3343_1.PDF

PDF 74 KB Posted

Attached to
Furnishing of Stack Emission Testing services
Contract number
505ENT-M16-StackTest WI-00
Issued by
Wisconsin

About this file

This document is a price list and fee schedule for stack testing services covering the 2016-2018 period for the State of Wisconsin. The document involves various Wisconsin state agencies and facilities including the University of Wisconsin system campuses (Madison, Platteville, River Falls, La Crosse, Stout-Menomonie, Eau Claire, Stevens Point, Superior, and Oshkosh), the Department of Administration (DOA) Capitol Heat & Power, the Department of Health Services facilities at Mendota and Winnebago Mental Health in Oshkosh, and the Department of Corrections Waupun Correctional facility. Two vendors are identified as primary and secondary providers: Air Tech Montrose and an unnamed secondary vendor.

The contract covers stack testing services for emissions monitoring, primarily focusing on nitrogen oxides (NOx) and carbon monoxide (CO) testing using various EPA methods including Method 3A, 7E, 10, and visual opacity Method 9. Testing is scheduled primarily during the first quarter of each year from 2016-2018, with some facilities requiring annual testing over the three-year period. The primary vendor's total pricing is $117,000 while the secondary vendor quotes $127,343 for the same scope of work. Services include Relative Accuracy Test Audits (RATA) on Continuous Emissions Monitoring Systems (CEMs), manual stack sampling, and visual opacity assessments, with testing conducted at various stack heights ranging from ground level to permanent platforms up to 237 feet high.

View the file

Other files

File Type Posted
3343_3.PDF PDF
3343_0.PDF PDF
3343_2.PDF PDF
Stack Test Pricing 2018.pdf PDF
Stack Test Pricing 2020.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF WISCONSIN

Price List for 2016‐2018

Stack Testing Services Fee Schedule:

2016-2018

(Attachment A)

Facility Required Test Test Site Prposed date Primary Vendor Secondary Vendor

Air Tech Montrose UW-Madison Charter Street NOx, CO RATA on 4 CEMs Permanent stack sampling platform 1st Qtr., 2016, 2017 and 2018 $31,800.00 $39,450.00

UW-Madison Walnut Street NOx, CO RATA (Method 3A, Permanent stack sampling platform 1st Qtr., 2016, 2017 and 2018 $14,700.00 $15,585.00 7E & 10)

DOA Capitol Heat & Power NOx, CO (Method 7E & 10) Stair access and sampling platform inside the plant 1st Qtr., 2017 $4,600.00 $5,195.00

DHS-Mendota (2 boilers) CO (Method 10) Permanent stack sampling platform 100’ up 175’ stack Early March 2017 $5,000.00 $3,996.00

DHS-Winnebago Mental Health – Oshkosh Visual opacity M-9 Visual of Heating Plant February 2016, 2017 & 2018 $3,000.00 $7,800.00 on oil

DOC – Waupun Correctional (3 boilers) Visual opacity M-9 9 (oil) Visual of Heating Plant February 2016, 2017 & 2018 $3,000.00 $11,400.00

UW-Platteville (2 boilers) CO (Method 10) Permanent Sampling Platform Late January 2017 $6,200.00 $5,096.00

UW-River Falls (2 boilers) CO (Method 10) Permanent sampling platform Late January 2017 $8,000.00 $6,175.00

UW-La Crosse (2 boilers) CO (Method 10) Permanent Platform 120’ up 220’ stack Late February 2017 $6,500.00 $5,800.00

UW-Stout – Menomonie (2 Boilers) CO (Method 10) Metal Stack Plant Roof Early February 2017 $7,600.00 $5,950.00

UW-Eau Claire (2 boilers) CO (Method 10) Permanent platform 196 feet up 237 foot stack Late February 2017 $8,500.00 $5,950.00

UW-Stevens Point CO (Method 10) Mid February 2017 $4,700.00 $4,400.00

UW-Superior CO (Method 10) Permanent stack sampling platform 120’ up 220’ stack Early February 2017 $6,800.00 $5,450.00

UW-Oshkosh (2 boilers) CO (Method 10) Metal Stack Plant Roof Mid February 2017 $6,600.00 $5,096.00

TOTAL COST $117,000.00 $127,343.00

Prepared by Dave on 12/8/2015, 2:45 PMStack Test Pricing 2015

File details come from the government source that posted it. Updated .