This is a technical specification section for asphalt paving work issued by the Office of Parks, Recreation and Historic Preservation (OPRHP) in New York for Project No. SA-SS-2026-001. The specification covers asphalt paving materials, installation methods, and quality control procedures for a project involving saw cutting asphalt pavement (975 linear feet x 4 feet), removal of 4 inches of existing asphalt, demolition and removal of flowable fill, installation of 6-8 inches of Type 2 stone subbase, installation of 2.5 inches of asphalt binder course (3,900 square feet), and installation of 1.5 inches of asphalt top course (3,900 square feet). The specification requires the use of NYS DOT-approved asphalt mixtures meeting NYS DOT MM 5.16 standards, specifically 12.5 Top Course Asphalt for large parking lots and access roads and 25.0 Binder Course Asphalt, with a mandatory preinstallation conference at the project site to include the contractor's paving superintendent, inspectors, asphalt plant representative, and density gauge operator.
The specification mandates strict quality assurance and field control requirements, including engagement of a qualified testing agency, density testing to achieve 95 percent compaction (with an acceptable range of 92-97 percent of maximum theoretical density), thickness tolerances of plus or minus 1/4 inch for courses 4 inches or less, and surface smoothness testing using a 10-foot straightedge with a maximum tolerance of 1/4 inch variance. All asphalt materials must be sourced from NYS DOT-approved suppliers, and contractors must submit product data, Environmental Product Declarations in accordance with ISO standards (or documentation of good faith efforts to obtain them), certified asphalt designs, NYSDOT-approved plant information, mix design test results no older than six months, and material delivery tickets. Reclaimed Asphalt Pavement (RAP) is permitted provided it meets NYS DOT MM 5.16 requirements. Work must comply with NYS DOT Standard Specifications for asphalt paving and cannot proceed if subgrade conditions are wet or excessively damp, or if rain is imminent; additionally, paving is restricted by specific dates listed in the General Conditions of the contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 310000 Earthwork.pdf | ||
| DOL Wage Schedule.pdf | ||
| SPAC East 50 Repairs 2026_RFQ.docx | DOCX document | |
| 5.0_139 J, Gen Con, App A, B, C combined 06.2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
321216-1 Project No. SA-SS-2026-001
SECTION 321216 - ASPHALT PAVING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Asphalt paving.
2. Asphalt curbs.
3. Asphalt traffic-calming devices.
B. Related Requirements:
1. Section 310000 "Earthwork” for subgrade preparation, fill material, separation geotextiles, unbound-aggregate subbase and base courses, and aggregate pavement shoulders.
1.2 REFERENCE STANDARDS
A. American Association of State Highway and Transportation Officials
1. AASHTO M 29 - Standard Specification for Fine Aggregate for Asphalt Mixtures
2. AASHTO M 140 - Standard Specification for Emulsified Asphalt
3. AASHTO M 208 - Standard Specification for Cationic Emulsified Asphalt
4. AASHTO M 288 - Standard Specification for Geosynthetic Specification for Highway
Applications
5. AASHTO M 320 - Standard Specification for Performance-Graded Asphalt Binder
6. AASHTO R 97 - Standard Practice for Sampling Asphalt Mixtures
7. AASHTO T 245 - Standard Method of Test for Resistance to Plastic Flow of Asphalt
Mixtures Using Marshall Apparatus.
B. Asphalt Institute
1. AI MS-2 - Asphalt Mix Design Methods
2. AI MS-22 - Construction of Hot Mix Asphalt Pavements
C. ASTM International
1. ASTM D242 - Standard Specification for Mineral Filler for Asphalt Mixtures
2. ASTM D977 - Standard Specification for Emulsified Asphalt
3. ASTM D979 - Standard Practice for Sampling Bituminous Paving Mixtures
4. ASTM D1188 - Standard Test Method for Bulk Specific Gravity and Density of
Compacted Bituminous Mixtures Using Coated Samples
5. ASTM D2027 - Standard Specification for Cutback Asphalt (Medium-Curing Type)
6. ASTM D2041 - Standard Test Method for Theoretical Maximum Specific Gravity and
Density of Asphalt Mixtures
321216-2 Project No. SA-SS-2026-001
7. ASTM D2397 - Standard Specification for Cationic Emulsified Asphalt
8. ASTM D2726 - Standard Test Method for Bulk Specific Gravity and Density of Non-
Absorptive Compacted Asphalt Mixtures
9. ASTM D2950 - Standard Test Method for Density of Bituminous Concrete in Place by
Nuclear Methods
10. ASTM D3141 - Standard Specification for Asphalt for Undersealing Portland-Cement
Concrete Pavements
11. ASTM D3381 - Standard Specification for Viscosity-Graded Asphalt Binder for Use in
Pavement Construction
12. ASTM D3549 - Standard Test Method for Thickness or Height of Compacted Asphalt
Mixture Specimens
13. ASTM D3666 - Standard Specification for Minimum Requirements for Agencies Testing and Inspecting Road and Paving Materials
14. ASTM D3910 - Standard Practices for Design, Testing, and Construction of Slurry Seal
15. ASTM D6373 - Standard Specification for Performance Graded Asphalt Binder
16. ASTM D6690 - Standard Specification for Joint and Crack Sealants, Hot Applied, for
Concrete and Asphalt Pavements
17. ASTM D6927 - Standard Test Method for Marshall Stability and Flow of Asphalt Mixtures
D. New York State Department of Transportation (NYS DOT)
1. DOT 300 – Bases and Subbases
2. DOT 400 – Asphalt Mixture and Pavement
3. DOT 600 – Incidental Construction
4. DOT MM 5.16 - Asphalt Mixture Design And Mixture Verification Procedures
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at the Project site.
1. The attendance at this meeting will include Contractor’s Paving Superintendent, Chief Inspector or Paving Inspector(s), asphalt plant representative, density gauge operator, depending on the compaction method used, and work zone traffic control (WZTC) competent person (if applicable).
2. Review methods and procedures related to asphalt paving including, but not limited to, the following:
a. Review proposed sources of paving materials, including capabilities and location of plant that will manufacture asphalt.
b. Review requirements for protecting paving work, including restriction of traffic during installation period and for remainder of construction period.
1.4 SUBMITTALS
A. Submittals for this section are subject to the re-evaluation fee identified in Article 4 of the General Conditions.
B. Manufacturer’s installation instructions shall be provided along with product data.
321216-3 Project No. SA-SS-2026-001
C. Submittals shall be provided in the order in which they are specified and tabbed (for combined submittals).
D. Product Data: Include manufacturer / provider / plant name, product name, technical data and tested physical and performance properties.
1. Paving geotextile.
a. Including specifications, MSDS as required, adhesion type and rate, and installation instructions.
E. Submit an Environmental Product Declaration (EPD) from the manufacturer for each asphalt mix within this specification section, if available. A statement of the contractor’s good faith effort to obtain the EPD shall be provided if not available.
1. Manufacturer-provided EPDs must be Product Specific Type III (Third-Party Reviewed), in adherence with ISO 14025 Environmental labels and declarations, ISO 14044 Environmental management – Life cycle assessment, and ISO 21930 Core rules for environmental product declarations of construction products and services.
F. Asphalt Designs:
1. Certification, by authorities having jurisdiction, of approval of each asphalt design proposed for the Work.
2. NYSDOT Approved Plant name, Number, and location of the asphalt plant for each asphalt design proposed for the Work.
3. Asphalt Mix Design Test results that are less than 6 months old for each mix proposed for the Work.
G. Material Delivery Tickets for pavement materials including the following information.
1. Ticket Number.
2. Plant Identification.
3. Project Name.
4. Mix Type.
5. Quantity of material in vehicle.
6. Date and Time.
7. [Statement that mixes containing recycled materials will perform equal to mixes produced from all new materials.]
H. Field quality-control reports.
1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications: A paving-mix manufacturer registered with and approved by the NYS Department of Transportation.
B. Testing Agency Qualifications: Qualified in accordance with ASTM D3666 for testing indicated.
321216-4 Project No. SA-SS-2026-001
C. Regulatory Requirements: Comply with materials, workmanship, and other applicable requirements of NYS Department of Transportation Standard Specifications for asphalt paving work.
1. Measurement and payment provisions and safety program submittals included in standard specifications do not apply to this Section.
1.6 FIELD CONDITIONS
A. Environmental Limitations: Do not apply asphalt materials if subgrade is wet or excessively damp, or if rain is imminent or expected before time required for adequate cure.
B. Discontinue paving when surface temperatures fall below requirements listed in NYSDOT Table 404-1 unless otherwise specified in the General Conditions of this Contract or as directed by the Director’s Representative.
C. Pavement is restricted by dates listed in the General Conditions.
PART 2 - PRODUCTS
2.1 AGGREGATES
A. All aggregate used in design mixes shall be as specified in NYS DOT Specification Section 401-
2.02 B; Coarse Aggregate Type F2 Conditions.
2.2 ASPHALT MATERIALS
A. Asphalt: Use aggregate and PG binder from suppliers listed in the NYS DOT’s Approved List for Fine and Coarse Aggregates and Performance Graded (PG) Binders and Warm Mix Technology for Asphalt Paving respectively. Mineral filler shall meet the requirements of NYS DOT Section 703-08.
B. Supply approved asphalt mixtures that meet the requirements of NYS DOT MM 5.16 Asphalt Mixture Design and Mixture Verification Procedures. Each mixture must be obtained from a single plant for the duration of the project. The following NYS DOT items only shall be utilized for this project:
1. 12.5 Top Course Top Course Asphalt (Large Parking Lots & Access Roads).
2. 25.0 Binder Course Asphalt.
C. Reclaimed Asphalt Pavement (RAP) shall meet the requirements of NYS DOT MM 5.16.
D. Asphalt Cement Tack Coat.
321216-5 Project No. SA-SS-2026-001
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that subgrade is dry and in suitable condition to begin paving.
B. Proceed with paving only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Protection: Provide protective materials, procedures, and worker training to prevent asphalt materials from spilling, coating, or building up on curbs, driveway aprons, manholes, and other surfaces adjacent to the Work.
B. Subgrade compaction shall adhere to Section 310000.
3.3 SURFACE PREPARATION
A. Prepare existing surfaces in accordance with DOT Section 402-3.05, Conditioning of Existing Surface.
B. Ensure that prepared subgrade has been proof-rolled and is ready to receive paving. Immediately before placing asphalt materials, remove loose and deleterious material from substrate surfaces.
3.4 ASPHALT PLACEMENT
A. Spread and Finish asphalt in accordance with DOT Section 404-3.06, Spreading and Finishing.
B. Remove and restore paved areas that are defective or contaminated as delineated by the Director’s Representative at no additional cost to the State.
3.5 JOINTS
A. Asphalt joints shall be in accordance with DOT Section 404-3.09, Joints.
3.6 COMPACTION
A. Provide compaction of asphalt mixtures in general accordance with DOT Section 404-3.07, Compaction, Paragraph D, 80 Series Compaction Methods, specifically meeting the minimum requirements as shown in Table 404-3 Number of Passes.
1. The Director’s Representative may increase or decrease the number of passes to obtain adequate density of the compacted asphalt.
2. The Director’s Representative may also approve alternate compaction procedures where the specified procedures are not applicable.
321216-6 Project No. SA-SS-2026-001
3. Testing to be performed at the direction of and in locations chosen by the Director’s Representative. Target compaction is 95% (92% - 97% range is acceptable; as mixture maximum theoretical density).
3.7 INSTALLATION TOLERANCES
A. Pavement Thickness: Compact each course to produce thickness indicated within the following tolerances:
1. Binder Course and Surface Course: Plus or minus ¼ inch when the total nominal thickness indicated on the plans is 4 inches or less. Plus or minus ½ inch when the total nominal thickness is over 4 inches but not more than 8 inches. When the asphalt mixture is placed on newly constructed subbase material, an additional tolerance of ½ inch will be allowed both in the nominal thickness of the course placed directly on the subbase and the total pavement thickness.
B. Pavement Surface Smoothness: Compact each course to produce surface smoothness within the following tolerances as determined by using a 10-foot straightedge applied transversely or longitudinally to paved areas:
1. Binder Course: 1/4 inch.
2. Surface Course: 1/4 inch
3. Crowned Surfaces: Test with crowned template centered and at right angle to crown.
Maximum allowable variance from template is 1/4 inch.
4. Variations exceeding ¼ inch will be appropriately corrected or the pavement be removed and replaced at no additional cost to the State.
3.8 FIELD QUALITY CONTROL
A. Testing Agency: Contractor shall engage a qualified testing agency to perform tests and inspections.
B. Thickness: In-place compacted thickness of asphalt courses will be determined in accordance with ASTM D3549.
C. Surface Smoothness: Finished surface of each asphalt course will be tested for compliance with smoothness tolerances.
D. Density Testing: Testing agency will take samples of uncompacted paving mixtures and compacted pavement in accordance with AASHTO T 168.
1. Reference maximum theoretical density will be determined by averaging results from four samples of asphalt-paving mixture delivered daily to site, prepared in accordance with ASTM D2041, and compacted in accordance with job-mix specifications.
2. Density of compacted pavement will be determined by testing core samples in accordance with ASTM D1188 or ASTM D2726.
321216-7 Project No. SA-SS-2026-001
a. One core sample will be taken for every 1000 sq. yd. or less of installed pavement, with no fewer than three cores taken.
b. Field density of in-place compacted pavement may also be determined by nuclear method in accordance with ASTM D2950 and coordinated with ASTM D1188 or
ASTM D2726.
E. Replace and compact asphalt where core tests were taken.
F. Remove and replace or install additional asphalt where test results or measurements indicate that it does not comply with specified requirements.
END OF SECTION 321216
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section Includes: |
| 1. Asphalt paving. |
| 2. Asphalt curbs. |
| 3. Asphalt traffic-calming devices. |
| B. Related Requirements: |
| 1. Section 310000 "Earthwork” for subgrade preparation, fill material, separation geotextiles, unbound-aggregate subbase and base courses, and aggregate pavement shoulders. |
| 1.2 REFERENCE STANDARDS |
| A. American Association of State Highway and Transportation Officials |
| 1. AASHTO M 29 - Standard Specification for Fine Aggregate for Asphalt Mixtures |
| 2. AASHTO M 140 - Standard Specification for Emulsified Asphalt |
| 3. AASHTO M 208 - Standard Specification for Cationic Emulsified Asphalt |
| 4. AASHTO M 288 - Standard Specification for Geosynthetic Specification for Highway Applications |
| 5. AASHTO M 320 - Standard Specification for Performance-Graded Asphalt Binder |
| 6. AASHTO R 97 - Standard Practice for Sampling Asphalt Mixtures |
| 7. AASHTO T 245 - Standard Method of Test for Resistance to Plastic Flow of Asphalt Mixtures Using Marshall Apparatus. |
| B. Asphalt Institute |
| 1. AI MS-2 - Asphalt Mix Design Methods |
| 2. AI MS-22 - Construction of Hot Mix Asphalt Pavements |
| C. ASTM International |
| 1. ASTM D242 - Standard Specification for Mineral Filler for Asphalt Mixtures |
| 2. ASTM D977 - Standard Specification for Emulsified Asphalt |
| 3. ASTM D979 - Standard Practice for Sampling Bituminous Paving Mixtures |
| 4. ASTM D1188 - Standard Test Method for Bulk Specific Gravity and Density of Compacted Bituminous Mixtures Using Coated Samples |
| 5. ASTM D2027 - Standard Specification for Cutback Asphalt (Medium-Curing Type) |
| 6. ASTM D2041 - Standard Test Method for Theoretical Maximum Specific Gravity and Density of Asphalt Mixtures |
| 7. ASTM D2397 - Standard Specification for Cationic Emulsified Asphalt |
| 8. ASTM D2726 - Standard Test Method for Bulk Specific Gravity and Density of Non-Absorptive Compacted Asphalt Mixtures |
| 9. ASTM D2950 - Standard Test Method for Density of Bituminous Concrete in Place by Nuclear Methods |
| 10. ASTM D3141 - Standard Specification for Asphalt for Undersealing Portland-Cement Concrete Pavements |
| 11. ASTM D3381 - Standard Specification for Viscosity-Graded Asphalt Binder for Use in Pavement Construction |
| 12. ASTM D3549 - Standard Test Method for Thickness or Height of Compacted Asphalt Mixture Specimens |
| 13. ASTM D3666 - Standard Specification for Minimum Requirements for Agencies Testing and Inspecting Road and Paving Materials |
| 14. ASTM D3910 - Standard Practices for Design, Testing, and Construction of Slurry Seal |
| 15. ASTM D6373 - Standard Specification for Performance Graded Asphalt Binder |
| 16. ASTM D6690 - Standard Specification for Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt Pavements |
| 17. ASTM D6927 - Standard Test Method for Marshall Stability and Flow of Asphalt Mixtures |
| D. New York State Department of Transportation (NYS DOT) |
| 1. DOT 300 – Bases and Subbases |
| 2. DOT 400 – Asphalt Mixture and Pavement |
| 3. DOT 600 – Incidental Construction |
| 4. DOT MM 5.16 - Asphalt Mixture Design And Mixture Verification Procedures |
| 1.3 PREINSTALLATION MEETINGS |
| A. Preinstallation Conference: Conduct conference at the Project site. |
| 1. The attendance at this meeting will include Contractor’s Paving Superintendent, Chief Inspector or Paving Inspector(s), asphalt plant representative, density gauge operator, depending on the compaction method used, and work zone traffic control (WZ... |
| 2. Review methods and procedures related to asphalt paving including, but not limited to, the following: |
| a. Review proposed sources of paving materials, including capabilities and location of plant that will manufacture asphalt. |
| b. Review requirements for protecting paving work, including restriction of traffic during installation period and for remainder of construction period. |
| 1.4 SUBMITTALS |
| A. Submittals for this section are subject to the re-evaluation fee identified in Article 4 of the General Conditions. |
| B. Manufacturer’s installation instructions shall be provided along with product data. |
| C. Submittals shall be provided in the order in which they are specified and tabbed (for combined submittals). |
| D. Product Data: Include manufacturer / provider / plant name, product name, technical data and tested physical and performance properties. |
| 1. Paving geotextile. |
| a. Including specifications, MSDS as required, adhesion type and rate, and installation instructions. |
| E. Submit an Environmental Product Declaration (EPD) from the manufacturer for each asphalt mix within this specification section, if available. A statement of the contractor’s good faith effort to obtain the EPD shall be provided if not available. |
| 1. Manufacturer-provided EPDs must be Product Specific Type III (Third-Party Reviewed), in adherence with ISO 14025 Environmental labels and declarations, ISO 14044 Environmental management – Life cycle assessment, and ISO 21930 Core rules for environ... |
| F. Asphalt Designs: |
| 1. Certification, by authorities having jurisdiction, of approval of each asphalt design proposed for the Work. |
| 2. NYSDOT Approved Plant name, Number, and location of the asphalt plant for each asphalt design proposed for the Work. |
| 3. Asphalt Mix Design Test results that are less than 6 months old for each mix proposed for the Work. |
| G. Material Delivery Tickets for pavement materials including the following information. |
| 1. Ticket Number. |
| 2. Plant Identification. |
| 3. Project Name. |
| 4. Mix Type. |
| 5. Quantity of material in vehicle. |
| 6. Date and Time. |
| 7. [Statement that mixes containing recycled materials will perform equal to mixes produced from all new materials.] |
H. Field quality-control reports.
| 1.5 QUALITY ASSURANCE |
| A. Manufacturer Qualifications: A paving-mix manufacturer registered with and approved by the NYS Department of Transportation. |
| B. Testing Agency Qualifications: Qualified in accordance with ASTM D3666 for testing indicated. |
| C. Regulatory Requirements: Comply with materials, workmanship, and other applicable requirements of NYS Department of Transportation Standard Specifications for asphalt paving work. |
| 1. Measurement and payment provisions and safety program submittals included in standard specifications do not apply to this Section. |
| 1.6 FIELD CONDITIONS |
| A. Environmental Limitations: Do not apply asphalt materials if subgrade is wet or excessively damp, or if rain is imminent or expected before time required for adequate cure. |
| B. Discontinue paving when surface temperatures fall below requirements listed in NYSDOT Table 404-1 unless otherwise specified in the General Conditions of this Contract or as directed by the Director’s Representative. |
| C. Pavement is restricted by dates listed in the General Conditions. |
| PART 2 - PRODUCTS |
| 2.1 AGGREGATES |
| A. All aggregate used in design mixes shall be as specified in NYS DOT Specification Section 401-2.02 B; Coarse Aggregate Type F2 Conditions. |
| 2.2 ASPHALT MATERIALS |
| A. Asphalt: Use aggregate and PG binder from suppliers listed in the NYS DOT’s Approved List for Fine and Coarse Aggregates and Performance Graded (PG) Binders and Warm Mix Technology for Asphalt Paving respectively. Mineral filler shall meet the re... |
| B. Supply approved asphalt mixtures that meet the requirements of NYS DOT MM 5.16 Asphalt Mixture Design and Mixture Verification Procedures. Each mixture must be obtained from a single plant for the duration of the project. The following NYS DOT it... |
| 1. 12.5 Top Course Top Course Asphalt (Large Parking Lots & Access Roads). |
| 2. 25.0 Binder Course Asphalt. |
| C. Reclaimed Asphalt Pavement (RAP) shall meet the requirements of NYS DOT MM 5.16. |
| D. Asphalt Cement Tack Coat. |
| PART 3 - EXECUTION |
| 3.1 EXAMINATION |
| A. Verify that subgrade is dry and in suitable condition to begin paving. |
| B. Proceed with paving only after unsatisfactory conditions have been corrected. |
| 3.2 PREPARATION |
| A. Protection: Provide protective materials, procedures, and worker training to prevent asphalt materials from spilling, coating, or building up on curbs, driveway aprons, manholes, and other surfaces adjacent to the Work. |
| B. Subgrade compaction shall adhere to Section 310000. |
| 3.3 SURFACE PREPARATION |
| A. Prepare existing surfaces in accordance with DOT Section 402-3.05, Conditioning of Existing Surface. |
| B. Ensure that prepared subgrade has been proof-rolled and is ready to receive paving. Immediately before placing asphalt materials, remove loose and deleterious material from substrate surfaces. |
| 3.4 ASPHALT PLACEMENT |
| A. Spread and Finish asphalt in accordance with DOT Section 404-3.06, Spreading and Finishing. |
| B. Remove and restore paved areas that are defective or contaminated as delineated by the Director’s Representative at no additional cost to the State. |
| 3.5 JOINTS |
| A. Asphalt joints shall be in accordance with DOT Section 404-3.09, Joints. |
| 3.6 COMPACTION |
| A. Provide compaction of asphalt mixtures in general accordance with DOT Section 404-3.07, Compaction, Paragraph D, 80 Series Compaction Methods, specifically meeting the minimum requirements as shown in Table 404-3 Number of Passes. |
| 1. The Director’s Representative may increase or decrease the number of passes to obtain adequate density of the compacted asphalt. |
| 2. The Director’s Representative may also approve alternate compaction procedures where the specified procedures are not applicable. |
| 3. Testing to be performed at the direction of and in locations chosen by the Director’s Representative. Target compaction is 95% (92% - 97% range is acceptable; as mixture maximum theoretical density). |
| 3.7 INSTALLATION TOLERANCES |
| A. Pavement Thickness: Compact each course to produce thickness indicated within the following tolerances: |
| 1. Binder Course and Surface Course: Plus or minus ¼ inch when the total nominal thickness indicated on the plans is 4 inches or less. Plus or minus ½ inch when the total nominal thickness is over 4 inches but not more than 8 inches. When the asphalt ... |
| B. Pavement Surface Smoothness: Compact each course to produce surface smoothness within the following tolerances as determined by using a 10-foot straightedge applied transversely or longitudinally to paved areas: |
| 1. Binder Course: 1/4 inch. |
| 2. Surface Course: 1/4 inch |
| 3. Crowned Surfaces: Test with crowned template centered and at right angle to crown. Maximum allowable variance from template is 1/4 inch. |
| 4. Variations exceeding ¼ inch will be appropriately corrected or the pavement be removed and replaced at no additional cost to the State. |
| 3.8 FIELD QUALITY CONTROL |
| A. Testing Agency: Contractor shall engage a qualified testing agency to perform tests and inspections. |
| B. Thickness: In-place compacted thickness of asphalt courses will be determined in accordance with ASTM D3549. |
| C. Surface Smoothness: Finished surface of each asphalt course will be tested for compliance with smoothness tolerances. |
| D. Density Testing: Testing agency will take samples of uncompacted paving mixtures and compacted pavement in accordance with AASHTO T 168. |
| 1. Reference maximum theoretical density will be determined by averaging results from four samples of asphalt-paving mixture delivered daily to site, prepared in accordance with ASTM D2041, and compacted in accordance with job-mix specifications. |
| 2. Density of compacted pavement will be determined by testing core samples in accordance with ASTM D1188 or ASTM D2726. |
| a. One core sample will be taken for every 1000 sq. yd. or less of installed pavement, with no fewer than three cores taken. |
| b. Field density of in-place compacted pavement may also be determined by nuclear method in accordance with ASTM D2950 and coordinated with ASTM D1188 or ASTM D2726. |
| E. Replace and compact asphalt where core tests were taken. |
| F. Remove and replace or install additional asphalt where test results or measurements indicate that it does not comply with specified requirements. |