2877-U_CC Coolers&Freezer_Bid Dwgs_8-24-26.pdf

PDF 9 MB Posted

Attached to
Crown Coliseum Coolers & Freezers Upgrades
Solicitation number
600600CCCooler
Issued by
Cumberland County, North Carolina

About this file

This is a Bid Drawings package for the Crown Coliseum Cooler/Freezer Upgrade project in Cumberland County, North Carolina, dated August 2026. The project involves the replacement and upgrade of existing refrigeration equipment throughout the Crown Coliseum Complex located at 1960 Coliseum Drive, Fayetteville, North Carolina. The scope of work includes demolition of existing walk-in cooler and freezer evaporator units, condensing units, and associated refrigerant piping across multiple areas including the main kitchen/commissary, service pantry, vendor depot, and concession areas. New Trenton-brand evaporator fan coil units and condensing units will be installed with R-448A refrigerant, featuring capacities ranging from approximately 11,180 to 29,640 BTUH. The mechanical work includes installation of new refrigerant piping, condensate drain systems, heat trace cables for freeze protection, and various pipe supports and hangers. Electrical work requires new branch circuits, disconnects, and panelboard upgrades to support the refrigeration equipment, with a new 200-amp, 208Y/120V, 3-phase main lug only panelboard specified for roof-mounted condensing units. The drawings indicate the project is issued for bid as of August 24, 2026.

The bid drawings detail comprehensive mechanical and electrical requirements prepared by The Wooten Company and include demolition plans, piping layouts, equipment schedules, and installation details. Mechanical notes require the contractor to verify all existing conditions prior to final bidding, perform service and repair on existing equipment to bring units into full compliance, handle all condensate drain connections, and ensure proper support and bracing per SMACNA standards and 2018 North Carolina Energy Conservation Code. Electrical notes specify that branch circuiting must be field-verified, existing conduit systems should be retained where possible, and all work must comply with the National Electrical Code and local authorities. The project requires a bid bond, performance bond, and payment bond, with minority bidders strongly encouraged to participate. Equipment specifications include defrost heaters for freezer units, neoprene vibration isolation pads, hail guards for condenser coils, sealed liquid line filters with sight glass, and a one-year warranty on all workmanship and materials following final acceptance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N o rt h B o y la n A v e n u e

R a le ig h N

C

-1

(9

-0 th e w o o te n c o m p a n y .c o m

L ic e n s e N u m b e r

F

-0

PROJECT NO.:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

C U

M B E R

L A

N D

C O

U N

T Y

N O

R T

H C

A R

O L

IN

A

R E V

IS

IO

N S

DATE:

ISSUED FOR:

BID

A u t o d e s k

D o c s

U

C r o w n

F r e e z e r

C o o le r s

U C r o w n

U p g r a d e

M E

P .r v t

:4

:3

P M

C O

V E R

S H

E E T

T-001

N L H

NLH

NLH

SLE

AUGUST 2026

2877-U

C R

O W

N C

O L

IS

E U

M C

O O

L E

R /F

R E

E Z

E R

U P

G R

A D

E

C U

M B

E R

L A

N D

C O

U N

T Y

CROWN COLISEUM COOLER/FREEZER UPGRADE

CUMBERLAND COUNTY

2877-U August 2026

CROWN COLISEUM COMPLEX

1960 Coliseum Dr, Fayetteville, NC 28306

SHEET

NUMBER SHEET NAME

T-001 COVER SHEET

M-001 MECHANICAL LEAD SHEET

MD-200 MECHANICAL PIPING PLANS - DEMOLITION

MD-201 MECHANICAL PIPING PLANS - DEMOLITION

MD-202 MECHANICAL PIPING PLANS - DEMOLITION

MD-203 MECHANICAL PIPING PLANS - DEMOLITION

M-200 MECHANICAL PIPING PLANS

M-201 MECHANICAL PIPING PLANS

M-202 MECHANICAL PIPING PLANS

M-203 MECHANICAL PIPING PLANS

M-600 MECHANICAL DETAILS

M-700 MECHANICAL SCHEDULES

E-001 ELECTRICAL LEAD SHEET SERIES

ED-100 DEMOLITION POWER PLANS

ED-101 DEMOLITION POWER PLANS

ED-102 DEMOLITION POWER PLANS

E-100 ELECTRICAL POWER PLANS

E-101 NEW WORK POWER PLANS

E-102 NEW WORK POWER PLANS

E-700 ELECTRICAL SCHEDULES AND DETAILS

E MOUNTAIN DRIVE PROJECT LOCATION PROJECT SITE E MOUNTAIN DRIVE

VICINITY MAP

NOT TO SCALE

N

LOCATION MAP

NOT TO SCALE

N

B

M

D

Ƨ

Ƨ

M

S

S

M

CO2

CO

H2

HZG

NO2

O2

HS

H

T

TC

TH

TS

CHWS

CD

CDR

CWR

CWS

HWR

HWS

G

STM

(E)

CHWR Chilled-Water Return

Chilled-Water Supply

Condensate Drain

Steam Condensate Return

Condenser-Water Return

Condenser-Water Supply

Hot-Water Return

Hot-Water Supply

Natural Gas

Steam Supply

RL

RS

Refrigerant Liquid

Refrigerant Gas

2"

RD Refrigerant Discharge

Mechanical Piping Symbols

Keynote Symbol

Continuation Symbol

Sheet Number Where Detail is Placed Detail Number on Sheet

Plan Revision Number

General Plan Symbols

Room Name / Number

Point Where New Connects To Existing

Existing Pipe To Remain

Area Being Demolished

Area Not In Contract

Pipe To Be Demolished

Above Ground Piping

Nominal Pipe Size

Below Ground Piping Pipe Slope (When Applicable)

* NOTE *

ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS IN

THIS SET.THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT BE

USED IN THIS SET OF DRAWINGS.

LP Liquid Propane

1/8" / 12" SLOPE

24"x12"

24"/12"

18"Ø

General Exhaust Air

Outdoor Air

Building Relief Air

Return Air

Supply Air

Transfer Air

Grille, Register, Diffusers

Airflow

Catalog Throw Performance Neck Size / Module Size

Existing Duct To Remain

Oval Duct Size (Width / Height)

Sq. Duct Size (Width x Height)

HVAC Symbols

Rect. Supply Duct Rise / Drop

Mechanical Equipment

Round Duct Size (Diameter)

Duct To Be Demolished

Kitchen Exhaust Duct

Env. Tobacco Smoke

Equipment By Others (Refer To Other Disciplines)

Existing to Remain Equipment

Flue Gas Vent

Combustion Air

Ventilation Air

(E)AHU-2

Ø ROUND

ABV ABOVE

AC AIR CONDITIONING

AD AREA DRAIN

ADD ADDENDUM

AFF ABOVE FINISHED FLOOR

AFUE ANNUAL FUEL UTILIZATION EFFICIENCY

ALT ALTERNATE

AP ACCESS PANEL

ARCH ARCHITECT/ARCHITECTURAL

BFF BELOW FINISHED FLOOR

BLW BELOW

BTU BRITISH THERMAL UNITS

BTUH BRITISH THERMAL UNITS PER HOUR

CAP CAPACITY

CB CATCH BASIN

CFM CUBIC FEET PER MINUTE

CLG CEILING

CO CLEAN OUT

CW COLD WATER

D DEGREE

DB DRY BULB

DIA DIAMETER

DN DOWN

DW DISTILLED WATER

EA EACH

EAT ENTERING AIR TEMPERATURE

ELEC ELECTRICAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

E/A EXHAUST AIR

EXIST EXISTING

F DEGREES FAHRENHEIT

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FL FLOOR

FO FUEL OIL

FOV FUEL OIL VENT

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FPM FEET PER MINUTE

FS FLOOR SINK

FT FOOT/FEET

FTR FIN TUBE RADIATION

GAL GALLON

GF GAS-FIRED

GC GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

GW GREASE WASTE

HB HOSE BIB

HP HORSE POWER

HTG HEATING

HTR HEATER

HW HOT WATER

HYD HYDRANT

ID INDIRECT

IN INCH

INV INVERT

LB POUND

LB/HR POUNDS PER HOUR

LAT LEAVING AIR TEMPERATURE

LP LOW PRESSURE

LPG LIQUEFIED PETROLEUM GAS

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M/A MIXED AIR

MAX MAXIMUM

MBH ONE THOUSAND BTU PER HOUR

MCF ONE THOUSAND CUBIC FEET

MD MOTORIZED DAMPER

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTR MOTOR

MU/A MAKE-UP/AIR

NC NOISE CRITERIA

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NUMBER

NO NORMALLY OPEN

NTS NOT TO SCALE

O OXYGEN

O/A OUTSIDE AIR

ORD OVERFLOW ROOF DRAIN

PD PRESSURE DROP

PIV POST INDICATOR VALVE

PLBG PLUMBING

PRESS PRESSURE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

PWR POWER

R DUCT RISER

R/A RETURN AIR

RCP RADIANT CEILING PANEL

RD ROOF DRAIN

REC RECESSED

RED REDUCER

RH RELATIVE HUMIDITY

RL/A RELIEF AIR

RM ROOM

RPM REVOLUTIONS PER MINUTE

RW RAIN WATER

SF SQUARE FOOT

S/A SUPPLY AIR

SAN SANITARY

SF SQUARE FOOT

SD SMOKE DAMPER

SM SURFACE MOUNT

SP STANDPIPE

SP STATIC PRESSURE

STM STEAM

T THERMOSTAT

TD TEMPERATURE DROP

TDR TRENCH DRAIN

TEMP TEMPERATURE

TYP TYPICAL

UG UNDERGROUND

VAC VACUUM

V VENT

VAV VARIABLE AIR VOLUME

VENT VENTILATION

VTR VENT THROUGH ROOF

W WASTE

WB WET BULB

WCO WALL CLEAN OUT

WH WALL HYDRANT

Abbreviations

Type (See Schedule)

Max NC Rating

Design Airflow Rate

RTU-1

10.0 ton

RTU-1

180000 Btu/h

180 CFH

3.7 GPM

VAV 1-2

Design Water Flow

Operating Weight

Heating Capacity

Nominal Cooling Capacity

Mechanical Devices

GWR

GWS

Geothermal-Water Return

Geothermal-Water Supply

Existing Relocated Equipment(R)AHU-3

AC AIR CONDITIONING UNIT

ACCU AIR COOLING CONDENSING UNIT

AHU AIR HANDLING UNIT

AS AIR SEPARATOR

B BOILER

CH CHILLER

CT COOLING TOWER

CUH CABINET UNIT HEATER

CHWP CHILLED WATER PUMP

DBP DOMESTIC WATER BOOSTER PUMP

DC DUCT MOUNTED COIL

DCP DOMESTIC WATER CIRCULATING PUMP

EF EXHAUST FAN

EDC ELECTRIC DUCT COIL

ET EXPANSION TANK

EWH ELECTRIC WATER HEATER

FCU FAN COIL UNIT

FP FIRE PUMP

GI GREASE INTERCEPTOR

GRV GRAVITY ROOF VENTILATOR

HWP HEATING WATER PUMP

HRU HEAT RECOVERY UNIT

PRV POWER ROOF VENTILATOR

RE RETURN/EXHAUST FAN

RTU ROOFTOP UNIT

SP SUMP PUMP

UH UNIT HEATER

WH WATER HEATER

Equipment Abbreviations

Damper Types

Laboratory Hood

Unit Identity

Valve Types

2" CHECK

2" BAL

3" CIRC

2" GATE

2" PRV

2" STRAIN

2" M-CNTRL

2" SHUTOFF

1" GAS-CNTRL

Alternate Check Valve

1" REG

1" GAS COCK

1" PLUG

2" BFV

2" GLOBE

2" LOCK

4" 3-WAY CNTRL

2" QUICK

FLUE

C/A

S/A

V/A

O/A

R/A

L/A

T/A

E/A

KED

LH

ETS

Round Supply Duct Rise / Drop

Rect. Return Duct Rise / Drop

Round Return Duct Rise / Drop

Rect. Exhaust Duct Rise / Drop

Round Exhaust Duct Rise / Drop

(E)

EF-XX

500 CFM

AC-1

AFF:7'-0" Bottom of Equipment Height

Carbon Dioxide Detector

Carbon Monoxide Detector

Hydrogen Gas Detector

Hazardous Gas Detector

Nitrogen Dioxide Detector

Oxygen Gas Detector

Smoke Damper

Fire Damper Comb. Fire/

Smoke Damper

Manual Damper

Motorized Damper

Backdraft Damper

Pipe Rise / Drop

Linear Diffuser

6"Ø

CD11 100

TYP. X 4

10"Ø/24x24 H6/9/1729

CD3 500

8"Ø/2s/4'-0"L

LD8 200

18"x10"

SG1 500

AFF:9'-0"

Neck Size Airflow

Airflow

Mounting Elevation (Centerline) Nominal Duct Size

Airflow Neck Size/ Slot(s)/ Active Length

16"x16"

RG1 800

AFF:9'-0"

12"x12"/24x24

RG2 500

Airflow

Mounting Elevation (Centerline) Nominal Duct Size

Airflow Neck Size / Module Size Max NC Rating

Type Count for Space

Unit Identity

Gas Supply Input Rate

ET-1

379 lb

Humidity Sensor

Humidistat

Thermostat

Temp/ CO2 Sensor

Temp/ Humidity Sensor

Temperature Sensor

AHU-1

Ball Valve

Balancing Valve

Butterfly Valve

Check Valve

Circuit Setter

Gate Valve Globe Valve

Locked Shield Valve

Pressure Reducing Valve

Quick Opening Valve

Fluid Strainer

Elec. Control Valve

3-Way Elec. Valve

Emergency Gas Shutoff

Plug Valve

Gas Shutoff Cock

Gas Regulator

2" CHECK

Throw Pattern

Room

Sidewall Supply Grille

Round Ceiling Diffuser

Square Ceiling Diffuser

Sidewall Return Grille

Ceiling Return

HVAC General Notes

A CONDENSATE DRAINS SHALL BE SUPPLIED FOR ALL COOLING

EQUIPMENT. CONTRACTOR SHALL ENSURE PROPER INSTALLATION

AND DRAINAGE AS REQUIRED BY FEDERAL, STATE, AND LOCAL

CODES. CONDENSATE PIPING SHALL BE TYPE "L" COPPER.

B PROVIDE A 4" HOUSEKEEPING PAD FOR EACH PIECE OF

MECHANICAL EQUIPMENT. COORDINATE SIZES WITH MECHANICAL

EQUIPMENT SELECTED.

C THIS CONTRACTOR SHALL BE REQUIRED TO REPLACE FILTERS ON

HVAC EQUIPMENT AFTER ALL DUST PRODUCING CONSTRUCTION

HAS BEEN COMPLETED AND PRIOR TO THE FINAL PUNCH.

D INSTALL, SUPPORT, AND BRACE ALL HVAC DUCTWORK AND

ACCESSORIES PER "HVAC DUCT CONSTRUCTION STANDARDS" BY

SMACNA, ANSI/SMACNA 006-2006 AND "SEISMIC RESTRAINT MANUAL

GUIDELINES FOR MECHANICAL SYSTEMS" BY SMACNA,

ANSI/SMACNA 001-2008.

E INSULATE ALL PIPING AS REQUIRED BY THE 2018 NC ENERGY

CONSERVATION CODE.

Project Requirements

A REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.

B THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR

FIELD VERIFYING, PRIOR TO FINAL BID, ALL EXISTING CONDITIONS

FOR PLUMBING AND MECHANICAL SYSTEMS WITHIN TENANT SPACE

AND WITHIN CLOSE PROXIMITY OF TENANT SPACE.

C THE MECHANICAL CONTRACTOR SHALL PERFORM SERVICE AND

REPAIR ON THE EXISTING EQUIPMENT AND ITS ACCESSORIES AS

FOLLOWS: CLEAN ALL COILS, REPLACE THE FILTERS AND BELTS,

INSPECT, REPAIR, OR REPLACE THE ECONOMIZERS, DRIVES AND

FAN BEARINGS, MOTORS, CONTROL COMPONENTS, VALVES AND

ANY OTHER ITEM NECESSARY FOR A COMPLETE AND PROPER

OPERATING SYSTEM. THIS CONTRACTOR SHALL ALSO VISIT THE

SITE, PRIOR TO FINAL BIDDING, AND VERIFY ALL EXISTING SITE

CONDITIONS. PROVIDE ALL MATERIAL AND COMPONENTS AS

NEEDED TO BRING THE UNITS TO FULL COMPLIANCE OF THE

LANDLORD'S CRITERIA AND LOCAL AUTHORITY HAVING

JURISDICTION.

D WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF

CONSTRUCTION, PREVENT CONSTRUCTION DEBRIS FROM

ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR TO

START OF WORK. UNSEAL DRAINS AT COMPLETION OF

CONSTRUCTION.

E COORDINATE INSTALLATION OF PIPING, DUCTWORK, CONDUIT,

LIGHTS, CABLE TRAY, STRUCTURE, AND EQUIPMENT TO PREVENT

CONFLICTS.

F THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS

BOTH EXISTING AND THOSE ILLUSTRATED BY THESE DOCUMENTS

AS WELL AS THOSE WHICH CAN BE REASONABLY ANTICIPATED

INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL, ELECTRICAL,

VENTILATION, PLUMBING, AND OTHER SYSTEMS INVOLVED ON THIS

PROJECT.

G FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING

SYSTEM, AND SHALL CONFORM TO ALL REQUIREMENTS OF

APPLICABLE FEDERAL, STATE, AND LOCAL CODES, INCLUDING BUT

NOT LIMITED TO THE INTERNATIONAL BUILDING CODE AND

INTERNATIONAL MECHANICAL CODE.

H LOCATE EQUIPMENT REQUIRING ACCESS 2'-0" MAXIMUM ABOVE

CEILING.

I ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT

EDITION OF ALL APPLICABLE CODES, INCLUDING THE 2018 NC

BUILDING CODES, AND/OR ANY CODES APPLIED BY THE AUTHORITY

HAVING JURISDICTION.

J ALL ROOF MOUNTED EQUIPMENT SHALL BE A MINIMUM 10'-0" FROM

EDGE OF ROOF.

K LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY

FROM THE SPACE ABOVE ELECTRICAL PANELS. TRANSFORMERS

AND OTHER ELECTRICAL EQUIPMENT.

L PENETRATIONS OF RATED ASSEMBLIES SHALL BE FIRE STOPPED.

FIRE STOPPING SHALL BE AN APPROVED MATERIAL AS

PRESCRIBED IN CSFM STANDARD 43-1 AND SHALL BE U.L. LISTED.

M PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND DUCTS

THROUGH FOUNDATIONS, FLOORS, WALLS, AND ROOF.

N MAINTAIN CLEAR ACCESS TO SERVICE EQUIPMENT AND OTHER

ACCESSORIES REQUIRING SERVICE, VISUAL INSPECTION OR HAND

OPERATION. WHERE INDICATED OR REQUIRED, PROVIDE ACCESS

PANELS OF THE TYPE SELECTED TO SUIT MATERIALS IN WHICH

INSTALLED.

O ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO

MECHANICAL EQUIPMENT.

P REFER TO HVAC SERIES DRAWINGS FOR GAS AND A.C.

CONDENSATE DRAIN PIPING.

Q PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF

FLOW UNTIL ANOTHER SIZE IS SHOWN.

R FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT

SHOWN ON THE SEGMENTS, REFER TO DETAILS, SCHEDULES, AND

SPECIFICATIONS.

S INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE RESPECTIVE

MANUFACTURER'S WRITTEN INSTALLATION INSTRUCTIONS, AT A

LEVEL OF QUALITY AND WORKMANSHIP CONSISTENT WITH THE

SPECIFICATIONS.

T LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS INDICATED

ON THE DRAWING, ARE APPROXIMATE AND SUBJECT TO MINOR

ADJUSTMENTS IN THE FIELD. WORK SHALL BE COORDINATED WITH

ALL OTHER TRADES TO AVOID INTERFERENCE IN THE FIELD.

U INSTALL EXPOSED PIPING AND DUCTWORK AS HIGH AS PRACTICAL

IN ROOMS WITHOUT CEILINGS.

V THE CONTRACTOR'S WORK SCHEDULE SHALL BE SUBMITTED TO

AND APPROVED BY THE OWNER.

W PRIOR TO STARTING WORK, SUBMIT SHOP DRAWINGS FOR ALL

MECHANICAL EQUIPMENT, PLUMBING FIXTURES, AND DIFFUSERS.

X CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY

PERMITS AND SHALL ARRANGE FOR ALL INSPECTIONS AS

REQUIRED.

Y PROVIDE ONE YEAR WARRANTY FOR ALL WORKMANSHIP AND

MATERIALS AFTER THE DATE OF FINAL ACCEPTANCE.

HVAC SHEET INDEX

M-001 MECHANICAL LEAD SHEET

MD-200 MECHANICAL PIPING PLANS - DEMOLITION

MD-201 MECHANICAL PIPING PLANS - DEMOLITION

MD-202 MECHANICAL PIPING PLANS - DEMOLITION

MD-203 MECHANICAL PIPING PLANS - DEMOLITION

M-200 MECHANICAL PIPING PLANS

M-201 MECHANICAL PIPING PLANS

M-202 MECHANICAL PIPING PLANS

M-203 MECHANICAL PIPING PLANS

M-600 MECHANICAL DETAILS

M-700 MECHANICAL SCHEDULES

N AORT H CAROL I N

SC OT T L. ENNIE RN GI NE E

P LROFESSIONA

027928

S

N or th

B oy la n

Av en ue

R al ei gh

, N C

-1

(9

) 8

-0 th ew oo te nc om pa ny

.c om

Li ce ns e

N um be r :

F -0

PROJECT NO.:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

CU

M

BE

RL

AN

D

C O

UN

TY

N O

RT

H

C

AR

O

LI

N A

RE

VI

SI

O

N S

DATE:

ISSUED FOR:ISSUED FOR:

BID

C:

\U se rs

\b co gg in s\ Ap pD at a\ Lo ca l\

Au to de sk

\R ev it\ Au to de sk R ev it

\C ol la bo ra tio nC ac he \B

UK

W C8

RF

U3

PQ

LC

\5 0e

1f 7d a-

-4

7c 1-

-3 c3 a5

1d d\ cd bf -2

7-b7

-8

9-

0c 5b c5

.r vt 8/

/2

4:

:0

PM

M

EC

H

AN

IC

AL

L

EA

D S

H

EE

T

M-001

BM

C

BMC

BMC

SLE

AUG 2026

2877-U

C R

O W

N C

O

LO

SS

EU

M C

O O

LE

R

/F R

EE

ZE

R U

PG

R

AD

E

C U

M

BE

R

LA

N D

C O

U N

TY

Ti tle S he et

R ev isi on

Docusign Envelope ID: 9FD881D0-9818-8E6F-8261-84CFF43016B7

8/24/2026

KITCHEN/COMMISSARY

COOLER

0327D

FREEZER

0327C

COOLER

0327B

FREEZER

0327A

SERVICE

CORRIDOR

BULK STORAGE

COOLER

0326A

FREEZER

0326B

EX-FCU-B2

EX-FCU-A2

EX-FCU-A

EX-FCU-B1

EX-CU-B1

EX-CU-B

EX-CU-A1EX-CU-A2

EX-CU-A

EX-CU-B2

EX-FCU-B

EX-FCU-A1

RS/RL

RS/RL

RS/RL

RS/RL

RS/RL

RS/RL

N AORT H CAROL I N

SC OT T L. ENNIE RN GI NE E

P LROFESSIONA

027928

S

N or th

B oy la n

Av en ue

R al ei gh

, N C

-1

(9

) 8

-0 th ew oo te nc om pa ny

.c om

Li ce ns e

N um be r :

F -0

PROJECT NO.:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

CU

M

BE

RL

AN

D

C O

UN

TY

N O

RT

H

C

AR

O

LI

N A

RE

VI

SI

O

N S

DATE:

ISSUED FOR:ISSUED FOR:

BID

C:

\U se rs

\b co gg in s\ Ap pD at a\ Lo ca l\

Au to de sk

\R ev it\ Au to de sk R ev it

\C ol la bo ra tio nC ac he \B

UK

W C8

RF

U3

PQ

LC

\5 0e

1f 7d a-

-4

7c 1-

-3 c3 a5

1d d\ cd bf -2

7-b7

-8

9-

0c 5b c5

.r vt 8/

/2

4:

:1

PM

M

EC

H

AN

IC

AL

P

IP

IN

G

PL

AN

S

D

EM

O

LI

TI

O

N

MD-200

BM

C

BMC

BMC

SLE

AUG 2026

2877-U

C R

O W

N C

O

LO

SS

EU

M C

O O

LE

R

/F R

EE

ZE

R U

PG

R

AD

E

C U

M

BE

R

LA

N D

C O

U N

TY

1/8" = 1'-0"MD-200

1 PIPING DEMOLITION-MAIN KITCHEN/COMMISSARY

REMOVE EXISTING WALK-IN FAN COIL UNIT AND ASSOCIATED

REFRIGERANT PIPING. CONDENSATE DRAIN LINE SHALL REMAIN FOR

RECONNECTION DURING CONSTRUCTION PHASE.

REMOVE ROOF MOUNTED CONDENSING UNIT AND ASSOCIATED

REFRIGERANT PIPING. ROOF PIPING PENETRATION SHALL REMAIN FOR

REUSE DURING CONSTRUCTION PHASE. ROOF STRUCTURAL STEEL

STAND SHALL REMAIN FOR REUSE DURING CONSTRUCTION PHASE.

DEMOLISH REFRIGERANT PIPING LINESET BETWEEN EVAPORATOR AND

CONDENSING UNIT (REFRIGERANT LINESET OF 2 PIPES - GAS AND

LIQUID - REPRESENTED WITH SINGLE LINE ON PLAN).

REFRIGERANT CURB SHALL REMAIN FOR REUSE DURING

CONSTRUCTION PHASE.

KEY NOTES:

SERVICE PANTRY

COOLER

0329A

EX-CU-0239

EX-FCU-0239

VENDOR DEPOT

BEER COOLER

0111A

EX-CU-0111

EX-FCU-0111

VENDOR DEPOT

BEER COOLER

0158A

EX-FCU-0158

EX-CU-0158

N AORT H CAROL I N

SC OT T L. ENNIE RN GI NE E

P LROFESSIONA

027928

S

N or th

B oy la n

Av en ue

R al ei gh

, N C

-1

(9

) 8

-0 th ew oo te nc om pa ny

.c om

Li ce ns e

N um be r :

F -0

PROJECT NO.:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

CU

M

BE

RL

AN

D

C O

UN

TY

N O

RT

H

C

AR

O

LI

N A

RE

VI

SI

O

N S

DATE:

ISSUED FOR:ISSUED FOR:

BID

C:

\U se rs

\b co gg in s\ Ap pD at a\ Lo ca l\

Au to de sk

\R ev it\ Au to de sk R ev it

\C ol la bo ra tio nC ac he \B

UK

W C8

RF

U3

PQ

LC

\5 0e

1f 7d a-

-4

7c 1-

-3 c3 a5

1d d\ cd bf -2

7-b7

-8

9-

0c 5b c5

.r vt 8/

/2

4:

:1

PM

M

EC

H

AN

IC

AL

P

IP

IN

G

PL

AN

S

D

EM

O

LI

TI

O

N

MD-201

BM

C

BMC

BMC

SLE

AUG 2026

2877-U

C R

O W

N C

O

LO

SS

EU

M C

O O

LE

R

/F R

EE

ZE

R U

PG

R

AD

E

C U

M

BE

R

LA

N D

C O

U N

TY

1/8" = 1'-0"MD-201

3 PIPING DEMOLITION-SERVICE PANTRY

1/8" = 1'-0"MD-201

2 PIPING DEMOLITION-VENDOR DEPOT

1/8" = 1'-0"MD-201

1 PIPING DEMOLITION-VENDOR DEPOT 3

REMOVE EXISTING WALK-IN FAN COIL UNIT AND ASSOCIATED

REFRIGERANT PIPING. CONDENSATE DRAIN LINE SHALL REMAIN FOR

RECONNECTION DURING CONSTRUCTION PHASE.

REMOVE CONDENSING UNIT LOCATED ABOVE WALK-IN UNIT AND

ASSOCIATED REFRIGERANT PIPING.

KEY NOTES:

CONCESSION

FOOD PREP

JANITOR

BEER COOLER

0125A

EX-FCU-0125 EX-CU-0125

CONCESSION

FOOD PREP

BEER COOLER

0134A

JANITOR

0133A

EX-FCU-0134EX-CU-0134

CONCESSION

0129JANITOR

FOOD PREP

BEER COOLER

0128A

EX-FCU-0128

EX-CU-0128

N AORT H CAROL I N

SC OT T L. ENNIE RN GI NE E

P LROFESSIONA

027928

S

N or th

B oy la n

Av en ue

R al ei gh

, N C

-1

(9

) 8

-0 th ew oo te nc om pa ny

.c om

Li ce ns e

N um be r :

F -0

PROJECT NO.:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

CU

M

BE

RL

AN

D

C O

UN

TY

N O

RT

H

C

AR

O

LI

N A

RE

VI

SI

O

N S

DATE:

ISSUED FOR:ISSUED FOR:

BID

C:

\U se rs

\b co gg in s\ Ap pD at a\ Lo ca l\

Au to de sk

\R ev it\ Au to de sk R ev it

\C ol la bo ra tio nC ac he \B

UK

W C8

RF

U3

PQ

LC

\5 0e

1f 7d a-

-4

7c 1-

-3 c3 a5

1d d\ cd bf -2

7-b7

-8

9-

0c 5b c5

.r vt 8/

/2

4:

:1

PM

M

EC

H

AN

IC

AL

P

IP

IN

G

PL

AN

S

D

EM

O

LI

TI

O

N

MD-202

BM

C

BMC

BMC

SLE

AUG 2026

2877-U

C R

O W

N C

O

LO

SS

EU

M C

O O

LE

R

/F R

EE

ZE

R U

PG

R

AD

E

C U

M

BE

R

LA

N D

C O

U N

TY

1/8" = 1'-0"MD-202

3 PIPING DEMOLITION-GENERAL/GRILL CONCESSION

1/8" = 1'-0"MD-202

1 PIPING DEMOLITION-GENERAL/GRILL CONCESSION 2

1/8" = 1'-0"MD-202

2 PIPING DEMOLITION-PIZZA/BBQ CONCESSION

REMOVE EXISTING WALK-IN EVAPORATOR UNIT AND ASSOCIATED

REFRIGERANT PIPING. CONDENSATE DRAIN LINE SHALL REMAIN FOR

RECONNECTION DURING CONSTRUCTION PHASE.

REMOVE CONDENSING UNIT LOCATED ABOVE WALK-IN UNIT AND

ASSOCIATED REFRIGERANT PIPING.

KEY NOTES:

CONCESSION

BEER COOLER

0153A

FOOD PREP

PANTRY

0152A

EX-FCU-0153

EX-CU-0153

N AORT H CAROL I N

SC OT T L. ENNIE RN GI NE E

P LROFESSIONA

027928

S

N or th

B oy la n

Av en ue

R al ei gh

, N C

-1

(9

) 8

-0 th ew oo te nc om pa ny

.c om

Li ce ns e

N um be r :

F -0

PROJECT NO.:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

CU

M

BE

RL

AN

D

C O

UN

TY

N O

RT

H

C

AR

O

LI

N A

RE

VI

SI

O

N S

DATE:

ISSUED FOR:ISSUED FOR:

BID

C:

\U se rs

\b co gg in s\ Ap pD at a\ Lo ca l\

Au to de sk

\R ev it\ Au to de sk R ev it

\C ol la bo ra tio nC ac he \B

UK

W C8

RF

U3

PQ

LC

\5 0e

1f 7d a-

-4

7c 1-

-3 c3 a5

1d d\ cd bf -2

7-b7

-8

9-

0c 5b c5

.r vt 8/

/2

4:

:1

PM

M

EC

H

AN

IC

AL

P

IP

IN

G

PL

AN

S

D

EM

O

LI

TI

O

N

MD-203

BM

C

BMC

BMC

SLE

AUG 2026

2877-U

C R

O W

N C

O

LO

SS

EU

M C

O O

LE

R

/F R

EE

ZE

R U

PG

R

AD

E

C U

M

BE

R

LA

N D

C O

U N

TY

REMOVE EXISTING WALK-IN FAN COIL UNIT AND ASSOCIATED

REFRIGERANT PIPING. CONDENSATE DRAIN LINE SHALL REMAIN FOR

RECONNECTION DURING CONSTRUCTION PHASE.

REMOVE CONDENSING UNIT LOCATED ON WALL MOUNT BRACKET IN

MECHANICAL ROOM.

1/8" = 1'-0"MD-203

1 PIPING DEMOLITION-CONCESSIONS

KEY NOTES:

COOLER

0327D

FREEZER

0327C

KITCHEN/COMMISSARY

COOLER

0327B

FREEZER

0327A

BULK STORAGE

COOLER

0326A

FREEZER

0326B

FCU-B2

FCU-A2

CU-B2

CU-A

CU-A2

CU-A1

CU-B

CU-B1

FCU-B1

FCU-A

FCU-B

FCU-A1

RL

RS

RS

RL

RL

RS

RS

RL

RS

RL

RS

RL

TYP

N AORT H CAROL I N

SC OT T L. ENNIE RN GI NE E

P LROFESSIONA

027928

S

N or th

B oy la n

Av en ue

R al ei gh

, N C

-1

(9

) 8

-0 th ew oo te nc om pa ny

.c om

Li ce ns e

N um be r :

F -0

PROJECT NO.:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

CU

M

BE

RL

AN

D

C O

UN

TY

N O

RT

H

C

AR

O

LI

N A

RE

VI

SI

O

N S

DATE:

ISSUED FOR:ISSUED FOR:

BID

C:

\U se rs

\b co gg in s\ Ap pD at a\ Lo ca l\

Au to de sk

\R ev it\ Au to de sk R ev it

\C ol la bo ra tio nC ac he \B

UK

W C8

RF

U3

PQ

LC

\5 0e

1f 7d a-

-4

7c 1-

-3 c3 a5

1d d\ cd bf -2

7-b7

-8

9-

0c 5b c5

.r vt 8/

/2

4:

:0

PM

M

EC

H

AN

IC

AL

P

IP

IN

G

PL

AN

S

M-200

BM

C

BMC

BMC

SLE

AUG 2026

2877-U

C R

O W

N C

O

LO

SS

EU

M C

O O

LE

R

/F R

EE

ZE

R U

PG

R

AD

E

C U

M

BE

R

LA

N D

C O

U N

TY

1/8" = 1'-0"M-200

1 PIPING FLOOR PLAN-MAIN KITCHEN/COMMISSARY

INSTALL EVAPORATOR FAN COIL UNIT IN WALK-IN BOX PER

MANUFACTURER'S INSTALLATION INSTRUCTIONS AND CLEARANCES.

CONNECT TO EXISTING CONDENSATE DRAIN SYSTEM. VERIFY EXISTING

CONDENSATE DRAIN IS CLOG-FREE AND DRAINS CORRECTLY. UNCLOG

OR REPAIR AS REQUIRED. PROVIDE NEW REFRIGERANT PIPING FROM

FAN COIL TO ROOF MOUNTED CONDENSING UNIT.

ROUTE NEW REFRIGERANT PIPING FROM NEW FAN COIL UNIT, UP OUT

OF WALK-IN BOX, AND THROUGH CEILING SPACE AS INDICATED. TURN

UP TO ROOF AS INDICATED.

ROUTE NEW REFRIGERANT PIPING UP ONTO ROOF AND TO ROOF

MOUNTED CONDENSING UNIT. VERIFY EXISTING PIPE CURB IS IN GOOD

ORDER. REPAIR OR REPLACE PIPE CURB ON ROOF AS REQUIRED TO

ENSURE A LEAK FREE INSTALLATION.

INSTALL NEW ROOF MOUNTED CONDENSING UNIT ON EXISTING STEEL

STAND PER MANUFACTURER'S INSTALLATION INSTRUCTIONS AND

CLEARANCES. CONDENSERS SHALL BE MOUNTED SUCH THAT HOT

DISCHARGE AIR IS DISCHARGED OUT AWAY FROM OTHER CONDENSING

UNITS. CONDENSER UNIT AIR INTAKE INTO REAR OF UNIT SHALL BE

ORIENTED TO FACE THE INSIDE OF THE GROUP OF UNITS. MAKE STEEL

STAND MODIFICATIONS AND/OR EXPAND STEEL STAND AS REQUIRED TO

INSTALL UNITS TO MAINTAIN REQUIRED CLEARANCES.

DIRECTION OF CONDENSING UNIT DISCHARGE SHALL BE OUT AND AWAY

FROM OTHER CONDENSING UNITS. MAINTAIN MANUFACTURER'S

REQUIRED CLEARANCES. (TYPICAL)

KEY NOTES:

SERVICE PANTRY

COOLER

0329A

CU-0329

FCU-0329

1RL

RS

VENDOR DEPOT

BEER COOLER

0111A

CU-0111

FCU-0111

RL

RS

VENDOR DEPOT

BEER COOLER

0158A

CU-0158

FCU-0158

RS

RL

N AORT H CAROL I N

SC OT T L. ENNIE RN GI NE E

P LROFESSIONA

027928

S

N or th

B oy la n

Av en ue

R al ei gh

, N C

-1

(9

) 8

-0 th ew oo te nc om pa ny

.c om

Li ce ns e

N um be r :

F -0

PROJECT NO.:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

CU

M

BE

RL

AN

D

C O

UN

TY

N O

RT

H

C

AR

O

LI

N A

RE

VI

SI

O

N S

DATE:

ISSUED FOR:ISSUED FOR:

BID

C:

\U se rs

\b co gg in s\ Ap pD at a\ Lo ca l\

Au to de sk

\R ev it\ Au to de sk R ev it

\C ol la bo ra tio nC ac he \B

UK

W C8

RF

U3

PQ

LC

\5 0e

1f 7d a-

-4

7c 1-

-3 c3 a5

1d d\ cd bf -2

7-b7

-8

9-

0c 5b c5

.r vt 8/

/2

4:

:0

PM

M

EC

H

AN

IC

AL

P

IP

IN

G

PL

AN

S

M-201

BM

C

BMC

BMC

SLE

AUG 2026

2877-U

C R

O W

N C

O

LO

SS

EU

M C

O O

LE

R

/F R

EE

ZE

R U

PG

R

AD

E

C U

M

BE

R

LA

N D

C O

U N

TY

1/8" = 1'-0"M-201

3 PIPING FLOOR PLAN-SERVICE PANTRY

1/8" = 1'-0"M-201

2 PIPING FLOOR PLAN-VENDOR DEPOT

1/8" = 1'-0"M-201

1 PIPING FLOOR PLAN-VENDOR DEPOT 2

INSTALL EVAPORATOR FAN COIL UNIT IN WALK-IN BOX PER

MANUFACTURER'S INSTALLATION INSTRUCTIONS AND CLEARANCES.

CONNECT TO EXISTING CONDENSATE DRAIN SYSTEM. VERIFY EXISTING

CONDENSATE DRAIN IS CLOG-FREE AND DRAINS CORRECTLY. UNCLOG OR

REPAIR AS REQUIRED. PROVIDE NEW REFRIGERANT PIPING FROM FAN

COIL TO ROOF MOUNTED CONDENSING UNIT.

ROUTE NEW REFRIGERANT PIPING FROM NEW FAN COIL UNIT, UP OUT OF

WALK-IN BOX, AND THROUGH CEILING SPACE AS INDICATED TO NEW

CONDENSING UNIT.

INSTALL NEW CONDENSING UNIT ABOVE CEILING PER MANUFACTURER'S

INSTALLATION INSTRUCTIONS AND CLEARANCES. CONDENSER SHALL BE

MOUNTED SUCH THAT HOT DISCHARGE AIR IS DISCHARGED AWAY FROM

ANY OBSTRUCTION INTO A FREE OPEN AREA.

KEY NOTES:

FOOD PREP

JANITOR

BEER COOLER

0125A

FCU-0125 CU-0125

RS

RL

CONCESSION

FOOD PREP

JANITOR

0133A

BEER COOLER

0134A

FCU-0134CU-0134

3 1

RSRL

JANITOR

FOOD PREP

BEER COOLER

0128A

CONCESSION

FCU-0128 CU-0128

RS

RL

N AORT H CAROL I N

SC OT T L. ENNIE RN GI NE E

P LROFESSIONA

027928

S

N or th

B oy la n

Av en ue

R al ei gh

, N C

-1

(9

) 8

-0 th ew oo te nc om pa ny

.c om

Li ce ns e

N um be r :

F -0

PROJECT NO.:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

CU

M

BE

RL

AN

D

C O

UN

TY

N O

RT

H

C

AR

O

LI

N A

RE

VI

SI

O

N S

DATE:

ISSUED FOR:ISSUED FOR:

BID

C:

\U se rs

\b co gg in s\ Ap pD at a\ Lo ca l\

Au to de sk

\R ev it\ Au to de sk R ev it

\C ol la bo ra tio nC ac he \B

UK

W C8

RF

U3

PQ

LC

\5 0e

1f 7d a-

-4

7c 1-

-3 c3 a5

1d d\ cd bf -2

7-b7

-8

9-

0c 5b c5

.r vt 8/

/2

4:

:0

PM

M

EC

H

AN

IC

AL

P

IP

IN

G

PL

AN

S

M-202

BM

C

BMC

BMC

SLE

AUG 2026

2877-U

C R

O W

N C

O

LO

SS

EU

M C

O O

LE

R

/F R

EE

ZE

R U

PG

R

AD

E

C U

M

BE

R

LA

N D

C O

U N

TY

1/8" = 1'-0"M-202

3 PIPING FLOOR PLAN-GENERAL/GRILL CONCESSION

1/8" = 1'-0"M-202

1 PIPING FLOOR PLAN-GENERAL/GRILL CONCESSION 2

1/8" = 1'-0"M-202

2 PIPING FLOOR PLAN-PIZZA/BBQ CONCESSION

INSTALL EVAPORATOR FAN COIL UNIT IN WALK-IN BOX PER

MANUFACTURER'S INSTALLATION INSTRUCTIONS AND CLEARANCES.

CONNECT TO EXISTING CONDENSATE DRAIN SYSTEM. VERIFY EXISTING

CONDENSATE DRAIN IS CLOG-FREE AND DRAINS CORRECTLY. UNCLOG OR

REPAIR AS REQUIRED. PROVIDE NEW REFRIGERANT PIPING FROM FAN

COIL TO ROOF MOUNTED CONDENSING UNIT.

ROUTE NEW REFRIGERANT PIPING FROM NEW FAN COIL UNIT, UP OUT OF

WALK-IN BOX, AND THROUGH CEILING SPACE AS INDICATED TO NEW

CONDENSING UNIT.

INSTALL NEW CONDENSING UNIT ABOVE CEILING PER MANUFACTURER'S

INSTALLATION INSTRUCTIONS AND CLEARANCES. CONDENSER SHALL BE

MOUNTED SUCH THAT HOT DISCHARGE AIR IS DISCHARGED AWAY FROM

ANY OBSTRUCTION INTO A FREE OPEN AREA.

KEY NOTES:

FOOD PREP

PANTRY

0152A

BEER COOLER

0153A

FCU-0153

CU-0153

RL

RS

N AORT H CAROL I N

SC OT T L. ENNIE RN GI NE E

P LROFESSIONA

027928

S

N or th

B oy la n

Av en ue

R al ei gh

, N C

-1

(9

) 8

-0 th ew oo te nc om pa ny

.c om

Li ce ns e

N um be r :

F -0

PROJECT NO.:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

CU

M

BE

RL

AN

D

C O

UN

TY

N O

RT

H

C

AR

O

LI

N A

RE

VI

SI

O

N S

DATE:

ISSUED FOR:ISSUED FOR:

BID

C:

\U se rs

\b co gg in s\ Ap pD at a\ Lo ca l\

Au to de sk

\R ev it\ Au to de sk R ev it

\C ol la bo ra tio nC ac he \B

UK

W C8

RF

U3

PQ

LC

\5 0e

1f 7d a-

-4

7c 1-

-3 c3 a5

1d d\ cd bf -2

7-b7

-8

9-

0c 5b c5

.r vt 8/

/2

4:

:0

PM

M

EC

H

AN

IC

AL

P

IP

IN

G

PL

AN

S

M-203

BM

C

BMC

BMC

SLE

AUG 2026

2877-U

C R

O W

N C

O

LO

SS

EU

M C

O O

LE

R

/F R

EE

ZE

R U

PG

R

AD

E

C U

M

BE

R

LA

N D

C O

U N

TY

1/8" = 1'-0"M-203

1 PIPING FLOOR PLAN-CONCESSIONS

INSTALL EVAPORATOR FAN COIL UNIT IN WALK-IN BOX PER

MANUFACTURER'S INSTALLATION INSTRUCTIONS AND CLEARANCES.

CONNECT TO EXISTING CONDENSATE DRAIN SYSTEM. VERIFY EXISTING

CONDENSATE DRAIN IS CLOG-FREE AND DRAINS CORRECTLY. UNCLOG OR

REPAIR AS REQUIRED. PROVIDE NEW REFRIGERANT PIPING FROM FAN

COIL TO ROOF MOUNTED CONDENSING UNIT.

ROUTE NEW REFRIGERANT PIPING FROM NEW FAN COIL UNIT, UP OUT OF

WALK-IN BOX, AND THROUGH CEILING SPACE AS INDICATED TO NEW

CONDENSING UNIT.

INSTALL NEW CONDENSING UNIT IN MECHANICAL ROOM ON WALL MOUNT

BRACKET/STAND PER MANUFACTURER'S INSTALLATION INSTRUCTIONS

AND CLEARANCES. CONDENSER SHALL BE MOUNTED SUCH THAT HOT

DISCHARGE AIR IS DISCHARGED AWAY FROM THE WALL OR ANY OTHER

OBSTRUCTION INTO A FREE OPEN AREA.

KEY NOTES:

1.

2.

3.

4.

5.

GENERAL NOTES:

IT IS THE RESPONSIBILITY OF THE F.S.E.C. TO FURNISH, INSTALL AND INTERCONNECT CONDUIT AND WIRING FOR ELECTRICAL COMPONENTS INCLUDING LIGHTS, SWITCHES, THERMOMETERS, DOOR, WINDOW, PRESSURE RELIEF PORT HEATERS AND RECEPTACLE FOR DRAINAGE HEATER TO EASILY ACCESSIBLE JUNCTION BOX ON TOP OF WALK-IN FOR FINAL CONNECTION BY

DIVISION 16.

ALL INTERCONNECTING CONDUIT RUN ABOVE WALK-IN PANELS OR WITHIN THE WALL PANELS - EXPOSED CONDUIT INSIDE WALK-IN WILL NOT BE ACCEPTABLE EXCEPT FOR THE CONDITIONS SHOWN AND NOTED IN THE ABOVE ILLUSTRATION.

SEAL PENETRATIONS THROUGH CEILING, WALLS AND INSIDE ELECTRICAL CONDUIT OUTSIDE AND INSIDE WALK-IN WITH DOW

CORNING #999A SILICONE GLAZING SEALANT.

PROVIDE HOLES FOR SPRINKLER HEAD AND ELECTRICAL CONDUIT.

PROVIDE 1/2" OD PVC CONDUIT AT ALL PENETRATIONS THRU INSULATED PANELS.

F.S.E.C. WILL PREWIRE ALL ELECTRICAL COMPONENTS

EXCEPT BLOWER COIL TO THIS JUNCTION BOX FOR

ONE FINAL CONNECTION BY DIVISION 16

TIME CLOCK FOR FREEZER SYSTEM -

DIVISION 16 TO MAKE FINAL FREEZER

BLOWER COIL CONNECTION THRU TIME

CLOCK (LOCATE TIME CLOCK IN EASILY

ACCESSIBLE SPECIFIED LOCATION)

BUILDING SPRINKLER

CONNECTION (NOT IN

DIV 23 CONTRACT)

JUNCTION BOX WITH OUTLET FOR

DRAINLINE HEATER ON FREEZER

(EXPOSED CONDUIT FOR

THIS CONDITION IS ACCEPTABLE)

CONDUIT DOWN THRU WALK-IN TOP TO JUNCTION

BOX ON COIL (EXPOSED CONDUIT ACCEPTABLE

FOR THIS CONDITION)

SECURE COIL WITH NYLON FASTENERS

HEATED PRESSURE RELIEF

PORT ON FREEZERS

6 1/2

FOOT

MIN.

FRONT VIEWSIDE VIEW

OK

OK

PA

N

EL

PANEL

6 FT

OR

LESS

N.E.C ARTICLE 110-26(F)(1)

FIXTURE

FIXTURE

STRUCTURAL

CEILING

SUSPENDED

CEILING

DEDICATED

ELECTRICAL

SPACE

DEDICATED

ELECTRICAL

SPACE

HEAT TRACE SPECIFICATION:

HEAT-TRACING CABLES: 5 W/FT OUTPUT. SELF-REGULATING, ELECTRIC HEATING CABLES SUITABLE FOR FREEZE PROTECTION OF METAL PIPING. CABLES: PAIR OF PARALLEL NO. 16 AWG TINNED-COPPER BUS WIRES EMBEDDED IN CROSS-LINKED CONDUCTIVE POLYMER CORE, WHICH VARIES POWER OUTPUT IN RESPONSE TO TEMPERATURE ALONG ITS LENGTH. CABLE SHALL BE CAPABLE OF CROSSING OVER ITSELF WITHOUT OVERHEATING. HEAT OUTPUT: AT LEAST 90 PERCENT OF RATING OVER A TEMPERATURE RANGE FROM 40 TO 150 DEG F PIPE TEMPERATURE. CABLE COVER:

FABRICATED OF CROSS-LINKED, MODIFIED, POLYOLEFIN DIELECTRIC JACKET; WITH ULTRAVIOLET INHIBITOR. PIPE THERMOSTAT: UNIT WITH ADJUSTABLE TEMPERATURE RANGE FROM 35 TO 50 DEG F SNAP ACTION; OPEN-ON-RISE, SINGLE-POLE SWITCH WITH 25-A RATING; AND REMOTE BULB FOR DIRECTLY SENSING PIPE-WALL TEMPERATURE.

HEAT TRACE POWER

CONNECTOR

HEAT TRACE

CABLE

SECURE HEAT

TRACE TO PIPE

WITH GLASS TAPE

SECURE MOUNTING

BASE TO PIPING WITH

PLASTIC CABLE TIE

ALL HEAT TAPE SHALL

BESPLICED OUTSIDE

OF INSULATION

HEAT TRACE POWER

CONNECTOR

OUNTING BASE

PROVIDE WITH DISCONNECT

SWITCH & CONNECT TO

ELECTRICAL CIRCUIT

HEAT TRACE END SEAL KIT

WITH L.E.D. PILOT LIGHT

AND MOUNTING BASE

SECTION A-A

NON-RATED WALL PIPE PENETRATION

FILL, VOID, OR CAVITY MATERIAL: FIRE CAULK.

THROUGH PENETRANTS - ONE PIPE, OR CONDUIT.

NON-RATED FLOOR OR WALL.

3.

1.

2.

A

A

ROOF DECKROOF DECK

3/4" PLYWOOD WITH

SHEET METAL CAP

SCREWED TO TOP

OF ROOF CURB

1-1/2" RIGID

INSULATION

SEAL AROUND PIPE

WATER TIGHT WITH

SILICONE SEALER

BLOCKING

AND FLASHING

AS REQUIRED

NOTE:

1. ROOF CURB PROVIDED BY MECHANICAL CONTRACTOR.

COORDINATE INSTALLATION AND FLASHING WITH THE

GENERAL CONTRACTOR.

2. MECHANICAL CONTRACTOR SHALL COORDINATE

ROOF OPENING, CURB SIZE AND HEIGHT REQUIRED

FOR PIPING PENETRATION.

PREFABRICATED

ROOF CURB

PIPE CLAMP ONE SIZE LARGER

THAN PIPE

PRE-FAB PIPE SUPPORT

ROOF

PIPE

PIPE SADDLE, 12" IN LENGTH

PROVIDE WITH RIGID INSERTS,

SAME LENGTH AS THE SADDLE

NOTE:

PIPE HANGERS, HARDWARE, ETC. SHALL BE COMPLETELY GALVANIZED.

THREADED ROD-

SEE SPECIFICATIONS

THREADED ROD-

SEE SPECIFICATIONS

STEEL STRUCTURE

OFFSET CLAMP-

SEE SPECIFICATIONS

PIPE HANGER-

SEE SPECIFICATIONS

PIPE

PIPE INSULATION

SWIVEL RING

PIPE

ALL

THREAD

ROD WITH

TWO NUTS

& FENDER

WASHERS

BOTTOM CHORD OF

BAR JOIST

TOP OF BAR

JOIST TO

CENTER LINE OF

PIPE

(DIM. "B")

MINIMUM

DISTANCE

ROUNDED TO

NEAREST

INCH AND

NOTED ON

PLAN

SWIVEL

RING TAKE

OUT

"C

"A

"B

"D

TOP OF BAR JOIST

NOTE ON PLAN: HANGER NUMBER AND "A" DIMENSION

3/4"

PIPE

SIZE

ROD

SIZE

'B'

DIM.

MIN 'C'

DIM.

MAX 'C'

DIM.

1" 1-1/4" 1-1/2" 2" 2-1/2" 3" 3-1/2" 4" 5" 6" 8"

3/8"

1/2"

SIZE OF ANGLE

IRON ON BOTTOM

CHORD OF BAR

JOIST PLUS 1-1/2"

1/2" 5/8 "13/16" 15/16" 1-3/16 "1-7/16" 1-3/4" 2" 2-1/4" 2-3/4" 3-5/16" 4-5/16"

1-5/8" 1-3/4" 1-7/8" 2" 2-3/8 "2-3/4" 3-1/4" 3-5/8" 3-7/8" 4-3/4" 5-1/2" 6-3/4"

BAR JOIST HANGER

WITH NUTS AND WASHERS

PIPE SADDLE, 12" IN LENGTH

PROVIDE WITH RIGID INSERTS,

SAME LENGTH AS THE SADDLENOTE:

PIPE HANGERS, HARDWARE, ETC. SHALL BE COMPLETELY GALVANIZED.

CONCRETE INSERT-

SEE SPECIFICATIONS

CONCRETE STRUCTURE-

SEE SPECIFICATIONS

THREADED ROD-

SEE SPECIFICATIONS

PIPE HANGER-

SEE SPECIFICATIONS

PIPE

PIPE INSULATION

N AORT H CAROL I N

SC OT T L. ENNIE RN GI NE E

P LROFESSIONA

027928

S

N or th

B oy la n

Av en ue

R al ei gh

, N C

-1

(9

) 8

-0 th ew oo te nc om pa ny

.c om

Li ce ns e

N um be r :

F -0

PROJECT NO.:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

CU

M

BE

RL

AN

D

C O

UN

TY

N O

RT

H

C

AR

O

LI

N A

RE

VI

SI

O

N S

DATE:

ISSUED FOR:ISSUED FOR:

BID

C:

\U se rs

\b co gg in s\ Ap pD at a\ Lo ca l\

Au to de sk

\R ev it\ Au to de sk R ev it

\C ol la bo ra tio nC ac he \B

UK

W C8

RF

U3

PQ

LC

\5 0e

1f 7d a-

-4

7c 1-

-3 c3 a5

1d d\ cd bf -2

7-b7

-8

9-

0c 5b c5

.r vt 8/

/2

4:

:0

PM

M

EC

H

AN

IC

AL

D

ET

AI

LS

M-600

BM

C

BMC

BMC

SLE

AUG 2026

2877-U

C R

O W

N C

O

LO

SS

EU

M C

O O

LE

R

/F R

EE

ZE

R U

PG

R

AD

E

C U

M

BE

R

LA

N D

C O

U N

TY

NO SCALEM-600

8 WALK-IN REFRIGERATOR/FREEZER INSTALLATION DETAIL

1/8" = 1'-0"M-600

9 DETAIL - DEDICATED SPACE FOR ELECTRICAL EQUIPMENT

1/8" = 1'-0"M-600

7 HEAT TRACE CABLE

1/8" = 1'-0"M-600

1 DETAIL - PENETRATION

1/8" = 1'-0"M-600

4 DOGHOUSE PIPE PENETRATION DETAIL

1/8" = 1'-0"M-600

6 ROOF PIPING SUPPORT DETAIL

1/8" = 1'-0"M-600

ASDFASDF DETAIL - HANGERS - BEAM CLAMP

1/8" = 1'-0"M-600

2 HANGERS

1/8" = 1'-0"M-600

5 DETAIL - HANGERS - CONCRETE INSERT

CONDENSER UNIT SCHEDULE

MARK MANUFACTURER MODEL INSTALLATION LOCATION REFRIGERANT REF. CHARGE

(LBS)

CAPACITY

(BTUH)

SUCTION

TEMP (°F)

AMBIENT

TEMP (°F)

FAN COMPRESSOR ELECTRICAL WEIGHT

(LBS) REMARKS

QTY POWER FLA QTY RLA LRA V PH MCA MOCP

CU-A TRENTON TEZA045L8-HT3D ROOF R-448A 9.0 13,530 -20.5 100.0 1 400 W 2.1 1 13.8 99.0 208-230 3 19.4 30 435

CU-A1 TRENTON TEZA075L8-HT3D ROOF R-448A 18.0 24,830 -20.5 100.0 1 400 W 2.1 1 26.7 224.0 208-230 3 35.5 60 495

CU-A2 TRENTON TEZA035L8-HT3D ROOF R-448A 6.0 11,180 -20.5 100.0 1 240 W 1.1 1 12.7 88.0 208-230 3 17.0 25 430

CU-B TRENTON TEZA030H8-HT3D ROOF R-448A 9.0 27,630 24.5 100.0 1 400 W 2.1 1 15.2 93.0 208-230 3 21.1 35 410

CU-B1 TRENTON TEZA020H8-HT3D ROOF R-448A 4.0 16,160 24.5 100.0 1 240 W 1.1 1 10.6 58.0 208-230 3 14.4 25 300

CU-B2 TRENTON TEZA015H8-HT3D ROOF R-448A 4.0 13,870 24.5 100.0 1 240 W 1.1 1 9.7 58.0 208-230 3 13.2 20 285

CU-0111 TRENTON TEZA025H8-IT2D ABOVE CEILING R-448A 5.0 20,400 24.5 95.0 1 400 W 2.1 1 13.7 73.0 208-230 3 19.2 30 370

CU-0125 TRENTON TEZA011H8-IT3D ABOVE CEILING R-448A 3.0 12,970 24.5 95.0 1 240 W 1.1 1 10.4 58.0 208-230 3 14.1 20 265

CU-0128 TRENTON TEZA011H8-IT3D ABOVE CEILING R-448A 3.0 12,970 24.5 95.0 1 240 W 1.1 1 10.4 58.0 208-230 3 14.1 20 265

CU-0134 TRENTON TEZA011H8-IT3D ABOVE CEILING R-448A 3.0 12,970 24.5 95.0 1 240 W 1.1 1 10.4 58.0 208-230 3 14.1 20 265

CU-0153 TRENTON TEZA011H8-IT3D WALL MOUNTED IN MECHANICAL 0143A R-448A 3.0 12,970 24.5 95.0 1 240 W 1.1 1 10.4 58.0 208-230 3 14.1 20 265

CU-0158 TRENTON TEZA011H8-IT3D ABOVE CEILING R-448A 3.0 12,970 24.5 95.0 1 240 W 1.1 1 10.4 58.0 208-230 3 14.1 20 265

CU-0329 TRENTON TEZA011H8-IT3D ABOVE CEILING R-448A 3.0 12,970 24.5 95.0 1 240 W 1.1 1 10.4 58.0 208-230 3 14.1 20 265

FAN COIL UNIT SCHEDULE

MARK MANUFACTURER MODEL SERVICE CFM CAPACITY

(BTUH)

EVAPORATOR

TEMP (°F)

WALK-IN BOX

SPACE TEMP

(°F)

FAN FAN ELECTRICAL DEFROST HEATER DEFROST HEATER

ELECTRICAL ELECTRICAL WEIGHT

(LBS) REMARKS

QTY POWER (HP) FLA (EACH FAN) MCA MOCP WATTS A MCA MOCP V PH

FCU-A TRENTON TPLP314LES2DR8-ESP FREEZER 2,115 14,008 -20.0 -10.0 3 0.07 0.6 2.0 15 2730 11.9 14.8 15 208-230 1 109 1

FCU-A1 TRENTON TPLP526LES2DR8-ESP FREEZER 4,080 26,368 -20.0 -10.0 5 0.07 0.6 3.2 15 4400 19.1 23.9 25 208-230 1 176 1

FCU-A2 TRENTON TPLP211LES2DR8-ESP FREEZER 1,360 11,330 -20.0 -10.0 2 0.07 0.6 1.4 15 1890 8.2 10.3 15 208-230 1 84 1

FCU-B TRENTON TPLP427MAS1DR8-ESP COOLER 2,720 29,640 25.0 35.0 4 0.07 1.0 4.3 15 N/A N/A N/A N/A 115 1 135

FCU-B1 TRENTON TPLP317MAS1DR8-ESP COOLER 2,115 18,638 25.0 35.0 3 0.07 1.0 3.3 15 N/A N/A N/A N/A 115 1 101

FCU-B2 TRENTON TPLP214MAS1DR8-ESP COOLER 1,360 14,933 25.0 35.0 2 0.07 1.0 2.3 15 N/A N/A N/A N/A 115 1 78

FCU-0111 TRENTON TPLP320MAS1DR8-ESP BEER COOLER 2,040 22,230 25.0 35.0 3 0.07 1.0 3.3 15 N/A N/A N/A N/A 115 1 107

FCU-0125 TRENTON TPLP211MAS1DR8-ESP BEER COOLER 1,410 12,463 25.0 35.0 2 0.07 1.0 2.3 15 N/A N/A N/A N/A 115 1 74

FCU-0128 TRENTON TPLP211MAS1DR8-ESP BEER COOLER 1,410 12,463 25.0 35.0 2 0.07 1.0 2.3 15 N/A N/A N/A N/A 115 1 74

FCU-0134 TRENTON TPLP211MAS1DR8-ESP BEER COOLER 1,410 12,463 25.0 35.0 2 0.07 1.0 2.3 15 N/A N/A N/A N/A 115 1 74

FCU-0153 TRENTON TPLP211MAS1DR8-ESP BEER COOLER 1,410 12,463 25.0 35.0 2 0.07 1.0 2.3 15 N/A N/A N/A N/A 115 1 74

FCU-0158 TRENTON TPLP211MAS1DR8-ESP BEER COOLER 1,410 12,463 25.0 35.0 2 0.07 1.0 2.3 15 N/A N/A N/A N/A 115 1 74

FCU-0329 TRENTON TPLP211MAS1DR8-ESP COOLER 1,410 12,463 25.0 35.0 2 0.07 1.0 2.3 15 N/A N/A N/A N/A 115 1 74

GENERAL NOTES:

A. PROVIDE NEOPRENE VIBRATION ISOLATION PADS.

B. PROVIDE HAIL GUARDS FOR CONDENSER COILS.

C. PROVIDE FUSED DISCONNECT.

D. REFRIGERANT LINE SIZES AS RECOMMENDED BY THE EQUIPMENT MANUFACTURER BASED ON HORIZONTAL AND VERTICA RUNS.

E. UNIT TO BE PROVIDED WITH ALL ACCESSORIES REQUIRED FOR LOW AMBIENT COOLING OPERATION.

F. PROVIDE WITH MANUFACTURER'S 5-YEAR COMPRESSOR WARRANTY.

G. PROVIDE QUICK VAC VALVES.

H. PROVIDE SEALED LIQUID LINE FILTER+SIGHT GLASS.

REMARKS:

GENERAL NOTES:

A. PROVIDE ISOLATION HANGERS.

B. UNIT SHALL BE FACTORY PREASSEMBLED.

C. UNIT SHALL HAVE EC MOTOR.

REMARKS:

1. PROVIDE HEAT TRACED DRAIN PAN.

N AORT H CAROL I N

SC OT T L. ENNIE RN GI NE E

P LROFESSIONA

027928

S

N or th

B oy la n

Av en ue

R al ei gh

, N C

-1

(9

) 8

-0 th ew oo te nc om pa ny

.c om

Li ce ns e

N um be r :

F -0

PROJECT NO.:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

CU

M

BE

RL

AN

D

C O

UN

TY

N O

RT

H

C

AR

O

LI

N A

RE

VI

SI

O

N S

DATE:

ISSUED FOR:ISSUED FOR:

BID

C:

\U se rs

\b co gg in s\ Ap pD at a\ Lo ca l\

Au to de sk

\R ev it\ Au to de sk R ev it

\C ol la bo ra tio nC ac he \B

UK

W C8

RF

U3

PQ

LC

\5 0e

1f 7d a-

-4

7c 1-

-3 c3 a5

1d d\ cd bf -2

7-b7

-8

9-

0c 5b c5

.r vt 8/

/2

4:

:0

PM

M

EC

H

AN

IC

AL

S

CH

ED

UL

ES

M-700

BM

C

BMC

BMC

SLE

AUG 2026

2877-U

C R

O W

N C

O

LO

SS

EU

M C

O O

LE

R

/F R

EE

ZE

R U

PG

R

AD

E

C U

M

BE

R

LA

N D

C O

U N

TY

OS

DL

CO

T

CO

OS

LC

F

F

F

DH

DCL

XXX

XXXX

XX

J

J

F1

DO

M

N

X

TV

XXXX

CR

CK

TV

CC

DC

ES

IC

ML

RX

REX

MD

XXX

OS

1P 1 Pole (2P, 3P, 4P, ETC.)

A, Amp Ampere AC Above Counter ACLG Above Ceiling ADO Automatic Door Opener AF Amp Frame AFF Above Finished Floor AFG Above Finished Grade AFI Arc Fault Circuit

Interrupter AHU Air Handling Unit AL Aluminum ALT Alternate AMP Ampere AMPL Amplifier ANNUN Annunciator APPROX Approximately AQ-STAT Aquastat ARCH Architect, Architectural AS Amp Switch AT Amp Trip ATS Automatic Transfer Switch AUTO Automatic AUX Auxiliary AV Audio Visual AWG American Wire Gauge BATT Battery BD Board BLDG Building BMS Building Management System C Conduit CAB Cabinet CAT Catalog CATV Cable Television CB Circuit Breaker CCTV Closed Circuit Television CKT Circuit CLG Ceiling COMB Combination CMPR Compressor CONN Connection CONST Construction CONT Continuation Or Continuous CONTR Contractor CONV Convector CP Circulating Pump CRT Cathode-Ray Tube CT Current Transformer CTR Center CU Copper DCP Domestic Water Circulating Pump DEPT Department DET Detail DIA Diameter DISC Disconnect DIST Distribution DN Down DPR Damper DS Safety Disconnect Switch DT Double Throw DWG Drawing EC Electrical Contractor ELEC Electric, Electrical ELEV Elevator ELU Emergency Lighting Unit EM Emergency EMS Energy Management System EMT Electrical Metallic Tubing EP Electric Pneumatic EQUIP Equipment EWC Electric Water Cooler EXIST Existing EXH Exhaust EXP Explosion Proof FA Fire Alarm FABP Fire Alarm Booster Power

Supply Panel FACP Fire Alarm Control Panel FCU Fan Coil Unit FIXT Fixture FLR Floor FLUOR Fluorescent FU Fuse FUDS Fused Safety Disconnect Switch GA Gauge GAL Gallon GALV Galvanized GC General Contractor GEN Generator GFI Ground Fault Circuit Interrupter GFP Ground Fault Protector GND Ground GRS Galvanized Rigid Steel (Conduit) GYP BD Gypsum Board HOA Hands-Off-Automatic Switch HORIZ Horizontal HP Horsepower HPF High Power Factor HT Height HTG Heating HTR Heater HV High Voltage HVAC Heating, Ventilating And Air

Conditioning IC Interrupting Capacity IG Isolated Ground IMC Intermediate Metal Conduit INCAND Incandescent IR Infrared I/W Interlock With J-BOX Junction Box KV Kilovolt KVA Kilovolt-Ampere KVAR Kilovolt-Ampere Reactive KW Kilowatt KWH Kilowatt Hour LOC Locate Or Location LT Light LTG Lighting LTNG Lightning LV Low Voltage MAX Maximum MAG.S Magnetic Starter M/C Momentary Contact MC Mechanical Contractor

Electrical Abbreviations

Electrical DeviceTags: Uppercase letter(s) indicates Panel ID and circuit number. Lowercase letter indicates designation of controlling switch (where applicable).

Switch ID indicated by a lowercase letter. Switch IDs are unique per space. A switch with an ID "a" controls all devices within the space in which it is located tagged with "a". A switch without a tagged ID controls all lighting fixtures within a space. ID tags may be used on control devices other than switches, such as occupancy sensors or contactors.

Equipment Tags: Equipment ID is indicated by an underlined tag adjacent to the equipment. See the equipment connection schedule for description, electrical requirements, and panel and circuit number. Symbols/graphic appearance of equipment varies.

Solid, arced lines connecting equipment, devices, or fixtures indicate unswitched power circuiting. Wires are only intended to indicate to what circuit devices are connected. Actual connections, circuit routing, installtion, junction boxes, etc. shall be field-determined by the contractor.

Home run to branch circuit panelboard. The equipment name and circuit number(s) are indicated, separated by a hyphen. Homeruns are only intended to indicate panel and circuit number. Actual homerun location shall be field-determined by the contractor.

Power Symbols

Electrical Symbol Legend

Room

MCB Main Circuit Breaker MCC Motor Control Center MDC Main Distribution Center MDP Main Distribution Panel MFR Manufacturer MFS Main Fused Disconnect Switch MH Manhole MIC Microphone MIN Minimum MISC Miscellaneous MLO Main Lugs Only MMS Manual Motor Starter MOA Multioutlet Assembly MSP Motor Starter Panelboard MSBD Main Switchboard MSS Motor Starter Switch MT Mount MT.C Empty Conduit MTS Manual Transfer Switch MTR Motor, Motorized N.C. Normally Closed NEC National Electrical Code NEMA National Electrical

Manufacturer's Association NFDS Non-Fused Safety Disconnect

Switch NIC Not In Contract NL Night Light N.O. Normally Open NPF Normal Power Factor NTS Not To Scale OC On Center OH Overhead OL Overloads PA Public Address PB Pull Box Or Pushbutton PE Pneumatic Electric PED Pedestal PF Power Factor PH Phase PIV Post Indicating Valve PNL Panel PP Power Pole PR Pair PRI Primary PROJ Projection PRV Power Roof Ventilator PT Potential Transformer PVC Polyvinyl Chloride (Conduit) PWR Power QUAN Quantity RCPT Receptacle REQD Required RM Room RSC Rigid Steel Conduit RTU Roof Top Unit SC Surface Conduit SEC Secondary SHT Sheet SIM Similar SLD Single-Line Diagram S/N Solid Neutral SPEC Specification SPKR Speaker SP Spare SPP Single-Point Power SR Surface Raceway SS Stainless Steel SSW Selector Switch S/S Stop/Start Pushbuttons STA Station STD Standard SURF Surface Mounted SW Switch SWBD Switchboard SYM Symmetrical SYS System TEL Telephone TERM Terminal TL Twist Lock TR Tamper Resistant T-STAT Thermostat TTC Telephone Terminal Cabinet TV Television TVTC Television Terminal Cabinet TYP Typical UC Under Counter UE Underground Electrical UG Underground UH Unit Heater UT Underground Telephone UTIL Utility UV Ultraviolet V Volt VA Volt-Amperes VDT Video Display Terminal VERT Vertical VFD Variable Frequency Drive VOL Volume W Watt W/ With WG Wire Guard WH Water Heater W/O Without WP Weatherproof XFMR Transformer XFR Transfer

∠ Angle

@ At ▲ Delta ' Feet " Inches # Number Ø Phase C Center Line P Plate

Exit Light, Wall-Mounted.

Shading and arrows indicate faces and directional chevrons.

Wall-mounted fixtures, Typical (Various Symbols)

Emergency Lighting Unit, Wall-Mounted, Remote Battery

Emergency Lighting Unit, Wall-Mounted, Integral Battery

Emergency Lighting Unit, Ceiling-Mounted, Integral Battery

Emergency Lighting Unit, Ceiling-Mounted, Remote Battery

Lighting Fixtures, Typical, Rectangular (Various Symbols) Filled circles indicate recessed.

Open circles indicate surface-mounted.

Diagonal line indicates lensed.

Outer dots indicate suspended.

Lighting Fixtures, Typical, Round (Various Symbols) Center dot indicates pendant.

Diagonal line indicates lensed.

Chevron indicates wall wash.

Strip Fixture

Directional Light, Track Light, Flood Light

Exit Light, Ceiling-Mounted.

Shading and arrows indicate faces and directional chevrons.

Linear Light, Tape Light

Exit/ELU Combo

Diagonal hatch indicates light on a critical circuit.

Solid hatch indicates light on an emergency or life safety circuit.

Pole/Area Lights

Post-Top Area Light

Bollard Light

Single-Pole Switch

Two-Pole Switch

Three-Pole Switch

Switch Modifiers:

3: 3-Way 4: 4-Way K: Keyed D: Dimming T: Timer

OS: Occupancy Sensor VS: Vacancy Sensor AC: Above-Counter LV: Low-Voltage M: Motor-Rated

Lighting Contactor

Lighting Control Panel

Occupancy Sensor

Daylight Harvesting Sensor

Smoke Detector

Heat Detector

Carbon Monoxide Detector

Beam Detector T: Transmitter R: Receiver

Combination Detector (Up to Three)

Duct Smoke Detector

Manual Pull Station

Horn, Wall

Horn, Ceiling

Strobe, Wall, Candela as indicated

Strobe, Ceiling, Candela as indicated

Horn/Strobe, Wall, Candela as indicated

Horn/Strobe, Ceiling, Candela as indicated

Remote Indicator w/ Test Switch, Wall

Remote Indicate w/ Test Switch, Ceiling

Door Holder

Door Closer

Fire Service Phone

Addressible Module

AIM: Addressible Input Module AOM:Addressible Output Control Module AIO: Addressible Input/Output Module

Fire Alarm Control Unit

EVAC: Voice Evacuation Control Panel FAA: Fire Alarm Annunciator FACP: Fire Alarm Control Panel FATC: Fire Alarm Terminal Cabinet NACP: Notification Appliance Circuit Panel FAMN: Fire Alarm Mass Notification Control Panel

Supervisory or Interface Device

PIV: Post Indicator Valve Supervisory PS: Pressure Switch R: Non-Addressible Relay VS: Valve Supervisory Switch WF: Water Flow Switch

Simplex Receptacle

Duplex Receptacle

Quadruplex Receptacle

Special Receptacle, Type as Indicated

W al l

C ei lin g

F lo or

Receptacle Modifiers:

##": Height AFF OC AC: Above Counter GFI: Ground-Fault Circuit Interrupter WP: Weatherproof In-Use Cover

Half shading indicates split (typically switched)

Outside shading indicates emergency circuit

Center shading indicates isolated ground

Multioutlet Assembly Filled squares indicate 120V outlet Open squares indicate with USB

Cord Reel, Device Varies

Drop Cord, Device Varies

Junction Box

Floor Box, see schedule for type

Emergency Power Off

Door Opener Push Plate

Power Meter

Safety Switch, Fused

Safety Switch, Unfused

Motor Starter

Combination Starter/Disconnect

Ground Rod

Ground Rod with Test Well

Lightning Protection Air Terminal

Lightning Protection Conductor Splice

Static Ground Receptacle

Data Outlet

Telephone Outlet

Data/Telephone Outlet

W al l

C ei lin g

F lo or

Outlet Modifiers:

##": Height AFF OC AC: Above Counter

Wireless Access Point

Nurse Call Corridor Light Number of lights as indicated

Nurse Call Device

B: Code Blue D: Duty Station E: Emergency P: Patient Call S: Staff

TV Outlet

Nurse Call Control Unit

NCAP: Nurse Call Annunciator Panel NCHS: Nurse Call Host Constroller NCPA: Nurse Call Power Supply NCTC: Nurse Call Terminal Cabinet NCUPS: Uninterruptable Power Supply

Lighting Symbols

Contactor

Single-Pole Switch

Two-Pole Switch

Three-Pole Switch

Switch Modifiers:

K: Keyed T: Timer AC: Above-Counter M: Motor-Rated

Fire Alarm Symbols

Grounding and Lightning Protection Symbols

Security Camera

PTZ: Pan/Tilt/Zoom

Card Reader

Card Reader with Keypad

Closed Circuit TV Outlet

Door Contact

Electric Strike

Intercom

Magnetic Lock

Request to Exit Button

Request to Exit Sensor

Motion Detector

Security Control Unit

SCP: Security Control Panel SPS: Security Power Supply Unit

Telecom Symbols

Nurse Call Symbols

Security Symbols a

A a

Equipment is tagged with Panel Name and with Panel ID in parentheses. Panel ID is intended as a design documentation aid only. Do not include Panel ID in field-applied circuit directories or labels.

Hatched fill indicates distribution panel or switchboard.

Solid fill indicates branch panel or load center.

Dashed box indicates code-required clearance (width and depth).

Door indicates front of recessed panel.

Panelboards are assigned an abbreviated indicator (or Panel ID) for use with circuit numbers. Panel ID is listed within the panel schedule and in the panel abbreviation schedule.

Power Distribution Equipment

H P

1A (B

LP

1A

(C

M D

P (A

SB1(S)

Devices and fixtures are tagged with Panel ID and circuit number. For example, a device tagged with "A1" indicates the device is circuited to panel designated "A," circuit number 1. The panel schedule circuit number contans both the panel abbreviation and the circuit number.

XX-1

Transformer: Typically transformer names begin with or contain the letter "T". See Single-Line Diagram for description and requirements.

T1

Dashed, arced lines connecting equipment, devices, or fixtures indicate switched power.

Absence of a switch designation on a lighting fixture indicates fixture is controlled by the only switch in the space. An "x" in place of the switch designation indicates unswitched.

Bottom Value, Lowercase Letter: Switch ID

Lighting Tags

Top Value: Fixture Type ID (Underlined)

Bottom Value, Uppercase Letter(s): Panel ID

Bottom Value, Number(s): Circuit Number a a

C1a

Wiring

Power Device and Equipment Tags

Construction Phasing

Existing to Remain

Existing to Be Demolished

New

(Typical All Symbols and Equipment)

Existing to Be Demolished

Area Not in Contract

Miscellaneous

Keynote

Callout:

Top Value: Detail Number on Sheet Bottom Value: Sheet Number of Detail

Room Name and Number

Smoke Damper

Electrical General Notes

A Conductors operating at 50 volts or greater shall be in raceway. Raceway within the structure above the floor slab shall be metal. Raceway below the floor slab and underground raceway outside the structure shall be PVC.

B Low voltage cables or conductors operating at less than 50 volts shall be in metal raceway where installed within walls or inaccessible spaces. Low voltage cables may be run in cable tray where noted. Low voltage cables may be run in cable support hooks above accessible ceilings where noted. Low voltage cable shall be plenum rated in plenum spaces.

B Low voltage cables or conductors operating at less than 50 volts shall be in metal raceway. Low voltage cables may be run in cable tray where noted. Low voltage cable shall be plenum rated in plenum spaces.

C Coordinate locations of devices with architectural elevations and details. Architectural elevations and details take precedence over locations shown on electrical drawings.

D Provide cable or conduit and wire as required to achieve circuiting shown. Size conductors per NEC ampacity and wire fill criteria. Provide dedicated neutral and ground conductors for circuiting, unless noted otherwise. Increase branch circuit and/or feeder conductors including equipment grounding conductors proportionally for no more than 3% voltage drop on branch circuits and 2% on feeders per energy code.

E It is the responsibility of this contractor to coordinate installation of electrical systems and those requiring electrical connections to maintain NEC required clearances, included but not limited to areas above accessible ceilings.

F Coordinate with other trades for proper installation of equipment. Consult the drawings of other trades or crafts to avoid conflicts with equipment, etc. Conflicts shall be resolved prior to rough-in and at no additional cost to the owner.

G Leave the site clean and ready for occupancy. Remove dirt, debris, empty cartons, tools, conduit and wire scraps, and miscellaneous spare equipment and materials used in this division of the work during construction. Components shall be free of dust, grit, and foreign materials and left as new before final acceptance of work.

H The symbols and abbreviations shown on this sheet may or may not be used in this set of drawings.

I Perform work to comply with the standard practices for good workmanship published by National Electrical Contractors Association (NECA). Comply with the latest enforced edition of the National Electrical Code (NEC), local codes, amendments, and ordinances.

J Field coordinate final mechanical and equipment locations along with connection requirements and control wiring prior to rough-in. Adjust corresponding circuit breaker ratings and branch circuiting accordingly.

K Electrical work shall be performed under the supervision of a licensed master electrician. Procure permits and licenses and pay fees associated with this work.

L Materials furnished for this project shall be new, commercial grade, free of defects, and listed by a nationally recognized testing laboratory unless noted otherwise.

M Provide complete operation & maintenance…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .