About this file

This is an Informal Bid Advertisement issued by the City of Raleigh Transportation/Transit Division for the GoRaleigh Timepoint Sign Installation Project. The project involves the installation of approximately 120 timepoint signs on thirty-four (34) GoRaleigh bus system routes throughout the city of Raleigh, North Carolina. The selected contractor will provide hardware to install the signs on existing signposts (no new signposts required), coordinate with the City project manager Sara Tromba, and perform work in accordance with City standards and applicable federal, state, and local regulations. All timepoint signs are pre-printed and available for pickup at the City of Raleigh Sign Shop. Installation work must be completed within 180 consecutive calendar days from the Notice to Proceed and should occur between 9:00 a.m. and 4:00 p.m. Monday through Friday or on weekends for safety compliance on NCDOT-maintained and major roads. Bids are due electronically by 5:00 p.m. on Friday, August 28, 2026, and must remain valid for forty-five (45) days following bid opening. The deadline for submitting questions is Friday, August 14, 2026, by 12:00 p.m. noon, with any addenda posted by Friday, August 21, 2026.

This project is federally funded through the Federal Transit Administration (FTA) with potential federal funding assistance up to eighty (80) percent. The contract is subject to Davis-Bacon prevailing wage requirements with a minimum wage rate of $13.30 per hour, and Buy America provisions apply. Bidders must be licensed to perform construction work in North Carolina per General Statute Chapter 87, registered with the System for Award Management (SAM.gov), and provide a bid bond or certified check equivalent to five percent (5%) of the bid price. All bids exceeding $100,000 require completion of federal certifications including Lobbying (Attachment A), Debarment and Suspension (Attachment D), and Owner's Certification of Compliance with Davis-Bacon Provisions (Attachment G). The bid submittal checklist requires submission of the Bid Proposal Form, bid amount, subcontractor names and license numbers, acknowledgement of addenda, bidder qualifications with three project references, safety evaluation questionnaire responses, federal attachments, and SAM.gov registration documentation. No bid withdrawal is permitted for sixty (60) days after the scheduled closing time.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF RALEIGH - ADVERTISEMENT FOR INFORMAL BIDS

POSTED: AUGUST 3, 2026

CITY PROJECT

NUMBER: 274-GORALTIMEPOINTSIGNS-2026

Project Name: GoRaleigh Timepoint Sign Installation Project Owner: City of Raleigh – Transportation/Transit Project Location: City of Raleigh/GoRaleigh Bus System Project Manager: Sara Tromba (sara.tromba@raleighnc.gov) Bid Due Date: 5 p.m. Friday, August 28, 2026

The City of Raleigh Transit Division invites informal bids for installation of timepoint signage on selected route signs within the GoRaleigh transit system.

The project scope includes the installation of approximately 120 timepoint signs that will be installed on thirty-four (34) of the GoRaleigh system routes. Please see the full project scope and spreadsheet below for further information.

Deadline for Questions: Questions must be submitted via email by Friday, August 14th, 2026, by 12 p.m.

noon to Sara Tromba, the project manager for the City of Raleigh. See contact information above and below to submit questions. If any questions are submitted, an addendum will be posted no later than Friday, August 21st, 2026, by EOD.

Informal Bids will be received electronically by email at the address below until 5 p.m. Friday, August 28th, 2026. Please see instructions to Bidders for preparation and submission of Bid.

Sara Tromba sara.tromba@raleighnc.gov

Bidders are responsible for submitting one signed copy of the bid proposal by email prior to 5 p.m.

on Friday, August 28th, 2026.

No bid may be withdrawn for sixty (60) days after the scheduled closing time for bids.

The City reserved the right to reject any or all bids and to waive informalities.

Bidders will be required to show evidence that they are licensed to perform the work in the Bidding Documents as required by North Carolina General Statute, Chapter 87.

This project involves Federal funding and is subject to requirements of Federal funded projects, including Davis-Bacon compliance and Buy America provisions. This project requires Davis-Bacon compliance, prevailing wage rates are attached. Note, the minimum wage rate shall be at least $13.30/hr.

Bidders are required to be registered with SAM (System for Award Management) at SAM.gov.

BID SUBMITTAL CHECKLIST

Complete sets of Bidding Documents shall be used in preparing bids; the City assumes no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. Each Bid shall be prepared on the Proposal Form provided in the Bid Documents.

The following items are required to be submitted as part of each Bid Submittal:

� Bid Proposal Form � Proposal Form with Base Bid, Alternates, and Owner’s Contingency � General and Subcontractor Names and License Numbers � Acknowledgement of Receipt of Addenda � Proposal Signature Page � Bidder Qualifications � Additional Bidders Certification � Contractor’s Performance Policy Resolution

� Bidders Safety Evaluation Questionnaire � Signed Federal Attachments A, B, D, E, F, and G � Completed List of subcontractors/Suppliers Form A and Form B � A screenshot of your company’s SAM.gov registration o Registration instructions are attached

NOTES REGARDING THE SUBMISSION OF BIDS

1. Each Bid shall be e-mailed to: Sara Tromba, sara.tromba@raleighnc.gov

Bid for GoRaleigh Timepoint Sign Installation

Bidder’s Name: ______________________________________________

Contractor License Number: ____________________________________

Address: ____________________________________________________

END OF SUBMITTAL CHECKLIST

CITY OF RALEIGH – BID PROPOSAL FORM

GoRaleigh Timepoint Sign Installation

PROJECT #274-GORALTIMEPOINTSIGNS-2026

City of Raleigh Date: Monday, August 3rd, 2026 Project Manager: Sara Tromba Transportation/Transit 510 West Martin Street, Suite 200 Raleigh, NC 27601

The undersigned bidder has carefully examined the Form of Contract, the Form of Contract Bonds, the General Conditions, the Supplemental Conditions, the Plans and Specifications, all of which are acknowledged to be part of the proposal and Proposal Form, and the Bidder has also carefully examined the site of the proposed work. The undersigned further agrees to sign a Contract for the work, if offered within forty-five (45) days after receipt of Bids, and to furnish surety as specified, upon failure to do so, agrees to forfeit to the Owner, attached Bid Bond in the amount of 5% of the bid if it exceeds $100,000. The Bidder further agrees to provide and furnish all necessary materials, equipment, machinery, and labor necessary to complete the construction of the work in full, in complete accordance with the plans and specifications and the contract documents to the full and entire satisfaction of the City of Raleigh and in accordance with these documents within the time and limit specified below:

In addition to all other agreements and assurances, the undersigned Bidder understands and hereby agrees as follows:

1. The Bidder represents and agrees to complete the entire project in the following number of Consecutive Calendar Days: 180 days from the date on the Notice to Proceed.

2. The Bidder agrees to comply with the City’s policy regarding the updated USDOT DBE Interim Final Rule program updates.

a. On Oct. 3, 2025, the United States Department of Transportation (USDOT) published an Interim Final Rule (IFR) in the Federal Register modifying the eligibility requirements for participation in the Disadvantaged Business Enterprise (DBE) program. Furthermore, the IFR mandates that all currently certified DBEs be reevaluated, and ultimately recertified, for continued program eligibility under these new requirements. 49 C.F.R. § 26.111.

b. The Disadvantaged Business Enterprise (DBE) and Airport Concessions Disadvantage Business Enterprise (ACDBE) modifications can be found in the Federal Register Update.

c. The IFR and the IFR Frequently Asked Questions (IFR FAQ) issued on October 24, 2025, require GoRaleigh to operate the DBE Program in a constitutionally compliant, nondiscriminatory manner. It eliminates all race- and sex-based presumptions of disadvantage and replaces them with a strictly individualized determination standard. The North Carolina Unified Certification Program (NCUCP) must reevaluate all DBE firms under the new criteria before their eligibility can be confirmed. Until the reevaluation is complete, DBE goals cannot be set on contracts, and no DBE participation may be counted toward any DBE goal.

i. Effective immediately, GoRaleigh, Primes and Subrecipients must operate under these new federal requirements.

d. DBE IFR Frequency Asked Questions

i. https://www.transportation.gov/sites/dot.gov/files/2025-

12/DBE%20IFR%20FAQ%27s%20-%20Updated%2012-1-2025_0.pdf

The Bidder agrees to execute the work described and set forth in the Plans and Specifications for the amounts as follows:

Base Bid: ______________________________________________________________ (In written word)

(In numerals)

Owner’s Contingency (will be determined by the Owner and added to the base bid)

(Note that the Owner’s Contingency shall only be used when pre-authorized in writing from the City. No mark-up shall be applied to reimbursable expenses.)

Total Bid Proposal:

(in written word)

(In numerals)

Name of General Contractor and License Number: _________________________________________

Name of Electrical Contractor and License Number: ________________________________________

Name of Plumbing Contractor and License Number: ________________________________________

Name of Mechanical Contractor and License Number: _______________________________________

GS143-128(d) requires all single prime bidders to identify their subcontractors for the above subdivisions of work. A contractor whose bid is accepted shall not substitute any person as subcontractor in the place of the subcontractor listed in the original bid, except (i) if the listed subcontractor's bid is later determined by the contractor to be non-responsible or non-responsive or the listed subcontractor refuses to enter into a contract for the complete performance of the bid work, or (ii) with the approval of the awarding authority for good cause shown by the contractor.

UNIT PRICES

Unit prices quoted and accepted shall apply throughout the life of the contract, except as otherwise specifically noted. Unit prices shall be applied, as appropriate, to compute the total value of changes to the base bid quantity of the work all in accordance with the contract documents.

Refer to Section 012200 “Unit Prices” for further clarification. N/A.

ALLOWANCES

Include in the base bid proposal the following allowances as specified in Division 01, Section 012100 “Allowances.”

Allowance No.1: N/A.

ACKNOWLEDGEMENT OF RECEIPT OF ADDENDA

The undersigned Bidder hereby acknowledges receipt of the following Addenda:

Addendum Number Dated Acknowledge Receipt (initial)

Please check here if no addenda were received: _______

Acknowledged for: _____________________________________ (Name of firm or corporation making bid)

By: _________________________________________________ (Signature of Authorized Representative)

Name: ______________________________________________ (Print or Type)

Title: ________________________________________________

Date: ________________________________________________

PROPOSAL SIGNATURE PAGE

The bidder is required to furnish surety as specified in the General Conditions. Upon failure to do so, the bidder agrees to forfeit to the Owner the attached cashier’s check, certified check, or bid bond in the amount of 5% of the total bid proposal.

The undersigned further agrees in the case of failure on his part to execute the said contract and the bonds within ten

(10) consecutive calendar days after being given written notice of the aware of contract, the certified check, cash or bid bond accompanying this bid shall be paid into the funds of the owner’s account set aside for the project.

Respectfully submitted this day of ________________________________________________________________

By: _________________________________________________________________________________________ (Name of firm or corporation making bid)

WITNESS: By: ___________________________________ Signature

_______________________________________ Name: ________________________________________ (Proprietorship or Partnership) Print or Type

Title: __________________________________ (Owner/Partner/Pres./V.Pres.)

Address: _______________________________

ATTEST:

By: ___________________________________ License No. ____________________________

Title: __________________________________ Federal I.D. No. _________________________ (Corp. Sec. or Asst. Sec. only) Email Address: __________________________

Office Phone Number: ____________________

(CORPORATE SEAL)

BIDDER QUALIFICATIONS

The Bidder shall furnish the following information; designed to assist the Owner in determining whether or not the Bidder is qualified to perform the work described in the Bid and Contract Documents:

1. List three references with contact person and telephone number who are qualified to objectively judge the results of similar work performed by the bidder in the last three years.

A. ___________________________________________________ ____________________________

Name and Title Telephone Number

Project Title/Description Date of Completion

B. ___________________________________________________ ____________________________

C. ___________________________________________________ ____________________________

2. List previous contracting experience, including contract dollar amounts:

NOTE: The Bidder shall attach additional sheets of information as needed to provide above requested information.

ADDITIONAL BIDDER’S CERTIFICATION

Acceptance of Terms:

In submitting this Proposal, the undersigned agrees that this Bid will remain in effect for a period of forty-five (45) days following the opening of the Bids, that the undersigned agrees to enter into a Contract with the Owner, if awarded, on the basis of this Proposal, and that the undersigned agrees to complete the work in accordance with the Contract Documents.

Non-Collusion in Bidding:

The Bidder specifically agrees to abide by all applicable provisions of Article 3 of Chapter 133 of the North Carolina General Statutes. By submission of this Bid, each Bidder and each person signing on behalf of any Bidder certifies, and in case of a joint Bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best knowledge and belief:

1. The prices in this Bid have been arrived at independently without collusion, consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such pries with any other Bidder or to any competitor; and

2. Unless otherwise required by law, the prices quoted in the Bid have not been knowingly disclosed by the Bidder and will not knowingly be disclosed by the Bidder prior to opening, directly or indirectly, to any other Bidder or to any competitor; and

3. No attempt has been made or will be made by the Bidder to induce any other person, partnership, or corporation to submit or not to submit a Bid for the purpose of restricting competition.

Type of Business:

The undersigned hereby represents that it is a

(corporation, partnership, or an individual)

If a corporation, the undersigned further represents that it is duly qualified as a corporation under the Laws of the State of North Carolina and it is authorized to do business in this State.

Firm Name Date

Authorized Signature

Title Name of Project

Address of Business

Office Telephone Number

CONTRACTOR’S PERFORMANCE POLICY

RESOLUTION NO. (1992) -790

A RESOLUTION TO REGULATE THE PARTICIPATION IN THE CITY CONSTRUCTION PROJECTS BY

CONTRACTORS WHO MAY NOT BE CAPABLE OF TIMELY AND PROPER COMPLETION OF CITY

PROJECTS.

WHEREAS, The City of Raleigh wishes to minimize cost and inconvenience to the citizenry caused by the failure of contractors to complete projects in a timely manner in accordance with approved project schedules; and Whereas, North Carolina law allows cities to award bids to responsible bidders and the inability to complete work on time is one indication of a lack of responsibility.

NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF RALEIGHL

Section 1. That the City Manager may disqualify bidders from participation in bidding and award of contracts for city construction projects based on the following conditions existing simultaneously:

A. The dollar value of the work completed is less than the dollar value of the work which should have been completed on the basis of the contractor’s approved progress schedule by more than twenty percent of the current contract amount. The dollar amount of the work completed will be the total estimate to date shown in the latest partial pay estimate. The current contract amount will be the contract estimate plus accumulated overruns and less accumulated underruns shown in the latest partial payment estimate.

B. The percentage of the work completed is less than the percentage of contract time elapsed on the work by more than twenty percent. The percentage or work completed will be the dollar value of the work completed as defined above divided by the current contract amount as defined above. The percentage of contract time elapsed will be the number of calendar days elapsed as shown in the latest partial pay estimate divided by the total contract time in calendar days.

Section 2. The City manager shall not include any late days, which are caused by the City in any of his calculations directed at determining bid status.

Section 3. All City construction project specifications shall contain a specific provision clearly outlining the policies set in this Resolution, including the criteria for determining whether a contractor is behind schedule, and the specifications shall clearly state the City’s intent to enforce the provisions of this Resolution.

Section 4. The terms of the Resolution shall apply only to contracts for which the specifications for bidders are issued after the effective date of this Resolution.

Section 5. Any contractor who wishes to contest the decision of the City Manager declaring ineligibility may appeal to the City Council by delivering a notice of appeal to the City Clerk no later than ten days after receipt of the City Manager’s decision. The notice of appeal shall clearly set out the reasons why the Contractor believes that the terms of this Resolution have been inappropriately applied or the equitable arguments for not applying this Resolution’s terms. When considering an appeal the City Council shall consider, among other things, the report of the City Manager, the notice of appeal, and the contractor’s current status on any other current City Contracts and its performance on any contracts to which the contractor and the City have been parties to within the two calendar years immediately preceding the filing of the notice of appeal.

Section 6. Bidders so disqualified shall remain disqualified for any period in which they are still in conflict with the schedule provisions of this section.

Section 7. This Resolution is effective upon adoption Adopted 10/6/92.

SIGNATURE

PRINTED NAME

TITLE

DATE

END OF CITY OF RALEIGH – BID PROPOSAL FORM

PROJECT SCOPE

The City of Raleigh Transit Division is seeking qualified contractor for the installation of timepoint signs at designated GoRaleigh bus stops throughout the GoRaleigh service area. The purpose of this project is to improve on-time performance and schedule reliability with GoRaleigh Bus Operators by clearly identifying designated timepoints along fixed-route transit services.

Work shall include installation of the new timepoint signage on existing signposts as directed and coordination with the City of Raleigh project manager, Sara Tromba. All work shall be performed in accordance with City of Raleigh standards, applicable federal, state, and local regulations, and the specifications contained within this solicitation.

Timepoint Signs

Required Tasks

• Selected contractor will need to provide hardware to install the signs to the signposts; however, will not need to provide any new signposts.

o Recommended hardware: 3-inch 5/16 bolts with nuts and washers.

• The current bus stop signs are installed with a wing bracket. If there are any bus stop signs that have been installed at the top of the post, move the current bus stop sign down to allow space for the timepoint sign.

• All the timepoint signs are printed and ready for installation at the City of Raleigh Sign Shop. Please give the sign shop 1-2 days’ notice before picking up the batch. The Raleigh Sign Shop number is (919) 996-6608.

and is located at 2530 Westinghouse Blvd Raleigh, NC 27604. You can also reach out to Brandon Fox at

(919) 996-5628 to coordinate picking up the signs.

• Instructions for where to install each sign will be provided by the City in a spreadsheet. (See attached).

Operations

• Contractor should operation with flashing lights and other safety measures to improve visibility while working within the right-of-way. City sign crew operate with an arrow board mounted on the work vehicle.

• For safety while operating on NCDOT maintained and major roads, installations should occur between 9:00am and 4:00pm Monday through Friday or on weekends.

Federal Requirements

• Project is federally funded and will have to follow Davis-Bacon prevailing wages. See attached wage determination for more information.

Resources

These resources are open to the public and available for the selected contractor to use to help identify bus stops and routes during the project.

• Raleigh Open Data Portal (https://data-ral.opendata.arcgis.com) o GoRaleigh Bus Stops (https://data-ral.opendata.arcgis.com/datasets/goraleigh-bus-stops-

1/explore?location=35.801604%2C-78.594635%2C11) o GoRaleigh Transit Routes (https://data-ral.opendata.arcgis.com/apps/23f8b6160e5444bf90db8049cac155da/explore)

• GoRaleigh Bus Stop Amenities Map

(https://experience.arcgis.com/experience/3350db865917460a8d4218738526dd73)

Stop ID Stop Name Notes

8019 Capital Blvd at Brentwood Rd (NB) 8030 Triangle Town Center at Park & Ride* *Overlaps with 14, 25L 8045 Capital Blvd at Brentwood Rd (SB)

Route 1 - Capital

9380 Glenwood Ave at Fairview Rd (NB) 8103 Wake Forest Rd at Wake Towne Dr (NB) 8126 Carlos Dr at Falls of Neuse Rd* *Overlaps with 25L 8057 Lafayette Village 8151 Falls of Neuse Rd at E Millbrook Rd (SB) 8161 Wake Forest Rd at Wake Towne Dr (SB)* *Overlaps with 24L 8174 Glenwood Ave at Glenn Ave (SB)

Route 2 - Falls of Neuse

8194 Glascock St at Raleigh Blvd 9634 Brentwood Rd at Stony Brook Dr 8867 Raleigh Blvd at Cantwell Ct

Route 3 - Glascock

8237 Hillsborough St at Enterprise St (WB) 8248 Ridge Rd at Wade Ave (NB) 8254 Rex Hospital (NB) 8355 Crabtree Valley Mall* *Overlaps with 6, 16, 23L, 27L, 36L 8668 Rex Hospital (SB) 8267 Ridge Rd at Wade Ave (SB) 8277 Hillsborough St at Enterprise St (NCSU Bell Tower)

Route 4 - Rex Hospital

8300 Sanderford Rd at Rock Quarry Rd 8304 Idlewood Village Dr at Sanderford Rd 8312 Dandridge Dr at Newcombe Rd

Route 5 - Biltmore Hills

8355 Crabtree Valley Mall* *Overlaps with 4, 16, 23L, 27L, 36L 8366 Townridge Shopping Center* *Overlaps with 70L

Route 6 - Glenwood

9656 S Wilmington St at Pecan Rd* *Overlaps with 7L 9787 Purser Dr at Walmart 9657 Pecan Rd at S Wilmington St* *Overlaps with 7L

Route 7 - South Saunders

9792 Trailwood Hills Dr at Tryon Rd (NB) 9656 S Wilmington St at Pecan Rd* *Overlaps with 7 9356 Cross Link Rd at Rock Quarry Rd 9657 Pecan Rd at S Wilmington St* *Overlaps with 7

Route 7L - Carolina Pines

8914 St Marys St at Anderson Dr 8449 Midtown - North Hills Mall (North State Bank)* *Overlaps with 24L 8786 Six Forks Rd at Lynn Rd (NB) 8842 Strickland Rd at Six Forks Rd 8871 Six Forks Rd at Lynn Rd (SB) 8450 Midtown - North Hills Mall (Bank of America) 8923 St Marys St at Glenwood Ave

Route 8 - Six Forks

9917 Harrington St at Hargett St 8240 Hillsborough St at Brooks Ave 9322 Western Blvd at Jones Franklin Rd* *Overlaps with 11L, 27L 8274 Hillsborough St at Gardner St *Overlaps with 12 9000 Raleigh Union Station

Route 9 - Hillsborough

Stop ID Stop Name

8498 Oakwood Ave at Tarboro St (EB) 8520 Oakwood Ave at Tarboro St (WB) (St. Augustine's) TBD Shanta Dr at New Bern Ave*

Route 10 - Longview

Notes

*Stops comes online with Route 10 realignment in November

Route 10 - Longview

8525 Morill Dr at Carmichael Gym 8532 Gorman St at Avent Ferry Rd (SB) 9795 Trailwood Hills Dr at Tryon Rd (SB) 8544 Gorman St at Avent Ferry Rd (NB)

Route 11 - Avent Ferry

8246 Brigadoon Dr 9057 Fort Sumter Rd at Jones Franklin Rd 9322 Western Blvd at Jones Franklin Rd* *Overlaps with 9, 27L 9068 Schaub Dr at Sandlin Pl

Route 11L - Buck Jones

8577 Cameron St at Woodburn Rd (WB)* *Overlaps with 16 8588 Beryl Rd at Method Rd 8274 Hillsborough St at Gardner St* *Overlaps with 9 8862 Cameron St at Woodburn Rd (EB)* *Overlaps with 16

Route 12 - Method

9284 Atlantic Ave at Six Forks Rd (NB) 9100 New Hope Church Rd at Brinkley Dr 8030 Triangle Town Center at Park & Ride* *Overlaps with 1, 25L 8067 New Hope Church Rd at Bonneville Ct 9297 Atlantic Ave at Six Forks Rd (SB)

Route 14 - Atlantic

8620 New Bern Ave at S Tarboro St 8633 WakeMed at The Andrews Center 9623 New Bern Ave Walmart* *Overlaps with 15L, 18L, 33L 8645 New Bern Ave at N Peartree Ln 8654 E Edenton St at N Tarboro St

Route 15 - WakeMed

9623 New Bern Ave Walmart* *Overlaps with 15, 18L, 33L 9740 Bastion Ln at Tower Shopping Center 9635 Brentwood Rd at Capital Blvd 9639 3812 Buffaloe Rd

Route 15L - Trawick

8577 Cameron St at Woodburn Rd (WB)* *Overlaps with 12 8352 Glenwood Ave at Oberlin Rd (NB) 8355 Crabtree Valley Mall* *Overlaps with 4, 6, 23L, 27L, 36L 8388 Glenwood Ave at Oberlin Rd (SB) 8862 Cameron St at Woodburn Rd (EB)* *Overlaps with 12

Route 16 - Oberlin

8211 Rock Quarry Rd at New Birch Dr 8200 Rock Quarry Rd at Riverbrook Dr 8190 Shoppes at Battle Bridge *Overlaps with 18L 8201 Rock Quarry Rd at Rockwood Dr 8213 Rock Quarry Rd at Compassionate Dr

Route 17 - Rock Quarry

9394 Peyton St at Belmont Dr (SB) 9260 Beverly Dr at Friar Tuck Rd 9207 Bus Way at Poole Rd* Overlaps with 18L, 55X 8942 Peyton St at Belmont Dr (NB) 9229 S Tarboro Rd at E Hargett St (SB)

Route 18 - Poole

9623 New Bern Ave Walmart* *Overlaps with 15, 15L, 33L 9207 Bus Way at Poole Rd* *Overlaps with 18, 55X 8190 Shoppes at Battle Bridge* *Overlaps with 17

Route 18L - Barwell-New Hope

If all these stops are already done since they all overlap with other routes, they can skip this.

9516 Martin Luther King Jr Blvd at Raleigh Blvd (EB) 8987 Sunnybrook Rd at Calumet Dr (SB) 9608 Martin Luther King Jr Blvd at Raleigh Blvd (WB)

Route 19 - MLK / Sunnybrook

8326 Garner Rd at Raleigh Pines Dr (SB) 8346 Poole Dr at Avesboro Rd (Garner Family Practice) 8757 Poole Dr at Bayleigh Ct 1637 White Oak Shopping Center Park & Ride 8679 Garner Rd at Benson Rd 8394 Garner Rd at Creech Rd (Park) 8417 Garner Rd at Raleigh Pines Dr (NB)

Route 20 - Garner

8834 Maywood Ave at Lake Wheeler Rd

Route 21 - Caraleigh

8355 Crabtree Valley Mall* *Overlaps with 4, 6, 16, 27L, 36L 8716 W Millbrook Rd at Dixon Dr (EB) 8725 E Millbrook Rd at Falls of Neuse Rd (Quail Corners) 9107 New Hope Rd at Capital Blvd 9301 E Millbrook Rd at Falls of Neuse Rd (WB) 8777 W Millbrook Rd at Dixon Dr (WB)

Route 23L - Millbrook

8449 Midtown - North Hills (North State Bank)* *Overlaps with 8 9098 New Hope Church Rd at Wake Forest Rd (EB) 9100 New Hope Church Rd at Brinkley Dr* *Overlaps with 14 8027 Capital Blvd at Spring Forest Rd (south side) 9121 New Hope Church Rd at Brentwood Rd 8161 Wake Forest Rd at Wake Towne Dr (SB)* *Overlaps with 2

Route 24L - North Crosstown

8125 Carlos Dr at Falls of Neuse Rd* *Overlaps with 2 8030 Triangle Town Center at Park & Ride* *Overlaps with 1, 14 9541 Wake Tech Community College North* *Overlaps in both directions 9547 Durant Rd at Capital Blvd (WB) 8952 Falls of Neuse Rd at WakeMed North 8961 Durant Rd at Capital Blvd (EB)

Route 25L - Triangle Town Center

8355 Crabtree Valley Mall* *Overlaps with 4, 6, 16, 23L, 36L 9685 Blue Ridge Rd at Carovel Ct (SB) 9322 Western Blvd at Jones Franklin Rd* *Overlaps with 9, 11L 8073 Blue Ridge Rd at Rex Way

Route 27L - Blue Ridge

8030 Triangle Town Center at Park & Ride* *Overlaps with 1, 14, 25L 8366 Townridge Shopping Center* *Overlaps with 6, 70L

Route 32L comes online Spring 2027, mid-route timepoints are still TBD.

Route 32L - Lynn-Spring Forest

9623 New Bern Ave Walmart* *Overlaps with 15, 15L, 18L 8433 Knightdale Blvd at Rex 8462 N 1st Ave at Knightdale Station 8919 Upward Dr at Inspiration Circle (Wake Tech East) 1905 McKnight Dr at Village Park Dr (NB) 8549 Knightdale Blvd at Hodge Rd (WB)

Route 33L - Knightdale

8355 Crabtree Valley Mall* *Overlaps with 4, 6, 16, 23L, 27L 9778 Creedmoor Rd at Lynn Rd (NB) 8693 Brennan Dr at Creedmoor Rd (Towne North) 8699 Creedmoor Rd at Lynn Rd (SB)

Route 36L - Creedmoor

8903 Wake Tech Community College - South

Route 40X - Wake Tech Express

9207 Bus Way at Poole Rd* *Overlaps with 18, 18L

Route 55X - Poole Road Express

If all this stop is already done under 18 or 18L, they can skip this.

8366 Townridge Shopping Center* *Overlaps with 6 9764 Alexander Promenade at Walmart 9769 Macaw St at Brier Creek Pkwy

Route 70L - Brier Creek

City of Raleigh Bidder Safety Evaluation Questionnaire

BIDDER SAFETY EVALUATION QUESTIONNAIRE

CONTRACTOR SAFETY RECORD INFORMATION

The Contractor’s safety record shall be reviewed and evaluated in addition to other quality and performance criteria as part of bid evaluation process. Failure to provide the requested information and documentation may result in rejection of your bid as non-responsive. Accordingly, all bidders must submit the following information regarding their safety record.

The following definitions shall apply to this section:

“OSHA” – Acronym for the Federal Occupational Health and Safety Administration. The term “OSHA” as used in this Policy also refers to any state or local agency having jurisdictional authorization to enforce worker safety requirements and assess fines or warnings for violation of worker safety standards.

1. Answer the following OSHA Specific Questions:

(a) Within the last 2 years, has the bidder received any citations classified by OSHA as being

(1) serious, (2) willful and/or (3) repeat violations where your company operates?

Yes No

(If yes, attach a copy of each such citation and include violation description.)

(b) Has the bidder experienced any major work-related injuries or work-related fatalities within the last five (5) years?

(c) Has the bidder had any citations issued by OSHA as a result of work related injuries or fatalities within the past five (5) years?

(d) Is the bidder under investigation for any work-related injuries or fatalities?

(e) If your answer is “yes” to 1(b), (c) or (d), provide a copy of the citation(s), list of number(s) of serious injuries and/or fatalities and documented explanation of the incident(s) and injuries/fatalities.

2. Safety Plan:

(a) Does the company have a written comprehensive safety program that includes and indicates responsibility for all aspects of safety management (i.e. overall company policy and individual responsibilities, site inspections, first aid, fall protection, injury and illness prevention, fleet safety, Personal Protective Equipment (PPE), aerial lift, fire protection procedures etc.)?

(b) Does the company have a written plan for safety training of new employees and ongoing training of existing personnel and supervisors?

(c) Are all trades and laborers made aware of, receive instruction and regularly updated on safety compliance, best practices and operational requirements to ensure safe conditions are maintained on the job site?

(d) Does the company have documented evidence of safety training that they have conducted?

(e) Does the company have and maintain documented safety plan information?

(f) Is there a specific safety plan implemented for each project including pre-job safety inspections, measures for corrective actions and means for documenting and correcting unsafe conditions?

(g) Does the company hold regular safety meetings for employees and subcontractors at each job site throughout duration of project construction?

(h) Does the company provide notice at the job site that indicates to all staff where safety equipment is available onsite and clearly indicates the locations of safety equipment storage locations?

(i) Do all supervisors have an appropriate documented level of OSHA training (e.g., a minimum of 30-hour OSHA construction safety training)?

(j) Do employees have documented basic OSHA 10-hour construction safety training?

(k) Does the company have a documented Hazard Communication Program?

3. Storm and Inclement Weather Safety Planning:

(a) Does the company have a written Storm Hazard Awareness and Preparedness Plan and site monitoring/notification means to provide proper safety measures at the project site in the event of inclement or extreme weather? (i.e. site evacuation procedures, damage protection, securement of equipment and materials, removal of debris and scrap materials, protection of incomplete underground storm drain system against sand and silt infiltration etc.)?

4. Required Written Explanation of Safety Record. If the bidder has any of the following:

(a) answered “yes” to any of the OSHA Specific Question above, or

(b) answered “no” to any of the Safety Plan or Storm Safety questions, the bidder shall then provide the City, in its bid, a detailed written explanation of its safety record and the reasons why such safety history is NOT representative of its future performance and an explanation of what specific actions it has taken to improve its overall safety record. Failure to provide a written explanation of its safety record pursuant to this paragraph may deem a bidder as non-responsive by the City.

END OF SAFETY EVALUATION QUESTIONNAIRE

Rev. 04/22

FEDERAL AND STATE REQUIREMENTS

AND SPECIAL CONDITIONS

for CONSTRUCTION

1. General

The work performed under this contract will be financed, in part, by grants provided under programs of the Federal Transit Administration. Citations to federal law, regulation, and guidance references include, but are not limited to, the Master Agreement, FTA MA (23), dated October 1, 2016; FTA Circular 4220.1F, dated November 1, 2008; "Best Practices Procurement & Lessons Learned Manual", October 2016; Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards,”, 2 C.F.R. Part 200, dated December 26, 2014, will supersede and apply in lieu of U.S. DOT’s common grant rules, 49 C.F.R. parts 18 and 19, State and Local Governments and Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations and any subsequent amendments or revisions thereto.

THE FOLLOWING MAY BE USED SYNONYMOUSLY:

“BIDDER” AND “CONTRACTOR”

“PURCHASER”, PROCURING AGENCY” AND “OWNER”

2. Federal Changes

Contractor shall at all times comply with all applicable Federal Transit Administration (FTA) regulations, policies, procedures and directives, including without limitation those listed directly or by reference in the Master Agreement between Purchaser and FTA, as they may be amended or promulgated from time to time during the term of this contract.

Contractor's failure to so comply shall constitute a material breach of this contract.

1. FTA’s new authorizing legislation, 49 U.S.C. chapter 53, as amended, by the following:

a. The Fixing America’s Surface Transportation (FAST) Act, Public Law No. 114-94, December 4, 2015,

b. The Moving Ahead for Progress in the 21st Century Act (MAP-21), Public Law No. 112-141, July 6, 2012, as amended by the “Surface Transportation and Veterans Health Care Choice Improvement Act of 2015,” Public La No. 114-41, July 31, 2015, and other authorizing legislation to be enacted and

c. The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) Public Law No. 109-59, August 10, 2005, as amended by the SAFTEA-LU technical Corrections Act of 2008, Public Law No 100-244, June 6, 2008.

2. Continuing resolutions or other Appropriations Resolutions or Acts funding the

Department of Transportation during Fiscal Year 2016.

3. Title 23, U.S.C. (Highways)

4. Other federal legislation FTA administers, as FTA so determines.

3. Notification of Federal Participation

To the extent required by Federal law, the State of North Carolina agrees that, in administering any Federal assistance Program or Project supported by the underlying Grant Agreement or Cooperative Agreement, any request for proposals, solicitation, grant application, form, notification, press release, or other publication involving the distribution of FTA assistance for the Program or the Project that it will identify the FTA grant source by listing the Catalog of Federal Domestic Assistance Number of the program. The following FTA grant programs will be eligible to participate in this bid, 20.500, 20.505, 20.507, 20.509, 20.513, 20.514, 20.516, 20.518, 20.519, 20.521, 20.522, 20.523, 20.525, 20.526, 20.527, 20.528, 20.529, 20.530, and 20.531. Federal funding assistance up to eighty (80%) percent may be provided.

4. Definitions

Third Party Agreement, in accordance with the Master Agreement unless FTA determines otherwise in writing, includes all of the following agreements, such as:

(1) Third party contracts,

(2) Leases,

(3) Third party subcontracts; and

(4) Other similar arrangements or agreements.

Third Party Participant, in accordance with the Master Agreement unless FTA determines otherwise in writing, includes all of the following participants, such as:

(1) Third party contractors,

(2) Lessees,

(3) Third party subcontractors, and

(4) Other participants in the Project

5. Conflict of Interest

No employee, officer, board member, or agent of the Owner shall participate in the selection, award, or administration of a contract supported by Federal Transit Administration (FTA) funds if a conflict of interest, real or apparent, would be involved.

Such a conflict would arise when the employee, officer, board member, or agent, any member of his or her immediate family, his or her partner, or an organization that employs, or is about to employ any of the above, has a financial or other interest in the firm selected for award.

6. Lobbying

Byrd Anti-Lobbying Amendment, 31 U.S.C. §1352(b) (5), as amended by the Lobbying Disclosure Act of 1995, PL 104-65 (2 U.S.C. §1601, et seq.); 2 C.F.R. §200.450, and 2 C.F.R. Part 200 appendix II (j). Contractors who apply or bid for an award of $100,000 or more shall file the certification required by 49 CFR Part 20, “New Restrictions on Lobbying.” Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 U.S. C. 1352.

Each tier must also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the non-Federal award.

The requisite “Lobbying Certification” is included as ATTACHMENT A (attach Standard Form-LLL if necessary) and must be executed for contracts of $100,000 or more and prior to the award of the contract.

7. Civil Rights Laws and Regulations

(1) Nondiscrimination on the Basis of Age – The Contractor agrees to comply with all applicable requirements of the Age Discrimination Act of 1975, as amended, 42 U.S.C.

§§ 6101 et seq., and with implementing U.S. Health and Human Services regulations, “Nondiscrimination on the Basis of Age in Programs or Activities Receiving Federal Financial Assistance, 45 C.F.R. Part 90, which prohibit discrimination against individuals on the basis of age.

The Age Discrimination in Employment Act (ADEA) 29 U.S.C. §§ 621 through 634 and with implementing U.S. Equal Employment Opportunity Commission (U.S. EEOC) regulations, “Age Discrimination in Employment Act,” 29 C.F.R. Part 1625, which prohibits discrimination against individuals on the basis of age.

(2) Access for Individuals with Disabilities - The Contractor agrees to comply with 49 U.S.C. § 5301(d), which states the Federal policy that elderly individuals and individuals with disabilities have the same right as other individuals to use public transportation services and facilities, and that special efforts shall be made in planning and designing those services and facilities to implement transportation accessibility rights for elderly individuals and individuals with disabilities. The Contractor also agrees to comply with all applicable provisions of section 504 of the Rehabilitation Act of 1973, as amended, with 29 U.S.C. § 794, which prohibits discrimination on the basis of disability; with the Americans with Disabilities Act of 1990 (ADA), as amended, 42 U.S.C.

§§ 12101 et seq., which requires that accessible facilities and services be made available to individuals with disabilities; and with the Architectural Barriers Act of 1968, as amended, 42 U.S.C. §§ 4151 et seq., which requires that buildings and public accommodations be accessible to individuals with disabilities. In addition, the Contractor agrees to comply with applicable Federal regulations and directives and any subsequent amendments thereto, except to the extent the Federal Government determines otherwise in writing, as follows:

(1) U.S. DOT regulations “Transportation Services for Individuals with Disabilities

(ADA)” 49 C.F.R. Part 37;

(2) U.S. DOT regulations “Nondiscrimination on the Basis of Handicap in Programs and Activities Receiving or Benefiting from Federal Financial Assistance,” 49 C.F.R. Part 27;

(3) Joint U.S. Architectural and Transportation Barriers Compliance Board (U.S.

ATBCB) U.S. DOT regulations, “Americans with Disabilities (ADA) Accessibility Specifications for Transportation Vehicles,” 36 C.F.R. Part 1192 and 49 C.F. R.

Part 38;

(4) U.S. DOJ regulations “Nondiscrimination on the Basis of Disability in State and

Local Government Services,”28 C.F.R. Part 35;

(5) U.S. DOJ regulations “Nondiscrimination on the Basis of Disability by Public Accommodations and in Commercial Facilities.” 28 C.F.R. Part 36;

(6) U.S. GSA regulations “Accommodations for the Physically Handicapped,” 41

C.F.R. Subpart 101-19;

(7) U.S. Equal Employment Opportunity Commission, “Regulations to Implement the Equal Employment Provisions of the Americans with Disabilities Act,” 29 C.F.R.

Part 1630;

(8) U.S. Federal Communications Commission regulations “Telecommunications

Relay Services and Related Customer Premises Equipment for the Hearing and Speech Disabled,” 49 C.F.R. Part 64, Subpart F;

(9) U.S. Architectural and Transportation Barriers Compliance Board regulations, “Electronic and Information Technology Accessibility Standards.” 36 C.F.R. Part 1194;

(10) FTA regulations, "Transportation of Elderly and Handicapped Persons," 49

C.F.R. part 609; and

(11) Federal regulations, "Miscellaneous Civil Rights Amendments (RRR)," pertaining to nondiscrimination on the basis of disability within 49 C.F.R. Parts 27, 37, and 38 were published in 79 Fed. Reg. 21402, April 16, 2014; and

(12) FTA Circular 4701.1, Americans with Disabilities Act (ADA) Guidance, dated

November 4, 2015.

(13) Federal civil rights and nondiscrimination directives implementing the foregoing Federal laws and regulations, except to the extent the Federal Government determines otherwise in writing.

(6) Drug or Alcohol Abuse-Confidentiality and Other Civil Rights Protections. To the extent applicable, the Contractor agrees to comply with the confidentiality and other civil rights protections of the Drug Abuse Office and Treatment Act of 1972, as amended, 21 U.S.C. §§ 1101 et seq., with the Comprehensive Alcohol Abuse and Alcoholism Prevention, Treatment and Rehabilitation Act of 1970, as amended, 42 U.S.C. §§ 4541 et seq., and with the Public Health Service Act of 1912, as amended, 42 U.S.C.

§§ 290dd through 290dd-2, and any amendments thereto.

(7) Other Nondiscrimination Laws. The Contractor agrees to comply with applicable provisions of other Federal laws and regulations, and follow applicable directives prohibiting discrimination, except to the extent that the Federal Government determines otherwise in writing.

(8) The Contractor also agrees to include these requirements in each subcontract financed in whole or in part with Federal assistance provided by FTA, modified only if necessary to identify the affected parties.

(9) Remedies for failure to comply with applicable Federal Civil Rights laws and Federal regulations may be enforced as provided in those Federal laws or Federal regulations.

8. Clean Air Act and Federal Water Pollution Control Act

The Clean Air and Clean Water Act requirements apply to each contract and subcontract exceeding $150,000. The Contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401–7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. 1251–1387) and 2 C.F.R. Part 200, Appendix II (g). Violations must be reported to the Federal awarding agency and the Regional Office of the Environmental Protection Agency (EPA).

The Contractor also agrees to include these requirements in each subcontract exceeding $150,000 financed in whole or in part with Federal Assistance provided by

FTA.

The Contractor agrees:

1) It will not use any violating facilities;

2) It will report the use of facilities placed on or likely to be placed on the U.S. EPA “List of Violating Facilities;”

3) It will report violations of use of prohibited facilities to FTA; and

4) It will comply with the inspection and other requirements of the Clean Air Act, as amended, (42 U.S.C. §§ 7401 – 7671q); and the Federal Water Pollution Control Act as amended, (33 U.S.C. §§ 1251-1387) and 2 C.F.R. Part 200, Appendix II (g).

9. Energy Conservation

The Contractor agrees to comply with mandatory standards and policies relating to energy efficiency that are contained in the state energy conservation plans issued in compliance with the Energy Policy and Conservation Act, as amended, 42 U.S.C. § 6321 et seq., and perform an energy assessment for any building constructed, reconstructed, or modified with federal assistance as required under FTA regulations, “Requirements for Energy Assessments,” 49 C.F.R. part 622, subpart C. These requirements extend to all third party contractors and their contracts at every tier and subrecipients and their subcontracts at every tier.

10. Environmental Protection

The Contractor agrees to comply with all applicable requirements of the National Environmental Policy Act of 1969, as amended, (NEPA) 42 U.S.C. §§ 4321 through 4335 (as restricted by 42 U.S. C. § 5159, if applicable); Executive Order No. 11514, as amended, “Protection and Enhancement of Environmental Quality,” 42 U.S.C. § 4321 note; FTA statutory requirements at 49 U.S.C. § 5323(c)(2) ), as amended by MAP-21, ;

U.S. Council on Environmental Quality regulations pertaining to compliance with NEPA, 40 C.F.R. Parts 1500 through 1508; and joint FHWA FTA regulations, “Environmental Impact and Related Procedures,” 23 C.F.R. Part 771 and 49 C.F.R. Part 622 were published in the Federal Register, 78 Fed. Reg. 8963, February 7, 2013; and other applicable Federal environmental protection regulations that may be promulgated at a later date. The Contractor agrees to comply with the applicable provisions of 23 U.S.C.

§ 139 “Efficient environmental reviews for project decision making”, pertaining to environmental procedures, and 23 U.S.C. § 326, pertaining to Purchaser’s responsibility for categorical exclusions, in accordance with the provisions of joint FHWA/FTA final guidance, “Environmental Review Process (Public Law 109-59),” 71 Fed. Reg. 66576 et seq. November 15, 2006. Joint FHWA and FTA final guidance, “Interim Guidance on MAP-21 Section 1319 Accelerated Decision making in Environmental Reviews,” dated January 14, 2013, and any applicable Federal directives that may be issued at a later date, except to the extent that FTA determines otherwise in writing.

11. Recycled Products

The Recycled Products requirement applies to all contracts for items designated by the EPA, when the purchaser or contractor procures $10,000 or more of one of these items during the fiscal year, or has procured $10,000 or more of such items in the previous fiscal year, using Federal funds. New requirements for "recovered materials" will become effective May 1, 1996. These regulations apply to all procurement actions involving items designated by the EPA, where the procuring agency purchases $10,000 or more of one of these items in a fiscal year, or when the cost of such items purchased during the previous fiscal year was $10,000. These requirements extend to all contractors and their subcontracts at every tier where the value of an EPA designated item exceeds $10,000.

To the extent possible the contractor agrees to comply with U. S. Environmental

Protection Agency (U.S. EPA), “Comprehensive Procurement Guidelines for Products Containing Recovered Materials,” 40 CFR Part 247, which implements section 6002 of the Resource Conservation and Recovery Act (RCRA), as amended, 42 U.S.C. 6962 and 2 C.F.R. part § 200.322. The contractor agrees to provide competitive preference for products and services that conserve natural resources, protect the environment and are energy efficient, except to the extent that the Federal Government determines otherwise in writing.

These items include, but may not be limited to:

Paper and paper products, excluding building and construction paper grades.

Construction products:

(a) Building insulation products, including the following items:

(1) Loose-fill insulation, including but not limited to cellulose fiber, mineral fibers (fiberglass and rock wool), vermiculite, and perlite;

(2) Blanket and batt insulation, including but not limited to mineral fibers (fiberglass and rock wool);

(3) Board (sheathing, roof decking, wall panel) insulation, including but not limited to structural fiberboard and laminated paperboard products, perlite composite board, polyurethane, polyisocyanurate, polystyrene, phenolics, and composites;

and

(4) Spray-in-place insulation, including but not limited to foam-in- place polyurethane and polyisocyanurate, and spray-on cellulose.

(b) Structural fiberboard and laminated paperboard products for applications other than building insulation, including building board, sheathing, shingle backer, sound deadening board, roof insulating board, insulating wallboard, acoustical and non-acoustical ceiling tile, acoustical and non-acoustical lay-in panels, floor underlayments, and roof overlay (coverboard).

(c) Cement and concrete, including concrete products such as pipe and block containing:

(1) Coal fly ash;

(2) Ground granulated blast furnace slag (GGBF);

(3) Cenospheres; or

(4) Silica fume from silicon and ferrosilicon metal production.

(d) Carpet made from polyester fiber made from recovered materials for use in moderate-wear applications such as single-family housing and similar wear applications.

(e) Floor tiles and patio blocks containing recovered rubber or plastic.

(f) Shower and restroom dividers/partitions containing recovered plastic or steel.

(g) (1) Consolidated latex paint used for covering graffiti; and

(2) Reprocessed latex paint used for interior and exterior architectural applications such as wallboard, ceilings, and trim; gutter boards; and concrete, stucco, masonry, wood, and metal surfaces.

(h) Carpet cushion made from bonded polyurethane, jute, synthetic fibers, or rubber containing recovered materials.

(i) Flowable fill containing coal fly ash and/or ferrous foundry sands.

(j) Railroad grade crossing surfaces made from cement and concrete containing fly ash, recovered rubber, recovered steel, recovered wood, or recovered plastic.

(k) Modular threshold ramps containing recovered steel, rubber, or aluminum.

(l) Nonpressure pipe containing…