in Section B, Paragraph B.2, “Ordering Procedures” and payment shall be made in accordance with Section B, Paragraph B.3, entitled “Payment Procedures Related to FFP task orders”.

Item No.
Description of Supplies/Services
Quantity
Unit
Unit Cost
Total Cost (Not to Exceed)
1001
Project Management

The following deliverables may be required at the task order level.

1001A
Contractor Project Management Plan IAW PWS Section 5.1.1
1
EA
NSP
NSP
1001B
Contractor Staff Roster IAW section 6.2.2 of the PWS
1
EA
NSP
NSP
1001C
Monthly Status Report IAW section 5.1.2 of the PWS
1
EA
NSP
NSP
1001D
Technical Kickoff Meeting IAW section 5.1.4
1
EA
NSP
NSP
1001E
Preliminary Hardware Deployment Design Document (HDDD) IAW section 5.3.2.1 and
1
EA
NSP
NSP
1002
Site Assessments IAW Section 5.2 of the PWS
1002A
Site Assessment Base Cost - Centrak

Flat fee for each site

1
JOB
$______
$______
1002B
Site Assessment- Per Room- Centrak

Additional price based on number of rooms at each site. Unit price is per room

1
JOB
$______
$______
1002C
Site Assessment- Per Room- Intelligent Insites

Additional price based on number of rooms at each site. Unit price is per room

1
JOB
$______
$______
1002D
Site Assessment- Per Room- Intelligent Insites

Additional price based on number of rooms at each site. Unit price is per room

1
JOB
$______
$______
1003
Centrak Brand Name Hardware IAW Section 5.4 of the PWS

The types and quantity will be determined at the task order level

NSP
NSP
1003A
Timing Star

ITK-123-G

1
EA
$______
$______
1003B
900 Mhz Star

ITK-103C-G

1
EA
$______
$______
1003C
IR Monitor Multi Mode

ITK-318-G

1
EA
$______
$______
1003D
IR Virtual Wall Multi Mode

ITK-325-G

1
EA
$______
$______
1003E
IR Virtual Wall Bay Use Multi Mode

ITK-326-G

1
EA
$______
$______
1003F
LF Exciter

ITK-340-G

1
EA
$______
$______
1003G
Asset Tag Multi Mode

ITK-761E-G

1
EA
$______
$______
1003H
Asset Tag Mini 900 Mhz

ITK-722E-G

1
EA
$______
$______
1004
Hardware Installation IAW Section 5.5 of the PWS

Price is a firm-fixed price and includes all associated costs, including travel and program management.

All prices are per device

NSP
NSP
1004A
Installation of Centrak infrastructure device
1
EA
$______
$______
1004B
Configuration of Centrak infrastructure device
1
EA
$______
$______
1004C
Validation of Centrak Infrastructure device
1
EA
$______
$______
1004D
Certification of Centrak Infrastructure device
1
EA
$______
$______
1004E
Install and Configure Asset Tag
1
EA
1004F
Install cabling per Star
1
EA
$______
$______
1004G
Replace infrastructure device batteries per device
1
EA
1005
Software IAW Section 5.8 of the PWS
NSP
NSP
1005A
Intelligent InSites Perpetual License

Platform (Asset Optimization and Connector to AT)

1
EA
$______
$______
1005B
InSites software license Perpetual License – Asset Optimization Add-On for 1 Outbuilding
1
EA
$________
$______
1005C
InSites software license Perpetual License – Asset Optimization Add-On for bundle of 4 Outbuildings
1
EA
$________
$______
1005D
InSites software license Perpetual License – Cisco MSE/CMX Connector
1
EA
$________
$______
1005E
CenTrak Connect Core - TRM
1
EA
$______
$______
1005F
CenTrak Connect Pulse - TRM
1
EA
$______
$______
1005G
CenTrak Fingerprinting Locating Engine - TRM
1
EA
$______
$______
1005H
CenTrak Connect Cisco MSE Bundle – TRM
1
EA
$______
$______
1005I
CenTrak Pulse Asset Viewer- TRM
1
EA
$________
$______
1006
Software Installation & Configuration IAW Sections 5.7, 5.8, and 5.9 of the PWS

Price is a firm-fixed price and includes all associated costs, including travel and program management

NSP
NSP
1006A
Install Intelligent InSites Perpetual License Platform (Asset Optimization and Connector to AT)
1
EA
$________
$______
1006B
Install InSites software license Perpetual License – Asset Optimization Add-On for 1 Outbuilding
1
EA
$________
$______
1006C
Install InSites software license Perpetual License – Asset Optimization Add-On for bundle of 4 Outbuildings
1
EA
$________
$______
1006D
Install InSites software license Perpetual License – Cisco MSE/CMX Connector
1
EA
$________
$______
1006E
Install CenTrak Connect Core - TRM
1
EA
$______
$______
1006F
Install CenTrak Connect Pulse - TRM
1
EA
$______
$______
1006G
Install CenTrak Fingerprinting Locating Engine - TRM
1
EA
$______
$______
1006H
Install CenTrak Connect Cisco MSE Bundle – TRM
1
EA
$______
$______
1006I
Install CenTrak Pulse Asset Viewer- TRM
1
EA
$______
$______
1006J
CenTrak Asset Viewer Mapping per room
1
EA
$______
$______
1006K
Intelligent InSites Software Mapping & Configuration per room
1
EA
$______
$______
1006L
Reserved
NA
NA
NA
NA
1006M
Intelligent InSites Fingerprinting per floor
1
EA
$______
$______
1006N
Fingerprinting Engineering Setup/Mapping

Priced per floor

1
EA
$______
$______
1006O
Fingerprinting Processing

Price per 1000 sq ft

1
EA
$______
$______
1006P
Fingerprinting Signature Capture

Price per 1000 sq ft

1
EA
$______
$______
1006Q
VISTA Interface
1
EA
$______
$______
1006R
Maximo Interface
1
EA
$______
$______
1006S
Software Installation Report
1
EA
NSP
NSP
1007
Testing and Validation IAW Section 5.9,
NSP
MSP
1007A
Facility acceptance testing- Base Cost
1
EA
$______
$______
1007B
Facility acceptance testing Clinical Grade- Per Room

Additional price based on number of rooms at each site. Unit price is per room

1
EA
$______
$______
1007C
Facility acceptance testing WiFi- Per Room

Additional price based on number of rooms at each site. Unit price is per room

1
EA
$______
$______
1007D
AT Acceptance Test Plan
1
EA
NSP
NSP
1007E
AT Facility Remediation Hardware Report
1
EA
NSP
NSP
1007F
Facility Acceptance Test Report
1
EA
NSP
NSP
1007G
Facility Final Hardware Design Document
1
EA
NSP
NSP
1008
User Training IAW Section 5.10.1, Performance Work Statement.

Price is a firm-fixed price per day (8 hours) and includes all associated costs, including travel.

All training shall be on-site

NSP
NSP
1008A
Onsite System User Training (CenTrak)
1
EA
$______
$______
1008B
Remote System User Training (CenTrak)
1
EA
$______
$______
1008C
Onsite System User Training (Intelligent InSites)
1
EA
$______
$______
1008D
Remote System User Training (Intelligent InSites)
1
EA
$______
$______
1008E
Onsite System Administrator Training (CenTrak)
1
EA
$______
$______
1008F
Remote System Administrator Training (CenTrak)
1
EA
$______
$______
1008G
Onsite System Administrator Training (Intelligent

InSites)

1
EA
$______
$______
1008H
Remote System Administrator Training (Intelligent InSites)
1
EA
$______
$______
1008I
Onsite Technical Maintenance & Repair Training IAW 5.10.2
1
EA
$______
$______
1008J
Remote Technical Maintenance & Repair Training IAW 5.10.2
1
EA
$______
$______
1009
Transition Planning IAW Section 5.11, Performance Work Statement.

Price is a firm-fixed and includes all associated costs, including travel.

NSP
NSP
1009A
AT Transition Plan
1
EA
$______
$______
1009B
User and Technical Manuals
1
EA
$______
$______
1010
Warranty Services IAW Section 5.13, Performance Work Statement. Price is a firm-fixed price IDIQ and includes all associated costs, including travel.
NSP
NSP
10010A
AT Warranty Status Report
1
EA
NSP
NSP

Total Ordering Period One

$TBP

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 PRICE SCHEDULE

Ordering Period Two: 12 months from end of Ordering Period 1

Specific requirements are detailed in Section D, Attachment 1, Performance Work Statement (PWS) titled "VISN 19 Real Time Location System (RTLS) Asset Tracking Expansion" dated XXXX XX, 2019.

Ordering shall be conducted through the process described in Section B, Paragraph B.2, “Ordering Procedures” and payment shall be made in accordance with Section B, Paragraph B.3, entitled “Payment Procedures Related to FFP task orders”.

Item No.
Description of Supplies/Services
Quantity
Unit
Unit Cost
Total Cost (Not to Exceed)
2001
Project Management
2001A
Contractor Project Management Plan IAW PWS Section 5.1.1
1
EA
NSP
NSP
2001B
Contractor Staff Roster IAW section 6.2.2 of the PWS
1
EA
NSP
NSP
2001C
Monthly Status Report IAW section 5.1.2 of the PWS
1
EA
NSP
NSP
2001D
Technical Kickoff Meeting IAW section 5.1.4
1
EA
NSP
NSP
2001E
Preliminary Hardware Deployment Design Document (HDDD) IAW section 5.3.2.1 and
1
EA
NSP
NSP
2002
Site Assessments IAW Section 5.2 of the PWS
2002A
Site Assessment Base Cost - Centrak
1
JOB
$______
$______
2002B
Site Assessment- Per Room- Centrak

Additional price based on number of rooms at each site. Unit price is per room

1
JOB
$______
$______
2002C
Site Assessment- Per Room- Intelligent Insites

Additional price based on number of rooms at each site. Unit price is per room

1
JOB
$______
$______
2002D
Site Assessment- Per Room- Intelligent Insites

Additional price based on number of rooms at each site. Unit price is per room

1
JOB
$______
$______
2003
Centrak Brand Name Hardware IAW Section 5.4 of the PWS
NSP
NSP
2003A
Timing Star

ITK-123-G

1
EA
$______
$______
2003B
900 Mhz Star

ITK-103C-G

1
EA
$______
$______
2003C
IR Monitor Multi Mode

ITK-318-G

1
EA
$______
$______
2003D
IR Virtual Wall Multi Mode

ITK-325-G

1
EA
$______
$______
2003E
IR Virtual Wall Bay Use Multi Mode

ITK-326-G

1
EA
$______
$______
2003F
LF Exciter

ITK-340-G

1
EA
$______
$______
2003G
Asset Tag Multi Mode

ITK-761E-G

1
EA
$______
$______
2003H
Asset Tag Mini 900 Mhz

ITK-722E-G

1
EA
$______
$______
2004
Hardware Installation IAW Section 5.5 of the PWS

Price is a firm-fixed price and includes all associated costs, including travel and program management.

NSP
NSP
2004A
Installation of Centrak infrastructure device
1
EA
$______
$______
2004B
Configuration of Centrak infrastructure device
1
EA
$______
$______
2004C
Validation of Centrak Infrastructure device
1
EA
$______
$______
2004D
Certification of Centrak Infrastructure device
1
EA
$______
$______
2004E
Install and Configure Asset Tag
1
EA
2004F
Install cabling per Star
1
EA
$______
$______
2004G
Replace infrastructure device batteries per device
1
EA
2005
Software IAW Section 5.8 of the PWS
NSP
NSP
2005A
Intelligent InSites Perpetual License

Platform (Asset Optimization and Connector to AT)

1
EA
$______
$______
2005B
InSites software license Perpetual License – Asset Optimization Add-On for 1 Outbuilding
1
EA
$________
$______
2005C
InSites software license Perpetual License – Asset Optimization Add-On for bundle of 4 Outbuildings
1
EA
$________
$______
2005D
InSites software license Perpetual License – Cisco MSE/CMX Connector
1
EA
$________
$______
2005E
CenTrak Connect Core - TRM
1
EA
$______
$______
2005F
CenTrak Connect Pulse - TRM
1
EA
$______
$______
2005G
CenTrak Fingerprinting Locating Engine - TRM
1
EA
$______
$______
2005H
CenTrak Connect Cisco MSE Bundle – TRM
1
EA
$______
$______
2005I
CenTrak Pulse Asset Viewer- TRM
1
EA
$________
$______
2006
Software Installation & Configuration IAW Sections 5.7, 5.8, and 5.9 of the PWS

Price is a firm-fixed price and includes all associated costs, including travel and program management

NSP
NSP
2006A
Install Intelligent InSites Perpetual License Platform (Asset Optimization and Connector to AT)
1
EA
$________
$______
2006B
Install InSites software license Perpetual License – Asset Optimization Add-On for 1 Outbuilding
1
EA
$________
$______
2006C
Install InSites software license Perpetual License – Asset Optimization Add-On for bundle of 4 Outbuildings
1
EA
$________
$______
2006D
Install InSites software license Perpetual License – Cisco MSE/CMX Connector
1
EA
$________
$______
2006E
Install CenTrak Connect Core - TRM
1
EA
$______
$______
2006F
Install CenTrak Connect Pulse - TRM
1
EA
$______
$______
2006G
Install CenTrak Fingerprinting Locating Engine - TRM
1
EA
$______
$______
2006H
Install CenTrak Connect Cisco MSE Bundle – TRM
1
EA
$______
$______
2006I
Install CenTrak Pulse Asset Viewer- TRM
1
EA
$______
$______
2006J
CenTrak Asset Viewer Mapping per room
1
EA
$______
$______
2006K
Intelligent InSites Software Mapping & Configuration per room
1
EA
$______
$______
2006L
Reserved
NA
NA
NA
NA
2006M
Intelligent InSites Fingerprinting per floor
1
EA
$______
$______
2006N
Fingerprinting Engineering Setup/Mapping

Priced per floor

1
EA
$______
$______
2006O
Fingerprinting Processing

Price per 1000 sq ft

1
EA
$______
$______
2006P
Fingerprinting Signature Capture

Price per 1000 sq ft

1
EA
$______
$______
2006Q
VISTA Interface
1
EA
$______
$______
2006R
Maximo Interface
1
EA
$______
$______
2006S
Software Installation Report
1
EA
NSP
NSP
2007
Testing and Validation IAW Section 5.9,
NSP
MSP
2007A
Facility acceptance testing- Base Cost
1
EA
$______
$______
2007B
Facility acceptance testing Clinical Grade- Per Room
1
EA
$______
$______
2007C
Facility acceptance testing WiFi- Per Room

Additional price based on number of rooms at each site. Unit price is per room

1
EA
$______
$______
2007D
AT Acceptance Test Plan
1
EA
NSP
NSP
2007E
AT Facility Remediation Hardware Report
1
EA
NSP
NSP
2007F
Facility Acceptance Test Report
1
EA
NSP
NSP
2007G
Facility Final Hardware Design Document
1
EA
NSP
NSP
2008
User Training IAW Section 5.10.1, Performance Work Statement.
NSP
NSP
2008A
Onsite System User Training (CenTrak)
1
EA
$______
$______
2008B
Remote System User Training (CenTrak)
1
EA
$______
$______
2008C
Onsite System User Training (Intelligent InSites)
1
EA
$______
$______
2008D
Remote System User Training (Intelligent InSites)
1
EA
$______
$______
2008E
Onsite System Administrator Training (CenTrak)
1
EA
$______
$______
2008F
Remote System Administrator Training (CenTrak)
1
EA
$______
$______
2008G
Onsite System Administrator Training (Intelligent
1
EA
$______
$______
2008H
Remote System Administrator Training (Intelligent InSites)
1
EA
$______
$______
2008I
Onsite Technical Maintenance & Repair Training IAW 5.10.2
1
EA
$______
$______
2008J
Remote Technical Maintenance & Repair Training IAW 5.10.2
1
EA
$______
$______
2009
Transition Planning IAW Section 5.11, Performance Work Statement.
NSP
NSP
2009A
AT Transition Plan
1
EA
$______
$______
2009B
User and Technical Manuals
1
EA
$______
$______
2010
Warranty Services IAW Section 5.13, Performance Work Statement. Price is a firm-fixed price IDIQ and includes all associated costs, including travel.
NSP
NSP
20010A
AT Warranty Status Report
1
EA
NSP
NSP

Total Ordering Period Two

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 PRICE SCHEDULE

Ordering Period Three: 12 months from end of Ordering Period 2 Specific requirements are detailed in Section D, Attachment 1, Performance Work Statement (PWS) titled "VISN 19 Real Time Location System (RTLS) Asset Tracking Expansion" dated XXXX XX, 2019.

Ordering shall be conducted through the process described in Section B, Paragraph B.2, “Ordering Procedures” and payment shall be made in accordance with Section B, Paragraph B.3, entitled “Payment Procedures Related to FFP task orders”.

Item No.
Description of Supplies/Services
Quantity
Unit
Unit Cost
Total Cost (Not to Exceed)
3001
Project Management
3001A
Contractor Project Management Plan IAW PWS Section 5.1.1
1
EA
NSP
NSP
3001B
Contractor Staff Roster IAW section 6.2.2 of the PWS
1
EA
NSP
NSP
3001C
Monthly Status Report IAW section 5.1.2 of the PWS
1
EA
NSP
NSP
3001D
Technical Kickoff Meeting IAW section 5.1.4
1
EA
NSP
NSP
3001E
Preliminary Hardware Deployment Design Document (HDDD) IAW section 5.3.2.1 and
1
EA
NSP
NSP
3002
Site Assessments IAW Section 5.2 of the PWS
3002A
Site Assessment Base Cost - Centrak
1
JOB
$______
$______
3002B
Site Assessment- Per Room- Centrak

Additional price based on number of rooms at each site. Unit price is per room

1
JOB
$______
$______
3002C
Site Assessment- Per Room- Intelligent Insites

Additional price based on number of rooms at each site. Unit price is per room

1
JOB
$______
$______
3002D
Site Assessment- Per Room- Intelligent Insites

Additional price based on number of rooms at each site. Unit price is per room

1
JOB
$______
$______
3003
Centrak Brand Name Hardware IAW Section 5.4 of the PWS
NSP
NSP
3003A
Timing Star

ITK-123-G

1
EA
$______
$______
3003B
900 Mhz Star

ITK-103C-G

1
EA
$______
$______
3003C
IR Monitor Multi Mode

ITK-318-G

1
EA
$______
$______
3003D
IR Virtual Wall Multi Mode

ITK-325-G

1
EA
$______
$______
3003E
IR Virtual Wall Bay Use Multi Mode

ITK-326-G

1
EA
$______
$______
3003F
LF Exciter

ITK-340-G

1
EA
$______
$______
3003G
Asset Tag Multi Mode

ITK-761E-G

1
EA
$______
$______
3003H
Asset Tag Mini 900 Mhz

ITK-722E-G

1
EA
$______
$______
3004
Hardware Installation IAW Section 5.5 of the PWS

Price is a firm-fixed price and includes all associated costs, including travel and program management.

NSP
NSP
3004A
Installation of Centrak infrastructure device
1
EA
$______
$______
3004B
Configuration of Centrak infrastructure device
1
EA
$______
$______
3004C
Validation of Centrak Infrastructure device
1
EA
$______
$______
3004D
Certification of Centrak Infrastructure device
1
EA
$______
$______
3004E
Install and Configure Asset Tag
1
EA
3004F
Install cabling per Star
1
EA
$______
$______
3004G
Replace infrastructure device batteries per device
1
EA
3005
Software IAW Section 5.8 of the PWS
NSP
NSP
3005A
Intelligent InSites Perpetual License

Platform (Asset Optimization and Connector to AT)

1
EA
$______
$______
3005B
InSites software license Perpetual License – Asset Optimization Add-On for 1 Outbuilding
1
EA
$________
$______
3005C
InSites software license Perpetual License – Asset Optimization Add-On for bundle of 4 Outbuildings
1
EA
$________
$______
3005D
InSites software license Perpetual License – Cisco MSE/CMX Connector
1
EA
$________
$______
3005E
CenTrak Connect Core - TRM
1
EA
$______
$______
3005F
CenTrak Connect Pulse - TRM
1
EA
$______
$______
3005G
CenTrak Fingerprinting Locating Engine - TRM
1
EA
$______
$______
3005H
CenTrak Connect Cisco MSE Bundle – TRM
1
EA
$______
$______
3005I
CenTrak Pulse Asset Viewer- TRM
1
EA
$________
$______
3006
Software Installation & Configuration IAW Sections 5.7, 5.8, and 5.9 of the PWS

Price is a firm-fixed price and includes all associated costs, including travel and program management

NSP
NSP
3006A
Install Intelligent InSites Perpetual License Platform (Asset Optimization and Connector to AT)
1
EA
$________
$______
3006B
Install InSites software license Perpetual License – Asset Optimization Add-On for 1 Outbuilding
1
EA
$________
$______
3006C
Install InSites software license Perpetual License – Asset Optimization Add-On for bundle of 4 Outbuildings
1
EA
$________
$______
3006D
Install InSites software license Perpetual License – Cisco MSE/CMX Connector
1
EA
$________
$______
3006E
Install CenTrak Connect Core - TRM
1
EA
$______
$______
3006F
Install CenTrak Connect Pulse - TRM
1
EA
$______
$______
3006G
Install CenTrak Fingerprinting Locating Engine - TRM
1
EA
$______
$______
3006H
Install CenTrak Connect Cisco MSE Bundle – TRM
1
EA
$______
$______
3006I
Install CenTrak Pulse Asset Viewer- TRM
1
EA
$______
$______
3006J
CenTrak Asset Viewer Mapping per room
1
EA
$______
$______
3006K
Intelligent InSites Software Mapping & Configuration per room
1
EA
$______
$______
3006L
Reserved
NA
NA
NA
NA
3006M
Intelligent InSites Fingerprinting per floor
1
EA
$______
$______
3006N
Fingerprinting Engineering Setup/Mapping

Priced per floor

1
EA
$______
$______
3006O
Fingerprinting Processing

Price per 1000 sq ft

1
EA
$______
$______
3006P
Fingerprinting Signature Capture

Price per 1000 sq ft

1
EA
$______
$______
3006Q
VISTA Interface
1
EA
$______
$______
3006R
Maximo Interface
1
EA
$______
$______
3006S
Software Installation Report
1
EA
NSP
NSP
3007
Testing and Validation IAW Section 5.9,
NSP
MSP
3007A
Facility acceptance testing- Base Cost
1
EA
$______
$______
3007B
Facility acceptance testing Clinical Grade- Per Room
1
EA
$______
$______
3007C
Facility acceptance testing WiFi- Per Room

Additional price based on number of rooms at each site. Unit price is per room

1
EA
$______
$______
3007D
AT Acceptance Test Plan
1
EA
NSP
NSP
3007E
AT Facility Remediation Hardware Report
1
EA
NSP
NSP
3007F
Facility Acceptance Test Report
1
EA
NSP
NSP
3007G
Facility Final Hardware Design Document
1
EA
NSP
NSP
3008
User Training IAW Section 5.10.1, Performance Work Statement.
NSP
NSP
3008A
Onsite System User Training (CenTrak)
1
EA
$______
$______
3008B
Remote System User Training (CenTrak)
1
EA
$______
$______
3008C
Onsite System User Training (Intelligent InSites)
1
EA
$______
$______
3008D
Remote System User Training (Intelligent InSites)
1
EA
$______
$______
3008E
Onsite System Administrator Training (CenTrak)
1
EA
$______
$______
3008F
Remote System Administrator Training (CenTrak)
1
EA
$______
$______
3008G
Onsite System Administrator Training (Intelligent
1
EA
$______
$______
3008H
Remote System Administrator Training (Intelligent InSites)
1
EA
$______
$______
3008I
Onsite Technical Maintenance & Repair Training IAW 5.10.2
1
EA
$______
$______
3008J
Remote Technical Maintenance & Repair Training IAW 5.10.2
1
EA
$______
$______
3009
Transition Planning IAW Section 5.11, Performance Work Statement.
NSP
NSP
3009A
AT Transition Plan
1
EA
$______
$______
3009B
User and Technical Manuals
1
EA
$______
$______
3010
Warranty Services IAW Section 5.13, Performance Work Statement. Price is a firm-fixed price IDIQ and includes all associated costs, including travel.
NSP
NSP
3010A
AT Warranty Status Report
1
EA
NSP
NSP

Total Ordering Period Three

See attached document: S02 - 36C10A19R0011 Technical Exhibit B - Pricing Evaluation Spreadsheet (update 9.4.19).

File details come from the government source that posted it.