This Statement of Work (SOW) details a flooring replacement project for the US Coast Guard Station Golden Gate in Sausalito, CA. The project involves removing and replacing flooring on the first and second floors, encompassing 6,700 square feet total: 3,500 square feet of first-floor carpet will be removed and the concrete floor polished, while 3,200 square feet of second-floor carpet will be replaced with Luxury Vinyl Plank (LVP) flooring. The contractor is responsible for providing all labor, materials, and equipment, with work to be completed between 7:00 AM and 5:00 PM, Monday through Friday, excluding federal holidays. The Technical Point of Contact is Francisco Rivera, and the government will provide electricity, parking, and a laydown area, though bathroom facilities will not be available to contractor personnel. The project requires thorough cleanup, proper waste disposal, and returning all work areas to their original condition upon completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

REPLACE FLOORING US COAST GUARD STATION GOLDEN GATE

PART 1 - GENERAL

The intent of this Statement of Work (SOW) is to have the contractor remove and replace the first and second-floor flooring at Station Golden Gate in Sausalito, CA. The contractor will provide all labor, materials, and equipment required to complete the installation. The color of the flooring will be chosen by the customer.

PART 2 - FACILITY AND SECURITY REQUIRMENTS

1. Contractor vehicles must have valid registration and insurance, and vehicle operators must have a valid driver license. All personnel shall have valid photo identification.

2. The contractor shall clean up all areas to ensure they are clear of debris daily. At completion of the project all construction areas will be returned to their original condition. The contractor shall remove all waste material generated and dispose of in accordance with industry standards and applicable environmental rules and regulations.

3. Minimizing impact to Coast Guard operations. Work performed at Sausalito, CA shall be completed between the hours of 7:00AM and 5:00PM, Monday thru Friday (excluding Federal Holidays) unless authorized by the Contracting Officer.

PART 3 - GOVERNMENT FURNISHED MATERIAL

1. Contractor will provide all materials to complete the work necessary. The government will provide electricity, parking, and laydown area as available from the unit. Bathroom facilities will not be available for contractor personnel.

PART 4 - TECHNICAL POINT OF CONTACT DESIGNATION

1. Technical POC for this task is:

Francisco Rivera Office: 909-973-3879 E-mail: Francisco.P.Rivera@uscg.mil

PART 5 – TASKS

1. Mobilization

a. Mobilize all necessary equipment and personnel to safely execute the flooring removal and installation tasks.

b. The government will ensure the worksite is cleared of furniture and other items prior to removal and installing of flooring.

First Floor Flooring

2. Removal of Carpet

a. Remove 3,500 square feet of existing carpet.

b. Ensure thorough cleaning and preparation of the underlying surface for polishing.

3. Concrete Polishing

a. Polish the exposed concrete floor to the specified finish as selected by the Technical POC.

Second Floor Flooring

4. Removal of Carpet

a. Remove 3,200 square feet of existing carpet.

b. Prepare the underlying surface for the installation of new flooring.

5. Installation of Luxury Vinyl Plank (LVP)

a. Install 3,200 square feet of LVP flooring as chosen by the Technical POC.

b. Ensure proper adhesive and installation techniques are used as per industry standards.

c. Cove Base shall be installed where applicable.

6. Disposal

a. Remove and dispose of all carpet and other waste materials in accordance with industry standards and applicable environmental rules and regulations.

7. Demobilization

a. Remove all equipment from government facilities.

b. Return all work areas to their original condition, ensuring proper cleanup and restoration.

PART 6 – ACCEPTANCE

1. Completion of work under this contract will be monitored and accepted by Coast Guard Technical POCs listed in