This is a Proposal - Itemized Breakdown for a construction project submitted by Schomburg & Schomburg Construction, Inc., the prime contractor. The project involves the Robinson Correctional Facility located at 13423 E 1150th Ave, Robinson, Illinois 62454. The proposal was prepared by estimator Marie Hardin on 8/13/2026.

The scope of work consists of removing and replacing a caustic door entirely. The total proposal cost is $8,898.00, comprised of prime contractor direct labor costs of $2,240.00 for 16 hours of carpenter journeyman work at $140.00 per hour and 16 hours of carpenter foreman work at $145.00 per hour totaling $2,320.00, combined with prime contractor miscellaneous costs of $1,640.00, direct material costs of $2,388.00, and equipment rental of $310.00. The miscellaneous costs include 4 hours of mobilization time, dump fees, and spoil haul-off expenses. No subcontractor proposals, direct overhead, insurance and taxes, bonding, or prime contractor fees are indicated on this proposal. All line items for added work are shown with costs, while omitted work credit line items are blank, indicating this is an added work change order or proposal.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LINE NO.

OMITTED WORK

(CREDIT) - (B)

ADDED WORK

(COST) - (C)

1A -$ -$

1B -$ -$

1C -$ -$

1D -$ -$

1E -$ -$

2 -$ -$

3 -$

4A 0.0% $ - -$

4B 0.0% $ - -$

4C 0.0% $ - -$

5 -$

LINE NO.

OMITTED WORK

(CREDIT) - (B)

ADDED WORK

(COST) - (C)

6 -$ 2,320.00$

PRIME CONTRACTOR DIRECT LABOR CARPENTER JOURNEYMAN __16___ HRS @ $140.00/ HR 2,240.00$

PRIME CONTRACT MISCELANEOUS COSTS 1,640.00$

7 -$ 2,388.00$

8 -$ 310.00$

9 -$ -$

10 8,898.00$

11A 0.0% $ - -$

11B 0.0% $ - -$

11C 0.0% $ - -$

12A 0.0% $ - -$

12B 0.0% $ - -$

12C 0.0% $ - -$

13 0.0% -$ -$

14 0.0% -$ -$

15 -$ -$

16 -$

17 0.0% -$

18 8,898.00$

Robinson Correctional Facility Caustic Door Replacement

Schomburg & Schomburg Inc.

PROPOSAL - ITEMIZED BREAKDOWN

(Prime Contractor)

CONTRACT NUMBER PROJECT NAME

PROJECT LOCATION

13423 E 1150th Ave Robinson Illinois 62454

PROJECT NUMBER NAME OF PRIME CONTRACTOR

Schomburg & Schomburg Construction, Inc.

DESCRIPTION OF WORK

Remove and replace Caustic Door entirely

REQUEST FOR PROPOSAL NUMBER CHANGE ORDER NUMBER (i.e. - Mod #)

SUBCONTRACTOR PROPOSAL SUMMARY

ITEM - (A)

SUBCONTRACTOR(S) PROPOSAL

Sub #1

Sub #2

Sub #3

Sub #4

Sub #5

PRIME CONTRACTOR DIRECT MATERIAL

(Lines 1A - 1E) -

(Column C, Line 2 minus Column B, Line 2) -

PRIME CONTRACTOR

FEE*

PRIME CONTRACTOR PROPOSAL SUMMARY

ITEM - (A)

PRIME CONTRACTOR DIRECT LABOR CARPENTER FOREMAN ____16_____ HRS @ $145.00/ HR

PRIME CONTRACTOR EQUIPMENT RENTAL

(Lines 6, 7, & 8) -

(Column C, Line 9 minus Column B, Line 9) -

DIRECT

OVERHEAD*

INSURANCE AND TAXES** (for Line 6)

TAXES ON MATERIAL AND EQUIPMENT*** (for Lines 7 & 8)

Bonding (for Line 16)

(to include Line 5 above) -

PRIME CONTRACTOR ESTIMATOR Marie Hardin 8/13/2026

Notes

MISC COSTS INCLUDE 4 HRS MOBILIZATION TIME, DUMP FEES, SPOIL HAUL OFF, ETC.