Attachment 02_QASP.pdf

PDF 255 KB Posted

Attached to
Technical Support for Drug Free Workplace Federal contract opportunity
Solicitation number
277-24-0621
Issued by
Department of Health and Human Services Substance Abuse and Mental Health Services Administration

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract opportunity to provide technical support for the Drug-Free Workplace Program (DFWP) administered by the Substance Abuse and Mental Health Services Administration (SAMHSA), Center for Substance Abuse Prevention (CSAP), Division of Workplace Programs (DWP).

The QASP outlines the performance standards, surveillance methods, and acceptable quality levels for various tasks under the contract, including: overall contract management and administration, group and workgroup support, operating and maintaining the DFWP ASR/Agency Archive Data System, certification and maintenance of federal DFWP plans, notifications to Congress, updates to DFWP tools, dissemination of information to DFWP stakeholders, consultation and briefings/trainings, and transition/transfer activities. The QASP also includes details on optional supplemental subject matter expert activities and supplemental meetings. The key objectives are to provide technical assistance, expertise and support for the federal DFWP program and monitor federal agency compliance.

View the file

Other files for this federal contract opportunity

Other files attached to Technical Support for Drug Free Workplace, newest first.
File Type Posted
Amendment 2 Questions And Answers.pdf PDF
RFP 277-24-0621 Amendment_1 TSDFW.pdf PDF
Attach 5_Sealed_Proposal_Cover_Page Amend 1.docx DOCX document
Attach 07_Proposal_Intent_Response.docx DOCX document
Attach 08_Packaging_and_Delivery_ of_Proposals_via_eCPS.docx DOCX document
Attach 09_Government_Notice.docx DOCX document
Attach 16_Section_508_Template.docx DOCX document
Attachment 01a_PWS.pdf PDF
Attachment 1c DTM OC General Requirements Deliverables v1.3 and Specific Requirements.pdf PDF
Attach 04_Billing_Instructions.docx DOCX document
Attach 07_Proposal_Intent_Response.docx DOCX document
Attach 11 and 12_Client_Letter_and_Contractor_Perf_Form.docx DOCX document
Attach 13_Breakdown_Estimated_Costs.docx DOCX document
Attachment 3 Reference Materials_Online ASR screens.pdf PDF
Attach 06_Disclosure_of_Lobbying_Activities.pdf PDF
Attach 10_Contact_Points.docx DOCX document
Attach 14_IT_Worksheets.pdf PDF
Attach 15_Summary_of_Cost_and_Hours_Spreadsheet.xlsx XLSX spreadsheet
Attachment 1b -IT OC Contract Technical Requirements Version 1.8.pdf PDF
Attach 5_Sealed_Proposal_Cover_Page.docx DOCX document
RFP 277-24-0621 Cover Letter.pdf PDF
RFP 277-24-0621 DFWP.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 277-24-0621

Attachment 2, QASP

Attachment 2: Quality Assurance Surveillance Plan (QASP)

Technical Support for Drug-Free Workplace

Task/Activity Description

Performance Standard Surveillance Method

Acceptable Quality Level (AQL) (“Satisfactory” rating)

DTM & OC

Requirements, Attachment 1c

IT Plans

IT Reports

IT training

Other IT deliverables

IT plans, reports and other IT deliverables are:

• Complete and Accurate:

- Requiring minimal revisions for approval

- current information

- accurate information including costs and calculations

• Compliant:

with security and privacy requirements

• Timely:

according to Delivery Schedule

IT training:

• Complete:

completion of all required training

• Compliant:

with security and privacy requirements

• Timely:

Complete training and submit written proof of training completion on date requested by COR

Contracting Officer’s Representative

(COR)

monitoring according to:

• PWS

• Delivery

Schedule

• Deliverables

• Status

Reports

• SAMHSA

DTM IT staff feedback

• Monthly Progress Reports

IT plans, reports and other IT deliverables:

• Complete and Accurate:

No more than 2 errors or no more than 2 pieces of missing information per year, for IT deliverables

• Compliant:

No more than 1 IT deliverable is rejected by

SAMHSA, DTM

• Timely:

No more than 1 IT deliverable is received past due date

IT training:

• Complete:

100% contractor staff/consultants/ subcontractors complete 100% of all required training

• Compliant:

100% contractor staff/consultants/ subcontractors are compliant with IT security requirements

• Timely:

All training and proof of training completion are no more than 2 workdays past due date

Description

Performance Standard Surveillance Method

Acceptable Quality Level (AQL) (“Satisfactory” rating)

Customer Satisfaction Contractor adheres to guidance provided by COR

COR & customer feedback

90% customer satisfaction rate, including COR comments

Task 1 Overall Contract Management and Administration to include cost and time

Communications:

Contractor maintains appropriate communications with COR, CO, DFWP stakeholders and partners:

• Professionalism

• Cooperativeness

• Cordial working relationship

• Responsiveness

• Communicates with Div. of Workplace

Programs (DWP) through COR

• Informs COR of new task activity, budget issues and other issues or problems in a timely manner

• Proactively anticipates needs and problems

Program Support:

Contractor supports the best interest of DFWP and DWP’s mission, i.e., when communicating with agencies and providing recommendations

Budget:

• Contractor remains within or below cost estimates, including meeting cost estimates

• No cost overruns

• Accurate and Complete vouchers;

no unallowable costs Quality Control:

• Internal inspection – appropriate layers of review Revisions:

Draft deliverables for all tasks show revisions (track changes or other method), or rationale for not making revisions

COR/CO

monitoring according to:

• PWS

• Delivery

Schedule

• Deliverables

• Status Reports

• Budget estimates compared to actual costs/ expenses reports

• Vouchers

• Verbal, written and email communication to COR, CO, DWP staff and DFWP partners and stakeholders

• Feedback from DWP staff, and DFWP partners and stakeholders

• Monthly Progress Reports

Communications:

• No more than 2 complaints per year

• No more than 2 occasions of Contractor not responding to COR’s requests (i.e., emails, phone calls) within same day of request or no later than 8 business hours from request

• No more than 2 occasions of contractor communications to DWP about contract work without informing COR, i.e., contractor emailing DWP staff without sending a “cc” email to COR

• No more than 1 occasion of Contractor not informing COR of new task activity, budget and other issues/problems before they occur

Program Support:

• No more than 2 occasions of communications

(verbal, written draft or final communications) that are not in the best interest of the DFWP and DWP’s mission

Budget:

• No more than 1 occasion of actual cost being above cost estimate

• 0% cost overruns

• No more than 1 voucher per contract year needing revisions after sent to COR, i.e., due to mistakes, incompleteness or unallowable costs

Quality Control:

• No more than 2 identified occasions of skipped layers of contractor review

Revisions:

• No more than 1 occasion of a revised document provided without showing revisions in track changes or other method of showing revisions

Task 1.1 Develop and Finalize Work Plan

Work Plan Deliverables:

(Base Year only)

• 1.1.a.) Draft Work

Plan

• 1.1.b.) Final Work

Plan (Option Years)

• 1.1.c.) Annual

Review of Work Plan

Work Plan (Deliverables 1.1.a., 1.1.b., 1.1.c.):

• Complete:

- minimal missing information

- includes components indicated in

PWS and COR’s revisions, or rationale for not making revisions

• Accurate:

with up-to-date information and minimal errors

• Well-organized:

clear information in concise format

• Timely:

according to Delivery Schedule

COR/CO

monitoring according to:

• PWS

• Delivery

Schedule

• Deliverables

• Status Reports

• Requested changes

• Monthly

Progress Reports

Work Plan (Deliverables 1.1.a., 1.1.b., 1.1.c.):

• Complete:

No more than 2 pieces of information are missing from Draft Work Plan

• Accurate:

100% information in Draft Work Plan is up-to-date, with no more than 2 errors

• Well-organized:

100% of Final Work Plan is in organized concise format according to template

• Timely:

Work plan is delivered no more than 2 workdays past due date

Performance Standard Surveillance Method

Acceptable Quality Level (AQL) (“Satisfactory” rating)

Task 1.2 Contract Management Meetings

Contract Management Kick-off meeting (Base Year only) Deliverables:

• 1.2.a.) Participation

• 1.2.b.) Agenda

• 1.2.c.) Meeting

Summary

IT Privacy & Security Kick-off meeting (Base Year only) Deliverables:

• 1.2.d.) Participation

• 1.2.e.) Agenda

• 1.2.f.) Meeting

Summary

Recurring Contract Management meetings Deliverable:

• 1.2.g.) Participation

Participation (Deliverables 1.2.a., 1.2.d., 1.2.g.):

• Well-prepared:

Contractor/consultants have necessary information for meetings and participate by offering technical expertise

• Timely:

Contractor and consultants are on-time at meetings

Agendas & Meeting Summaries (Deliverables 1.2.b., 1.2.c., 1.2.e., 1.2.f.):

• Complete:

minimal missing information;

includes components noted in PWS and COR’s revisions, or rationale for not making revisions

• Accurate:

minimal errors

• Well-organized:

clear information; concise format

• Timely:

according to Delivery Schedule

COR monitoring according to:

• PWS

• Delivery

Schedule

• Deliverables

• Status Reports

• Feedback from meeting attendees

• Observed

Contractor staff/ consultants attendance at meetings

• Review of agendas

• Review of meeting summaries

• Monthly Progress Reports

Participation (Deliverables 1.2.a., 1.2.d., 1.2.g.):

• Well-prepared:

No more than 1 occasion of contractor/consultants not prepared or not participating in meetings

• Timely:

No more than 2 occasions of invited contractor or consultants not attending or being late for meeting

Agendas & Meeting Summaries (Deliverables 1.2.b., 1.2.c., 1.2.e., 1.2.f.):

• Complete:

No more than 1 meeting agenda or summary has no more than 1 piece of missing information

• Accurate:

No more than 1 meeting agenda or 1 meeting summary has no more than 1 error

• Well-organized:

No more than 1 meeting agenda or 1 meeting summary contains disorganized format or unconcise wording

• Timely:

- No more than 1 meeting agenda is no later than

1 workday past due date

- No more than 1 meeting summary is no later than

2 workdays past due date Task 1.3 Administrative Reports

Deliverables:

• 1.3.a.) Monthly

Progress Report

• 1.3.b.) IT Reports

• 1.3.c.) Ad-hoc Administrative

Administrative Reports (Deliverables 1.3.a., 1.3.b., 1.3.c.):

• Complete:

with requested revisions and required components in PWS

• Accurate:

minimal errors; with most current information; accurate costs

• Well-organized:

clear information, succinct format, concise wording, according to template if applicable

• Timely:

according to Delivery Schedule

COR monitoring according to:

• PWS

• Delivery

Schedule

• Deliverables

• Status Reports

• Monthly Progress

Administrative Reports (Deliverables 1.3.a., 1.3.b., 1.3.c.):

• Complete:

No more than 1 report has no more than 2 pieces of missing information

• Accurate:

No more than 2 reports with errors; no more than 2 errors in any report; 100% accurate cost information

• Well-organized:

No more than 1 report has no more than 2 pieces of disorganized information

• Timely:

No more than 2 reports are no later than 1 workday past due date

Task 2 Group and Workgroup Support

Task 2.1 Technical SME Meeting Support

Deliverable:

• 2.1.a.) Technical

SME Meeting Support

Technical SME Meeting Support (Deliverable 2.1.a.):

• Well-prepared:

attendees have appropriate expertise; contractor/consultants have necessary information for meetings and participate in meetings; offer technical expertise;

and fulfill their role

• Timely:

Contractor and consultants are on-time at meetings

COR monitoring according to:

• PWS

• Delivery Schedule

• Deliverables

• Status Reports

• Attendee feedback

• Meeting approvals

• Vouchers

• Progress Reports

• Expense Reports

Technical SME Meeting Support (Deliverable 2.1.a.)

• Well-prepared:

No more than 1 occasion of contractor or consultants not being well-prepared, not fully participating in meeting, or not fulfilling their role

• Timely:

No more than 2 occasions of invited contractor staff or consultants being late for meeting or not attending a meeting

Performance Standard Surveillance Method

Acceptable Quality Level (AQL) (“Satisfactory” rating)

Task 2.2 Logistical Meeting Support

Deliverables:

• 2.2.a.) Logistical

Meeting Support

- Meeting Design

- Meeting Planning

- Pre-Meeting

- On-Site During

Meeting

- Post-Meeting

• 2.2.b) DTAB

Transcript and Meeting Summary Package

Meeting Materials:

- Transcripts

- Meeting

Summaries

- Agendas

- Presentations

- Other meeting materials

Logistical Meeting Support (Deliverable 2.2.a.):

• Complete:

all details are tended to for meeting planning, arrangements, and meeting activity coordination

• Well-organized:

- meetings are well-planned and well-coordinated

- meeting rooms/virtual platforms are functional and fit purpose of meetings

• Compliant:

with Federal government travel regulations and conference approval requirements

• Timely:

meetings are scheduled and planned far in advance

DTAB Transcript and Meeting Summary Package (Deliverable 2.2.b.):

• Complete:

with all components according to template or requested information

• Accurate:

minimal errors

• Well-organized:

clear information in succinct format and concise wording

• Compliant:

with requirements, i.e., FACA

• Timely:

according to Delivery Schedule;

pre-meeting documents provided before meeting

COR

monitoring according to:

• PWS

• Delivery

Schedule

• Deliverables

• Status

Reports

• Feedback from attendees

• Conference approvals

• Federal Advisory Committee Act (FACA)

• Vouchers

• Monthly

Progress Reports

• Expense Reports

Logistical Meeting Support (Deliverable 2.2.a.)

• Complete:

No more than 2 meeting details are missing from no more than 1 meeting (i.e., invitee not contacted)

• Well-organized:

- No more than 1 meeting is not well-planned or not well-coordinated

- No more than 2 occasions of meeting problems, or inappropriate meeting room/virtual platform

- No more than 2 complaints

• Compliant:

100% of meetings are compliant with federal travel regulations and conference approval requirements

• Timely:

- Late meeting planning/scheduling – No more than 1 anticipated meeting is planned and scheduled less than 1 month in advance for large meetings, and less than 1 week in advance for small meetings

- No more than 2 occasions of a 15-minute (or more) delay in starting meeting due to logistical issues

DTAB Transcript and Meeting Summary Package (Deliverable 2.2.b.)

• Complete:

No more than 1 meeting document has no more than 2 pieces of missing information for no more than 1 meeting

• Accurate:

No more than 1 meeting document has no more than 2 errors (i.e., errors in spelling, content, scientific terminology)

• Well-organized:

No more than 1 document/report has no more than 2 pieces of disorganized information

• Compliant:

100% of meetings are compliant with FACA or other requirements

• Timely:

- No more than 2 occasions of pre-meeting documents provided to attendees less than 1 week prior to meeting

- No more than 2 occasions of post-meeting documents no more than 2 workdays past due date

Performance Standard Surveillance Method

Acceptable Quality Level (AQL) (“Satisfactory” rating)

Task 3 DFWP ASR/Agency Archive Data System

Task 3.1 Operate and Maintain ASR/Archive System:

Records Management Deliverables:

• 3.1.a.) Create New Data

Records

• 3.1.b.) Update Data

Records

Data Collection Deliverables:

• 3.1.c.) Review Data

Collection Documents and Provide Recommended Revisions

• 3.1.d.) Revise Data Collection Documents

• 3.1.e.) Perform Data Collection

• 3.1.f.) Technical Assistance on Data Entry and Reporting

Data Analyses

• 3.1.g.) Perform Data

Analyses

Data Quality

• 3.1.h.) Correct Data

System Review

• 3.1.i.) System

Recommendations

System Modifications/ Enhancements Deliverables:

• 3.1.j.) System Updates

• 3.1.k.) System Upgrades

Records Management (Deliverables 3.1.a., 3.1.b.)

• Complete:

with new and updated data records

• Accurate:

with up-to-date information;

minimal errors; and consistency among records

• Well-Organized:

clear information, well-structured and minimal duplication of data records

• Timely:

according to Delivery Schedule

Data Collection & Analyses & Quality (Deliverables 3.1.c., 3.1.d., 3.1.e., 3.1.f., 3.1.g., 3.1.h.)

(includes these documents: data collection instrument, data entry screens, data reports, alert and launch memos, user guide)

• Complete:

documents, analyses and processes are complete

• Accurate:

content per quality control checks according to Delivery Schedule

(Deliverable 3.1.i.)

• Complete:

recommendations demonstrate detailed review of system and provide rational suggestions

• Well-Organized:

clear recommendations provided in an organized format

System Modifications/ Enhancements (Deliverables: 3.1.j., 3.1.k.)

• Complete:

Updates/upgrades completed according to requests with minimal missed requests

• Timely:

according to Delivery Schedule

COR monitoring according to:

• PWS

• Delivery Schedule

• Deliverables

• Status Reports

• System review

• Review of requested record updates

• Feedback from DWP staff, and DFWP partners and stakeholders

• Contractor’s records of TA provided

• Monthly Progress

Records Management (Deliverables 3.1.a., 3.1.b.)

• Complete/Accurate/Well-Organized/

Timely:

No more than 2 occasions of incomplete, inaccurate or disorganized data records, or delays in accessing records

Data Collection & Analyses & Quality (Deliverables 3.1.c., 3.1.d., 3.1.e., 3.1.f., 3.1.g., 3.1.h.)

(includes these documents: data collection instrument, data entry screens, data reports, alert and launch memos, user guide)

• Complete:

- No more than 1 occasion of incomplete data collection activity, TA or quality control checks

- No more than 1 document/analysis is missing no more than 2 pieces of information requested

• Accurate:

- No more than 2 errors in data collection activity, TA or quality control checks

- No more than 1 document/analysis with no more than 2 errors

• Timely:

No more than 2 occasions of delay no more than 2 workdays past the due date

(Deliverable 3.1.i.)

• Complete & Well-Organized:

No more than 2 pieces of information are missing or in disorganized format

System Modifications/Enhancements (Deliverables: 3.1.j., 3.1.k.)

• Complete:

No more than 2 missed requests for system updates/upgrades

• Timely:

No more than 1 occasion of delay no more than 2 workdays past due date

Performance Standard Surveillance Method

Acceptable Quality Level (AQL) (“Satisfactory” rating)

Task 3.2 ASR Annual Data Reporting

Annual Schedule – for Data Collection & Reporting Deliverables:

• 3.2.a.) Draft Annual

Schedule

• 3.2.b.) Final Annual

Schedule

DFWP ASR Annual

Deliverables:

• 3.2.c.) Draft DFWP ASR Annual Aggregate Report

• 3.2.d.) Final DFWP ASR Annual Aggregate Report

• 3.2.e.) Agency Profile Annual Report

Annual Schedule – for Data Collection & Reporting (Deliverables 3.2.a., 3.2.b.)

• Complete:

with due dates for all activities listed in Task 3.2. of PWS, and COR’s revisions

• Accurate:

minimal errors

DFWP ASR Annual

(Deliverables 3.2.c., 3.2.d., 3.2.e.)

• Complete:

with data received and including COR’s revisions

• Accurate:

- minimal errors

- current information

• Well-Organized:

with concise summary highlights and follows template

• Timely:

according to Schedule in Deliverable 3.2.b.

COR monitoring according to:

• PWS

• Delivery

Schedule

• ASR schedule

• Deliverables

• Status Reports

• Goal of 90% agency ASR response rate

• Feedback from DWP staff, DFWP partners/ stakeholders and ASR system users

• Monthly

Annual Schedule – for Data Collection & Reporting (Deliverables 3.2.a., 3.2.b.)

• Complete:

- Draft schedule: missing no more than 2 pieces of information

- Final schedule: 100% complete with due dates for all activities listed in Task 3.2. of PWS and COR’s revisions, or rationale for not making revisions

• Accurate:

Final schedule: No more than 2 errors (i.e., spelling, inappropriate due date)

DFWP ASR Annual Report – Draft (Deliverable 3.2.c.)

• Complete:

Complete with no more than 2 pieces of missing information or data from agency data received (i.e., missing narrative data responses, percent sign, COR’s revisions)

• Accurate:

- No more than 2 inaccurate and invalid data found (i.e., no incorrect auto-calculations)

- No more than 2 errors

- Data discrepancies are resolved with agencies in advance so that no more than 2 data discrepancies are found

• Well-Organized:

- No more than 2 pieces of disorganized data/information

- 85% follows approved outline/template

- Contains graphics summarizing data tables & key information

No more than 1 occasion of 2 or more weeks past due date

DFWP ASR Annual Report – Final (Deliverable 3.2.d)

At least 90% agency response rate or demonstrated attempts to reach unresponsive agencies; includes 100% of data received (including narrative responses); reflects 100% of comments received or rationale for not making revisions

• Accurate:

- 100% accurate with current information and valid data (i.e., no incorrect auto-calculations)

- No more than 2 errors

- Data discrepancies are resolved with agencies in advance such that no data discrepancies are found

• Well-Organized:

- No more than 1 piece of disorganized data/information

- 100% follows approved outline/template

- Contains graphics summarizing data tables & key information

No more than 1 occasion of 2 or more weeks past due date

Agency Profile Annual Report (Deliverable 3.2.e.)

• Complete & Accurate:

- Includes 100% of data received (including narrative responses)

- 100% accurate and valid data

Performance Standard Surveillance Method

Acceptable Quality Level (AQL) (“Satisfactory” rating)

Task 3.3 Special Reports

• 3.3.a.) Ad-hoc Special

Data Reports

Ad-hoc Special Data Reports (Deliverable 3.3.a.)

• Complete:

with data received and including COR’s revisions

• Accurate:

minimal errors

• Well-Organized:

clear information in concise format

• Timely:

according to Delivery Schedule

COR monitoring according to:

• PWS

• Delivery

Schedule

• Deliverables

• Status Reports

• Feedback from

DWP staff, DFWP partners/ stakeholders and ASR system users

• Monthly Progress Reports

Ad-hoc Special Data Reports (Deliverable 3.3.a.)

• Complete:

- No more than 1 report with no more than 2 pieces of missing information (i.e., missing percent sign)

- Reflects all COR’s comments or rationale for not making revisions

• Accurate:

- 100% accurate with current information and valid data (i.e., no incorrect auto-calculations)

- No more than 1 report with no more than 2 errors

• Well-Organized:

No more than 1 report with no more than 2 pieces of disorganized data/information

• Timely:

No more than 1 occasion of no more than 2 days past due date

Task 4 Certification and Maintenance of Federal DFWP Plans

TA to Agencies Deliverable:

• 4.a.) TA Responses Review Agency DFWP Plans Deliverable:

• 4.b.) Plan Review

Package Notification of Completed Reviews and Plans Deliverables:

• 4.c.) Notification

• 4.d.) Comprehensive

Package of Review Activity

ICG-EC Plan/TDP Reviews Deliverables:

• 4.e.) Plan/TDP Review

Package

• 4.f.) Summary Report of ICG-EC Review Contacting Agencies Deliverables:

• 4.g.) Follow-up with

Agencies

• 4.h.) Identify New

Agencies

• 4.i.) New Contact with

Agencies

TA to Agencies, DFWP Plan Reviews, and Contacting Agencies (Deliverables: 4.a., 4.b., 4.c., 4.d., 4.e., 4.f., 4.g., 4.h., 4.i.)

• Complete:

- TA responses address requesters’ needs

- Plan reviews indicate thorough review activity and compliance with policy requirements

- Summary report includes all ICG- EC reviews and comments

- Comprehensive contact with agencies

• Accurate:

minimal errors

• Timely:

according to Delivery Schedule

COR monitoring according to:

• PWS

• Delivery

Schedule

• Deliverables

• Status Reports

• Feedback from

DWP staff and federal agencies

• Monthly Progress Reports

• Model Plan

• TDP Guidance

• Contract’s records of TA provided

TA to Agencies, DFWP Plan Reviews, and Contacting Agencies (Deliverables: 4.a., 4.b., 4.c., 4.d., 4.e., 4.f., 4.g., 4.h., 4.i.)

• Complete:

No more than 1 response/package/report with no more than 2 pieces of missing information

• Accurate:

No more than 1 response/package/report with no more than 2 errors

• Timely:

- No more than 1 response/package/report is no more than 2 workdays past due date

- No more than 1 notification to the COR is no more than 2 workdays past due date

Performance Standard Surveillance Method

Acceptable Quality Level (AQL) (“Satisfactory” rating)

Task 5 Notifications to Congress

Deliverables:

• 5.a.) Draft

Notification to Congress

• 5.b.) Final Notification to Congress

Draft and Final Notifications to Congress (Deliverables 5.a., 5.b.)

• Complete:

with components and COR’s revisions, or rationale for not making revisions

• Accurate:

- minimal errors

- accurately follows package requirements

• Well-Organized:

clear information in concise format

• Timely:

according to Delivery Schedule

COR

monitoring according to:

• PWS

• Delivery

Schedule

• Deliverables

• Status

Reports

• Feedback from

SAMHSA

and HHS

• Monthly Progress Reports

Draft reports (Deliverable 5.a.)

• Complete:

- No more than 1 report with no more than 2 pieces of missing information

- No more than 1 report with no more than 2 missing package components according to requirements

- Missing no more than 2 of COR’s requested revisions or provides rationale for not making revisions

• Accurate:

- No more than 2 errors

- 85% follows package requirements

• Well-Organized:

No more than 2 pieces of disorganized or unclear information, or unconcise format

• Timely:

No more than 1 occasion of 2 or more workdays past due

Final report (Deliverable 5.b.)

• Complete:

100% complete with all information and components according to requirements; reflects all COR’s requested revisions or rationale for not including all revisions

• Accurate:

100% error-free; 100% follows package requirements

• Well-Organized:

No more than 1 piece of disorganized or unclear information, or unconcise format

• Timely:

No more than 1 occasion of no more than 2 workdays past due date

Task 6 DFWP Tools – Updates

DFWP Tools (documents) Deliverables:

• 6.a.) Review

DFWP

Tools

• 6.b.) Revise

DFWP

Tools

• 6.c.) Clearance Documents

• 6.d.) Final

DFWP

Tools

• 6.e.) Recommend Efficiencies

DFWP Tools (documents) (Deliverables 6.a., 6.e.)

• Complete:

recommendations demonstrate detailed and thorough review and provide rational suggestions

• Consistent:

with DFWP requirements and program updates

(Deliverables 6.b., 6.c., 6.d.):

minimal missing information and includes COR’s requested revisions, or rationale for not making revisions

• Accurate/Consistent:

minimal errors; and consistent with requirements and program updates

• Timely:

according to Delivery Schedule

COR

monitoring according to:

• PWS

• Delivery

Schedule

• Deliverables

• Status

Reports

• Monthly

Progress Reports

• DFWP

program requirements

• Clearance requirements

DFWP Tools (documents) (Deliverables 6.a., 6.e.)

- No more than 2 pieces of information were missed among all documents during review

- 85% recommendations are rational suggestions

• Consistent:

100% consistent with DFWP requirements and program updates

(Deliverables 6.b., 6.c., 6.d.)

• Complete:

- No more than 1 document is missing no more than 2 pieces of information

- Reflects 100% of COR’s comments or rationale for not making revisions

• Accurate/Consistent:

- No more than 1 document with no more than 2 errors

- 100% consistent with requirements and program updates, and contains current information

• Timely:

No more than 1 document is no more than 2 workdays past due date

Performance Standard Surveillance Method

Acceptable Quality Level (AQL) (“Satisfactory” rating)

Task 7 Dissemination of Information to DFWP Stakeholders

Distribution Deliverables:

• 7.a.) Routine

Distribution of HHS Certified Lab List

• 7.b.) Occasional Ad-hoc Distribution

Mailing Lists Deliverables:

• 7.c.) Existing mailing lists

• 7.d.) New mailing lists

Distribution & Mailing Lists (Deliverables 7.a., 7.b., 7.c., 7.d.)

• Complete:

- complete email addresses and mailing list updates

- minimal missing components

• Accurate:

Mail-out package components and mailing lists

• Timely:

according to Delivery Schedule

COR

monitoring according to:

• PWS

• Delivery

Schedule

• Deliverables

• Status

Reports

• Monthly

Progress Reports

• Feedback from COR and recipients on mailing list

Distribute Information Materials & Mailing Lists (Deliverables 7.a., 7.b., 7.c., 7.d.)

• Complete:

- No more than 1 missing package component in mailing

- No more than 1 occasion of 2 or more missed mailing addresses or mailing list updates

- No more than 2 complaints

- 100% follow-up on non-deliverables/email bounce backs

• Accurate:

- No more than 2 errors in no more than 1 mail-out (i.e., sending wrong information, sending to wrong person, error in following mailing instructions)

- Items produced have no more than 2 errors

• Timely:

- No more than 1 occasion of no more than 2 workdays past due date

- 100% of time-sensitive alert notices meet deadline

Task 8 Consultation – Briefings and Trainings

Briefings and Trainings Deliverables:

• 8.a.) Respond to

Requests for Briefings/ Trainings

• 8.b.) Provide Briefings/ Trainings

Briefing/Training Materials Deliverable:

• 8.c.) Other Additional

Presentation Materials

Tracking DPC Briefings Deliverables:

• 8.d.) Arrange, Schedule, Track DPC Briefing Requests

• 8.e.) Report Status of DPC Briefings

Briefings and Trainings (Deliverables 8.a., 8.b., 8.c., 8.d., 8.e.)

• Complete:

- minimal missing information and includes COR’s revisions, or rationale for not making revisions

- detailed tracking of briefings

• Accurate:

- up-to-date information

- minimal errors

- consistent with program requirements and updates

• Well-Organized:

clear information in succinct format and concise wording

• Timely:

- according to

Delivery Schedule

- on time for briefings

COR

monitoring according to:

• PWS

• Delivery

Schedule

• Deliverables

• Status

Reports

• Feedback from agencies

• Monthly Progress Reports

• Contractor’s records of briefings and trainings provided

• Attended briefings/ trainings

Briefings and Trainings (Deliverables 8.a., 8.b., 8.c., 8.d., 8.e.)

• Complete:

- No more than 2 pieces of missing information

- Missing no more than 2 of COR’s requested revisions or rationale for not making revisions

• Accurate:

- No more than 2 errors

- No more than 2 pieces of inaccurate or inconsistent information

• Well-Organized:

- No more than 2 pieces of disorganized or unclear information, or unconcise format

- No more than 1 occasion of contractor not informing

COR of new DPCs and briefings

- Briefings/trainings are appropriate for audience

• Complaints:

No more than 2 complaints

• Timely:

100% of contractor staff providing briefings/trainings are on time and attend 100% of contractor’s scheduled briefings/trainings

Performance Standard Surveillance Method

Acceptable Quality Level (AQL) (“Satisfactory” rating)

Task 9 Subject Matter Expert (SME) Activities/ Special Projects

Deliverable:

• 9.a.) SME

Special Projects

SME Special Projects (Deliverable 9.a.)

• Complete:

- minimal missing information

- includes COR’s revisions, or rationale for not making revisions

• Accurate:

- up-to-date information

- minimal errors

- consistent with program requirements and updates

• Well-Organized:

clear information in succinct format and concise wording

• Thorough:

- provide high quality professional work, i.e., appropriate detail, in-depth research, and demonstrated expertise in successfully addressing topics

- detailed review and rational recommendations

• Timely:

according to Delivery Schedule

COR

monitoring according to:

• PWS

• Delivery

Schedule

• Deliverables

• Status

Reports

• Feedback from staff, DFWP partners and stakeholders

• Monthly

SME Special Projects (Deliverable 9.a.)

- No more than 1 document with no more than 2 pieces of missing information

- No more than 1 document missing no more than 2 of COR’s requested revisions, or rationale for not making revisions

• Accurate:

- 100% consistent with program requirements and updates, and contains current information

- No more than 2 errors in no more than 1 document

- No more than 2 pieces of inconsistent information in no more than 1 document (i.e., inconsistent with current program requirements)

• Well-Organized:

No more than 1 document with no more than 2 pieces of disorganized or unclear information, or unconcise format or wording

• Thorough:

- No more than 1 project is provided without appropriate detail, in-depth research and demonstrated expertise in successfully addressing topics

- No more than 1 project is provided without detailed review and rational recommendations

• 100% appropriate staff and consultants with appropriate expertise work on projects; 0% unnecessary staff work on projects

• Complaints:

No more than 2 complaints

• Timely:

No more than 1 occasion of 2 or more workdays past due date

Performance Standard Surveillance Method

Acceptable Quality Level (AQL) (“Satisfactory” rating)

Task 10 Transition/Transfer Activities – Contract Closeout

Deliverable:

• 10.a. 90-Day

Transition Plan

Transition Activities Deliverables:

• 10.b. Implement

Transition Plan

• 10.c. Close-out

Meetings

• 10.d. Training

Transfer Activities Deliverables:

• 10.e. Transfer IT

System

• 10.f. Transfer

Documentation

• 10.g. Notify the COR

System Migration Deliverables:

• 10.h. Work Plan

• 10.i. Approvals for

System Migration

• 10.j. Implement Work

Plan

90-Day Transition Plan/ Transition Activities/Transfer Activities (Deliverables 10.a., 10.b., 10.d., 10.e., 10.f., 10.g.)

• Complete:

- minimal missing information from 90-Day Transition Plan

- completed transition and transfer activities without system disruptions

• Accurate:

minimal errors

• Well-Organized:

clear information in concise format

• Timely:

according to Delivery Schedule and 90-Day Transition Plan schedule

Participation in Close-out Meetings (Deliverable 10.c.)

• Well-prepared:

- contractor and consultants are well-prepared with necessary information

- appropriate attendees offer technical expertise

• Timely:

contractor staff and consultants are on-time at meetings

System Migration (Deliverables 10.h., 10.i., 10.j.)

• Complete:

completed in an efficient manner that does not disrupt system operations

• Timely:

according to migration Work Plan schedule

COR monitoring according to:

• PWS

• Delivery

Schedule

• Deliverables

• Status Reports

• 90-Day

Transition Plan

• Migration Work

Plan

• Feedback from contractor and government confirming effective completion of contract turnover

• Amount of COR time required for transition

• Efficient transition – services continue without disruption

• IT and other requirements

• Monthly Progress Reports

90-Day Transition Plan/Transition Activities/Transfer Activities (Deliverables 10.a., 10.b., 10.d., 10.e., 10.f., 10.g.)

• Complete:

- No more than 2 pieces of missing information, i.e., COR’s revisions

- 100% transition and transfer activities are completed; no unresolved problems

• Accurate:

No more than 1 error

• Well-Organized:

No more than 2 pieces of disorganized information

• Timely:

No more than 1 occasion of no more than 2 workdays past due date

Participation in Close-out Meetings (Deliverable 10.c.)

• Well-prepared:

- No more than 1 occasion of unprepared staff/consultants

- 100% meetings attended by 100% of appropriate staff/consultants with technical expertise

• Timely:

No more than 2 occasions of invited contractor staff/consultants being late for meeting or not attending a meeting

System Migration (Deliverables 10.h., 10.i., 10.j.)

• Complete:

100% efficient and orderly contract closeout

• Timely:

No more than 1 hour system disruption

OPTIONAL Task 11 Supplemental SME Activities/Special Projects

Deliverable:

• 11.a. SME Special

Projects

FOR MORE INFORMATION, SEE

TASK 9 in this QASP

SEE TASK 9 in this

QASP

SEE TASK 9 in this QASP

OPTIONAL Task 12 Supplemental Meetings

Deliverable:

• 12.a. Meeting Support

FOR MORE INFORMATION, SEE

TASK 2 in this QASP

SEE TASK 2 in this

QASP

SEE TASK 2 in this QASP

Attachment 2: Quality Assurance Surveillance Plan (QASP) Technical Support for Drug-Free Workplace

File details come from the government source that posted it. Updated .