3_Quality_Assurance_Letter_of_Instruction.pdf
PDF 907 KB Posted
- Attached to
- T-38 EXPLOSIVE ROTARY ACTUATOR Federal contract opportunity
- Solicitation number
- FA8213-20-Q-0009
About this file
This document outlines quality assurance inspection requirements for an explosive actuator contract. The contractor must follow DCMA inspection points including mandatory stamps or signatures on manufacturing documentation, witnessing of 50% of production lots, verification stamps unless noted, and notification of testing schedules. Inspection points cover explosive weight verification, leak testing, x-ray inspection, lot acceptance testing with calibration verification, ammunition data card review, packaging requirements, and additional points as required by DCMA. The related federal contract opportunity is a solicitation from the Department of the Air Force seeking 10 T-38 explosive rotary actuators over 12 months for delivery to Hill Air Force Base.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 8_Contract_Data_Requirements_List.pdf | ||
| 4_ES7034_Rework_and_Repair_of_Nonconforming_Material.doc | DOC document | |
| 16_Section_M_Lowest_Price.docx | DOCX document | |
| 7_CADPAD_Item_Marking.pdf | ||
| 5_REPSHIP_of_HAZMAT.doc | DOC document | |
| 2_Statement_of_Work_Ammunition_Data_Card.doc | DOC document | |
| 13_Bid_Sets.doc | DOC document | |
| 11_Item_Description.pdf | ||
| 10_SOW_for_Packaging_and_Preservation.pdf | ||
| 15_Section_L_Lowest_Price.docx | DOCX document | |
| 12_Engineering_Data_List.pdf | ||
| 9_AFMC_Form_158_Packaging_Requirements.pdf | ||
| 1_Airmunition_Specification.docx | DOCX document | |
| 14_JFQR_1377-00-313-4761ES_F-15_ARR_Thruster).pdf | ||
| 6_Report_of_Shipment.pdf | ||
| FA8213-20-Q-0009.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name CAGE code
DCMA QAR Reviewer
Date Review Completed
Date Issued to Contractor
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.
All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
Concurrence Signature by QAR/DCMA:
QAR/DCMA Signature
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer Signature
Date
Rev Date: 30 Apr 2019
Sheet1
| Text49: | |
| Text46: 21 Oct 2019 | |
| 2019-05-02T10:47:03-0600 | |
| TIDWELL.QUINN.RAY.1241451913 |
| undefined_9: N |
| Text32: 9. Additional Requirements |
| undefined_8: M |
| Text31: 8. Shippers (DD250, DD1149, Reports) |
| undefined_7: |
| Text30: 7. AMMO Data Card Review |
| undefined_6: V |
| Text29: 6. Preparation for Shipment |
| undefined_5: V |
| Text28: 5. LAT |
| undefined_4: V |
| Text27: 4. LAT Sample Selection |
| undefined_3: V |
| Text26: 3. X-Ray/N-Ray |
| undefined_2: |
| Text25: 2. Leak Test |
| undefined: |
| Text36: 1. Explosive Weight |
2. Verify gross leak and fine leak check are performed.
3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.
4. Randomly select LAT units per latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment.
5. Testing should occur in accordance with latest government approved ATP. Witness proper test setup and at least the first 3 functional tests. Further witness may be required if there are known concerns with the item or requested by Government Engineer.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer
| Text24: 1.Inspection |
| Part Number: 30351-9 |
| Text23: |
| DODIC: MC57 |
| Text22: |
| Text21: |
| Text20: 12116 |
| Text19: Nammo Talley |
| Part Number Line 2: |
| Contract No: 20-50009 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: F-15 |
File details come from the government source that posted it. Updated .