27ROB0174 Vendor Quote.pdf
PDF 139 KB Posted
- Contract number
- 26-416CMS-BOPM4-P-88370
- Issued by
- Illinois
About this file
This is a Proposal - Itemized Breakdown submitted by Schomburg & Schomburg Construction, Inc., the prime contractor, for work at Robinson Correctional Facility located at 13423 E 1150th Ave, Robinson, Illinois 62454. The proposal was prepared by estimator Marie Hardin on August 13, 2026.
The scope of work includes repairs to three doors at the correctional facility: Door 5 requires replacement of the top seal, jamb seal, and wire pneumatic reversing edge kit; Door 8 requires replacement of drums and seals; and Door 9 requires replacement of the operator and safety sensors, vertical track, and seals. The total proposal cost is $10,984.00, comprised of prime contractor direct labor costs of $5,360.00 (24 hours of Carpenter Foreman labor at $145.00 per hour and 24 hours of Carpenter Journeyman labor at $140.00 per hour), prime contractor miscellaneous costs of $1,640.00 (which include 4 hours of mobilization time, dump fees, and spoil haul-off), prime contractor direct materials of $2,069.00, and prime contractor equipment rental of $435.00. No subcontractor proposals are included in this itemized breakdown. The document indicates that all percentage-based fees and overhead charges are set at 0.0%.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LINE NO.
OMITTED WORK
(CREDIT) - (B)
ADDED WORK
(COST) - (C)
1A -$ -$
1B -$ -$
1C -$ -$
1D -$ -$
1E -$ -$
2 -$ -$
3 -$
4A 0.0% $ - -$
4B 0.0% $ - -$
4C 0.0% $ - -$
5 -$
LINE NO.
OMITTED WORK
(CREDIT) - (B)
ADDED WORK
(COST) - (C)
6 -$ 3,480.00$
PRIME CONTRACTOR DIRECT LABOR CARPENTER JOURNEYMAN __24___ HRS @ $140.00/ HR 3,360.00$
PRIME CONTRACT MISCELANEOUS COSTS 1,640.00$
7 -$ 2,069.00$
8 -$ 435.00$
9 -$ -$
10 10,984.00$
11A 0.0% $ - -$
11B 0.0% $ - -$
11C 0.0% $ - -$
12A 0.0% $ - -$
12B 0.0% $ - -$
12C 0.0% $ - -$
13 0.0% -$ -$
14 0.0% -$ -$
15 -$ -$
16 -$
17 0.0% -$
18 10,984.00$
Robinson Correctional Facility Doors 5,8 and 9 Service
Schomburg & Schomburg Inc.
PROPOSAL - ITEMIZED BREAKDOWN
(Prime Contractor)
CONTRACT NUMBER PROJECT NAME
PROJECT LOCATION
13423 E 1150th Ave Robinson Illinois 62454
PROJECT NUMBER NAME OF PRIME CONTRACTOR
Schomburg & Schomburg Construction, Inc.
DESCRIPTION OF WORK
Door 5- Replace top seal, jamb seal, wire pneumatic reversing edge kit Door 8 - Replace Drums and seals Door 9 - replace operator and safety sensors, vertical track, and seals
REQUEST FOR PROPOSAL NUMBER CHANGE ORDER NUMBER (i.e. - Mod #)
SUBCONTRACTOR PROPOSAL SUMMARY
ITEM - (A)
SUBCONTRACTOR(S) PROPOSAL
Sub #1
Sub #2
Sub #3
Sub #4
Sub #5
PRIME CONTRACTOR DIRECT MATERIAL
(Lines 1A - 1E) -
(Column C, Line 2 minus Column B, Line 2) -
PRIME CONTRACTOR
FEE*
PRIME CONTRACTOR PROPOSAL SUMMARY
ITEM - (A)
PRIME CONTRACTOR DIRECT LABOR CARPENTER FOREMAN ____24_____ HRS @ $145.00/ HR
PRIME CONTRACTOR EQUIPMENT RENTAL
(Lines 6, 7, & 8) -
(Column C, Line 9 minus Column B, Line 9) -
DIRECT
OVERHEAD*
INSURANCE AND TAXES** (for Line 6)
TAXES ON MATERIAL AND EQUIPMENT*** (for Lines 7 & 8)
Bonding (for Line 16)
(to include Line 5 above) -
PRIME CONTRACTOR ESTIMATOR Marie Hardin 8/13/2026
Notes
MISC COSTS INCLUDE 4 HRS MOBILIZATION TIME, DUMP FEES, SPOIL HAUL OFF, ETC.