About this file
This document is a state and local contract pricing schedule for MH Corbin, detailing an electrical and infrastructure services contract across multiple service groups. The contract covers electrical work, pole installations, device services, maintenance of traffic, and ITS (Intelligent Transportation Systems) cabinets and hardware, with pricing structured for standard (14-day), rush (7-day), and expedited (2-day) service delivery timelines.
The contract is organized into five distinct groups: Electrical, Poles, Devices, Maintenance of Traffic, and ITS Cabinets and Hardware. Pricing varies by service and response time, with expedited services commanding a premium. Notable services include light pole foundations, CCTV lowering unit installations, connected vehicle infrastructure work, roadway traffic management, and specialized equipment installations like Lidar-based ceilometers. The pricing schedule includes specific line items for tasks ranging from cable installation and conduit work to device removal, field surveys, and system monitoring, with per-unit or per-task pricing that allows for flexible procurement across different project scales and urgencies.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ODOT_Terms___Conditions_with_excel_pricing.pdf | ||
| Affirmation_and_Disclosure_MH_Corbin.pdf | ||
| 330aspec_Bid_Doc..pdf | ||
| Signature__4___1___002_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electrical
| Vendor Name: | MH Corbin | ||||
| GROUP 1 - Electrical (Award by lowest bid per group) | |||||
| ITEM | UNIT | DESCRIPTION | STANDARD (14 days) | RUSH (7 days) | EXPEDITED (2 days) |
| E-1 | FT | 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT CABLES (Furnish and Install) | |||
| E-2 | FT | CONDUIT, JACKED OR DRILLED, AS PER PLAN (Furnish and Install) | |||
| E-3 | FT | CONDUIT, JACKED OR DRILLED, 725.04, 3" (Furnish and Install) | |||
| E-4 | FT | CONDUIT, 4", MULTICELL, 725.20, EPC-40 | |||
| E-5 | FT | CONDUIT, MULTICELL, 4", 725.20, SCHEDULE 80, JACKED OR DRILLED | |||
| E-6 | FT | TRENCH, 30" DEEP | |||
| E-7 | EACH | PULL BOX, 725.08, 18" (Furnish and Install) | |||
| E-8 | EACH | GROUND ROD, AS PER PLAN (Furnish and Install) | |||
| E-9 | FT | PLASTIC CAUTION TAPE (Furnish and Install) | |||
| E-10 | EACH | CONNECTION, UNFUSED PERMANENT (Furnish and Install) | |||
| E-11 | EACH | CONNECTION, FUSED PULL APART (Furnish and Install) | |||
| E-12 | EACH | CONNECTION, UNFUSED PULL APART (Furnish and Install) | |||
| E-13 | EACH | STEP-DOWN TRANSFORMER AND SUPPORT (Furnish and Install) | |||
| E-14 | EACH | POWER SERVICE, AS PER PLAN A | |||
| E-15 | EACH | POWER SERVICE, AS PER PLAN B | |||
| E-16 | EACH | POWER SERVICE, AS PER PLAN C | |||
| E-17 | EACH | POWER SERVICE, AS PER PLAN D | |||
| E-18 | EACH | POWER SERVICE REFURBISHED, AS PER PLAN | |||
| E-19 | EACH | STEP-DOWN TRANSFORMER FOR EXISTING POWER SERVICE (Furnish and Install) | |||
| E-20 | EACH | TROUBLESHOOTING UNDERGROUND AND ABOVE GROUND CIRCUITRY PROBLEM | |||
| E-21 | EACH | VERIFICATION OF SITE GROUNDING | |||
| E-22 | EACH | MOBILIZATION (AS SPECIFIED) | |||
| Comments | TOTAL |
Poles
| Vendor Name: | |||||
| GROUP 2 - Poles (Award by lowest bid per group) | |||||
| ITEM | UNIT | DESCRIPTION | STANDARD (14 days) | RUSH (7 days) | EXPEDITED (2 days) |
| P-1 | EACH | LIGHT POLE FOUNDATION | |||
| P-2 | EACH | LIGHT POLE (Installation Only) | |||
| P-3 | EACH | Remove and reerect 40' pole | |||
| P-4 | EACH | Remove and reerect 50' pole | |||
| P-5 | EACH | Remove and reerect 70' pole | |||
| P-6 | EACH | Repair a light pole or pedestal foundation | |||
| P-7 | EACH | Furnish and install a 35 ft. wood pole | |||
| P-8 | EACH | Furnish and Install a 40 ft. steel pole | |||
| P-9 | EACH | Furnish and Install a 50 ft. steel pole | |||
| P-10 | EACH | Furnish and Install a Bracket Arm, 15', as per plan | |||
| P-11 | EACH | Furnish and Install a Bracket Arm, 20', as per plan | |||
| P-12 | EACH | Furnish and Install a Bracket Arm, 30', as per plan | |||
| P-13 | EACH | MOBILIZATION | |||
| Comments |
Devices
| Vendor Name: | MH Corbin | ||||||
| GROUP 3- Devices (Award by lowest bid per group) | |||||||
| ITEM | UNIT | DESCRIPTION | Manufacturer | Model | STANDARD (14 days) | RUSH (7 days) | EXPEDITED (2 days) |
| D-1 | EACH | Remove/replace CCTV Lowering Units (Install Only) | MHC | $ 2,500.00 | $ 3,000.00 | $ 3,500.00 | |
| D-2 | WEEK | Bucket truck/crane rental | MHC | $ 4,000.00 | $ 4,500.00 | $ 6,000.00 | |
| D-3 | EACH | Install of Device attached to existing support (including necessary cabling) | MHC | $ 1,100.00 | $ 1,300.00 | $ 1,500.00 | |
| D-4 | EACH | Connected Vehicle RSU Installation | MHC | $ 1,450.00 | $ 1,450.00 | $ 1,450.00 | |
| D-5 | EACH | Connected Vehicle RSU Field Survey | MHC | $ 995.00 | $ 1,150.00 | $ 1,250.00 | |
| D-6 | EACH | Connected Vehicle FCC Licensing & Site Registration | MHC | $ 495.00 | $ 495.00 | $ 550.00 | |
| D-7 | EACH | Map File Generation / Configuration | MHC | $ 115.00 | $ 150.00 | $ 190.00 | |
| D-8 | EACH | Connected Vehicle RSU Installation Support & Configuration | MHC | $ 425.00 | $ 495.00 | $ 550.00 | |
| D-9 | MONTH | Maintenance of GPS Correction/ Real-Time System | MHC | $ 1,400.00 | $ 1,400.00 | $ 1,400.00 | |
| D-10 | EACH | Connected Vehicle Application Integration | MHC | $ 3,995.00 | $ 4,200.00 | $ 4,500.00 | |
| D-11 | MONTH | US-33 Connected Vehicle System Monitoring and Maintenance | MHC | $ 8,995.00 | $ 8,995.00 | $ 8,995.00 | |
| D-12 | EACH | Remove/replace device communication and power cables | MHC | $ 550.00 | $ 650.00 | $ 700.00 | |
| D-13 | FT | Outdoor-rated ethernet cable | MHC | $ 2.00 | $ 3.00 | $ 4.00 | |
| D-14 | EACH | ITS Cabinet Cleaning / Inspection | MHC | $ 950.00 | $ 1,100.00 | $ 1,300.00 | |
| D-15 | EACH | Cabinet and Pull Box Duct Seal Replacement | MHC | $ 400.00 | $ 450.00 | $ 500.00 | |
| D-16 | EACH | ITS Cabinet Lock Replacement | MHC | $ 150.00 | $ 175.00 | $ 200.00 | |
| D-17 | EACH | ITS Cabinet Wiring Inspection and Repair | MHC | $ 550.00 | $ 595.00 | $ 640.00 | |
| D-18 | EACH | Lidar-based 49,000 ft Ceilometer (Furnish and Install) | Lufft | CHM 15k | $ 85,000.00 | $ 85,000.00 | $ 85,000.00 |
| D-19 | EACH | Lidar-based 25,000 ft Ceilometer (Furnish and Install) | Lufft | CHM 8k | $ 72,500.00 | $ 72,500.00 | $ 72,500.00 |
| D-20 | EACH | Power Distribution Unit, ITS Commander (Installation Only) | SOUTHERN MANUFACTURING | ITS Commander | $ 250.00 | $ 300.00 | $ 400.00 |
| D-21 | EACH | Removal of existing device | MHC | $ 350.00 | $ 400.00 | $ 450.00 | |
| D-22 | EACH | Replacement of exisiting device on pole | MHC | $ 800.00 | $ 950.00 | $ 1,150.00 | |
| D-23 | HOUR | General Labor | MHC | $ 200.00 | $ 200.00 | $ 200.00 | |
| D-24 | EACH | MOBILIZATION | MHC | $ 2,500.00 | $ 3,000.00 | $ 3,500.00 | |
| Comments |
Maintenance of Traffic
| Vendor Name: | |||||
| GROUP 4 - Maintenance of Traffic (Award by lowest bid per group) | |||||
| ITEM | UNIT | DESCRIPTION | STANDARD (14 days) | RUSH (7 days) | EXPEDITED (2 days) |
| MAINT-1 | EACH | Maintenance of Traffic, Shoulder Closure on Any Highway | |||
| MAINT-2 | EACH | Maintenance of Traffic, One Lane Closure on a Multi-Lane Divided Highway | |||
| MAINT-3 | EACH | Maintenance of Traffic, One Lane Closure on a Two Lane Highway | |||
| MAINT-4 | EACH | Maintenance of Traffic, Lane Closure at Entrance Ramp | |||
| MAINT-5 | EACH | Maintenance of Traffic, Lane Closure at Entrance Ramp Acceleration Lane | |||
| MAINT-6 | EACH | Maintenance of Traffic, One Lane Closure on a Four Lane or Greater Divided Highway | |||
| MAINT-7 | EACH | Maintenance of Traffic, Multiple Lane Closures at an Intersection | |||
| MAINT-8 | EACH | Maintenance of Traffic, Flagger Closing 1 Lane of a 2-Lane Highway - Stationary Operation | |||
| MAINT-9 | EACH | Maintenance of Traffic, Lane Closure Within Exit Ramp | |||
| MAINT-10 | EACH | Maintenance of Traffic, Lane Closure in Deceleration Lane | |||
| MAINT-11 | EACH | Maintenance of Traffic, Exit Ramp Closure | |||
| MAINT-12 | EACH | Maintenance of Traffic, Road Closure | |||
| MAINT-13 | EACH | Maintenance of Traffic, Entrance Ramp Closure | |||
| MAINT-14 | EACH | Mobilization | |||
| MAINT-15 | HR | Law Enforcement Officer with Patrol Car | |||
| Comments |
ITS Cabinets and Hardware
| Vendor Name: | |||||||
| GROUP 5 - ITS Cabinets and Hardware (Award by lowest bid per group) | |||||||
| ITEM | UNIT | DESCRIPTION | MANUFACTURER | PART # | STANDARD (14 days) | RUSH (7 days) | EXPEDITED (2 days) |
| CAB-1 | EACH | NETWORK DEVICE PANEL / DIN RAIL (Furnish and Install) | SOUTHERN MANUFACTURING | ||||
| CAB-2 | EACH | POWER UNIT (Furnish and Install) | SOUTHERN MANUFACTURING | ASSY-PPPANEL-03 | |||
| CAB-3 | EACH | ITS POLE MOUNTED CABINET (Furnish and Install, including any needed conduit/conduit couplings) | SOUTHERN MANUFACTURING | WE336S-ITOH-05 Rev 01 | |||
| CAB-4 | EACH | ITS GROUND MOUNTED CABINET (Furnish and Install) | SOUTHERN MANUFACTURING | SOUH-WE334-ODOT-ITS-B-07 | |||
| CAB-5 | EACH | ITS Cabinet Foundation | |||||
| CAB-6 | EACH | Workpad | |||||
| CAB-7 | EACH | Mobilization | |||||
| Comments | |||||||
| weighted percentages | 50 | 35 | 15 |