This is a site development plan and construction document for the Georgia Breakbulk Logistics Park project prepared by Thomas & Hutton Engineering for the Golden Isles Development Authority in Glynn County, Georgia. The project involves the construction of entrance road infrastructure for an industrial logistics park located on US Highway 82, including the installation of two driveways (one full access and one right-in/right-out configuration), site clearing, grading, and associated utilities. The work encompasses approximately 815 to 1,203 linear feet of roadway development with multiple phases: initial, intermediate, and final phases. Key infrastructure components include water mains (12-inch PVC), sanitary force mains, storm drainage systems with multiple drainage runs and structures, pavement marking and signaling, and erosion and sedimentation control measures. The project design was last revised on February 3, 2026, following multiple iterations of reviews and revisions by Glynn County and Georgia Department of Transportation (GDOT) personnel. Sealed proposals were to be received by March 10, 2026, at 10:00 AM at Thomas & Hutton's offices. This is a rebid of the original solicitation after only one proposal was received in the initial bidding cycle.
The project specifications require adherence to GDOT standard specifications for roadway construction, geotechnical investigation criteria established by Terracon, and Brunswick-Glynn Joint Water and Sewer Commission (BGJWSC) standards for utility installation. All proposed water mains, sanitary sewer mains, and force mains will be dedicated to BGJWSC for ownership and maintenance, while public rights-of-way will be dedicated to Glynn County. The contractor is responsible for utility location verification, all necessary construction permits, erosion and sediment control installation and maintenance, traffic control compliance, and daily site cleanup and drainage functionality. The project prohibits lane closures during peak traffic hours (6:00-9:00 AM and 4:00-7:00 PM). No specific pricing information, funding sources, or award amounts are documented within these construction plans; this document serves as the technical specifications and design reference for bidders preparing cost proposals for the sealed bid submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 30688_0002 _ Contract Docs_Specs.pdf | ||
| Invitation to Bid_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US HIGHWAY 82
OLD BROOKMAN RD EMANUEL CHURCH RD
O
LD
C C
C R
D
REV. NO. REVISION
REVISION HISTORY
BY DATE
SUBMITTED TO
SUBMITTAL HISTORY
DATEDATE
ISSUED FOR BID 11/04/2025
A REVISED PER GLYNN COUNTY & GDOT COMMENTS TMV 09/17/25
B REVISED PER GLYNN COUNTY & GDOT COMMENTS TMV 10/28/25
C REVISED PER GDOT COMMENTS TMV 11/04/25
D REVISED PER GLYNN COUNTY & GDOT COMMENTS TMV 12/05/25
E REVSIED PER INTERNAL REVIEW TMV 02/03/26
J-
8.
4/
/2
G
EO
RG
IA
B
RE
A
KB
UL
K
LO
G
IS
TIC
S
PA
RK
US
EN
TR
A
N C
E
RO
A D
SITE DEVELOPMENT PLANS
OF
GEORGIA BREAKBULK LOGISTICS PARK - US 82
ENTRANCE ROAD
GLYNN COUNTY, GA
PREPARED FOR:
GOLDEN ISLES DEVELOPMENT AUTHORITY
209 GLOUCESTER ST, SUITE 201
BRUNSWICK, GA 31520
APRIL 30, 2025
LAST REVISED: FEBRUARY 3, 2026
TM# 02-02811
J-30688.0002
VICINITY MAP
SCALE: 1" = 1000'
SITE
PREPARED BY:
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
C
O .D
W G
Fe b 4,
- 1
0:
A M
Sheet List Table Sheet Number Sheet Title
CO COVER SHEET
GN1.1 GENERAL NOTES AND LEGENDS
GN1.2 OVERALL SITE PLAN
GN1.3 OVERALL SITE PLAN
EX1.1 EXISTING CONDITIONS AND DEMOLITION PLANS
EX1.2 EXISTING CONDITIONS AND DEMOLITION PLANS
C1.1 LAYOUT SIGNING & MARKING PLAN
C1.2 LAYOUT SIGNING & MARKING PLAN
C1.3 LAYOUT SIGNING & MARKING PLAN
C2.1 WATER AND SEWER PLAN
C2.2 WATER AND SEWER PLAN
C2.3 WATER AND SEWER DETAILS
C2.4 WATER AND SEWER DETAILS
C3.1 PAVING GRADING AND DRAINAGE PLAN
C3.2 PAVING GRADING AND DRAINAGE PLAN
C3.3 PAVING GRADING AND DRAINAGE PLAN
C3.4 DRAINAGE PROFILES
C3.5 PAVING GRADING AND DRAINAGE DETAILS
EC0.1 ES & PC NOTES
EC0.2 ES & PC NOTES
EC0.3 ES & PC NOTES
EC1.1 ES & PC PLAN - INITIAL PHASE
EC1.2 ES & PC PLAN - INITIAL PHASE
EC2.1 ES & PC PLAN - INTERMEDIATE PHASE
EC2.2 ES & PC PLAN - INTERMEDIATE PHASE
EC3.1 ES & PC PLAN - FINAL PHASE
EC3.2 ES & PC PLAN - FINAL PHASE
EC4.1 ES & PC DETAILS
EC4.2 ES & PC DETAILS
Know what'sbelow.
before you dig.Call
R
1208 Newcastle Street • Suite 201 Brunswick, GA 31520 p.912.466.0536 www.thomasandhutton.com
INFRASTRUCTURE OWNERSHIP STATEMENT:
ALL PROPOSED WATER MAINS, SANITARY SEWER MAINS, AND SANITARY FORCE MAINS SHALL
BE DEDICATED TO BRUNSWICK-GLYNN JOINT WATER AND SEWER COMMISSION (BGJWSC)
FOR OWNERSHIP AND MAINTENANCE. ALL BGJWSC UTILITIES SHALL BE LOCATED WITHIN THE
PROPOSED PUBLIC RIGHTS-OF-WAY OR WITHIN EASEMENTS DEDICATED TO BGJWSC.
PROPOSED PUBLIC RIGHTS-OF-WAY SHALL BE DEDICATED TO GLYNN COUNTY FOR
OWNERSHIP AND MAINTENANCE.
PROPOSED UNDERGROUND STORM SEWER WITHIN THE PROPOSED PUBLIC RIGHTS-OF-WAY
SHALL BE OWNED AND MAINTAINED BY GLYNN COUNTY. PROPOSED UNDERGROUND
STORM SEWER OUTSIDE OF THE PROPOSED PUBLIC RIGHT-OF-WAY SHALL BE LOCATED IN
COMMON AREA AND SHALL BE BE PRIVATELY OWNED AND MAINTAINED BY THE PROPERTY
OWNER.
ENGINEER:
PROPERTY OWNER:
BRUNSWICK & GLYNN COUNTY DEVELOPMENT
AUTHORITY
A: 209 GLOUCESTER STREET, SUITE 211
BRUNSWICK, GA 31520
CONTACT: RYAN MOORE
E: RYANMOORE@GOLDENISLESDEV.COM
C: (912) 222-0388
THOMAS & HUTTON
1208 NEWCASTLE STREET, SUITE 201
BRUNSWICK, GA 31520
(912) 466-0536
MR. TYLER VAUGHN, P.E.
VAUGHN.T@TANDH.COM
NO LANE CLOSURE DURING THE FOLLOWING TIMES:
6:00 AM - 9:00 AM AND 4:00 PM - 7:00 PM
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
N
BID SET - NOT FOR CONSTRUCTION
http://www.thomasandhutton.com
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distri bution Airbus DS © 2025 TomTom
GN1.2; EX1.1; C2.1;
EC1.1; EC2.1; EC3.1
GN1.3; EX1.2; C2.2;
EC1.2; EC2.2; EC3.2
C1.2;
C3.2
C1.3; C3.3C1.1; C3.1
ENGINEER:
GLYNNCOUNTY
GENERAL INFORMATION
OWNER:
UTILITY:
SURVEYOR:
ZONING PD
GOLDEN ISLES DEVELOPMENT AUTHORITY
209 GLOUCESTER ST, SUITE 211
BRUNSWICK, GA 31520
877-265-6629
1. THE CONTRACTOR SHALL NOTIFY THE OWNER AND THE ENGINEER 48 HOURS IN ADVANCE OF ALL REQUIRED TESTS AND
INSPECTIONS.
2. THE CONTRACTOR WILL NOTIFY THE ENGINEER IF UNSUITABLE MATERIAL IS DISCOVERED PRIOR TO BEGINNING ANY
REMOVAL OPERATION.
3. SURVEYING AND BOUNDARY INFORMATION BY THOMAS AND HUTTON DATED 02/14/2025 J - 30688.002.
4. ALL ELEVATIONS SHOWN ARE BASED ON NAVD88.
5. TOPOGRAPHIC SURVEY BY THOMAS AND HUTTON DATED 02/14/2025 J - 30688.002.
6. CONTRACTOR IS TO VERIFY ACCURACY OF ANY TEMPORARY BENCHMARKS SHOWN PRIOR TO UTILIZING THEM FOR
CONSTRUCTION.
7. THE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE INFORMATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL UTILITIES OTHER THAN THOSE SHOWN ARE ENCOUNTERED DURING CONSTRUCTION , THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY AND TAKE STEPS TO PROTECT THE LINE(S) AND ENSURE CONTINUED SERVICE. DAMAGE CAUSED TO EXISTING UTILITIES BY THE CONTRACTOR SHALL BE REPAIRED BY THE CONTRACTOR. ADDITIONALLY, THE CONTRACTOR SHALL CONFIRM THE CONNECTION POINTS
OF NEW UTILITIES TO EXISTING UTILITIES PRIOR TO BEGINNING NEW CONSTRUCTION.
8. IF WORK IS SUSPENDED OR DELAYED FOR 14 DAYS, THE CONTRACTOR SHALL TEMPORARILY STABILIZE THE DISTURBED AREA
AT NO ADDITIONAL COST TO THE OWNER.
9. THE CONTRACTOR SHALL INSTALL ANY BARRICADES PRIOR TO BEGINNING CONSTRUCTION
10. THE FOLLOWING NOTES ARE TO BE EXECUTED BY THE CONTRACTOR
a. ANY DAMAGE TO EXISTING PAVEMENT MUST BE REPAIRED AT CONTRACTORS EXPENSE AND TO THE SATISFACTION OF
THE COUNTY ENGINEER AND THE PROJECT ENGINEER.
b. ALL RIGHT-OF-WAY AND DRAINAGE EASEMENT CONSTRUCTION SHALL MEET GDOT STANDARD SPECIFICATIONS
UNLESS SPECIFIED ELSEWHERE AND APPROVED IN WRITING BY THE COUNTY ENGINEER.
c. ALL LOTS WITHIN THE DEVELOPMENT SHALL BE FILLED AND HAVE POSITIVE DRAINAGE TO THE APPROPRIATE EASEMENT OR RIGHT-OF-WAY AS APPROVED ON THE PLANS PRIOR TO THE ISSUANCE OF ANY BUILDING PERMITS OR FINAL
ACCEPTANCE OF THE RIGHT-OF-WAYS BY THE COUNTY
d. WHERE FIELD INSPECTIONS ARE REQUIRED BY THE COUNTY, THE CONTRACTOR SHALL NOTIFY THE ENGINEERING
DIVISION A MINIMUM OF 48 HOURS IN ADVANCE TO SCHEDULE SUCH INSPECTIONS.
e. A COMPLETE SET OF APPROVED DRAWINGS AND SPECIFICATIONS MUST BE MAINTAINED ON SITE AT ALL TIMES THAT THE CONTRACTOR IS PERFORMING WORK. THESE DRAWINGS SHALL BE MADE AVAILABLE UPON REQUEST.
f. ANY REVISIONS DURING CONSTRUCTION WHICH ALTER THE ROAD LAYOUT, CONSTRUCTION METHODS, RIGHT-OF-WAY LOCATION OR DRAINAGE MUST BE SUBMITTED AND APPROVED IN WRITING BY THE DESIGN AND COUNTY ENGINEER.
g. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL CONSTRUCTION PERMITS NECESSARY FROM OTHER
RESPONSIBLE AGENCIES.
11. THE CONTRACTOR SHALL INSTALL ALL EROSION CONTROL AND PREVENTION STRUCTURES SHOWN ON THE PLANS. BOTH MUST BE APPROVED BY GLYNN COUNTY PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES
12. THE FOLLOWING NOTES ARE SPECIFIED BY THE GEORGIA SOIL AND WATER CONSERVATION COMMISSION AND ARE TO BE
EXECUTED BY THE CONTRACTOR:
a. ALL SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND AFTER ANY STORM EVENT OF GREATER THAN 0.5 INCHES OF PRECIPITATION DURING ANY 24-HOUR PERIOD. ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED UNTIL FINAL STABILIZATION HAS BEEN OBTAINED.
b. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED, UNLESS ACTIVITY IN THAT PORTION OF THE SITE WILL RESUME WITHIN 14 DAYS.
13. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE CONSTRUCTED SIMULTANEOUSLY WITH THE DISTURBANCE OF
THE LAND AND SHALL REMAIN FUNCTIONAL UNTIL THE CONTRIBUTING DISTURBED AREAS ARE STABILIZED. SILT BARRIERS WILL BE INSTALLED AS NECESSARY TO PREVENT EXCESSIVE SEDIMENTATION OF DOWNSTREAM AREAS. DEVICES SHALL BE IN ACCORDANCE WITH THE MANUAL OF "EROSION AND SEDIMENT CONTROL PRACTICES FOR DEVELOPING AREAS" BY THE
GSWCC
14. CONTRACTOR SHALL GRADE AREAS TO DRAIN FOR POSITIVE FLOW PRIOR TO FINAL APPROVAL.
15. ALL TRAFFIC CONTROL SIGNS AND PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH THE MANUAL ON "UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS" AND "GEORGIA MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES" BOTH CURRENT EDITIONS.
16. ALL AREAS DISTURBED WILL BE GRASSED IMMEDIATELY AFTER THE INSTALLATION. GRASSING SHALL BE IN ACCORDANCE WITH SECTION 810 OF THE GDOT STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION CURRENT EDITION. PAYMENT SHALL BE AS SHOWN IN THE BID FORM AND SHALL BE COMPENSATION FOR ALL NECESSARY WORK AND MATERIALS TO COMPLETE THE SEEDING IN ACCORDANCE WITH THESE SPECIFICATIONS. (SEE SPECIFICATIONS BELOW)
17. ALL DRAINAGE WILL BE MADE FUNCTIONAL DAILY AS WORK PROGRESSES.
18. EACH EXISTING ROAD WILL BE CLEANED UP AND RESTORED DAILY.
19. NEW PAVEMENT TO BE FLUSH WITH EDGE OF EXISTING PAVEMENT.
20. ALL STORM DRAIN PIPE INVERTS IN AND OUT ARE THE SAME AS THE BOX INVERT UNLESS OTHERWISE NOTED ON THE PLAN
SHEETS AND/OR PROFILES.
21. ONLY TYPE S AND M MORTAR IS TO BE USED IN STORMWATER SYSTEM CONSTRUCTION AND ALL BRICKWORK AND BRICK
MUST MEET GDOT SPECIFICATIONS.
22. THE DESIGN OF THE PAVEMENT AND EARTHWORK MATERIALS, PROCEDURES AND METHODS SPECIFIED ARE BASED ON THE CRITERIA AND RECOMMENDATIONS ESTABLISHED IN THE GEOTECHNICAL INVESTIGATION REPORT PREPARED BY TERRACON
ON 02/08/2024 AND SUBSEQUENT ADDENDUMS.
GENERAL NOTES
ABBREVIATIONS
DBL DOUBLE FM FORCE MAIN (SANITARY SEWER) OC ON CENTER SS SANITARY SEWER
BOT BOTTOM FP FINISH PAD PC POINT OF CURVE TC TOP OF CURB
CB CATCH BASIN FPW FIRE PROTECTION PH POST HYDRANT TH THROAT ELEVATION
CI CURB INLET FR FRAME PT POINT OF TANGENT TG TOP OF GUTTER
CO CLEAN OUT GI GRATE INLET PVC POLYVINYL CHLORIDE TP TOP OF PAVEMENT
CPP CORRUGATED PLASTIC PIPE GV GATE VALVE RCP REINFORCED CONCRETE PIPE TW TOP OF WALK
DBL DOUBLE HDPE HIGH DENSITY POLYETHYLENE RC ROLL CURB INLET TYP TYPICAL
DI DITCH INLET HI HOODED INLET RCP REINFORCED CONCRETE PIPE VI VALLEY INLET
DIP DUCTILE IRON PIPE INV INVERT ELEVATION RI ROOF INLET W WATER
EL ELEVATION JB JUNCTION BOX RJP RESTRAINED JOINT PIPE W/ WITH
ES END SECTION LF LINEAR FEET R/W RIGHT-OF-WAY WV WATER VALVE
FES FLARED END SECTION MAX MAXIMUM SD STORM DRAINAGE YI YARD INLET
FG FINISH GRADE MIN MINIMUM SDMH STORM DRAINAGE MANHOLE
FH FIRE HYDRANT MH MANHOLE SF SQUARE FEET
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
G
N .D
W G
Fe b 4,
- 1
0:
A M
THOMAS & HUTTON
1208 NEWCASTLE ST, SUITE 201
BRUNSWICK, GA 31520
912-234-5300
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
GENERAL NOTES AND
LEGENDS
GN1.1
30688.0002
GEORGIA BREAKBULK LOGISTICS
PARK - US 82 ENTRANCE ROAD
NAD-83 GA-EF NAVD-1988
GOLDEN ISLES DEVELOPMENT AUTHORITY
4/30/25
TAS
RHK
TAP
TMV
www.thomasandhutton.com
DRAINAGE LEGEND
EXISTING PROPOSED
PIPE
DITCH
CURB INLET (CI)
CATCH BASIN
(CB)
CURB INLET -
RIGHT (CI)
OR
CATCH BASIN -
RIGHT (CB)
OR OR
CURB INLET -
LEFT (CI)
OR
CATCH BASIN -
LEFT (CB)
OR OR
CURB INLET -
BOTH (CI)
OR
CATCH BASIN -
BOTH (CB)
OR OR
CONTROL
STRUCTURE (CS)
DITCH INLET (DI)
GRATE INLET
(GI)
HOODED INLET
(HI)
OR OR
JUNCTION BOX
(JB)
MANHOLE
(SDMH)
ROLL CURB
INLET (RC)
ROOF INLET (RI)
VALLEY INLET
(VI)
YARD INLET (YI)
BEVELED END
SECTION (BES)
END SECTION
(ES)
FLARED END
SECTION (FES)
11-14° BEND -
HORIZONTAL
22-12° BEND -
HORIZONTAL
45° BEND -
HORIZONTAL
90° BEND -
HORIZONTAL
CLEANOUT
PLUG
TEE
WYE
SEWER LEGEND
EXISTING PROPOSED
GRAVITY PIPE
SINGLE SERVICE
LATERAL
DOUBLE
SERVICE
LATERAL
DROP
MANHOLE
(DMH)
MANHOLE (MH)
CLEANOUT
(CO)
FORCEMAIN
AIR RELEASE
VALVE (ARV)
CHECK VALVE
(CV)
PLUG VALVE
AND BOX (PV)
FLUSH HYDRANT
PUMP
CONNECTION
(PC)
REDUCER
TRACER WIRE
ACCESS BOX
(TWAB)
CROSS
TEE
TAPPING
SLEEVE (TS)
90° BEND
HORIZONTAL
45° BEND
HORIZONTAL
22-12° BEND
HORIZONTAL
11-14° BEND
HORIZONTAL
BEND
VERTICAL
PLUG \ CAP
ss
10"FM 10"FM
WATER LEGEND
EXISTING PROPOSED
FIRE
PROTECTION
WATER MAIN
SINGLE SERVICE
LATERAL
DOUBLE
SERVICE
LATERAL
BUTTERFLY
VALVE (BV)
DOUBLE CHECK
DETECTOR
ASSEMBLY
(DCDA)
GATE VALVE
AND BOX (GV)
POST
INDICATOR
VALVE (PIV)
TAPPING
SLEEVE AND
VALVE (TSV)
REDUCED
PRESSURE ZONE
BACKFLOW
(RPZ)
WATER LEGEND
EXISTING PROPOSED
WATER METER
(WM)
TRACER WIRE
ACCESS BOX
(TWAB)
FIRE HYDRANT
W/TEE, VALVE &
BOX (FHA)
POST HYDRANT
(PH)
REDUCER
CROSS
TEE
90° BEND -
HORIZONTAL
45° BEND -
HORIZONTAL
22-12° BEND -
HORIZONTAL
11-14° BEND -
HORIZONTAL
BEND -
VERTICAL
CAP
10"FPW 10"FPW
10"W 10"W
OTHER UTILITIES LEGEND
EXISTING
NATURAL GAS
TELEPHONE
UNDERGROUND TELEPHONE
ELECTRICITY
UNDERGROUND ELECTRICITY
UGG
OHT
UTL
OHP
UGP
THOMAS & HUTTON
1208 NEWCASTLE ST, SUITE 201
BRUNSWICK, GA 31520
912-234-5300
GEORGIA POWER
800 GLOUCESTER ST
BRUNSWICK, GA 31520
888-891-0938
INDEX
SCALE: 1" = 300'
NORTH
US HIGHWAY 82 - GA 520
200' R/W - 65 MPH
US HIGHWAY 82 - GA 520
200' R/W - 55 MPH
OLD BROOKMAN ROAD/EMANUEL C
HURCH ROAD
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
N
815'
1203' 97'
US HIGHWAY 82
SPEED LIMIT 65
BIKE - 10 - EAST
US HIGHWAY 82
SPEED LIMIT 65
WRONG WAY
MILE 8
DO NOT ENTER
SPEED LIMIT 55
SPEED LIMIT 55
SPEED LIMIT 65
SPEED LIMIT 65DO NOT ENTER
YIELD
STOP
YIELD
MILE 8BIKE - 10 - WEST
PAVEMENT LEGEND
EXISTING GDOT ASPHALT ROADWAY:
HEAVY DUTY ASPHALT:
GDOT ASPHALT PAVEMENT:
CONCRETE ISLAND:
GRAVEL DRIVE:
DIRT DRIVE:
Note
SIGHT DISTANCE TRIANGLE
1" = 50'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
O
V
ST
PL
.D W
G
Fe b
4,
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
OVERALL SITE PLAN
GN1.2
RHK
1208 Newcastle Street • Suite 201 Brunswick, GA 31520 • 912.466.0536
GRAPHIC SCALE:
1 INCH =
50 FEET
50 25 50
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
720'
1203' 475'
0'
US HIGHWAY 82
SPEED LIMIT 55
US HIGHWAY 82
SPEED LIMIT 55
SPEED LIMIT 55
SPEED LIMIT 55
SPEED LIMIT 65
ONE WAY (RIGHT) DO NOT ENTER
YIELD
NO LEFT TURN
WRONG WAY
SPEED LIMIT 65DO NOT ENTER
1126'
PAVEMENT LEGEND
EXISTING GDOT ASPHALT ROADWAY:
HEAVY DUTY ASPHALT:
GDOT ASPHALT PAVEMENT:
CONCRETE ISLAND:
GRAVEL DRIVE:
DIRT DRIVE:
610'
1" = 50'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
O
V
ST
PL
.D W
G
Fe b
4,
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
OVERALL SITE PLAN
GN1.3
GEORGIA BREAKBULK
LOGISTICS PARK - US 82
RHK
50 FEET
50 25 50
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
17 18
16 17
17 18
16 16
15 15
15 15
EXISTING M3-2 & M1-8
SIGN TO REMAIN
EXISTING M3-4 & M1-8
SIGN TO REMAIN
REMOVE EXISTING R5-1
SIGN RELOCATE
SHEETS C1.1, C1.2, C1.3
REMOVE EXISTING R5-1a
SIGN RELOCATE PER
SHEETS C1.1, C1.2, C1.3
REMOVE EXISTING D10-1
SIGN RELOCATE PER
SHEETS C1.1, C1.2, C1.3
EXISTING R5-1 SIGN
TO REMAIN
EXISTING R5-1a SIGN TO REMAIN
EXISTING R2-1 SIGN TO REMAIN
REMOVE EXISTING R2-1
SIGN RELOCATE PER
SHEETS C1.1, C1.2, C1.3
EXISTING DRAINAGE STRUCTURE TO BE
CONVERTED TO STORM MANHOLE AND FRAME
ADJUSTED TO MATCH PROPOSED GRADE.
EXISTING ASPHALT
RIGHT OF WAY (TYP.)
TO REMAIN
REMOVE EXISTING
RIGHT-OF-WAY
STRIPING (TYP.)
REMOVE CHAIN 4' LINK FENCE
EXISTING GUY WIRES TO REMAIN (TYP.)
EXISTING DRAINAGE STRUCTURE TO BE FIELD LOCATED WITH
FRAME AND INVERT VERIFIED BY CONTRACTOR. THE
STRUCTURE HAS BEEN LOCATED VIA AERIAL PHOTOGRAPHY.
CONTRACTOR TO COORDINATE WITH ENGINEER.
EXISTING DRAINAGE STRUCTURE TO BE
CONVERTED TO STORM MANHOLE AND FRAME
ADJUSTED TO MATCH PROPOSED PAVEMENT.
CONTRACTOR TO FIELD VERIFY INVERT.
EXISTING ROADWAY ASPHALT TO
BE REMOVED AND SAWCUT TO
NEAT EDGE FOR PROPOSED TIE IN
EXISTING ROADWAY ASPHALT TO
BE REMOVED AND SAWCUT TO
NEAT EDGE FOR PROPOSED TIE IN
REMOVE EXISTING D10-1
SIGN RELOCATE PER
SHEETS C1.1, C1.2, C1.3
1" = 50'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
EX
PL
.D W
G
Fe b
4,
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EXISTING CONDITIONS AND
DEMOLITION PLANS
EX1.1
RHK
50 FEET
50 25 50
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
18 18
19 19
16 17
15 15
15 15
16 16
EXISTING 4' WIRE
FENCE TO REMAIN
EXISTING GUY WIRE
TO REMAIN (TYP.)
REMOVE EXISTING R5-1
SIGN RELOCATE
SHEETS C1.1, C1.2, C1.3
REMOVE EXISTING R5-1a
SIGN RELOCATE PER
SHEETS C1.1, C1.2, C1.3
EXISTING R2-1 SIGN TO REMAIN
REMOVE EXISTING R2-1
SIGN RELOCATE PER
SHEETS C1.1, C1.2, C1.3
EXISTING ROADWAY ASPHALT TO
BE REMOVED AND SAWCUT TO
NEAT EDGE FOR PROPOSED TIE IN
EXISTING ROADWAY ASPHALT TO
BE REMOVED AND SAWCUT TO
NEAT EDGE FOR PROPOSED TIE IN
EXISTING MAILBOX
TO REMAIN
EXISTING GRAVEL DRIVE TO REMAIN
AS IT SERVES SURROUNDING
RESIDENTIAL PROPERTIES.
EXISTING UTILITY
POLE TO
REMAIN (TYP.)
EXISTING 12" WATER MAIN
REALIGNMENT OF EXISTING
DITCH TO COMMENCE
PER SHEET C3.3 (TYP.)
1" = 50'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
EX
PL
.D W
G
Fe b
4,
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EXISTING CONDITIONS AND
DEMOLITION PLANS
EX1.2
RHK
50 FEET
50 25 50
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
45°
180' 510'180'
15'
TYPE 2 ARROW (TYP.)
THERMOPLASTIC
DETAIL T-12B
6" YELLOW SOLID
LANE LINE (TYP.)
THERMOPLASTIC
DETAIL T-11A
6" SKIP WHITE
2' SEGMENT
6' GAP (TYP.)
THERMOPLASTIC
DETAIL T11-B
6" WHITE SOLID LANE LINE
THERMOPLASTIC (TYP.)
DETAIL T-11A
12' LEFT TURN
DECELERATION LANE
EXISTING PAVEMENT
CENTERLINE (TYP.)
1' PAVED SHOULDER (TYP.)
EXISTING EDGE OF
PAVEMENT (TYP.)
NOTE: NO LANE CLOSURE DURING THE FOLLOWING
TIMES: 6:00-9:00 AM AND 4:00-7:00 PM.
*CONTRACTOR TO REFERENCE CURRENT GDOT
DETAILS REFERENCED IN PLAN
0'
R/ W
1" = 30'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
ST
PL
.D W
G
Fe b
4,
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
LAYOUT SIGNING & MARKING
PLAN
C1.1
GLYNN COUNTY,
GEORGIA
NAD-83 GA-EF NAVD-1988
BRUNSWICK GLYNN COUNTY DEV AUTHORITY
1505 RICHMOND STREET, 2ND FLOOR
BRUNSWICK, GEORGIA 31520
TMV
30 FEET
30 15 30
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
45°
7'R
5'R 75'R
6' R
8'R
8'R
6'R
23'
12'
12'12'
2'
15'
350'
WHITE TRAFFIC STRIPING
THERMOPLASTIC
DETAIL T-14 WHITE DETAIL "B"
(TYP) WITH TYPE 3 C/R RPMS @
20' SPACING ON BORDER -
DETAIL T-15
24" SOLID WHITE
STOP BAR
THERMOPLASTICYELLOW TRAFFIC STRIPING
THERMOPLASTIC
DETAIL T-14 YELLOW DETAIL "A"
6" SKIP WHITE
2' SEGMENT
6' GAP (TYP.)
THERMOPLASTIC
DETAIL T11-B
TYPE 7 ARROWS (TYP.)
THERMOPLASTIC
DETAIL T-12B
TYPE 2 ARROWS (TYP.)
THERMOPLASTIC
DETAIL T-12B
6" SOLID DOUBLE YELLOW
THERMOPLASTIC WITH TYPE
1 YELLOW RPMS @ 40'
SPACING - DETAIL T-15
TYPE 2 ARROW (TYP.)
THERMOPLASTIC
DETAIL T-12B
6" YELLOW SOLID
LANE LINE (TYP.)
THERMOPLASTIC
DETAIL T-11A
6" SKIP WHITE
2' SEGMENT
6' GAP (TYP.)
THERMOPLASTIC
DETAIL T11-B
6" WHITE SOLID LANE LINE (TYP.)
THERMOPLASTIC
DETAIL T-11A
6" YELLOW SOLID LANE LINE (TYP.)
THERMOPLASTIC
DETAIL T-11A
4' PAVED SHOULDER (TYP.)
2' PAVED SHOULDER (TYP.)
1' PAVED SHOULDER (TYP.)
12' RIGHT TURN
DECELERATION LANE
CONCRETE MEDIAN WITH
TYPE 9 MOUNTABLE CURB
DETAIL 9032B
WHITE TRAFFIC STRIPING
THERMOPLASTIC
DETAIL T-14 WHITE DETAIL "C"
6" WHITE SOLID LANE LINE (TYP.)
THERMOPLASTIC
DETAIL T-11A
WHITE TRAFFIC STRIPING
THERMOPLASTIC
DETAIL T-14 WHITE DETAIL "A"WHITE TRAFFIC STRIPING
THERMOPLASTIC
DETAIL T-14 WHITE DETAIL "A"
EXISTING PAVEMENT
CENTERLINE (TYP.)
1' PAVED SHOULDER (TYP.)
EXISTING EDGE OF
PAVEMENT (TYP.)
100'
100' 100'
12'R
4' PAVED SHOULDER (TYP.)
4'
120'
R/W
0'
R/ W
28'R
48'R
EMERGENCY VEHICLE
TURNAROUND
BORROW MATERIAL POND
(EMERGENCY OVERFLOW ONLY)
TOB: 15.5
NWL: 15.0
BOT: 7:0
NOTE: NO LANE CLOSURE DURING THE FOLLOWING
TIMES: 6:00-9:00 AM AND 4:00-7:00 PM.
*CONTRACTOR TO REFERENCE CURRENT GDOT
DETAILS REFERENCED IN PLAN
6" WHITE SOLID LANE LINE (TYP.)
THERMOPLASTIC
DETAIL T-11A
CND CND
(1) 6" PVC CONDUIT
(2) 4" PVC CONDUIT
1" = 30'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
ST
PL
.D W
G
Fe b
4,
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
LAYOUT SIGNING & MARKING
PLAN
C1.2
GLYNN COUNTY,
GEORGIA
BRUNSWICK GLYNN COUNTY DEV AUTHORITY
BRUNSWICK, GEORGIA 31520
TMV
30 FEET
30 15 30
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
2'R 2'R
'R
250'
6" WHITE SOLID LANE LINE (TYP.)
THERMOPLASTIC
DETAIL T-11A
6" WHITE SOLID LANE LINE (TYP.)
THERMOPLASTIC
DETAIL T-11A
YELLOW TRAFFIC STRIPING
THERMOPLASTIC
DETAIL T-14 YELLOW DETAIL "A"
CONCRETE MEDIAN WITH
TYPE 9 MOUNTABLE CURB
DETAIL 9032B
WHITE TRAFFIC STRIPING
THERMOPLASTIC
DETAIL T-14 WHITE DETAIL "A"
WHITE TRAFFIC STRIPING
THERMOPLASTIC
DETAIL T-14 WHITE DETAIL "C"
EXISTING PAVEMENT
CENTERLINE (TYP.)
6" SKIP WHITE
2' SEGMENT
6' GAP (TYP.)
THERMOPLASTIC
DETAIL T11-B
12' RIGHT TURN
DECELERATION LANE
4' PAVED SHOULDER (TYP.)
2' PAVED SHOULDER
EXISTING EDGE OF
PAVEMENT (TYP.)
GRAVEL DRIVE
SERVICES RESIDENTIAL
PROPERTIES OUTSIDE OF
CLIENT PROPERTY LINE.
100'
4'
120'
R/W
0'
R/ W
48'R
28'R
EMERGENCY VEHICLE
TURNAROUND
12'
10'
NOTE: NO LANE CLOSURE DURING THE FOLLOWING
TIMES: 6:00-9:00 AM AND 4:00-7:00 PM.
*CONTRACTOR TO REFERENCE CURRENT GDOT
DETAILS REFERENCED IN PLAN
CND CND
(1) 6" PVC CONDUIT
(2) 4" PVC CONDUIT
'R
75'R
1" = 30'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
ST
PL
.D W
G
Fe b
4,
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
LAYOUT SIGNING & MARKING
PLAN
C1.3 30688.0002
GEORGIA BREAKBULK LOGISTICS
PARK - US 82 ENTRANCE ROAD
GLYNN COUNTY,
GEORGIA
BRUNSWICK GLYNN COUNTY DEV AUTHORITY
TMV
30 FEET
30 15 30
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
''W
12''W12''W12''W12''W12''W12''W12''W12''W
" P
V C
C
- D R
12" PVC - C900 - DR 18
''W
''W
''W
120'
R/W (PUBLIC)
BGJWSC STANDARD NOTES:
1. ALL WATER AND SEWER CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE
DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS OF THE JOINT WATER &
SEWER COMMISSION. IN THE EVENT OF A DISCREPANCY BETWEEN THESE CONSTRUCTION
PLANS AND THE AFOREMENTIONED STANDARDS AND SPECIFICATIONS, THE DESIGN AND
CONSTRUCTION STANDARDS AND SPECIFICATIONS SHALL TAKE PRECEDENCE UNLESS THE
DEVIATION HAS BEEN APPROVED IN WRITING BY THE JWSC.
2. THE MINIMUM HORIZONTAL AND VERTICAL SEPARATION BETWEEN WATER LINES, SEWER
LINES, AND STORM DRAINS SHALL CONFORM TO THE LATEST GEORGIA EPD
REQUIREMENTS.
3. ALL PLANNED MAINS AND SERVICES OUTSIDE OF ROADWAYS OR OTHER COMPACTED
FINAL GRADES SHALL HAVE A MINIMUM FINAL COVER DEPTH OF 36". THOSE WITHIN
COMPACTED FINAL GRADES SHALL BE INSTALLED WITH A FINAL COVER DEPTH OF 48"
(ASTM D2321).
4. A MINIMUM DISTANCE OF 20' OR TWO TIMES THE DEPTH OF THE MAIN, WHICHEVER IS
GREATER, SHALL BE MAINTAINED FROM ALL BUILDINGS, FOUNDATIONS, AND THE TOP OF
BANK OF ALL PONDS. ANY DEVIATION FROM THIS REQUIREMENT MUST BE APPROVED IN
WRITING BY THE JWSC.
5. PRESSURE AND LEAKAGE TESTING SHALL BE PERFORMED IN ACCORDANCE WITH THE
DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS OF THE JWSC.
6. DISINFECTION OF WATER MAINS SHALL BE PERFORMED IN ACCORDANCE WITH THE
DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS OF THE JWSC. NOTE
THAT TABLET METHOD FOR DISINFECTION IS NOT ALLOWED.
7. AT LEAST 72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, THE CONTRACTOR SHALL
NOTIFY UTILITIES PROTECTION CENTER (UPC) AT 1-800-282-7411 (GA811) TO REQUEST
UNDERGROUND UTILITY LOCATE SERVICE.
BORROW MATERIAL POND
(EMERGENCY OVERFLOW ONLY)
TOB: 15.5
NWL: 15.0
BOT: 7:0
1" = 30'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
W
S
- P
L.
D
W G
Fe b 4,
- 1
0:
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
WATER AND SEWER PLAN
C2.1
TMV
30 FEET
30 15 30
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
12''W12''W12''W12''W
''W
''F
M
''F M
''F
M
''F M
''F
M
''F M
12" PVC - C900 - DR 18
" P
V C
C
- D R
120'
R/W (PUBLIC)
BGJWSC STANDARD NOTES:
1. ALL WATER AND SEWER CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE
DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS OF THE JOINT WATER &
SEWER COMMISSION. IN THE EVENT OF A DISCREPANCY BETWEEN THESE CONSTRUCTION
PLANS AND THE AFOREMENTIONED STANDARDS AND SPECIFICATIONS, THE DESIGN AND
CONSTRUCTION STANDARDS AND SPECIFICATIONS SHALL TAKE PRECEDENCE UNLESS THE
DEVIATION HAS BEEN APPROVED IN WRITING BY THE JWSC.
2. THE MINIMUM HORIZONTAL AND VERTICAL SEPARATION BETWEEN WATER LINES, SEWER
LINES, AND STORM DRAINS SHALL CONFORM TO THE LATEST GEORGIA EPD
REQUIREMENTS.
3. ALL PLANNED MAINS AND SERVICES OUTSIDE OF ROADWAYS OR OTHER COMPACTED
FINAL GRADES SHALL HAVE A MINIMUM FINAL COVER DEPTH OF 36". THOSE WITHIN
COMPACTED FINAL GRADES SHALL BE INSTALLED WITH A FINAL COVER DEPTH OF 48"
(ASTM D2321).
4. A MINIMUM DISTANCE OF 20' OR TWO TIMES THE DEPTH OF THE MAIN, WHICHEVER IS
GREATER, SHALL BE MAINTAINED FROM ALL BUILDINGS, FOUNDATIONS, AND THE TOP OF
BANK OF ALL PONDS. ANY DEVIATION FROM THIS REQUIREMENT MUST BE APPROVED IN
WRITING BY THE JWSC.
5. PRESSURE AND LEAKAGE TESTING SHALL BE PERFORMED IN ACCORDANCE WITH THE
DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS OF THE JWSC.
6. DISINFECTION OF WATER MAINS SHALL BE PERFORMED IN ACCORDANCE WITH THE
DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS OF THE JWSC. NOTE
THAT TABLET METHOD FOR DISINFECTION IS NOT ALLOWED.
7. AT LEAST 72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, THE CONTRACTOR SHALL
NOTIFY UTILITIES PROTECTION CENTER (UPC) AT 1-800-282-7411 (GA811) TO REQUEST
UNDERGROUND UTILITY LOCATE SERVICE.
12''W
12" PVC - C900 - DR 18
1" = 30'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
W
S
- P
L.
D
W G
Fe b 4,
- 1
0:
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
WATER AND SEWER PLAN
C2.2
TMV
30 FEET
30 15 30
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
BGJWSC STANDARD NOTES:
1. ALL WATER AND SEWER CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE
DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS OF THE JOINT WATER &
SEWER COMMISSION. IN THE EVENT OF A DISCREPANCY BETWEEN THESE CONSTRUCTION
PLANS AND THE AFOREMENTIONED STANDARDS AND SPECIFICATIONS, THE DESIGN AND
CONSTRUCTION STANDARDS AND SPECIFICATIONS SHALL TAKE PRECEDENCE UNLESS THE
DEVIATION HAS BEEN APPROVED IN WRITING BY THE JWSC.
2. THE MINIMUM HORIZONTAL AND VERTICAL SEPARATION BETWEEN WATER LINES, SEWER
LINES, AND STORM DRAINS SHALL CONFORM TO THE LATEST GEORGIA EPD
REQUIREMENTS.
3. ALL PLANNED MAINS AND SERVICES OUTSIDE OF ROADWAYS OR OTHER COMPACTED
FINAL GRADES SHALL HAVE A MINIMUM FINAL COVER DEPTH OF 36". THOSE WITHIN
COMPACTED FINAL GRADES SHALL BE INSTALLED WITH A FINAL COVER DEPTH OF 48"
(ASTM D2321).
4. A MINIMUM DISTANCE OF 20' OR TWO TIMES THE DEPTH OF THE MAIN, WHICHEVER IS
GREATER, SHALL BE MAINTAINED FROM ALL BUILDINGS, FOUNDATIONS, AND THE TOP OF
BANK OF ALL PONDS. ANY DEVIATION FROM THIS REQUIREMENT MUST BE APPROVED IN
WRITING BY THE JWSC.
5. PRESSURE AND LEAKAGE TESTING SHALL BE PERFORMED IN ACCORDANCE WITH THE
DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS OF THE JWSC.
6. DISINFECTION OF WATER MAINS SHALL BE PERFORMED IN ACCORDANCE WITH THE
DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS OF THE JWSC. NOTE
THAT TABLET METHOD FOR DISINFECTION IS NOT ALLOWED.
7. AT LEAST 72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, THE CONTRACTOR SHALL
NOTIFY UTILITIES PROTECTION CENTER (UPC) AT 1-800-282-7411 (GA811) TO REQUEST
UNDERGROUND UTILITY LOCATE SERVICE.
N.T.S.
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
W
S
- D
T.
D
W G
Fe b 4,
- 1
0:
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
WATER AND SEWER DETAILS
C2.3
TMV
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
BGJWSC STANDARD NOTES:
1. ALL WATER AND SEWER CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE
DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS OF THE JOINT WATER &
SEWER COMMISSION. IN THE EVENT OF A DISCREPANCY BETWEEN THESE CONSTRUCTION
PLANS AND THE AFOREMENTIONED STANDARDS AND SPECIFICATIONS, THE DESIGN AND
CONSTRUCTION STANDARDS AND SPECIFICATIONS SHALL TAKE PRECEDENCE UNLESS THE
DEVIATION HAS BEEN APPROVED IN WRITING BY THE JWSC.
2. THE MINIMUM HORIZONTAL AND VERTICAL SEPARATION BETWEEN WATER LINES, SEWER
LINES, AND STORM DRAINS SHALL CONFORM TO THE LATEST GEORGIA EPD
REQUIREMENTS.
3. ALL PLANNED MAINS AND SERVICES OUTSIDE OF ROADWAYS OR OTHER COMPACTED
FINAL GRADES SHALL HAVE A MINIMUM FINAL COVER DEPTH OF 36". THOSE WITHIN
COMPACTED FINAL GRADES SHALL BE INSTALLED WITH A FINAL COVER DEPTH OF 48"
(ASTM D2321).
4. A MINIMUM DISTANCE OF 20' OR TWO TIMES THE DEPTH OF THE MAIN, WHICHEVER IS
GREATER, SHALL BE MAINTAINED FROM ALL BUILDINGS, FOUNDATIONS, AND THE TOP OF
BANK OF ALL PONDS. ANY DEVIATION FROM THIS REQUIREMENT MUST BE APPROVED IN
WRITING BY THE JWSC.
5. PRESSURE AND LEAKAGE TESTING SHALL BE PERFORMED IN ACCORDANCE WITH THE
DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS OF THE JWSC.
6. DISINFECTION OF WATER MAINS SHALL BE PERFORMED IN ACCORDANCE WITH THE
DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS OF THE JWSC. NOTE
THAT TABLET METHOD FOR DISINFECTION IS NOT ALLOWED.
7. AT LEAST 72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, THE CONTRACTOR SHALL
NOTIFY UTILITIES PROTECTION CENTER (UPC) AT 1-800-282-7411 (GA811) TO REQUEST
UNDERGROUND UTILITY LOCATE SERVICE.
N.T.S.
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
W
S
- D
T.
D
W G
Fe b 4,
- 1
0:
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
WATER AND SEWER DETAILS
C2.4
TMV
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
16 17
17 18
PAVEMENT LEGEND
EXISTING GDOT ASPHALT ROADWAY:
MEDIUM DUTY ASPHALT:
GDOT ASPHALT PAVEMENT:
CONCRETE ISLAND:
GRAVEL DRIVE:
DIRT DRIVE:
SMH #13
FR: 18.70
INV. IN: 15.00 (NE)
DI #12
FR: 17.50
INV. OUT: 15.03 (SW)
10 LF 18" RCP
@ 0.30%
16 17
17 18
CONTRACTOR TO CONVERT EXISTING STRUCTURE TO A
STORM MANHOLE AND MATCH GRADE OF PROPSED
PAVEMENT. CONTRACTOR TO FIELD LOCATE STRUCTURE,
PIPE, VERIFY INVERT, AND COORDINATE WITH ENGINEER
18.27TP
18.40TP18.00TP
18.79TP
18.53TP
18.99TP
18.93TP
19.19TP
19.39TP
15.0FG
RIP-RAP OVERFLOW WEIR -
BORROW POND (SEE DETAIL)
1" = 30'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
G
D O
T
- P
G D
PL
.D W
G
Fe b
4,
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
PAVING GRADING AND
DRAINAGE PLAN
C3.1
TMV
30 FEET
30 15 30
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
16 16
PAVEMENT LEGEND
EXISTING GDOT ASPHALT ROADWAY:
MEDIUM DUTY ASPHALT:
GDOT ASPHALT PAVEMENT:
CONCRETE ISLAND:
GRAVEL DRIVE:
DIRT DRIVE:
DI #5
FR: 17.50
INV. OUT: 15.65 (NW)
DI #7
FR: 17.57
INV. OUT: 15.84 (SE)
GI #6
FR: 19.26
INV. IN: 15.50 (SE)
INV. IN: 15.50 (NW)
S.E.S.
(GDOT DETAIL 1122)
INV.: 14.84
159 LF 18" RCP
@ -0.10%
50 LF 18" RCP
@ 0.30%
112 LF 18" RCP
@ 0.30%
17 18 19
16 16
FES
INV.: 15.25
CONTRACTOR TO CONVERT EXISTING STRUCTURE TO
A GRATE INLET AND MATCH GRADE OF PROPOSED
PAVEMENT. CONTRACTOR TO VERIFY INVERT AND
COORDINATE WITH ENGINEER
''W
12''W12''W12''W12''W12''W12''W12''W12''W
''W
''W
''W
65 LF 18" RCP
@ 0.00%
FES
INV.: 15.25
INV.: 17.25
S.E.S.
(GDOT DETAIL 1122)
INV.: 15.88
S.E.S.
(GDOT DETAIL 1122)
INV.: 15.00
.0
0%
.0
0%
.1
5%
.9
9%
19.51TP
19.10TP
19.59TP
19.58TP
19.41TP
19.63TP19.66TP
19.49TP
19.39TP
19.61TP
19.54TP
19.92TP
19.63TP
19.39TP
19.31TP
19.60TP19.60TP
19.52TP
19.04TP
18.93TP
18.87TP
18.63TP 19.49TP
19.49TP
18.63TP
18.36TP
18.55
TP
19.30TP
19.27TP 19.27TP
18.76TP18.76TP
19.80TP19.30TP
19.24TP
19.74TP
19.24TP
18.84TP
18.88TP
18.30
TP
18.02
TP 18.02
TP
18.66
TP
18.38TP
18.38TP
18.3FG
17.9FG
17.6FG
18.2FG
18.1FG
18.3FG
18.3FG
18.0FG
17.8FG
17.8FG
18.0FG
17.4FG 17.7FG
17.6FG
19.95TP
19.63TP
19.96TP
20.04TP 19.96TP
19.88TP
19.66TP
FG
FG
18.93TP
19.19TP
19.39TP
19.68TP
19.61TP
19.80TP19.75TP
15.0FG
15.1FG
15.2FG
16.0FG
16.5FG
17.0FG
15.9FG
15.6FG
16.7FG
16.6FG
15.7FG
15.9FG
18.83TP
19.74
TP
18.36TP
15.2FG
BORROW MATERIAL POND
(EMERGENCY OVERFLOW ONLY)
TOB: 15.5
NWL: 15.0
BOT: 7:0
19.64
TP
1" = 30'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
G
D O
T
- P
G D
PL
.D W
G
Fe b
4,
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
PAVING GRADING AND
DRAINAGE PLAN
C3.2
TMV
30 FEET
30 15 30
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
19 19
PAVEMENT LEGEND
EXISTING GDOT ASPHALT ROADWAY:
MEDIUM DUTY ASPHALT:
GDOT ASPHALT PAVEMENT:
CONCRETE ISLAND:
GRAVEL DRIVE:
DIRT DRIVE:
INV.: 17.25
115 LF 18" RCP
@ 0.10%
52 LF 18" RCP
@ 0.00%
19 19
12''W12''W12''W12''W
''W
INV.: 17.25
S.E.S.
(GDOT DETAIL 1122)
INV.: 15.88
S.E.S.
(GDOT DETAIL 1122)
INV.: 16.00
.0
0%
.0
0%
19.96TP
20.04TP 19.96TP
19.88TP
19.66TP 19.70TP
19.57TP
20.07TP
20.03TP
20.17TP
20.13TP
20.27TP
20.37TP
20.27TP
20.26TP
20.29TP
20.15TP
20.28TP 20.41TP
19.61TP
19.73TP
19.77TP
21.37TP
21.09TP
21.09TP
20.34
TP
20.06
TP
20.06TP
20.1FG 20.1FG
20.2FG20.2FG
20.3FG
20.2FG
20.4FG
20.4FG
20.4FG
19.9FG
19.7FG
20.0FG
20.2FG
18.8FG
18.6FG
19.2FG
19.1FG
18.3FG
18.2FG
18.0FG
18.0FG
20.25TP
20.57TP 21.09TP
20.77TP
21.42TP
21.34TP
20.48TP20.74TP
20.8FG
17.0FG
17.5FG
18.8FG
19.2FG
18.9FG
19.2FG
17.6FG
12''W
1" = 30'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
G
D O
T
- P
G D
PL
.D W
G
Fe b
4,
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
PAVING GRADING AND
DRAINAGE PLAN
C3.3
TMV
30 FEET
30 15 30
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
30688.0002 - Drainage - Run 1
STATIONS: -0+25 - 2+50
SCALE: HORZ.: 1" = 50'
VERT.: 1" = 5'
-0+25 0+00 1+00 2+00 2+50
.8
.0
.5
.0
.7
.1
.9
.4
30688.0002 - Drainage - Run 2
STATIONS: -0+25 - 1+50
SCALE: HORZ.: 1" = 50'
VERT.: 1" = 5'
-0+25 0+00 1+00 1+50
.0
.2
.7
.2
30688.0002 - Drainage - Run 3
STATIONS: -0+25 - 1+50
SCALE: HORZ.: 1" = 50'
VERT.: 1" = 5'
-0+25 0+00 1+00 1+50
.7
.2
.9
.4
30688.0002 - Drainage - Run 4
STATIONS: -0+25 - 2+50
SCALE: HORZ.: 1" = 50'
VERT.: 1" = 5'
-0+25 0+00 1+00 2+00 2+50
.4
.5
.5
.3
.9
.0
.3
.3
30688.0002 - Drainage - Run 5
STATIONS: -0+25 - 1+50
SCALE: HORZ.: 1" = 50'
VERT.: 1" = 5'
-0+25 0+00 1+00 1+50
.5
.5
ES
IN
V
. O
UT
: 1 4.
(E
159 LF 18" RCP @ 0.10%
ES
IN
V
. I N
: 1 5.
(W
ES
IN
V
. I N
: 1 7.
(S
E)
52 LF 18" RCP @ 0.00%
ES
IN
V
. O
UT
: 1 7.
(N
W
ES
IN
V
. I N
: 1 5.
(S
E)
65 LF 18" RCP @ 0.00%
ES
IN
V
. O
UT
: 1 5.
(N
W
D I #
FR
: 1 7.
IN
V . O
UT
: 1
5.
(N W
50 LF 18" RCP
@ 0.30%
G I #
FR
: 1 9.
IN
V . I
N : 1
5.
(S E)
IN
V
. I N
: 1 5.
(N
W
112 LF 18" RCP @ 0.30%
D I #
FR
: 1 7.
IN
V . O
UT
: 1
5.
(S E)
SM
H
FR
: 1
8.
IN
V
. I N
: 1 5.
(N
E)
10 LF 18" RCP
@ 0.30%
D I #
FR
: 1 7.
IN
V . O
UT
: 1
5.
(S W
FINISH GRADE
EXISTING GRADE
FINISH GRADE
EXISTING GRADE
FINISH GRADE
EXISTING GRADE
FINISH GRADE
EXISTING GRADE
FINISH GRADE
EXISTING GRADE
1" = 50'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
PG
D
PR
.D
W G
Fe b 4,
- 1
0:
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
DRAINAGE PROFILES
C3.4
TMV
50 FEET
50 25 50
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
N.T.S.
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
PG
D
D T.
D W
G
Fe b
4,
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
PAVING GRADING AND
DRAINAGE DETAILS
C3.5
TMV
OCT. 2008
T5
THOMAS & HUTTON
ENGINEERING CO.
OCT. 2008
T6
THOMAS & HUTTON
ENGINEERING CO.
AT BOTH ENDS
48"*
PVC CONDUIT
WITH CAP AT
BOTH ENDS
CONDUIT DETAIL
12" MIN.
TIE FLAGGING
TO WIRE AS PER
FLAGGING CODE SCHEDULEFINISHED GRADE OR
TOP OF PAVEMENT
ABOVE GROUND
6 TIMES AND EXTEND
WRAP AROUND PIPE
NOTE:
* REQUIRED DEPTH BASED ON UTILITY COMPANY PLANS AND SPECIFICATIONS. CONTRACTOR TO
COORDINATE WITH UTILITY COMPANY TO VERIFY DEPTH PRIOR TO INSTALLATION.
NOT TO SCALE
NOT TO SCALE
RIP-RAP OVERFLOW WEIR DETAIL (BORROW POND)
1' O
N E-
M A
N
RI
P-
RA
P
10' WIDE BOTTOM
JUNE 2018
D1
THOMAS & HUTTON
ENGINEERING CO.
NOT TO SCALE
2.00%2.00%
4' 4:1 3:14' 2'
3:1
TYPICAL PAVED SECTION NOTE: PAVEMENT COURSE DEPTHS TO BE
DETERMINED BY GEOTECHNICAL STUDY
BASE COURSE
ROADSIDE
SWALE
EXISTING
GROUND
PROPOSED
GROUND
24" COMPACTED
SUB-BASE
PROFILE GRADE
LINE
±120' RIGHT-OF-WAY
60' 60'
12' VARIES VARIES12'6'VARIES
3:1 4:1
2'
6'
ASPHALTIC CONCRETE
SURFACE COURSE
ASPHALTIC CONCRETE
BINDER COURSE
NOT TO SCALE
24" COMPACTED SUB-BASE @ 98% AS PER ASTM D-1557
6" COMPACTED GRANITE SABC @ 100% AS PER ASTM D-1557
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
EROSION,SEDIMENTATION & POLLUTION CONTROL PLAN CHECKLIST -
INFRASTRUCTURE CONSTRUCTION PROJECTS
N/A
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
EC
N
T.
D
W G
Fe b 4,
- 1
0:
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
ES & PC NOTES
EC0.1
TMV
TYLER M. VAUGHN, P.E., GSWCC LEVEL II DESIGN PROFESSIONAL
CERTIFICATION NO. 0000099816, EXPIRES 10/07/25
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
CONSTRUCTION SCHEDULE
ACTIVITY 1
PERIMETER BMPS
TEMPORARY SEDIMENT
CONTROL BMPS
SITE CLEARING
TEMPORARY GRASSING
PERMANENT GRASSING
FINAL STABILIZATION/
BMP REMOVAL
BMP MAINTENANCE
SITE GRADING
1. OBTAIN ALL PLAN APPROVALS AND OTHER
APPLICABLE PERMITS.
2. FLAG THE WORK LIMITS AND MARK THE TREES
AND BUFFER AREAS FOR PROTECTION.
3. HOLD PRE CONSTRUCTION CONFERENCE AT LEAST
ONE WEEK PRIOR TO STARTING CONSTRUCTION.
4. CONSTRUCTION ACCESS - CONSTRUCTION
ENTRANCE, CONSTRUCTION ROUTES, EQUIPMENT
PARKING AREAS.
5. SEDIMENT TRAPS AND BARRIERS - BASIN TRAPS,
SEDIMENT FENCES, AND OUTLET PROTECTION.
6. RUNOFF CONTROL - DIVERSIONS, PERIMETER
DIKES, WATER BARS, AND OUTLET PROTECTION.
7. RUNOFF CONVEYANCE SYSTEM- STABILIZE
STREAM BANKS, STORM DRAINS, CHANNELS, INLET
AND OUTLET PROTECTION, SLOPE DRAINS.
8. LAND CLEARING AND GRADING - SITE
PREPARATION CUTTING, FILLING AND GRADING,
SEDIMENTATION TRAPS, BARRIERS, DIVERSIONS,
DRAINS,SURFACE ROUGHENING.
9. SURFACE STABILIZATION - TEMPORARY AND
PERMANENT SEEDING, MULCHING, SODDING, RIPRAP.
10. BUILDING CONSTRUCTION- BUILDINGS UTILITIES,
PAVING.
11. LANDSCAPING AND FINAL STABILIZATION -
TOPSOILING, TREES AND SHRUBS, PERMANENT
SEEDING, MULCHING, SODDING RIPRAP.
LAST CONSTRUCTION PHASE--STABILIZE ALL OPEN
AREAS, INCLUDING BORROW AND SPOIL AREAS.
REMOVE AND STABILIZE ALL TEMPORARY CONTROL
MEASURES.
APPLY TEMPORARY OR PERMANENT STABILIZATION
MEASURES IMMEDIATELY ON ALL DISTURBED AREAS
WHERE WORK IS DELAYED OR COMPLETE.
INSTALL NECESSARY EROSION AND SEDIMENTATION
CONTROL PRACTICES AS WORK TAKES PLACE.
BEGIN MAJOR CLEARING AND GRADING AFTER
PRINCIPAL SEDIMENT AND KEY RUNOFF - CONTROL
MEASURES ARE INSTALLED. INSTALL ADDITIONAL
CONTROL MEASURES AS GRADING PROGRESSES.
MARK TREES AND BUFFER AREAS FOR PRESERVATION.
WHERE NECESSARY, STABILIZE STREAM BANKS AS
EARLY AS POSSIBLE. INSTALL PRINCIPAL RUNOFF
CONVEYANCE SYSTEM WITH RUNOFF- CONTROL
MEASURES. INSTALL REMAINDER OF SYSTEM AFTER
GRADING.
INSTALL KEY PRACTICES AFTER PRINCIPAL SEDIMENT
TRAPS AND BEFORE LAND GRADING. INSTALL
ADDITIONAL RUNOFF-CONTROL MEASURES DURING
GRADING.
INSTALL PRINCIPAL BASINS AFTER CONSTRUCTION SITE
IS ACCESSED. INSTALL ADDITIONAL TRAPS AND
BARRIERS AS NEEDED DURING GRADING.
FIRST LAND DISTURBING ACTIVITY - STABILIZE BARE
AREAS IMMEDIATELY WITH GRAVEL AND
TEMPORARY VEGETATION AS CONSTRUCTION TAKES
PLACE.
CONSTRUCTION ACTIVITY SCHEDULE CONSIDERATION
MONTH
3 5 7 9 11
UTILITY INSTALLATION
ROAD CONSTRUCTION
BUILDING
CONSTRUCTION
SITE PAVING
N/A
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
EC
N
T.
D
W G
Fe b 4,
- 1
0:
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
ES & PC NOTES
EC0.2
TMV
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
N/A
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
EC
N
T.
D
W G
Fe b 4,
- 1
0:
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
ES & PC NOTES
EC0.3
TMV
SITE
CERTIFICATION NO. 0000099816, EXPIRES 10/07/25
USGS QUAD MAP EXCERPT: BLADEN
SCALE: 1" = 1,000'
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
17 18
16 17
17 18
16 16
15 15
15 15
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
EROSION CONTROL
LEGEND
DESCRIPTION PLAN SYMBOL
DISTURBED AREA STABILIZATION
(MULCHING ONLY)
DISTURBED AREA STABILIZATION
(TEMPORARY SEEDING)
DISTURBED AREA STABILIZATION
(PERMANENT VEGETATION)
DUST CONTROL
SLOPE STABILIZATION
CHECK DAM (HAY BALE)
CONSTRUCTION EXIT
DIVERSION
SILT FENCE - TYPE NS
SILT FENCE - TYPE S
INLET SEDIMENT TRAP
(FILTER FABRIC WITH FRAME)
INLET SEDIMENT TRAP
(CURB INLET)
STORM DRAIN OUTLET PROTECTION
Ds1
Ds2
Ds3
Du
Ss
Cd-Hb
Co
Di
Sd1-NS
Sd1-S
Sd2-F
Sd2-P
St
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
SINGLE ROW SILT FENCE (TYP.)
SINGLE ROW SILT FENCE (TYP.)
SINGLE ROW SILT FENCE (TYP.)
SINGLE ROW SILT FENCE (TYP.)
Du Ds1 Ds2
Du Ds1 Ds2
Du Ds1 Ds2
Du Ds1 Ds2
Sd1-NS
Sd1-NS
Sd1-NS
Sd1-NS Sd2-F
LAT: 31.1836
LONG: -81.6404
Co
Sd4-C TEMPORARY SEDIMENT TRAP
WIDE: 29.8'
LONG: 29.8'
DEPTH: 2'
STORAGE PROVIDED: 167.5 CY
DRAINAGE AREA: 2.5 AC.
Sd4
1" = 50'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
EC
- P
L.
D
W G
Fe b 4,
- 1
0:
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
ES & PC PLAN - INITIAL PHASE
EC1.1
TMV
50 FEET
50 25 50
TYLER M. VAUGHN, P.E., GSWCC LEVEL II DESIGN PROFESSIONAL
CERTIFICATION NO. 0000099816, EXPIRES 10/07/25
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
18 18
19 19
16 17
15 15
15 15
X
X
X X
X X
X X
X X
X X
X X
X
X
X
LOD
LO
D
LO
D
LODLODLODLODLODLODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
X
X
X
X
X
EROSION CONTROL
LEGEND
DESCRIPTION PLAN SYMBOL
DISTURBED AREA STABILIZATION
(MULCHING ONLY)
DISTURBED AREA STABILIZATION
(TEMPORARY SEEDING)
DISTURBED AREA STABILIZATION
(PERMANENT VEGETATION)
DUST CONTROL
SLOPE STABILIZATION
CHECK DAM (HAY BALE)
CONSTRUCTION EXIT
DIVERSION
SILT FENCE - TYPE NS
SILT FENCE - TYPE S
INLET SEDIMENT TRAP
(FILTER FABRIC WITH FRAME)
INLET SEDIMENT TRAP
(CURB INLET)
STORM DRAIN OUTLET PROTECTION
Ds1
Ds2
Ds3
Du
Ss
Cd-Hb
Co
Di
Sd1-NS
Sd1-S
Sd2-F
Sd2-P
St
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
SINGLE ROW SILT FENCE (TYP.)
SINGLE ROW SILT FENCE (TYP.)
SINGLE ROW SILT FENCE (TYP.)
SINGLE ROW SILT FENCE (TYP.)
Du Ds1 Ds2
Du Ds1 Ds2
Sd1-NS
Sd1-NS
Sd1-NS Sd1-NS Sd2-F
LAT: 31.1828
LONG: -81.6386
Co
Sd4-C TEMPORARY SEDIMENT TRAP
WIDE: 29.8'
LONG: 29.8'
DEPTH: 2'
STORAGE PROVIDED: 167.5 CY
DRAINAGE AREA: 2.5 AC.
Sd4
1" = 50'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
EC
- P
L.
D
W G
Fe b 4,
- 1
0:
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
ES & PC PLAN - INITIAL PHASE
EC1.2
TMV
50 FEET
50 25 50
TYLER M. VAUGHN, P.E., GSWCC LEVEL II DESIGN PROFESSIONAL
CERTIFICATION NO. 0000099816, EXPIRES 10/07/25
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
18 18
16 17
17 18
16 16
15 15
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
12''W12''W12''W
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
SINGLE ROW SILT FENCE (TYP.)
Sd1-NS
SINGLE ROW SILT FENCE (TYP.)
Sd1-NS
SINGLE ROW SILT FENCE (TYP.)
Sd1-NS
SINGLE ROW SILT FENCE (TYP.)
Sd1-NS Sd2-FSd2-F
St
St
LAT: 31.1836
LONG: -81.6404
CONSTRUCTION EXIT
Co
CONCRETE WASHOUT
Sd2-F
Sd4-C TEMPORARY SEDIMENT TRAP
WIDE: 29.8'
LONG: 29.8'
DEPTH: 2'
STORAGE PROVIDED: 167.5 CY
DRAINAGE AREA: 2.5 AC.
Sd4
OUTLET PROTECTION
OUTLET OPENING :
FLOW RATE (CFS):
VELOCITY (FPS):
TAILWATER CONDITION:
(MIN. or MAX.)
La:
Wup:
Wdown :
d RIPRAP SIZE:
d RIPRAP SIZE:
MIN. RIPRAP THICKNESS(D):
DESIGN CRITERIA
max
St 18"
10.0 CFS
5.66 FPS
<0.5 Ø
6" 9"
13.5" 9'
4.5' 13.5'
Du Ds1 Ds2
Du Ds1 Ds2
Du Ds1 Ds2
Du Ds1 Ds2
Du
Du
OUTLET PROTECTION
OUTLET OPENING :
FLOW RATE (CFS):
VELOCITY (FPS):
TAILWATER CONDITION:
(MIN. or MAX.)
La:
Wup:
Wdown :
d RIPRAP SIZE:
d RIPRAP SIZE:
MIN. RIPRAP THICKNESS(D):
DESIGN CRITERIA
max
St 18"
10.0 CFS
5.66 FPS
<0.5 Ø
6" 9"
13.5" 9'
4.5' 13.5'
''W
BORROW MATERIAL POND
(EMERGENCY OVERFLOW ONLY)
TOB: 15.5
NWL: 15.0
BOT: 7:0
11 12 13 14
1" = 50'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
EC
- P
L.
D
W G
Fe b 4,
- 1
0:
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
ES & PC PLAN - INTERMEDIATE
PHASE
EC2.1
TMV
50 FEET
50 25 50
TYLER M. VAUGHN, P.E., GSWCC LEVEL II DESIGN PROFESSIONAL
CERTIFICATION NO. 0000099816, EXPIRES 10/07/25
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
18 18
18 18
19 19
15 15
15 15
X
X
X X
X X
X X
X X
X X
X X
X
X
X
LOD
LO
D
LO
D
LODLODLODLODLODLODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
X
X
X
X
X
12''W12''W12''W12''W12''W12''W
''F
M
''F M
''F
M
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
SINGLE ROW SILT FENCE (TYP.)
Sd1-NS
SINGLE ROW SILT FENCE (TYP.)
Sd1-NS
SINGLE ROW SILT FENCE (TYP.)
Sd1-NS
SINGLE ROW SILT FENCE (TYP.)
Sd1-NS Sd2-F
St
St LAT: 31.1828
LONG: -81.6386
CONSTRUCTION EXIT
Co
CONCRETE WASHOUT
CONCRETE WASHOUT
Sd4-C TEMPORARY SEDIMENT TRAP
WIDE: 29.8'
LONG: 29.8'
DEPTH: 2'
STORAGE PROVIDED: 167.5 CY
DRAINAGE AREA: 2.5 AC.
Sd4
Du Ds1 Ds2
Du Ds1 Ds2
Du Ds1 Ds2
Du Ds1 Ds2
Du Ds1 Ds2
Du
Du
OUTLET PROTECTION
OUTLET OPENING :
FLOW RATE (CFS):
VELOCITY (FPS):
TAILWATER CONDITION:
(MIN. or MAX.)
La:
Wup:
Wdown :
d RIPRAP SIZE:
d RIPRAP SIZE:
MIN. RIPRAP THICKNESS(D):
DESIGN CRITERIA
max
St 18"
10.0 CFS
5.66 FPS
<0.5 Ø
6" 9"
13.5" 9'
4.5' 13.5'
OUTLET PROTECTION
OUTLET OPENING :
FLOW RATE (CFS):
VELOCITY (FPS):
TAILWATER CONDITION:
(MIN. or MAX.)
La:
Wup:
Wdown :
d RIPRAP SIZE:
d RIPRAP SIZE:
MIN. RIPRAP THICKNESS(D):
DESIGN CRITERIA
max
St 18"
10.0 CFS
5.66 FPS
<0.5 Ø
6" 9"
13.5" 9'
4.5' 13.5'
1" = 50'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
EC
- P
L.
D
W G
Fe b 4,
- 1
0:
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
ES & PC PLAN - INTERMEDIATE
PHASE
EC2.2
TMV
50 FEET
50 25 50
TYLER M. VAUGHN, P.E., GSWCC LEVEL II DESIGN PROFESSIONAL
CERTIFICATION NO. 0000099816, EXPIRES 10/07/25
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
18 18
16 17
17 18
16 16
15 15
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
12''W12''W12''W
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
SINGLE ROW SILT FENCE (TYP.)
Sd1-NS
SINGLE ROW SILT FENCE (TYP.)
Sd1-NS
SINGLE ROW SILT FENCE (TYP.)
Sd1-NS
SINGLE ROW SILT FENCE (TYP.)
Sd1-NS Sd2-F
Sd2-F
Sd2-F
St
St
LAT: 31.1836
LONG: -81.6404
CONSTRUCTION EXIT
Co
CONCRETE WASHOUT
Du Ds1
Du Ds1
Du Ds1
Du Ds1
Ds3
Ds3
Ds3Ds3
Sd4-C TEMPORARY SEDIMENT TRAP
WIDE: 29.8'
LONG: 29.8'
DEPTH: 2'
STORAGE PROVIDED: 167.5 CY
DRAINAGE AREA: 2.5 AC.
Sd4
OUTLET PROTECTION
OUTLET OPENING :
FLOW RATE (CFS):
VELOCITY (FPS):
TAILWATER CONDITION:
(MIN. or MAX.)
La:
Wup:
Wdown :
d RIPRAP SIZE:
d RIPRAP SIZE:
MIN. RIPRAP THICKNESS(D):
DESIGN CRITERIA
max
St 18"
10.0 CFS
5.66 FPS
<0.5 Ø
6" 9"
13.5" 9'
4.5' 13.5'
OUTLET PROTECTION
OUTLET OPENING :
FLOW RATE (CFS):
VELOCITY (FPS):
TAILWATER CONDITION:
(MIN. or MAX.)
La:
Wup:
Wdown :
d RIPRAP SIZE:
d RIPRAP SIZE:
MIN. RIPRAP THICKNESS(D):
DESIGN CRITERIA
max
St 18"
10.0 CFS
5.66 FPS
<0.5 Ø
6" 9"
13.5" 9'
4.5' 13.5'
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
''W
BORROW MATERIAL POND
(EMERGENCY OVERFLOW ONLY)
TOB: 15.5
NWL: 15.0
BOT: 7:0
1" = 50'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
EC
- P
L.
D
W G
Fe b 4,
- 1
0:
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
ES & PC PLAN - FINAL PHASE
EC3.1
TMV
50 FEET
50 25 50
TYLER M. VAUGHN, P.E., GSWCC LEVEL II DESIGN PROFESSIONAL
CERTIFICATION NO. 0000099816, EXPIRES 10/07/25
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
18 18
18 18
19 19
16 17
15 15
15 15
X
X
X X
X X
X X
X X
X X
X X
X
X
X
LOD
LO
D
LO
D
LODLODLODLODLODLODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
X
X
X
X
X
12''W12''W12''W12''W12''W12''W
''F
M
''F M
''F
M
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
SINGLE ROW SILT FENCE (TYP.)
Sd1-NS
SINGLE ROW SILT FENCE (TYP.)
Sd1-NS
SINGLE ROW SILT FENCE (TYP.)
Sd1-NS
SINGLE ROW SILT FENCE (TYP.)
Sd1-NS Ds3Sd2-F
St
St LAT: 31.1828
LONG: -81.6386
CONSTRUCTION EXIT
Co
CONCRETE WASHOUT
Du Ds1
Du Ds1
Du Ds1
Du Ds1
Ds3
Ds3
Ds3
Sd4-C TEMPORARY SEDIMENT TRAP
WIDE: 29.8'
LONG: 29.8'
DEPTH: 2'
STORAGE PROVIDED: 167.5 CY
DRAINAGE AREA: 2.5 AC.
Sd4
OUTLET PROTECTION
OUTLET OPENING :
FLOW RATE (CFS):
VELOCITY (FPS):
TAILWATER CONDITION:
(MIN. or MAX.)
La:
Wup:
Wdown :
d RIPRAP SIZE:
d RIPRAP SIZE:
MIN. RIPRAP THICKNESS(D):
DESIGN CRITERIA
max
St 18"
10.0 CFS
5.66 FPS
<0.5 Ø
6" 9"
13.5" 9'
4.5' 13.5'
OUTLET PROTECTION
OUTLET OPENING :
FLOW RATE (CFS):
VELOCITY (FPS):
TAILWATER CONDITION:
(MIN. or MAX.)
La:
Wup:
Wdown :
d RIPRAP SIZE:
d RIPRAP SIZE:
MIN. RIPRAP THICKNESS(D):
DESIGN CRITERIA
max
St 18"
10.0 CFS
5.66 FPS
<0.5 Ø
6" 9"
13.5" 9'
4.5' 13.5'
LOD
LO
D
LO
D
LODLODLODLODLODLODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
19 19
1" = 50'
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
EC
- P
L.
D
W G
Fe b 4,
- 1
0:
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
ES & PC PLAN - FINAL PHASE
EC3.2
TMV
50 FEET
50 25 50
TYLER M. VAUGHN, P.E., GSWCC LEVEL II DESIGN PROFESSIONAL
CERTIFICATION NO. 0000099816, EXPIRES 10/07/25
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
SEEDING RATES FOR TEMPORARY & PERMANENT COVER
2*
SEEDING RATES FOR TEMPORARY & PERMANENT COVER
1. UNSCARIFIED
2. SCARIFIED
* 1*
* 1*
1*
* INDICATES MARGINAL (BUT PERMISSIBLE) PLANTING DATE
ALL PERMANENT GRASS PLANTINGS SHALL BE MULCHED
NOTES
3. CENTIPEDE SOD CAN BE USED AS PERMANENT COVER ANYTIME EXCEPT
JUNE THRU OCTOBER
BACK OF CURB
INSTALL SILT FENCE
24" DEPTH LINED W/ PLASTIC
8' 8'
1'
6' M
A X.
N.T.S.
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
EC
D
T.
D
W G
Fe b 4,
- 1
0:
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
ES & PC DETAILS
EC4.1
TMV
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
SILT FENCE - TYPE NON-SENSITIVE
SIDE VIEW
FRONT VIEW
Sd1-NS
CRUSHED STONE CONSTRUCTION EXIT
EXIT DIAGRAM
ENTRANCE ELEVATION
Co
St
PIPE OUTLET TO WELL DEFINED CHANNEL
La
D
3d D
D
La
PIPE OUTLET TO FLAT AREA -- NO WELL DEFINED CHANNEL
RIPRAP OUTLET PROTECTION
FABRIC AND SUPPORTING FRAME FOR
STEEL FRAME AND SILT FENCE INSTALLATION
INLET PROTECTIONSd2-F
Sd4TEMPORARY SEDIMENT TRAP
ROCK OUTLET
N.T.S.
Z:
\3
\3
.0
2\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
8.
EC
D
T.
D
W G
Fe b 4,
- 1
0:
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
ES & PC DETAILS
EC4.2
TMV
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
N http://www.thomasandhutton.com
| Sheets and Views |
| CO COVER SHEET |
| GN1.1 GENERAL NOTES AND LEGENDS |
| GN1.2 OVERALL SITE PLAN |
| GN1.3 OVERALL SITE PLAN |
| EX1.1 EXISTING CONDITIONS AND DEMOLITION PLANS |
| EX1.2 EXISTING CONDITIONS AND DEMOLITION PLANS |
| C1.1 LAYOUT SIGNING & MARKING PLAN |
| C1.2 LAYOUT SIGNING & MARKING PLAN |
| C1.3 LAYOUT SIGNING & MARKING PLAN |
| C2.1 WATER AND SEWER PLAN |
| C2.2 WATER AND SEWER PLAN |
| C2.3 WATER AND SEWER DETAILS |
| C2.4 WATER AND SEWER DETAILS |
| C3.1 PAVING GRADING AND DRAINAGE PLAN |
| C3.2 PAVING GRADING AND DRAINAGE PLAN |
| C3.3 PAVING GRADING AND DRAINAGE PLAN |
| C3.4 DRAINAGE PROFILES |
| C3.5 PAVING GRADING AND DRAINAGE DETAILS |
| EC0.1 ES & PC NOTES |
| EC0.2 ES & PC NOTES |
| EC0.3 ES & PC NOTES |
| EC1.1 ES & PC PLAN - INITIAL PHASE |
| EC1.2 ES & PC PLAN - INITIAL PHASE |
| EC2.1 ES & PC PLAN - INTERMEDIATE PHASE |
| EC2.2 ES & PC PLAN - INTERMEDIATE PHASE |
| EC3.1 ES & PC PLAN - FINAL PHASE |
| EC3.2 ES & PC PLAN - FINAL PHASE |
| EC4.1 ES & PC DETAILS |
| EC4.2 ES & PC DETAILS |