2877-U_CC Coolers&Freezer_Bid Dwgs_8-24-26.pdf
PDF 9 MB Posted
- Attached to
- Crown Coliseum Coolers & Freezers Upgrades
- Solicitation number
- 600600CCCooler
- Issued by
- Cumberland County, North Carolina
About this file
This is a Bid Drawings package for the Crown Coliseum Cooler/Freezer Upgrade project in Cumberland County, North Carolina, dated August 2026. The project involves the replacement and upgrade of existing refrigeration equipment throughout the Crown Coliseum Complex located at 1960 Coliseum Drive, Fayetteville, North Carolina. The scope of work includes demolition of existing walk-in cooler and freezer evaporator units, condensing units, and associated refrigerant piping across multiple areas including the main kitchen/commissary, service pantry, vendor depot, and concession areas. New Trenton-brand evaporator fan coil units and condensing units will be installed with R-448A refrigerant, featuring capacities ranging from approximately 11,180 to 29,640 BTUH. The mechanical work includes installation of new refrigerant piping, condensate drain systems, heat trace cables for freeze protection, and various pipe supports and hangers. Electrical work requires new branch circuits, disconnects, and panelboard upgrades to support the refrigeration equipment, with a new 200-amp, 208Y/120V, 3-phase main lug only panelboard specified for roof-mounted condensing units. The drawings indicate the project is issued for bid as of August 24, 2026.
The bid drawings detail comprehensive mechanical and electrical requirements prepared by The Wooten Company and include demolition plans, piping layouts, equipment schedules, and installation details. Mechanical notes require the contractor to verify all existing conditions prior to final bidding, perform service and repair on existing equipment to bring units into full compliance, handle all condensate drain connections, and ensure proper support and bracing per SMACNA standards and 2018 North Carolina Energy Conservation Code. Electrical notes specify that branch circuiting must be field-verified, existing conduit systems should be retained where possible, and all work must comply with the National Electrical Code and local authorities. The project requires a bid bond, performance bond, and payment bond, with minority bidders strongly encouraged to participate. Equipment specifications include defrost heaters for freezer units, neoprene vibration isolation pads, hail guards for condenser coils, sealed liquid line filters with sight glass, and a one-year warranty on all workmanship and materials following final acceptance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2877-U_CC Coolers&Freezer_Bid Specs_8-24-26 Corrected.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N o rt h B o y la n A v e n u e
R a le ig h N
C
-1
(9
-0 th e w o o te n c o m p a n y .c o m
L ic e n s e N u m b e r
F
-0
PROJECT NO.:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
C U
M B E R
L A
N D
C O
U N
T Y
N O
R T
H C
A R
O L
IN
A
R E V
IS
IO
N S
DATE:
ISSUED FOR:
BID
A u t o d e s k
D o c s
U
C r o w n
F r e e z e r
C o o le r s
U C r o w n
U p g r a d e
M E
P .r v t
:4
:3
P M
C O
V E R
S H
E E T
T-001
N L H
NLH
NLH
SLE
AUGUST 2026
2877-U
C R
O W
N C
O L
IS
E U
M C
O O
L E
R /F
R E
E Z
E R
U P
G R
A D
E
C U
M B
E R
L A
N D
C O
U N
T Y
CROWN COLISEUM COOLER/FREEZER UPGRADE
CUMBERLAND COUNTY
2877-U August 2026
CROWN COLISEUM COMPLEX
1960 Coliseum Dr, Fayetteville, NC 28306
SHEET
NUMBER SHEET NAME
T-001 COVER SHEET
M-001 MECHANICAL LEAD SHEET
MD-200 MECHANICAL PIPING PLANS - DEMOLITION
MD-201 MECHANICAL PIPING PLANS - DEMOLITION
MD-202 MECHANICAL PIPING PLANS - DEMOLITION
MD-203 MECHANICAL PIPING PLANS - DEMOLITION
M-200 MECHANICAL PIPING PLANS
M-201 MECHANICAL PIPING PLANS
M-202 MECHANICAL PIPING PLANS
M-203 MECHANICAL PIPING PLANS
M-600 MECHANICAL DETAILS
M-700 MECHANICAL SCHEDULES
E-001 ELECTRICAL LEAD SHEET SERIES
ED-100 DEMOLITION POWER PLANS
ED-101 DEMOLITION POWER PLANS
ED-102 DEMOLITION POWER PLANS
E-100 ELECTRICAL POWER PLANS
E-101 NEW WORK POWER PLANS
E-102 NEW WORK POWER PLANS
E-700 ELECTRICAL SCHEDULES AND DETAILS
E MOUNTAIN DRIVE PROJECT LOCATION PROJECT SITE E MOUNTAIN DRIVE
VICINITY MAP
NOT TO SCALE
N
LOCATION MAP
NOT TO SCALE
N
B
M
D
Ƨ
Ƨ
M
S
S
M
CO2
CO
H2
HZG
NO2
O2
HS
H
T
TC
TH
TS
CHWS
CD
CDR
CWR
CWS
HWR
HWS
G
STM
(E)
CHWR Chilled-Water Return
Chilled-Water Supply
Condensate Drain
Steam Condensate Return
Condenser-Water Return
Condenser-Water Supply
Hot-Water Return
Hot-Water Supply
Natural Gas
Steam Supply
RL
RS
Refrigerant Liquid
Refrigerant Gas
2"
RD Refrigerant Discharge
Mechanical Piping Symbols
Keynote Symbol
Continuation Symbol
Sheet Number Where Detail is Placed Detail Number on Sheet
Plan Revision Number
General Plan Symbols
Room Name / Number
Point Where New Connects To Existing
Existing Pipe To Remain
Area Being Demolished
Area Not In Contract
Pipe To Be Demolished
Above Ground Piping
Nominal Pipe Size
Below Ground Piping Pipe Slope (When Applicable)
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS IN
THIS SET.THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT BE
USED IN THIS SET OF DRAWINGS.
LP Liquid Propane
1/8" / 12" SLOPE
24"x12"
24"/12"
18"Ø
General Exhaust Air
Outdoor Air
Building Relief Air
Return Air
Supply Air
Transfer Air
Grille, Register, Diffusers
Airflow
Catalog Throw Performance Neck Size / Module Size
Existing Duct To Remain
Oval Duct Size (Width / Height)
Sq. Duct Size (Width x Height)
HVAC Symbols
Rect. Supply Duct Rise / Drop
Mechanical Equipment
Round Duct Size (Diameter)
Duct To Be Demolished
Kitchen Exhaust Duct
Env. Tobacco Smoke
Equipment By Others (Refer To Other Disciplines)
Existing to Remain Equipment
Flue Gas Vent
Combustion Air
Ventilation Air
(E)AHU-2
Ø ROUND
ABV ABOVE
AC AIR CONDITIONING
AD AREA DRAIN
ADD ADDENDUM
AFF ABOVE FINISHED FLOOR
AFUE ANNUAL FUEL UTILIZATION EFFICIENCY
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT/ARCHITECTURAL
BFF BELOW FINISHED FLOOR
BLW BELOW
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
CAP CAPACITY
CB CATCH BASIN
CFM CUBIC FEET PER MINUTE
CLG CEILING
CO CLEAN OUT
CW COLD WATER
D DEGREE
DB DRY BULB
DIA DIAMETER
DN DOWN
DW DISTILLED WATER
EA EACH
EAT ENTERING AIR TEMPERATURE
ELEC ELECTRICAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
E/A EXHAUST AIR
EXIST EXISTING
F DEGREES FAHRENHEIT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FL FLOOR
FO FUEL OIL
FOV FUEL OIL VENT
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPM FEET PER MINUTE
FS FLOOR SINK
FT FOOT/FEET
FTR FIN TUBE RADIATION
GAL GALLON
GF GAS-FIRED
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GW GREASE WASTE
HB HOSE BIB
HP HORSE POWER
HTG HEATING
HTR HEATER
HW HOT WATER
HYD HYDRANT
ID INDIRECT
IN INCH
INV INVERT
LB POUND
LB/HR POUNDS PER HOUR
LAT LEAVING AIR TEMPERATURE
LP LOW PRESSURE
LPG LIQUEFIED PETROLEUM GAS
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M/A MIXED AIR
MAX MAXIMUM
MBH ONE THOUSAND BTU PER HOUR
MCF ONE THOUSAND CUBIC FEET
MD MOTORIZED DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTR MOTOR
MU/A MAKE-UP/AIR
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NUMBER
NO NORMALLY OPEN
NTS NOT TO SCALE
O OXYGEN
O/A OUTSIDE AIR
ORD OVERFLOW ROOF DRAIN
PD PRESSURE DROP
PIV POST INDICATOR VALVE
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PWR POWER
R DUCT RISER
R/A RETURN AIR
RCP RADIANT CEILING PANEL
RD ROOF DRAIN
REC RECESSED
RED REDUCER
RH RELATIVE HUMIDITY
RL/A RELIEF AIR
RM ROOM
RPM REVOLUTIONS PER MINUTE
RW RAIN WATER
SF SQUARE FOOT
S/A SUPPLY AIR
SAN SANITARY
SF SQUARE FOOT
SD SMOKE DAMPER
SM SURFACE MOUNT
SP STANDPIPE
SP STATIC PRESSURE
STM STEAM
T THERMOSTAT
TD TEMPERATURE DROP
TDR TRENCH DRAIN
TEMP TEMPERATURE
TYP TYPICAL
UG UNDERGROUND
VAC VACUUM
V VENT
VAV VARIABLE AIR VOLUME
VENT VENTILATION
VTR VENT THROUGH ROOF
W WASTE
WB WET BULB
WCO WALL CLEAN OUT
WH WALL HYDRANT
Abbreviations
Type (See Schedule)
Max NC Rating
Design Airflow Rate
RTU-1
10.0 ton
RTU-1
180000 Btu/h
180 CFH
3.7 GPM
VAV 1-2
Design Water Flow
Operating Weight
Heating Capacity
Nominal Cooling Capacity
Mechanical Devices
GWR
GWS
Geothermal-Water Return
Geothermal-Water Supply
Existing Relocated Equipment(R)AHU-3
AC AIR CONDITIONING UNIT
ACCU AIR COOLING CONDENSING UNIT
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
CH CHILLER
CT COOLING TOWER
CUH CABINET UNIT HEATER
CHWP CHILLED WATER PUMP
DBP DOMESTIC WATER BOOSTER PUMP
DC DUCT MOUNTED COIL
DCP DOMESTIC WATER CIRCULATING PUMP
EF EXHAUST FAN
EDC ELECTRIC DUCT COIL
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
FCU FAN COIL UNIT
FP FIRE PUMP
GI GREASE INTERCEPTOR
GRV GRAVITY ROOF VENTILATOR
HWP HEATING WATER PUMP
HRU HEAT RECOVERY UNIT
PRV POWER ROOF VENTILATOR
RE RETURN/EXHAUST FAN
RTU ROOFTOP UNIT
SP SUMP PUMP
UH UNIT HEATER
WH WATER HEATER
Equipment Abbreviations
Damper Types
Laboratory Hood
Unit Identity
Valve Types
2" CHECK
2" BAL
3" CIRC
2" GATE
2" PRV
2" STRAIN
2" M-CNTRL
2" SHUTOFF
1" GAS-CNTRL
Alternate Check Valve
1" REG
1" GAS COCK
1" PLUG
2" BFV
2" GLOBE
2" LOCK
4" 3-WAY CNTRL
2" QUICK
FLUE
C/A
S/A
V/A
O/A
R/A
L/A
T/A
E/A
KED
LH
ETS
Round Supply Duct Rise / Drop
Rect. Return Duct Rise / Drop
Round Return Duct Rise / Drop
Rect. Exhaust Duct Rise / Drop
Round Exhaust Duct Rise / Drop
(E)
EF-XX
500 CFM
AC-1
AFF:7'-0" Bottom of Equipment Height
Carbon Dioxide Detector
Carbon Monoxide Detector
Hydrogen Gas Detector
Hazardous Gas Detector
Nitrogen Dioxide Detector
Oxygen Gas Detector
Smoke Damper
Fire Damper Comb. Fire/
Smoke Damper
Manual Damper
Motorized Damper
Backdraft Damper
Pipe Rise / Drop
Linear Diffuser
6"Ø
CD11 100
TYP. X 4
10"Ø/24x24 H6/9/1729
CD3 500
8"Ø/2s/4'-0"L
LD8 200
18"x10"
SG1 500
AFF:9'-0"
Neck Size Airflow
Airflow
Mounting Elevation (Centerline) Nominal Duct Size
Airflow Neck Size/ Slot(s)/ Active Length
16"x16"
RG1 800
AFF:9'-0"
12"x12"/24x24
RG2 500
Airflow
Mounting Elevation (Centerline) Nominal Duct Size
Airflow Neck Size / Module Size Max NC Rating
Type Count for Space
Unit Identity
Gas Supply Input Rate
ET-1
379 lb
Humidity Sensor
Humidistat
Thermostat
Temp/ CO2 Sensor
Temp/ Humidity Sensor
Temperature Sensor
AHU-1
Ball Valve
Balancing Valve
Butterfly Valve
Check Valve
Circuit Setter
Gate Valve Globe Valve
Locked Shield Valve
Pressure Reducing Valve
Quick Opening Valve
Fluid Strainer
Elec. Control Valve
3-Way Elec. Valve
Emergency Gas Shutoff
Plug Valve
Gas Shutoff Cock
Gas Regulator
2" CHECK
Throw Pattern
Room
Sidewall Supply Grille
Round Ceiling Diffuser
Square Ceiling Diffuser
Sidewall Return Grille
Ceiling Return
HVAC General Notes
A CONDENSATE DRAINS SHALL BE SUPPLIED FOR ALL COOLING
EQUIPMENT. CONTRACTOR SHALL ENSURE PROPER INSTALLATION
AND DRAINAGE AS REQUIRED BY FEDERAL, STATE, AND LOCAL
CODES. CONDENSATE PIPING SHALL BE TYPE "L" COPPER.
B PROVIDE A 4" HOUSEKEEPING PAD FOR EACH PIECE OF
MECHANICAL EQUIPMENT. COORDINATE SIZES WITH MECHANICAL
EQUIPMENT SELECTED.
C THIS CONTRACTOR SHALL BE REQUIRED TO REPLACE FILTERS ON
HVAC EQUIPMENT AFTER ALL DUST PRODUCING CONSTRUCTION
HAS BEEN COMPLETED AND PRIOR TO THE FINAL PUNCH.
D INSTALL, SUPPORT, AND BRACE ALL HVAC DUCTWORK AND
ACCESSORIES PER "HVAC DUCT CONSTRUCTION STANDARDS" BY
SMACNA, ANSI/SMACNA 006-2006 AND "SEISMIC RESTRAINT MANUAL
GUIDELINES FOR MECHANICAL SYSTEMS" BY SMACNA,
ANSI/SMACNA 001-2008.
E INSULATE ALL PIPING AS REQUIRED BY THE 2018 NC ENERGY
CONSERVATION CODE.
Project Requirements
A REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.
B THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR
FIELD VERIFYING, PRIOR TO FINAL BID, ALL EXISTING CONDITIONS
FOR PLUMBING AND MECHANICAL SYSTEMS WITHIN TENANT SPACE
AND WITHIN CLOSE PROXIMITY OF TENANT SPACE.
C THE MECHANICAL CONTRACTOR SHALL PERFORM SERVICE AND
REPAIR ON THE EXISTING EQUIPMENT AND ITS ACCESSORIES AS
FOLLOWS: CLEAN ALL COILS, REPLACE THE FILTERS AND BELTS,
INSPECT, REPAIR, OR REPLACE THE ECONOMIZERS, DRIVES AND
FAN BEARINGS, MOTORS, CONTROL COMPONENTS, VALVES AND
ANY OTHER ITEM NECESSARY FOR A COMPLETE AND PROPER
OPERATING SYSTEM. THIS CONTRACTOR SHALL ALSO VISIT THE
SITE, PRIOR TO FINAL BIDDING, AND VERIFY ALL EXISTING SITE
CONDITIONS. PROVIDE ALL MATERIAL AND COMPONENTS AS
NEEDED TO BRING THE UNITS TO FULL COMPLIANCE OF THE
LANDLORD'S CRITERIA AND LOCAL AUTHORITY HAVING
JURISDICTION.
D WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF
CONSTRUCTION, PREVENT CONSTRUCTION DEBRIS FROM
ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR TO
START OF WORK. UNSEAL DRAINS AT COMPLETION OF
CONSTRUCTION.
E COORDINATE INSTALLATION OF PIPING, DUCTWORK, CONDUIT,
LIGHTS, CABLE TRAY, STRUCTURE, AND EQUIPMENT TO PREVENT
CONFLICTS.
F THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS
BOTH EXISTING AND THOSE ILLUSTRATED BY THESE DOCUMENTS
AS WELL AS THOSE WHICH CAN BE REASONABLY ANTICIPATED
INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL, ELECTRICAL,
VENTILATION, PLUMBING, AND OTHER SYSTEMS INVOLVED ON THIS
PROJECT.
G FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING
SYSTEM, AND SHALL CONFORM TO ALL REQUIREMENTS OF
APPLICABLE FEDERAL, STATE, AND LOCAL CODES, INCLUDING BUT
NOT LIMITED TO THE INTERNATIONAL BUILDING CODE AND
INTERNATIONAL MECHANICAL CODE.
H LOCATE EQUIPMENT REQUIRING ACCESS 2'-0" MAXIMUM ABOVE
CEILING.
I ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT
EDITION OF ALL APPLICABLE CODES, INCLUDING THE 2018 NC
BUILDING CODES, AND/OR ANY CODES APPLIED BY THE AUTHORITY
HAVING JURISDICTION.
J ALL ROOF MOUNTED EQUIPMENT SHALL BE A MINIMUM 10'-0" FROM
EDGE OF ROOF.
K LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY
FROM THE SPACE ABOVE ELECTRICAL PANELS. TRANSFORMERS
AND OTHER ELECTRICAL EQUIPMENT.
L PENETRATIONS OF RATED ASSEMBLIES SHALL BE FIRE STOPPED.
FIRE STOPPING SHALL BE AN APPROVED MATERIAL AS
PRESCRIBED IN CSFM STANDARD 43-1 AND SHALL BE U.L. LISTED.
M PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND DUCTS
THROUGH FOUNDATIONS, FLOORS, WALLS, AND ROOF.
N MAINTAIN CLEAR ACCESS TO SERVICE EQUIPMENT AND OTHER
ACCESSORIES REQUIRING SERVICE, VISUAL INSPECTION OR HAND
OPERATION. WHERE INDICATED OR REQUIRED, PROVIDE ACCESS
PANELS OF THE TYPE SELECTED TO SUIT MATERIALS IN WHICH
INSTALLED.
O ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO
MECHANICAL EQUIPMENT.
P REFER TO HVAC SERIES DRAWINGS FOR GAS AND A.C.
CONDENSATE DRAIN PIPING.
Q PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF
FLOW UNTIL ANOTHER SIZE IS SHOWN.
R FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT
SHOWN ON THE SEGMENTS, REFER TO DETAILS, SCHEDULES, AND
SPECIFICATIONS.
S INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE RESPECTIVE
MANUFACTURER'S WRITTEN INSTALLATION INSTRUCTIONS, AT A
LEVEL OF QUALITY AND WORKMANSHIP CONSISTENT WITH THE
SPECIFICATIONS.
T LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS INDICATED
ON THE DRAWING, ARE APPROXIMATE AND SUBJECT TO MINOR
ADJUSTMENTS IN THE FIELD. WORK SHALL BE COORDINATED WITH
ALL OTHER TRADES TO AVOID INTERFERENCE IN THE FIELD.
U INSTALL EXPOSED PIPING AND DUCTWORK AS HIGH AS PRACTICAL
IN ROOMS WITHOUT CEILINGS.
V THE CONTRACTOR'S WORK SCHEDULE SHALL BE SUBMITTED TO
AND APPROVED BY THE OWNER.
W PRIOR TO STARTING WORK, SUBMIT SHOP DRAWINGS FOR ALL
MECHANICAL EQUIPMENT, PLUMBING FIXTURES, AND DIFFUSERS.
X CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY
PERMITS AND SHALL ARRANGE FOR ALL INSPECTIONS AS
REQUIRED.
Y PROVIDE ONE YEAR WARRANTY FOR ALL WORKMANSHIP AND
MATERIALS AFTER THE DATE OF FINAL ACCEPTANCE.
HVAC SHEET INDEX
M-001 MECHANICAL LEAD SHEET
MD-200 MECHANICAL PIPING PLANS - DEMOLITION
MD-201 MECHANICAL PIPING PLANS - DEMOLITION
MD-202 MECHANICAL PIPING PLANS - DEMOLITION
MD-203 MECHANICAL PIPING PLANS - DEMOLITION
M-200 MECHANICAL PIPING PLANS
M-201 MECHANICAL PIPING PLANS
M-202 MECHANICAL PIPING PLANS
M-203 MECHANICAL PIPING PLANS
M-600 MECHANICAL DETAILS
M-700 MECHANICAL SCHEDULES
N AORT H CAROL I N
SC OT T L. ENNIE RN GI NE E
P LROFESSIONA
027928
S
N or th
B oy la n
Av en ue
R al ei gh
, N C
-1
(9
) 8
-0 th ew oo te nc om pa ny
.c om
Li ce ns e
N um be r :
F -0
PROJECT NO.:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
CU
M
BE
RL
AN
D
C O
UN
TY
N O
RT
H
C
AR
O
LI
N A
RE
VI
SI
O
N S
DATE:
ISSUED FOR:ISSUED FOR:
BID
C:
\U se rs
\b co gg in s\ Ap pD at a\ Lo ca l\
Au to de sk
\R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \B
UK
W C8
RF
U3
PQ
LC
\5 0e
1f 7d a-
-4
7c 1-
-3 c3 a5
1d d\ cd bf -2
7-b7
-8
9-
0c 5b c5
.r vt 8/
/2
4:
:0
PM
M
EC
H
AN
IC
AL
L
EA
D S
H
EE
T
M-001
BM
C
BMC
BMC
SLE
AUG 2026
2877-U
C R
O W
N C
O
LO
SS
EU
M C
O O
LE
R
/F R
EE
ZE
R U
PG
R
AD
E
C U
M
BE
R
LA
N D
C O
U N
TY
Ti tle S he et
R ev isi on
Docusign Envelope ID: 9FD881D0-9818-8E6F-8261-84CFF43016B7
8/24/2026
KITCHEN/COMMISSARY
COOLER
0327D
FREEZER
0327C
COOLER
0327B
FREEZER
0327A
SERVICE
CORRIDOR
BULK STORAGE
COOLER
0326A
FREEZER
0326B
EX-FCU-B2
EX-FCU-A2
EX-FCU-A
EX-FCU-B1
EX-CU-B1
EX-CU-B
EX-CU-A1EX-CU-A2
EX-CU-A
EX-CU-B2
EX-FCU-B
EX-FCU-A1
RS/RL
RS/RL
RS/RL
RS/RL
RS/RL
RS/RL
N AORT H CAROL I N
SC OT T L. ENNIE RN GI NE E
P LROFESSIONA
027928
S
N or th
B oy la n
Av en ue
R al ei gh
, N C
-1
(9
) 8
-0 th ew oo te nc om pa ny
.c om
Li ce ns e
N um be r :
F -0
PROJECT NO.:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
CU
M
BE
RL
AN
D
C O
UN
TY
N O
RT
H
C
AR
O
LI
N A
RE
VI
SI
O
N S
DATE:
ISSUED FOR:ISSUED FOR:
BID
C:
\U se rs
\b co gg in s\ Ap pD at a\ Lo ca l\
Au to de sk
\R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \B
UK
W C8
RF
U3
PQ
LC
\5 0e
1f 7d a-
-4
7c 1-
-3 c3 a5
1d d\ cd bf -2
7-b7
-8
9-
0c 5b c5
.r vt 8/
/2
4:
:1
PM
M
EC
H
AN
IC
AL
P
IP
IN
G
PL
AN
S
D
EM
O
LI
TI
O
N
MD-200
BM
C
BMC
BMC
SLE
AUG 2026
2877-U
C R
O W
N C
O
LO
SS
EU
M C
O O
LE
R
/F R
EE
ZE
R U
PG
R
AD
E
C U
M
BE
R
LA
N D
C O
U N
TY
1/8" = 1'-0"MD-200
1 PIPING DEMOLITION-MAIN KITCHEN/COMMISSARY
REMOVE EXISTING WALK-IN FAN COIL UNIT AND ASSOCIATED
REFRIGERANT PIPING. CONDENSATE DRAIN LINE SHALL REMAIN FOR
RECONNECTION DURING CONSTRUCTION PHASE.
REMOVE ROOF MOUNTED CONDENSING UNIT AND ASSOCIATED
REFRIGERANT PIPING. ROOF PIPING PENETRATION SHALL REMAIN FOR
REUSE DURING CONSTRUCTION PHASE. ROOF STRUCTURAL STEEL
STAND SHALL REMAIN FOR REUSE DURING CONSTRUCTION PHASE.
DEMOLISH REFRIGERANT PIPING LINESET BETWEEN EVAPORATOR AND
CONDENSING UNIT (REFRIGERANT LINESET OF 2 PIPES - GAS AND
LIQUID - REPRESENTED WITH SINGLE LINE ON PLAN).
REFRIGERANT CURB SHALL REMAIN FOR REUSE DURING
CONSTRUCTION PHASE.
KEY NOTES:
SERVICE PANTRY
COOLER
0329A
EX-CU-0239
EX-FCU-0239
VENDOR DEPOT
BEER COOLER
0111A
EX-CU-0111
EX-FCU-0111
VENDOR DEPOT
BEER COOLER
0158A
EX-FCU-0158
EX-CU-0158
N AORT H CAROL I N
SC OT T L. ENNIE RN GI NE E
P LROFESSIONA
027928
S
N or th
B oy la n
Av en ue
R al ei gh
, N C
-1
(9
) 8
-0 th ew oo te nc om pa ny
.c om
Li ce ns e
N um be r :
F -0
PROJECT NO.:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
CU
M
BE
RL
AN
D
C O
UN
TY
N O
RT
H
C
AR
O
LI
N A
RE
VI
SI
O
N S
DATE:
ISSUED FOR:ISSUED FOR:
BID
C:
\U se rs
\b co gg in s\ Ap pD at a\ Lo ca l\
Au to de sk
\R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \B
UK
W C8
RF
U3
PQ
LC
\5 0e
1f 7d a-
-4
7c 1-
-3 c3 a5
1d d\ cd bf -2
7-b7
-8
9-
0c 5b c5
.r vt 8/
/2
4:
:1
PM
M
EC
H
AN
IC
AL
P
IP
IN
G
PL
AN
S
D
EM
O
LI
TI
O
N
MD-201
BM
C
BMC
BMC
SLE
AUG 2026
2877-U
C R
O W
N C
O
LO
SS
EU
M C
O O
LE
R
/F R
EE
ZE
R U
PG
R
AD
E
C U
M
BE
R
LA
N D
C O
U N
TY
1/8" = 1'-0"MD-201
3 PIPING DEMOLITION-SERVICE PANTRY
1/8" = 1'-0"MD-201
2 PIPING DEMOLITION-VENDOR DEPOT
1/8" = 1'-0"MD-201
1 PIPING DEMOLITION-VENDOR DEPOT 3
REMOVE EXISTING WALK-IN FAN COIL UNIT AND ASSOCIATED
REFRIGERANT PIPING. CONDENSATE DRAIN LINE SHALL REMAIN FOR
RECONNECTION DURING CONSTRUCTION PHASE.
REMOVE CONDENSING UNIT LOCATED ABOVE WALK-IN UNIT AND
ASSOCIATED REFRIGERANT PIPING.
KEY NOTES:
CONCESSION
FOOD PREP
JANITOR
BEER COOLER
0125A
EX-FCU-0125 EX-CU-0125
CONCESSION
FOOD PREP
BEER COOLER
0134A
JANITOR
0133A
EX-FCU-0134EX-CU-0134
CONCESSION
0129JANITOR
FOOD PREP
BEER COOLER
0128A
EX-FCU-0128
EX-CU-0128
N AORT H CAROL I N
SC OT T L. ENNIE RN GI NE E
P LROFESSIONA
027928
S
N or th
B oy la n
Av en ue
R al ei gh
, N C
-1
(9
) 8
-0 th ew oo te nc om pa ny
.c om
Li ce ns e
N um be r :
F -0
PROJECT NO.:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
CU
M
BE
RL
AN
D
C O
UN
TY
N O
RT
H
C
AR
O
LI
N A
RE
VI
SI
O
N S
DATE:
ISSUED FOR:ISSUED FOR:
BID
C:
\U se rs
\b co gg in s\ Ap pD at a\ Lo ca l\
Au to de sk
\R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \B
UK
W C8
RF
U3
PQ
LC
\5 0e
1f 7d a-
-4
7c 1-
-3 c3 a5
1d d\ cd bf -2
7-b7
-8
9-
0c 5b c5
.r vt 8/
/2
4:
:1
PM
M
EC
H
AN
IC
AL
P
IP
IN
G
PL
AN
S
D
EM
O
LI
TI
O
N
MD-202
BM
C
BMC
BMC
SLE
AUG 2026
2877-U
C R
O W
N C
O
LO
SS
EU
M C
O O
LE
R
/F R
EE
ZE
R U
PG
R
AD
E
C U
M
BE
R
LA
N D
C O
U N
TY
1/8" = 1'-0"MD-202
3 PIPING DEMOLITION-GENERAL/GRILL CONCESSION
1/8" = 1'-0"MD-202
1 PIPING DEMOLITION-GENERAL/GRILL CONCESSION 2
1/8" = 1'-0"MD-202
2 PIPING DEMOLITION-PIZZA/BBQ CONCESSION
REMOVE EXISTING WALK-IN EVAPORATOR UNIT AND ASSOCIATED
REFRIGERANT PIPING. CONDENSATE DRAIN LINE SHALL REMAIN FOR
RECONNECTION DURING CONSTRUCTION PHASE.
REMOVE CONDENSING UNIT LOCATED ABOVE WALK-IN UNIT AND
ASSOCIATED REFRIGERANT PIPING.
KEY NOTES:
CONCESSION
BEER COOLER
0153A
FOOD PREP
PANTRY
0152A
EX-FCU-0153
EX-CU-0153
N AORT H CAROL I N
SC OT T L. ENNIE RN GI NE E
P LROFESSIONA
027928
S
N or th
B oy la n
Av en ue
R al ei gh
, N C
-1
(9
) 8
-0 th ew oo te nc om pa ny
.c om
Li ce ns e
N um be r :
F -0
PROJECT NO.:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
CU
M
BE
RL
AN
D
C O
UN
TY
N O
RT
H
C
AR
O
LI
N A
RE
VI
SI
O
N S
DATE:
ISSUED FOR:ISSUED FOR:
BID
C:
\U se rs
\b co gg in s\ Ap pD at a\ Lo ca l\
Au to de sk
\R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \B
UK
W C8
RF
U3
PQ
LC
\5 0e
1f 7d a-
-4
7c 1-
-3 c3 a5
1d d\ cd bf -2
7-b7
-8
9-
0c 5b c5
.r vt 8/
/2
4:
:1
PM
M
EC
H
AN
IC
AL
P
IP
IN
G
PL
AN
S
D
EM
O
LI
TI
O
N
MD-203
BM
C
BMC
BMC
SLE
AUG 2026
2877-U
C R
O W
N C
O
LO
SS
EU
M C
O O
LE
R
/F R
EE
ZE
R U
PG
R
AD
E
C U
M
BE
R
LA
N D
C O
U N
TY
REMOVE EXISTING WALK-IN FAN COIL UNIT AND ASSOCIATED
REFRIGERANT PIPING. CONDENSATE DRAIN LINE SHALL REMAIN FOR
RECONNECTION DURING CONSTRUCTION PHASE.
REMOVE CONDENSING UNIT LOCATED ON WALL MOUNT BRACKET IN
MECHANICAL ROOM.
1/8" = 1'-0"MD-203
1 PIPING DEMOLITION-CONCESSIONS
KEY NOTES:
COOLER
0327D
FREEZER
0327C
KITCHEN/COMMISSARY
COOLER
0327B
FREEZER
0327A
BULK STORAGE
COOLER
0326A
FREEZER
0326B
FCU-B2
FCU-A2
CU-B2
CU-A
CU-A2
CU-A1
CU-B
CU-B1
FCU-B1
FCU-A
FCU-B
FCU-A1
RL
RS
RS
RL
RL
RS
RS
RL
RS
RL
RS
RL
TYP
N AORT H CAROL I N
SC OT T L. ENNIE RN GI NE E
P LROFESSIONA
027928
S
N or th
B oy la n
Av en ue
R al ei gh
, N C
-1
(9
) 8
-0 th ew oo te nc om pa ny
.c om
Li ce ns e
N um be r :
F -0
PROJECT NO.:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
CU
M
BE
RL
AN
D
C O
UN
TY
N O
RT
H
C
AR
O
LI
N A
RE
VI
SI
O
N S
DATE:
ISSUED FOR:ISSUED FOR:
BID
C:
\U se rs
\b co gg in s\ Ap pD at a\ Lo ca l\
Au to de sk
\R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \B
UK
W C8
RF
U3
PQ
LC
\5 0e
1f 7d a-
-4
7c 1-
-3 c3 a5
1d d\ cd bf -2
7-b7
-8
9-
0c 5b c5
.r vt 8/
/2
4:
:0
PM
M
EC
H
AN
IC
AL
P
IP
IN
G
PL
AN
S
M-200
BM
C
BMC
BMC
SLE
AUG 2026
2877-U
C R
O W
N C
O
LO
SS
EU
M C
O O
LE
R
/F R
EE
ZE
R U
PG
R
AD
E
C U
M
BE
R
LA
N D
C O
U N
TY
1/8" = 1'-0"M-200
1 PIPING FLOOR PLAN-MAIN KITCHEN/COMMISSARY
INSTALL EVAPORATOR FAN COIL UNIT IN WALK-IN BOX PER
MANUFACTURER'S INSTALLATION INSTRUCTIONS AND CLEARANCES.
CONNECT TO EXISTING CONDENSATE DRAIN SYSTEM. VERIFY EXISTING
CONDENSATE DRAIN IS CLOG-FREE AND DRAINS CORRECTLY. UNCLOG
OR REPAIR AS REQUIRED. PROVIDE NEW REFRIGERANT PIPING FROM
FAN COIL TO ROOF MOUNTED CONDENSING UNIT.
ROUTE NEW REFRIGERANT PIPING FROM NEW FAN COIL UNIT, UP OUT
OF WALK-IN BOX, AND THROUGH CEILING SPACE AS INDICATED. TURN
UP TO ROOF AS INDICATED.
ROUTE NEW REFRIGERANT PIPING UP ONTO ROOF AND TO ROOF
MOUNTED CONDENSING UNIT. VERIFY EXISTING PIPE CURB IS IN GOOD
ORDER. REPAIR OR REPLACE PIPE CURB ON ROOF AS REQUIRED TO
ENSURE A LEAK FREE INSTALLATION.
INSTALL NEW ROOF MOUNTED CONDENSING UNIT ON EXISTING STEEL
STAND PER MANUFACTURER'S INSTALLATION INSTRUCTIONS AND
CLEARANCES. CONDENSERS SHALL BE MOUNTED SUCH THAT HOT
DISCHARGE AIR IS DISCHARGED OUT AWAY FROM OTHER CONDENSING
UNITS. CONDENSER UNIT AIR INTAKE INTO REAR OF UNIT SHALL BE
ORIENTED TO FACE THE INSIDE OF THE GROUP OF UNITS. MAKE STEEL
STAND MODIFICATIONS AND/OR EXPAND STEEL STAND AS REQUIRED TO
INSTALL UNITS TO MAINTAIN REQUIRED CLEARANCES.
DIRECTION OF CONDENSING UNIT DISCHARGE SHALL BE OUT AND AWAY
FROM OTHER CONDENSING UNITS. MAINTAIN MANUFACTURER'S
REQUIRED CLEARANCES. (TYPICAL)
KEY NOTES:
SERVICE PANTRY
COOLER
0329A
CU-0329
FCU-0329
1RL
RS
VENDOR DEPOT
BEER COOLER
0111A
CU-0111
FCU-0111
RL
RS
VENDOR DEPOT
BEER COOLER
0158A
CU-0158
FCU-0158
RS
RL
N AORT H CAROL I N
SC OT T L. ENNIE RN GI NE E
P LROFESSIONA
027928
S
N or th
B oy la n
Av en ue
R al ei gh
, N C
-1
(9
) 8
-0 th ew oo te nc om pa ny
.c om
Li ce ns e
N um be r :
F -0
PROJECT NO.:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
CU
M
BE
RL
AN
D
C O
UN
TY
N O
RT
H
C
AR
O
LI
N A
RE
VI
SI
O
N S
DATE:
ISSUED FOR:ISSUED FOR:
BID
C:
\U se rs
\b co gg in s\ Ap pD at a\ Lo ca l\
Au to de sk
\R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \B
UK
W C8
RF
U3
PQ
LC
\5 0e
1f 7d a-
-4
7c 1-
-3 c3 a5
1d d\ cd bf -2
7-b7
-8
9-
0c 5b c5
.r vt 8/
/2
4:
:0
PM
M
EC
H
AN
IC
AL
P
IP
IN
G
PL
AN
S
M-201
BM
C
BMC
BMC
SLE
AUG 2026
2877-U
C R
O W
N C
O
LO
SS
EU
M C
O O
LE
R
/F R
EE
ZE
R U
PG
R
AD
E
C U
M
BE
R
LA
N D
C O
U N
TY
1/8" = 1'-0"M-201
3 PIPING FLOOR PLAN-SERVICE PANTRY
1/8" = 1'-0"M-201
2 PIPING FLOOR PLAN-VENDOR DEPOT
1/8" = 1'-0"M-201
1 PIPING FLOOR PLAN-VENDOR DEPOT 2
INSTALL EVAPORATOR FAN COIL UNIT IN WALK-IN BOX PER
MANUFACTURER'S INSTALLATION INSTRUCTIONS AND CLEARANCES.
CONNECT TO EXISTING CONDENSATE DRAIN SYSTEM. VERIFY EXISTING
CONDENSATE DRAIN IS CLOG-FREE AND DRAINS CORRECTLY. UNCLOG OR
REPAIR AS REQUIRED. PROVIDE NEW REFRIGERANT PIPING FROM FAN
COIL TO ROOF MOUNTED CONDENSING UNIT.
ROUTE NEW REFRIGERANT PIPING FROM NEW FAN COIL UNIT, UP OUT OF
WALK-IN BOX, AND THROUGH CEILING SPACE AS INDICATED TO NEW
CONDENSING UNIT.
INSTALL NEW CONDENSING UNIT ABOVE CEILING PER MANUFACTURER'S
INSTALLATION INSTRUCTIONS AND CLEARANCES. CONDENSER SHALL BE
MOUNTED SUCH THAT HOT DISCHARGE AIR IS DISCHARGED AWAY FROM
ANY OBSTRUCTION INTO A FREE OPEN AREA.
KEY NOTES:
FOOD PREP
JANITOR
BEER COOLER
0125A
FCU-0125 CU-0125
RS
RL
CONCESSION
FOOD PREP
JANITOR
0133A
BEER COOLER
0134A
FCU-0134CU-0134
3 1
RSRL
JANITOR
FOOD PREP
BEER COOLER
0128A
CONCESSION
FCU-0128 CU-0128
RS
RL
N AORT H CAROL I N
SC OT T L. ENNIE RN GI NE E
P LROFESSIONA
027928
S
N or th
B oy la n
Av en ue
R al ei gh
, N C
-1
(9
) 8
-0 th ew oo te nc om pa ny
.c om
Li ce ns e
N um be r :
F -0
PROJECT NO.:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
CU
M
BE
RL
AN
D
C O
UN
TY
N O
RT
H
C
AR
O
LI
N A
RE
VI
SI
O
N S
DATE:
ISSUED FOR:ISSUED FOR:
BID
C:
\U se rs
\b co gg in s\ Ap pD at a\ Lo ca l\
Au to de sk
\R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \B
UK
W C8
RF
U3
PQ
LC
\5 0e
1f 7d a-
-4
7c 1-
-3 c3 a5
1d d\ cd bf -2
7-b7
-8
9-
0c 5b c5
.r vt 8/
/2
4:
:0
PM
M
EC
H
AN
IC
AL
P
IP
IN
G
PL
AN
S
M-202
BM
C
BMC
BMC
SLE
AUG 2026
2877-U
C R
O W
N C
O
LO
SS
EU
M C
O O
LE
R
/F R
EE
ZE
R U
PG
R
AD
E
C U
M
BE
R
LA
N D
C O
U N
TY
1/8" = 1'-0"M-202
3 PIPING FLOOR PLAN-GENERAL/GRILL CONCESSION
1/8" = 1'-0"M-202
1 PIPING FLOOR PLAN-GENERAL/GRILL CONCESSION 2
1/8" = 1'-0"M-202
2 PIPING FLOOR PLAN-PIZZA/BBQ CONCESSION
INSTALL EVAPORATOR FAN COIL UNIT IN WALK-IN BOX PER
MANUFACTURER'S INSTALLATION INSTRUCTIONS AND CLEARANCES.
CONNECT TO EXISTING CONDENSATE DRAIN SYSTEM. VERIFY EXISTING
CONDENSATE DRAIN IS CLOG-FREE AND DRAINS CORRECTLY. UNCLOG OR
REPAIR AS REQUIRED. PROVIDE NEW REFRIGERANT PIPING FROM FAN
COIL TO ROOF MOUNTED CONDENSING UNIT.
ROUTE NEW REFRIGERANT PIPING FROM NEW FAN COIL UNIT, UP OUT OF
WALK-IN BOX, AND THROUGH CEILING SPACE AS INDICATED TO NEW
CONDENSING UNIT.
INSTALL NEW CONDENSING UNIT ABOVE CEILING PER MANUFACTURER'S
INSTALLATION INSTRUCTIONS AND CLEARANCES. CONDENSER SHALL BE
MOUNTED SUCH THAT HOT DISCHARGE AIR IS DISCHARGED AWAY FROM
ANY OBSTRUCTION INTO A FREE OPEN AREA.
KEY NOTES:
FOOD PREP
PANTRY
0152A
BEER COOLER
0153A
FCU-0153
CU-0153
RL
RS
N AORT H CAROL I N
SC OT T L. ENNIE RN GI NE E
P LROFESSIONA
027928
S
N or th
B oy la n
Av en ue
R al ei gh
, N C
-1
(9
) 8
-0 th ew oo te nc om pa ny
.c om
Li ce ns e
N um be r :
F -0
PROJECT NO.:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
CU
M
BE
RL
AN
D
C O
UN
TY
N O
RT
H
C
AR
O
LI
N A
RE
VI
SI
O
N S
DATE:
ISSUED FOR:ISSUED FOR:
BID
C:
\U se rs
\b co gg in s\ Ap pD at a\ Lo ca l\
Au to de sk
\R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \B
UK
W C8
RF
U3
PQ
LC
\5 0e
1f 7d a-
-4
7c 1-
-3 c3 a5
1d d\ cd bf -2
7-b7
-8
9-
0c 5b c5
.r vt 8/
/2
4:
:0
PM
M
EC
H
AN
IC
AL
P
IP
IN
G
PL
AN
S
M-203
BM
C
BMC
BMC
SLE
AUG 2026
2877-U
C R
O W
N C
O
LO
SS
EU
M C
O O
LE
R
/F R
EE
ZE
R U
PG
R
AD
E
C U
M
BE
R
LA
N D
C O
U N
TY
1/8" = 1'-0"M-203
1 PIPING FLOOR PLAN-CONCESSIONS
INSTALL EVAPORATOR FAN COIL UNIT IN WALK-IN BOX PER
MANUFACTURER'S INSTALLATION INSTRUCTIONS AND CLEARANCES.
CONNECT TO EXISTING CONDENSATE DRAIN SYSTEM. VERIFY EXISTING
CONDENSATE DRAIN IS CLOG-FREE AND DRAINS CORRECTLY. UNCLOG OR
REPAIR AS REQUIRED. PROVIDE NEW REFRIGERANT PIPING FROM FAN
COIL TO ROOF MOUNTED CONDENSING UNIT.
ROUTE NEW REFRIGERANT PIPING FROM NEW FAN COIL UNIT, UP OUT OF
WALK-IN BOX, AND THROUGH CEILING SPACE AS INDICATED TO NEW
CONDENSING UNIT.
INSTALL NEW CONDENSING UNIT IN MECHANICAL ROOM ON WALL MOUNT
BRACKET/STAND PER MANUFACTURER'S INSTALLATION INSTRUCTIONS
AND CLEARANCES. CONDENSER SHALL BE MOUNTED SUCH THAT HOT
DISCHARGE AIR IS DISCHARGED AWAY FROM THE WALL OR ANY OTHER
OBSTRUCTION INTO A FREE OPEN AREA.
KEY NOTES:
1.
2.
3.
4.
5.
GENERAL NOTES:
IT IS THE RESPONSIBILITY OF THE F.S.E.C. TO FURNISH, INSTALL AND INTERCONNECT CONDUIT AND WIRING FOR ELECTRICAL COMPONENTS INCLUDING LIGHTS, SWITCHES, THERMOMETERS, DOOR, WINDOW, PRESSURE RELIEF PORT HEATERS AND RECEPTACLE FOR DRAINAGE HEATER TO EASILY ACCESSIBLE JUNCTION BOX ON TOP OF WALK-IN FOR FINAL CONNECTION BY
DIVISION 16.
ALL INTERCONNECTING CONDUIT RUN ABOVE WALK-IN PANELS OR WITHIN THE WALL PANELS - EXPOSED CONDUIT INSIDE WALK-IN WILL NOT BE ACCEPTABLE EXCEPT FOR THE CONDITIONS SHOWN AND NOTED IN THE ABOVE ILLUSTRATION.
SEAL PENETRATIONS THROUGH CEILING, WALLS AND INSIDE ELECTRICAL CONDUIT OUTSIDE AND INSIDE WALK-IN WITH DOW
CORNING #999A SILICONE GLAZING SEALANT.
PROVIDE HOLES FOR SPRINKLER HEAD AND ELECTRICAL CONDUIT.
PROVIDE 1/2" OD PVC CONDUIT AT ALL PENETRATIONS THRU INSULATED PANELS.
F.S.E.C. WILL PREWIRE ALL ELECTRICAL COMPONENTS
EXCEPT BLOWER COIL TO THIS JUNCTION BOX FOR
ONE FINAL CONNECTION BY DIVISION 16
TIME CLOCK FOR FREEZER SYSTEM -
DIVISION 16 TO MAKE FINAL FREEZER
BLOWER COIL CONNECTION THRU TIME
CLOCK (LOCATE TIME CLOCK IN EASILY
ACCESSIBLE SPECIFIED LOCATION)
BUILDING SPRINKLER
CONNECTION (NOT IN
DIV 23 CONTRACT)
JUNCTION BOX WITH OUTLET FOR
DRAINLINE HEATER ON FREEZER
(EXPOSED CONDUIT FOR
THIS CONDITION IS ACCEPTABLE)
CONDUIT DOWN THRU WALK-IN TOP TO JUNCTION
BOX ON COIL (EXPOSED CONDUIT ACCEPTABLE
FOR THIS CONDITION)
SECURE COIL WITH NYLON FASTENERS
HEATED PRESSURE RELIEF
PORT ON FREEZERS
6 1/2
FOOT
MIN.
FRONT VIEWSIDE VIEW
OK
OK
PA
N
EL
PANEL
6 FT
OR
LESS
N.E.C ARTICLE 110-26(F)(1)
FIXTURE
FIXTURE
STRUCTURAL
CEILING
SUSPENDED
CEILING
DEDICATED
ELECTRICAL
SPACE
DEDICATED
ELECTRICAL
SPACE
HEAT TRACE SPECIFICATION:
HEAT-TRACING CABLES: 5 W/FT OUTPUT. SELF-REGULATING, ELECTRIC HEATING CABLES SUITABLE FOR FREEZE PROTECTION OF METAL PIPING. CABLES: PAIR OF PARALLEL NO. 16 AWG TINNED-COPPER BUS WIRES EMBEDDED IN CROSS-LINKED CONDUCTIVE POLYMER CORE, WHICH VARIES POWER OUTPUT IN RESPONSE TO TEMPERATURE ALONG ITS LENGTH. CABLE SHALL BE CAPABLE OF CROSSING OVER ITSELF WITHOUT OVERHEATING. HEAT OUTPUT: AT LEAST 90 PERCENT OF RATING OVER A TEMPERATURE RANGE FROM 40 TO 150 DEG F PIPE TEMPERATURE. CABLE COVER:
FABRICATED OF CROSS-LINKED, MODIFIED, POLYOLEFIN DIELECTRIC JACKET; WITH ULTRAVIOLET INHIBITOR. PIPE THERMOSTAT: UNIT WITH ADJUSTABLE TEMPERATURE RANGE FROM 35 TO 50 DEG F SNAP ACTION; OPEN-ON-RISE, SINGLE-POLE SWITCH WITH 25-A RATING; AND REMOTE BULB FOR DIRECTLY SENSING PIPE-WALL TEMPERATURE.
HEAT TRACE POWER
CONNECTOR
HEAT TRACE
CABLE
SECURE HEAT
TRACE TO PIPE
WITH GLASS TAPE
SECURE MOUNTING
BASE TO PIPING WITH
PLASTIC CABLE TIE
ALL HEAT TAPE SHALL
BESPLICED OUTSIDE
OF INSULATION
HEAT TRACE POWER
CONNECTOR
OUNTING BASE
PROVIDE WITH DISCONNECT
SWITCH & CONNECT TO
ELECTRICAL CIRCUIT
HEAT TRACE END SEAL KIT
WITH L.E.D. PILOT LIGHT
AND MOUNTING BASE
SECTION A-A
NON-RATED WALL PIPE PENETRATION
FILL, VOID, OR CAVITY MATERIAL: FIRE CAULK.
THROUGH PENETRANTS - ONE PIPE, OR CONDUIT.
NON-RATED FLOOR OR WALL.
3.
1.
2.
A
A
ROOF DECKROOF DECK
3/4" PLYWOOD WITH
SHEET METAL CAP
SCREWED TO TOP
OF ROOF CURB
1-1/2" RIGID
INSULATION
SEAL AROUND PIPE
WATER TIGHT WITH
SILICONE SEALER
BLOCKING
AND FLASHING
AS REQUIRED
NOTE:
1. ROOF CURB PROVIDED BY MECHANICAL CONTRACTOR.
COORDINATE INSTALLATION AND FLASHING WITH THE
GENERAL CONTRACTOR.
2. MECHANICAL CONTRACTOR SHALL COORDINATE
ROOF OPENING, CURB SIZE AND HEIGHT REQUIRED
FOR PIPING PENETRATION.
PREFABRICATED
ROOF CURB
PIPE CLAMP ONE SIZE LARGER
THAN PIPE
PRE-FAB PIPE SUPPORT
ROOF
PIPE
PIPE SADDLE, 12" IN LENGTH
PROVIDE WITH RIGID INSERTS,
SAME LENGTH AS THE SADDLE
NOTE:
PIPE HANGERS, HARDWARE, ETC. SHALL BE COMPLETELY GALVANIZED.
THREADED ROD-
SEE SPECIFICATIONS
THREADED ROD-
SEE SPECIFICATIONS
STEEL STRUCTURE
OFFSET CLAMP-
SEE SPECIFICATIONS
PIPE HANGER-
SEE SPECIFICATIONS
PIPE
PIPE INSULATION
SWIVEL RING
PIPE
ALL
THREAD
ROD WITH
TWO NUTS
& FENDER
WASHERS
BOTTOM CHORD OF
BAR JOIST
TOP OF BAR
JOIST TO
CENTER LINE OF
PIPE
(DIM. "B")
MINIMUM
DISTANCE
ROUNDED TO
NEAREST
INCH AND
NOTED ON
PLAN
SWIVEL
RING TAKE
OUT
"C
"A
"B
"D
TOP OF BAR JOIST
NOTE ON PLAN: HANGER NUMBER AND "A" DIMENSION
3/4"
PIPE
SIZE
ROD
SIZE
'B'
DIM.
MIN 'C'
DIM.
MAX 'C'
DIM.
1" 1-1/4" 1-1/2" 2" 2-1/2" 3" 3-1/2" 4" 5" 6" 8"
3/8"
1/2"
SIZE OF ANGLE
IRON ON BOTTOM
CHORD OF BAR
JOIST PLUS 1-1/2"
1/2" 5/8 "13/16" 15/16" 1-3/16 "1-7/16" 1-3/4" 2" 2-1/4" 2-3/4" 3-5/16" 4-5/16"
1-5/8" 1-3/4" 1-7/8" 2" 2-3/8 "2-3/4" 3-1/4" 3-5/8" 3-7/8" 4-3/4" 5-1/2" 6-3/4"
BAR JOIST HANGER
WITH NUTS AND WASHERS
PIPE SADDLE, 12" IN LENGTH
PROVIDE WITH RIGID INSERTS,
SAME LENGTH AS THE SADDLENOTE:
PIPE HANGERS, HARDWARE, ETC. SHALL BE COMPLETELY GALVANIZED.
CONCRETE INSERT-
SEE SPECIFICATIONS
CONCRETE STRUCTURE-
SEE SPECIFICATIONS
THREADED ROD-
SEE SPECIFICATIONS
PIPE HANGER-
SEE SPECIFICATIONS
PIPE
PIPE INSULATION
N AORT H CAROL I N
SC OT T L. ENNIE RN GI NE E
P LROFESSIONA
027928
S
N or th
B oy la n
Av en ue
R al ei gh
, N C
-1
(9
) 8
-0 th ew oo te nc om pa ny
.c om
Li ce ns e
N um be r :
F -0
PROJECT NO.:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
CU
M
BE
RL
AN
D
C O
UN
TY
N O
RT
H
C
AR
O
LI
N A
RE
VI
SI
O
N S
DATE:
ISSUED FOR:ISSUED FOR:
BID
C:
\U se rs
\b co gg in s\ Ap pD at a\ Lo ca l\
Au to de sk
\R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \B
UK
W C8
RF
U3
PQ
LC
\5 0e
1f 7d a-
-4
7c 1-
-3 c3 a5
1d d\ cd bf -2
7-b7
-8
9-
0c 5b c5
.r vt 8/
/2
4:
:0
PM
M
EC
H
AN
IC
AL
D
ET
AI
LS
M-600
BM
C
BMC
BMC
SLE
AUG 2026
2877-U
C R
O W
N C
O
LO
SS
EU
M C
O O
LE
R
/F R
EE
ZE
R U
PG
R
AD
E
C U
M
BE
R
LA
N D
C O
U N
TY
NO SCALEM-600
8 WALK-IN REFRIGERATOR/FREEZER INSTALLATION DETAIL
1/8" = 1'-0"M-600
9 DETAIL - DEDICATED SPACE FOR ELECTRICAL EQUIPMENT
1/8" = 1'-0"M-600
7 HEAT TRACE CABLE
1/8" = 1'-0"M-600
1 DETAIL - PENETRATION
1/8" = 1'-0"M-600
4 DOGHOUSE PIPE PENETRATION DETAIL
1/8" = 1'-0"M-600
6 ROOF PIPING SUPPORT DETAIL
1/8" = 1'-0"M-600
ASDFASDF DETAIL - HANGERS - BEAM CLAMP
1/8" = 1'-0"M-600
2 HANGERS
1/8" = 1'-0"M-600
5 DETAIL - HANGERS - CONCRETE INSERT
CONDENSER UNIT SCHEDULE
MARK MANUFACTURER MODEL INSTALLATION LOCATION REFRIGERANT REF. CHARGE
(LBS)
CAPACITY
(BTUH)
SUCTION
TEMP (°F)
AMBIENT
TEMP (°F)
FAN COMPRESSOR ELECTRICAL WEIGHT
(LBS) REMARKS
QTY POWER FLA QTY RLA LRA V PH MCA MOCP
CU-A TRENTON TEZA045L8-HT3D ROOF R-448A 9.0 13,530 -20.5 100.0 1 400 W 2.1 1 13.8 99.0 208-230 3 19.4 30 435
CU-A1 TRENTON TEZA075L8-HT3D ROOF R-448A 18.0 24,830 -20.5 100.0 1 400 W 2.1 1 26.7 224.0 208-230 3 35.5 60 495
CU-A2 TRENTON TEZA035L8-HT3D ROOF R-448A 6.0 11,180 -20.5 100.0 1 240 W 1.1 1 12.7 88.0 208-230 3 17.0 25 430
CU-B TRENTON TEZA030H8-HT3D ROOF R-448A 9.0 27,630 24.5 100.0 1 400 W 2.1 1 15.2 93.0 208-230 3 21.1 35 410
CU-B1 TRENTON TEZA020H8-HT3D ROOF R-448A 4.0 16,160 24.5 100.0 1 240 W 1.1 1 10.6 58.0 208-230 3 14.4 25 300
CU-B2 TRENTON TEZA015H8-HT3D ROOF R-448A 4.0 13,870 24.5 100.0 1 240 W 1.1 1 9.7 58.0 208-230 3 13.2 20 285
CU-0111 TRENTON TEZA025H8-IT2D ABOVE CEILING R-448A 5.0 20,400 24.5 95.0 1 400 W 2.1 1 13.7 73.0 208-230 3 19.2 30 370
CU-0125 TRENTON TEZA011H8-IT3D ABOVE CEILING R-448A 3.0 12,970 24.5 95.0 1 240 W 1.1 1 10.4 58.0 208-230 3 14.1 20 265
CU-0128 TRENTON TEZA011H8-IT3D ABOVE CEILING R-448A 3.0 12,970 24.5 95.0 1 240 W 1.1 1 10.4 58.0 208-230 3 14.1 20 265
CU-0134 TRENTON TEZA011H8-IT3D ABOVE CEILING R-448A 3.0 12,970 24.5 95.0 1 240 W 1.1 1 10.4 58.0 208-230 3 14.1 20 265
CU-0153 TRENTON TEZA011H8-IT3D WALL MOUNTED IN MECHANICAL 0143A R-448A 3.0 12,970 24.5 95.0 1 240 W 1.1 1 10.4 58.0 208-230 3 14.1 20 265
CU-0158 TRENTON TEZA011H8-IT3D ABOVE CEILING R-448A 3.0 12,970 24.5 95.0 1 240 W 1.1 1 10.4 58.0 208-230 3 14.1 20 265
CU-0329 TRENTON TEZA011H8-IT3D ABOVE CEILING R-448A 3.0 12,970 24.5 95.0 1 240 W 1.1 1 10.4 58.0 208-230 3 14.1 20 265
FAN COIL UNIT SCHEDULE
MARK MANUFACTURER MODEL SERVICE CFM CAPACITY
(BTUH)
EVAPORATOR
TEMP (°F)
WALK-IN BOX
SPACE TEMP
(°F)
FAN FAN ELECTRICAL DEFROST HEATER DEFROST HEATER
ELECTRICAL ELECTRICAL WEIGHT
(LBS) REMARKS
QTY POWER (HP) FLA (EACH FAN) MCA MOCP WATTS A MCA MOCP V PH
FCU-A TRENTON TPLP314LES2DR8-ESP FREEZER 2,115 14,008 -20.0 -10.0 3 0.07 0.6 2.0 15 2730 11.9 14.8 15 208-230 1 109 1
FCU-A1 TRENTON TPLP526LES2DR8-ESP FREEZER 4,080 26,368 -20.0 -10.0 5 0.07 0.6 3.2 15 4400 19.1 23.9 25 208-230 1 176 1
FCU-A2 TRENTON TPLP211LES2DR8-ESP FREEZER 1,360 11,330 -20.0 -10.0 2 0.07 0.6 1.4 15 1890 8.2 10.3 15 208-230 1 84 1
FCU-B TRENTON TPLP427MAS1DR8-ESP COOLER 2,720 29,640 25.0 35.0 4 0.07 1.0 4.3 15 N/A N/A N/A N/A 115 1 135
FCU-B1 TRENTON TPLP317MAS1DR8-ESP COOLER 2,115 18,638 25.0 35.0 3 0.07 1.0 3.3 15 N/A N/A N/A N/A 115 1 101
FCU-B2 TRENTON TPLP214MAS1DR8-ESP COOLER 1,360 14,933 25.0 35.0 2 0.07 1.0 2.3 15 N/A N/A N/A N/A 115 1 78
FCU-0111 TRENTON TPLP320MAS1DR8-ESP BEER COOLER 2,040 22,230 25.0 35.0 3 0.07 1.0 3.3 15 N/A N/A N/A N/A 115 1 107
FCU-0125 TRENTON TPLP211MAS1DR8-ESP BEER COOLER 1,410 12,463 25.0 35.0 2 0.07 1.0 2.3 15 N/A N/A N/A N/A 115 1 74
FCU-0128 TRENTON TPLP211MAS1DR8-ESP BEER COOLER 1,410 12,463 25.0 35.0 2 0.07 1.0 2.3 15 N/A N/A N/A N/A 115 1 74
FCU-0134 TRENTON TPLP211MAS1DR8-ESP BEER COOLER 1,410 12,463 25.0 35.0 2 0.07 1.0 2.3 15 N/A N/A N/A N/A 115 1 74
FCU-0153 TRENTON TPLP211MAS1DR8-ESP BEER COOLER 1,410 12,463 25.0 35.0 2 0.07 1.0 2.3 15 N/A N/A N/A N/A 115 1 74
FCU-0158 TRENTON TPLP211MAS1DR8-ESP BEER COOLER 1,410 12,463 25.0 35.0 2 0.07 1.0 2.3 15 N/A N/A N/A N/A 115 1 74
FCU-0329 TRENTON TPLP211MAS1DR8-ESP COOLER 1,410 12,463 25.0 35.0 2 0.07 1.0 2.3 15 N/A N/A N/A N/A 115 1 74
GENERAL NOTES:
A. PROVIDE NEOPRENE VIBRATION ISOLATION PADS.
B. PROVIDE HAIL GUARDS FOR CONDENSER COILS.
C. PROVIDE FUSED DISCONNECT.
D. REFRIGERANT LINE SIZES AS RECOMMENDED BY THE EQUIPMENT MANUFACTURER BASED ON HORIZONTAL AND VERTICA RUNS.
E. UNIT TO BE PROVIDED WITH ALL ACCESSORIES REQUIRED FOR LOW AMBIENT COOLING OPERATION.
F. PROVIDE WITH MANUFACTURER'S 5-YEAR COMPRESSOR WARRANTY.
G. PROVIDE QUICK VAC VALVES.
H. PROVIDE SEALED LIQUID LINE FILTER+SIGHT GLASS.
REMARKS:
GENERAL NOTES:
A. PROVIDE ISOLATION HANGERS.
B. UNIT SHALL BE FACTORY PREASSEMBLED.
C. UNIT SHALL HAVE EC MOTOR.
REMARKS:
1. PROVIDE HEAT TRACED DRAIN PAN.
N AORT H CAROL I N
SC OT T L. ENNIE RN GI NE E
P LROFESSIONA
027928
S
N or th
B oy la n
Av en ue
R al ei gh
, N C
-1
(9
) 8
-0 th ew oo te nc om pa ny
.c om
Li ce ns e
N um be r :
F -0
PROJECT NO.:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
CU
M
BE
RL
AN
D
C O
UN
TY
N O
RT
H
C
AR
O
LI
N A
RE
VI
SI
O
N S
DATE:
ISSUED FOR:ISSUED FOR:
BID
C:
\U se rs
\b co gg in s\ Ap pD at a\ Lo ca l\
Au to de sk
\R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \B
UK
W C8
RF
U3
PQ
LC
\5 0e
1f 7d a-
-4
7c 1-
-3 c3 a5
1d d\ cd bf -2
7-b7
-8
9-
0c 5b c5
.r vt 8/
/2
4:
:0
PM
M
EC
H
AN
IC
AL
S
CH
ED
UL
ES
M-700
BM
C
BMC
BMC
SLE
AUG 2026
2877-U
C R
O W
N C
O
LO
SS
EU
M C
O O
LE
R
/F R
EE
ZE
R U
PG
R
AD
E
C U
M
BE
R
LA
N D
C O
U N
TY
OS
DL
CO
T
CO
OS
LC
F
F
F
DH
DCL
XXX
XXXX
XX
J
J
F1
DO
M
N
X
TV
XXXX
CR
CK
TV
CC
DC
ES
IC
ML
RX
REX
MD
XXX
OS
1P 1 Pole (2P, 3P, 4P, ETC.)
A, Amp Ampere AC Above Counter ACLG Above Ceiling ADO Automatic Door Opener AF Amp Frame AFF Above Finished Floor AFG Above Finished Grade AFI Arc Fault Circuit
Interrupter AHU Air Handling Unit AL Aluminum ALT Alternate AMP Ampere AMPL Amplifier ANNUN Annunciator APPROX Approximately AQ-STAT Aquastat ARCH Architect, Architectural AS Amp Switch AT Amp Trip ATS Automatic Transfer Switch AUTO Automatic AUX Auxiliary AV Audio Visual AWG American Wire Gauge BATT Battery BD Board BLDG Building BMS Building Management System C Conduit CAB Cabinet CAT Catalog CATV Cable Television CB Circuit Breaker CCTV Closed Circuit Television CKT Circuit CLG Ceiling COMB Combination CMPR Compressor CONN Connection CONST Construction CONT Continuation Or Continuous CONTR Contractor CONV Convector CP Circulating Pump CRT Cathode-Ray Tube CT Current Transformer CTR Center CU Copper DCP Domestic Water Circulating Pump DEPT Department DET Detail DIA Diameter DISC Disconnect DIST Distribution DN Down DPR Damper DS Safety Disconnect Switch DT Double Throw DWG Drawing EC Electrical Contractor ELEC Electric, Electrical ELEV Elevator ELU Emergency Lighting Unit EM Emergency EMS Energy Management System EMT Electrical Metallic Tubing EP Electric Pneumatic EQUIP Equipment EWC Electric Water Cooler EXIST Existing EXH Exhaust EXP Explosion Proof FA Fire Alarm FABP Fire Alarm Booster Power
Supply Panel FACP Fire Alarm Control Panel FCU Fan Coil Unit FIXT Fixture FLR Floor FLUOR Fluorescent FU Fuse FUDS Fused Safety Disconnect Switch GA Gauge GAL Gallon GALV Galvanized GC General Contractor GEN Generator GFI Ground Fault Circuit Interrupter GFP Ground Fault Protector GND Ground GRS Galvanized Rigid Steel (Conduit) GYP BD Gypsum Board HOA Hands-Off-Automatic Switch HORIZ Horizontal HP Horsepower HPF High Power Factor HT Height HTG Heating HTR Heater HV High Voltage HVAC Heating, Ventilating And Air
Conditioning IC Interrupting Capacity IG Isolated Ground IMC Intermediate Metal Conduit INCAND Incandescent IR Infrared I/W Interlock With J-BOX Junction Box KV Kilovolt KVA Kilovolt-Ampere KVAR Kilovolt-Ampere Reactive KW Kilowatt KWH Kilowatt Hour LOC Locate Or Location LT Light LTG Lighting LTNG Lightning LV Low Voltage MAX Maximum MAG.S Magnetic Starter M/C Momentary Contact MC Mechanical Contractor
Electrical Abbreviations
Electrical DeviceTags: Uppercase letter(s) indicates Panel ID and circuit number. Lowercase letter indicates designation of controlling switch (where applicable).
Switch ID indicated by a lowercase letter. Switch IDs are unique per space. A switch with an ID "a" controls all devices within the space in which it is located tagged with "a". A switch without a tagged ID controls all lighting fixtures within a space. ID tags may be used on control devices other than switches, such as occupancy sensors or contactors.
Equipment Tags: Equipment ID is indicated by an underlined tag adjacent to the equipment. See the equipment connection schedule for description, electrical requirements, and panel and circuit number. Symbols/graphic appearance of equipment varies.
Solid, arced lines connecting equipment, devices, or fixtures indicate unswitched power circuiting. Wires are only intended to indicate to what circuit devices are connected. Actual connections, circuit routing, installtion, junction boxes, etc. shall be field-determined by the contractor.
Home run to branch circuit panelboard. The equipment name and circuit number(s) are indicated, separated by a hyphen. Homeruns are only intended to indicate panel and circuit number. Actual homerun location shall be field-determined by the contractor.
Power Symbols
Electrical Symbol Legend
Room
MCB Main Circuit Breaker MCC Motor Control Center MDC Main Distribution Center MDP Main Distribution Panel MFR Manufacturer MFS Main Fused Disconnect Switch MH Manhole MIC Microphone MIN Minimum MISC Miscellaneous MLO Main Lugs Only MMS Manual Motor Starter MOA Multioutlet Assembly MSP Motor Starter Panelboard MSBD Main Switchboard MSS Motor Starter Switch MT Mount MT.C Empty Conduit MTS Manual Transfer Switch MTR Motor, Motorized N.C. Normally Closed NEC National Electrical Code NEMA National Electrical
Manufacturer's Association NFDS Non-Fused Safety Disconnect
Switch NIC Not In Contract NL Night Light N.O. Normally Open NPF Normal Power Factor NTS Not To Scale OC On Center OH Overhead OL Overloads PA Public Address PB Pull Box Or Pushbutton PE Pneumatic Electric PED Pedestal PF Power Factor PH Phase PIV Post Indicating Valve PNL Panel PP Power Pole PR Pair PRI Primary PROJ Projection PRV Power Roof Ventilator PT Potential Transformer PVC Polyvinyl Chloride (Conduit) PWR Power QUAN Quantity RCPT Receptacle REQD Required RM Room RSC Rigid Steel Conduit RTU Roof Top Unit SC Surface Conduit SEC Secondary SHT Sheet SIM Similar SLD Single-Line Diagram S/N Solid Neutral SPEC Specification SPKR Speaker SP Spare SPP Single-Point Power SR Surface Raceway SS Stainless Steel SSW Selector Switch S/S Stop/Start Pushbuttons STA Station STD Standard SURF Surface Mounted SW Switch SWBD Switchboard SYM Symmetrical SYS System TEL Telephone TERM Terminal TL Twist Lock TR Tamper Resistant T-STAT Thermostat TTC Telephone Terminal Cabinet TV Television TVTC Television Terminal Cabinet TYP Typical UC Under Counter UE Underground Electrical UG Underground UH Unit Heater UT Underground Telephone UTIL Utility UV Ultraviolet V Volt VA Volt-Amperes VDT Video Display Terminal VERT Vertical VFD Variable Frequency Drive VOL Volume W Watt W/ With WG Wire Guard WH Water Heater W/O Without WP Weatherproof XFMR Transformer XFR Transfer
∠ Angle
@ At ▲ Delta ' Feet " Inches # Number Ø Phase C Center Line P Plate
Exit Light, Wall-Mounted.
Shading and arrows indicate faces and directional chevrons.
Wall-mounted fixtures, Typical (Various Symbols)
Emergency Lighting Unit, Wall-Mounted, Remote Battery
Emergency Lighting Unit, Wall-Mounted, Integral Battery
Emergency Lighting Unit, Ceiling-Mounted, Integral Battery
Emergency Lighting Unit, Ceiling-Mounted, Remote Battery
Lighting Fixtures, Typical, Rectangular (Various Symbols) Filled circles indicate recessed.
Open circles indicate surface-mounted.
Diagonal line indicates lensed.
Outer dots indicate suspended.
Lighting Fixtures, Typical, Round (Various Symbols) Center dot indicates pendant.
Diagonal line indicates lensed.
Chevron indicates wall wash.
Strip Fixture
Directional Light, Track Light, Flood Light
Exit Light, Ceiling-Mounted.
Shading and arrows indicate faces and directional chevrons.
Linear Light, Tape Light
Exit/ELU Combo
Diagonal hatch indicates light on a critical circuit.
Solid hatch indicates light on an emergency or life safety circuit.
Pole/Area Lights
Post-Top Area Light
Bollard Light
Single-Pole Switch
Two-Pole Switch
Three-Pole Switch
Switch Modifiers:
3: 3-Way 4: 4-Way K: Keyed D: Dimming T: Timer
OS: Occupancy Sensor VS: Vacancy Sensor AC: Above-Counter LV: Low-Voltage M: Motor-Rated
Lighting Contactor
Lighting Control Panel
Occupancy Sensor
Daylight Harvesting Sensor
Smoke Detector
Heat Detector
Carbon Monoxide Detector
Beam Detector T: Transmitter R: Receiver
Combination Detector (Up to Three)
Duct Smoke Detector
Manual Pull Station
Horn, Wall
Horn, Ceiling
Strobe, Wall, Candela as indicated
Strobe, Ceiling, Candela as indicated
Horn/Strobe, Wall, Candela as indicated
Horn/Strobe, Ceiling, Candela as indicated
Remote Indicator w/ Test Switch, Wall
Remote Indicate w/ Test Switch, Ceiling
Door Holder
Door Closer
Fire Service Phone
Addressible Module
AIM: Addressible Input Module AOM:Addressible Output Control Module AIO: Addressible Input/Output Module
Fire Alarm Control Unit
EVAC: Voice Evacuation Control Panel FAA: Fire Alarm Annunciator FACP: Fire Alarm Control Panel FATC: Fire Alarm Terminal Cabinet NACP: Notification Appliance Circuit Panel FAMN: Fire Alarm Mass Notification Control Panel
Supervisory or Interface Device
PIV: Post Indicator Valve Supervisory PS: Pressure Switch R: Non-Addressible Relay VS: Valve Supervisory Switch WF: Water Flow Switch
Simplex Receptacle
Duplex Receptacle
Quadruplex Receptacle
Special Receptacle, Type as Indicated
W al l
C ei lin g
F lo or
Receptacle Modifiers:
##": Height AFF OC AC: Above Counter GFI: Ground-Fault Circuit Interrupter WP: Weatherproof In-Use Cover
Half shading indicates split (typically switched)
Outside shading indicates emergency circuit
Center shading indicates isolated ground
Multioutlet Assembly Filled squares indicate 120V outlet Open squares indicate with USB
Cord Reel, Device Varies
Drop Cord, Device Varies
Junction Box
Floor Box, see schedule for type
Emergency Power Off
Door Opener Push Plate
Power Meter
Safety Switch, Fused
Safety Switch, Unfused
Motor Starter
Combination Starter/Disconnect
Ground Rod
Ground Rod with Test Well
Lightning Protection Air Terminal
Lightning Protection Conductor Splice
Static Ground Receptacle
Data Outlet
Telephone Outlet
Data/Telephone Outlet
W al l
C ei lin g
F lo or
Outlet Modifiers:
##": Height AFF OC AC: Above Counter
Wireless Access Point
Nurse Call Corridor Light Number of lights as indicated
Nurse Call Device
B: Code Blue D: Duty Station E: Emergency P: Patient Call S: Staff
TV Outlet
Nurse Call Control Unit
NCAP: Nurse Call Annunciator Panel NCHS: Nurse Call Host Constroller NCPA: Nurse Call Power Supply NCTC: Nurse Call Terminal Cabinet NCUPS: Uninterruptable Power Supply
Lighting Symbols
Contactor
Single-Pole Switch
Two-Pole Switch
Three-Pole Switch
Switch Modifiers:
K: Keyed T: Timer AC: Above-Counter M: Motor-Rated
Fire Alarm Symbols
Grounding and Lightning Protection Symbols
Security Camera
PTZ: Pan/Tilt/Zoom
Card Reader
Card Reader with Keypad
Closed Circuit TV Outlet
Door Contact
Electric Strike
Intercom
Magnetic Lock
Request to Exit Button
Request to Exit Sensor
Motion Detector
Security Control Unit
SCP: Security Control Panel SPS: Security Power Supply Unit
Telecom Symbols
Nurse Call Symbols
Security Symbols a
A a
Equipment is tagged with Panel Name and with Panel ID in parentheses. Panel ID is intended as a design documentation aid only. Do not include Panel ID in field-applied circuit directories or labels.
Hatched fill indicates distribution panel or switchboard.
Solid fill indicates branch panel or load center.
Dashed box indicates code-required clearance (width and depth).
Door indicates front of recessed panel.
Panelboards are assigned an abbreviated indicator (or Panel ID) for use with circuit numbers. Panel ID is listed within the panel schedule and in the panel abbreviation schedule.
Power Distribution Equipment
H P
1A (B
LP
1A
(C
M D
P (A
SB1(S)
Devices and fixtures are tagged with Panel ID and circuit number. For example, a device tagged with "A1" indicates the device is circuited to panel designated "A," circuit number 1. The panel schedule circuit number contans both the panel abbreviation and the circuit number.
XX-1
Transformer: Typically transformer names begin with or contain the letter "T". See Single-Line Diagram for description and requirements.
T1
Dashed, arced lines connecting equipment, devices, or fixtures indicate switched power.
Absence of a switch designation on a lighting fixture indicates fixture is controlled by the only switch in the space. An "x" in place of the switch designation indicates unswitched.
Bottom Value, Lowercase Letter: Switch ID
Lighting Tags
Top Value: Fixture Type ID (Underlined)
Bottom Value, Uppercase Letter(s): Panel ID
Bottom Value, Number(s): Circuit Number a a
C1a
Wiring
Power Device and Equipment Tags
Construction Phasing
Existing to Remain
Existing to Be Demolished
New
(Typical All Symbols and Equipment)
Existing to Be Demolished
Area Not in Contract
Miscellaneous
Keynote
Callout:
Top Value: Detail Number on Sheet Bottom Value: Sheet Number of Detail
Room Name and Number
Smoke Damper
Electrical General Notes
A Conductors operating at 50 volts or greater shall be in raceway. Raceway within the structure above the floor slab shall be metal. Raceway below the floor slab and underground raceway outside the structure shall be PVC.
B Low voltage cables or conductors operating at less than 50 volts shall be in metal raceway where installed within walls or inaccessible spaces. Low voltage cables may be run in cable tray where noted. Low voltage cables may be run in cable support hooks above accessible ceilings where noted. Low voltage cable shall be plenum rated in plenum spaces.
B Low voltage cables or conductors operating at less than 50 volts shall be in metal raceway. Low voltage cables may be run in cable tray where noted. Low voltage cable shall be plenum rated in plenum spaces.
C Coordinate locations of devices with architectural elevations and details. Architectural elevations and details take precedence over locations shown on electrical drawings.
D Provide cable or conduit and wire as required to achieve circuiting shown. Size conductors per NEC ampacity and wire fill criteria. Provide dedicated neutral and ground conductors for circuiting, unless noted otherwise. Increase branch circuit and/or feeder conductors including equipment grounding conductors proportionally for no more than 3% voltage drop on branch circuits and 2% on feeders per energy code.
E It is the responsibility of this contractor to coordinate installation of electrical systems and those requiring electrical connections to maintain NEC required clearances, included but not limited to areas above accessible ceilings.
F Coordinate with other trades for proper installation of equipment. Consult the drawings of other trades or crafts to avoid conflicts with equipment, etc. Conflicts shall be resolved prior to rough-in and at no additional cost to the owner.
G Leave the site clean and ready for occupancy. Remove dirt, debris, empty cartons, tools, conduit and wire scraps, and miscellaneous spare equipment and materials used in this division of the work during construction. Components shall be free of dust, grit, and foreign materials and left as new before final acceptance of work.
H The symbols and abbreviations shown on this sheet may or may not be used in this set of drawings.
I Perform work to comply with the standard practices for good workmanship published by National Electrical Contractors Association (NECA). Comply with the latest enforced edition of the National Electrical Code (NEC), local codes, amendments, and ordinances.
J Field coordinate final mechanical and equipment locations along with connection requirements and control wiring prior to rough-in. Adjust corresponding circuit breaker ratings and branch circuiting accordingly.
K Electrical work shall be performed under the supervision of a licensed master electrician. Procure permits and licenses and pay fees associated with this work.
L Materials furnished for this project shall be new, commercial grade, free of defects, and listed by a nationally recognized testing laboratory unless noted otherwise.
M Provide complete operation & maintenance…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .