Summary of Addendum #1 to Bid 274-2026-CM-PSSP-08
This document is Addendum #1 issued by the City of Raleigh, North Carolina, Engineering Services Construction Management division for the East Raleigh Park and Ride project. The addendum adds enhanced landscape plans to the original bid documents, specifically including Sheet L5.00 (Landscape Plan) and Sheet L5.10 (Landscape Details), along with pre-bid meeting minutes and related materials. The landscape plan encompasses approximately 5,246 square feet of Bermuda turf seed, 835 square feet of Bermuda turf sod, and extensive plantings including 2 trees, 117 shrubs and small trees, 356 perennials, and 2,110 ground cover plugs. Key species include Freeman Maples, Canadian Serviceberries, Constellation Flowering Dogwoods, and various native and ornamental shrubs and grasses. The pre-bid meeting was held on June 16, 2026, with bid submissions due at 2:00 p.m. on July 21, 2026, at One Exchange Plaza, Suite 801, 219 Fayetteville Street, Raleigh, NC 27601. The construction contract period is 300 consecutive calendar days from Notice to Proceed for substantial completion, with final completion required within 345 days. Bid award and approval by City Council is anticipated for August 2026, with Notice to Proceed issuance expected in September 2026.
All plant materials must comply with American Standard for Nursery Stock and be #1 quality or better, with contractors responsible for proper handling, installation, and one-year warranty and maintenance of all plantings following substantial completion. The contractor must ensure 100% biodegradable erosion matting, positive drainage in all planting areas, and compliance with Buy America Program requirements for federally funded transportation projects per 49 CFR 661. All products must be manufactured in compliance with federal requirements. There is no DBE goal for this project; however, the addendum includes information regarding the United States Department of Transportation's October 3, 2025, Interim Final Rule modifying DBE program eligibility requirements, which eliminates race- and sex-based presumptions of disadvantage and establishes individualized determination standards. Contractors must hold a valid North Carolina General Contractor license, provide a 5% bid bond, and submit a two-envelope sealed bid system with separate envelopes for the bid bond and bid form.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid 274-2026-CM-PSSP-08 -Addendum 2-Final.pdf | ||
| 274-2026-CM-PSSP-08 ERPR.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
v.04/2022
City of Raleigh Addendum # 1 to Bid 274-2026-CM-PSSP-08 East Raleigh Park and Ride City of Raleigh Wake County, North Carolina Construction Services
June 25, 2026
To: All Proposers
This Addendum, containing the following additions, clarifications, and/or changes, is issued prior to receipt of qualification packages and does hereby become part of the original Bid documents and supersedes the original Bid documents in case of conflict.
Receipt of this addendum must be acknowledged by signing in the area indicated below. Please make the following additions, clarifications, and/or changes to the Bid as listed below and sign and return this addendum with your submittal package.
1. Enhanced Landscape Plans as enumerated below:
Sheet L5.00 - Landscape Plan Sheet L5.10 – Landscape Details
2. Pre-Bid Meeting Minutes includuding:
DBE Slides Sign-In Sheet from the Pre-Bid Conference
END OF ADDENDUM #1
All other requirements, scope of services, and terms and conditions remain as required in the initial Bid 274-2026-CM-PSSP-08
Ahmed Alrubaye Construction PM/Engineer City of Raleigh Engineering Services Construction Management – Public Safety & Special Projects Division
Sign below and return this addendum with your submittal response.
Proposer Name & Company: ___________________________ Date: ____________
Signature: ______________________________ Title: _________________________
W
ILDERS GROVE LANE
P
NORTH NEW
HOPE ROAD
(VARIABLE W
IDTH PUBLIC R/W
B.M
2009, PG. 851
(2) IRVI
(4) JUES
(3) EUDU
(3) JUES
(3) IRVI
(3) JUES
(4) JUES
(5) EUDU
(5) IRVI
(5) JUES
(2) EUDU
(3) EUDU
(3) JUES
(3) MOXS
(7) MOXS(2) IRVI
(7) MOXS
(1) JUES
(1) IRVI
(2) EUDU
(1) AMCA
(1) CORC
(1) QUSH(1) CORC(1) QUSH
(196 sf) SOD (339 sf) SOD
(36) ECPM
(25) ECPM
(3,296 sf) STS
(5) ILGN
(4) RUFS
(22) MOXS
(20) JUES
(55) ECPM
(49) ECPM
(53) ECPM
(51) ECPM
(40) ECPM
(41) ECPM
(17) JUES
(19) MOXS
(20) JUES
(5) RUFS
(15) MOXS
(23) JUES
(3) DISW
(12) PITT
(2) DISW
(2) ILVS
(1) DISW
(10) LIML
(10) LIML
(1) CORC
(24) HEST
(36) LIML
(25) HEST
(5) RUFS
(17) MOXS
(18) JUES
(11) DIVI
(1) DISW
(2) CHPG
(3) PITT
(3) IRVI
(1) ACFR
(6) ECPM
(1,514 sf) SEED
(391) CADI
(483) CADI
(469) CADI
(394) CADI
(1) ILVN
(3) ILVN
(5) ILGN
(9) ILVN
(10) PITT
(2) CEHP
(18) MUCA
(10) RUFS
(2) ILGN(689 sf) SEED
(2,011 sf) SEED (17 sf) CODC
(1) DISW(8) ILGN
(17 sf) CODC
(373) CADI
(300 sf) SOD
(6) RUFS
GRAPHIC SCALE
0 10 20 40
1 inch = 20 ft.
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com
X:
\P ro je ct s\
RA
L\
RA
L2
\0 4-
Pr od uc tio n\ En gi ne er in g\ Co ns tr uc tio n Dr aw in gs \C ur re nt D ra w in gs
\R
AL
5-
LS
2.
dw g, 0/ 1/
:5
2:
A M
, A lli so n
M ar bl e
REVISIONS
PROJECT NO. RAL22005
FILENAME
CHECKED BY
DRAWN BY
SCALE 1"=20'
DATE 09.29.2025
N0. DATE
TITLE
PLAN INFORMATION
RAL22005-LS2.DWG
CASE #: ASR-0086-2023
EA
ST
R
AL
EI
GH
P
AR
K
AN
D
RI
DE
IS
SU
ED
FO
R
BI
D
W
ILD
ER
S
GR
OV
E
LN
. A
ND
N . N
EW
H
OP
E
RD
RA
LE
IG
H, N C
CITY OF RALEIGH
ATTN: AHMED AL RUBAYE
ONE EXCHANGE PLAZA
RALEIGH, NC 27601
PHONE: 919.996.5583
EMAIL: AHMED.ALRUBAYE@RALEIGHNC.GOV
INSTALL BERMUDA SEED IN
DRAINAGE DITCH PER (NCDOT
1631.01 MATTING INSTALLATION)
GENERAL LANDSCAPE NOTES:
1. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE
CITY OF RALEIGH AND THE STATE OF NORTH CAROLINA STANDARDS AND
SPECIFICATIONS.
2. CONTRACTOR IS RESPONSIBLE FOR THE SITE INSPECTION BEFORE LANDSCAPE
CONSTRUCTION AND INSTALLATION IN ORDER TO BECOME FAMILIAR WITH THE EXISTING
CONDITIONS.
3. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES
BEFORE BEGINNING DEMOLITION OR INSTALLATION.
4. CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT OF ANY DISCREPANCIES BETWEEN
THE NOTES, SPECIFICATIONS, DRAWINGS OR SITE CONDITIONS FOR RESOLUTION PRIOR
TO INSTALLATION.
5. ANY DAMAGE TO UTILITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
6. THIS PLAN IS FOR PLANTING PURPOSES ONLY. FOR INFORMATION REGARDING
BUILDINGS, GRADING, WALLS, ETC., REFER TO ARCHITECTURE, SITE AND GRADING PLANS.
7. VERIFICATION OF TOTAL PLANT QUANTITIES AS SHOWN IN THE PLANT SCHEDULE SHALL
BE THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR. ANY DISCREPANCIES SHALL
BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT.
8. CONTRACTOR TO ENSURE PROPER STABILIZATION AND SEEDING OF THE SITE IN
ACCORDANCE WITH APPLICABLE REGULATIONS.
9. LANDSCAPE MATERIAL SHALL BE WELL FORMED, VIGOROUS, GROWING SPECIMENS WITH
GROWTH TYPICAL OF VARIETIES SPECIFIED AND SHALL BE FREE FROM DAMAGE, INSECTS
AND DISEASES. MATERIAL SHALL EQUAL OR SURPASS #1 QUALITY AS DEFINED IN THE
CURRENT ISSUE OF “AMERICAN STANDARD FOR NURSERY STOCK” AS PUBLISHED BY THE
AMERICAN NURSERY & LANDSCAPE ASSOCIATION.
10. ALL PLANT MATERIAL IS TO BE CAREFULLY HANDLED BY THE ROOT BALL, NOT THE TRUNK, BRANCHES AND/OR FOLIAGE OF THE PLANT. MISHANDLED PLANT MATERIAL MAY BE
REJECTED BY THE LANDSCAPE ARCHITECT.
11. ALL PLANT MATERIAL IS TO BE WELL ROOTED, NOT ROOT BOUND, SUCH THAT THE ROOT
BALL REMAINS INTACT THROUGHOUT THE PLANTING PROCESS. DEFICIENT PLANT
MATERIAL MAY BE REJECTED BY THE LANDSCAPE ARCHITECT OR OWNER.
12. ALL PLANTS TO BE A MINIMUM OF WHAT IS SPECIFIED IN THE PLANT SCHEDULE. ANY
CHANGES OR SUBSTITUTIONS SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT AND
GOVERNING JURISDICTION PRIOR TO ANY HOLE BEING DUG.
13. CONTRACTOR TO COORDINATE WITH OWNER'S REPRESENTATIVE AND LANDSCAPE
ARCHITECT TO ESTABLISH THE EXTENTS OF MULCH/SEED/SOD IF NOT SPECIFICALLY
SHOWN ON PLANS.
14. CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE IN ALL PLANTING AREAS.
15. REFER TO SPECIFICATION FOR MORE INFORMATION ON DELIVERY, STORAGE AND
HANDLING OF PLANT MATERIAL, QUALITY ASSURANCE, PRODUCTS AND MATERIALS, SOIL
TESTING AND AMENDMENTS, INSTALLATION, MAINTENANCE AND WARRANTIES, AND
ADDITIONAL PLANTING REQUIREMENTS.
16. ALL EROSION MATTING TO BE 100% BIODEGRADABLE.
WARRANTY & MAINTENANCE:
1. WARRANTY: INSTALLER SHALL REPAIR OR REPLACE ANY PLANTINGS
THAT FAIL IN MATERIALS, WORKMANSHIP, OR GROWTH WITHIN ONE
YEAR AFTER THE DATE OF SUBSTANTIAL COMPLETION. FAILURES
INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING:
· DEATH AND UNSATISFACTORY GROWTH, EXCEPT FOR DEFECTS
RESULTING FROM LACK OF ADEQUATE MAINTENANCE,
NEGLECT, ABUSE BY OWNER, OR INCIDENTS THAT ARE BEYOND
CONTRACTOR'S CONTROL.
· STRUCTURAL FAILURES INCLUDING PLANTINGS FALLING OR
BLOWING OVER.
2. MAINTENANCE: INITIAL MAINTENANCE SHALL BE PROVIDED
IMMEDIATELY AFTER EACH AREA IS PLANTED AND CONTINUE UNTIL
SUBSTANTIAL COMPLETION. UPON SUBSTANTIAL COMPLETION,
MAINTENANCE FOR ALL PLANT MATERIAL SHALL BE PROVIDED FOR
ONE YEAR AT A MINIMUM SHALL INCLUDE:
· TREE AND SHRUB MAINTENANCE: MAINTAIN PLANTINGS BY
PRUNING, CULTIVATING, WATERING, WEEDING, FERTILIZING,
RESTORING PLANTING SAUCERS, AND RESETTING TO PROPER
GRADES OR VERTICAL POSITION, AS REQUIRED TO ESTABLISH
HEALTHY, VIABLE PLANTINGS. SPRAY OR TREAT AS REQUIRED TO
KEEP TREES AND SHRUBS FREE OF INSECTS AND DISEASE.
· GROUND COVER AND PLANT MAINTENANCE: MAINTAIN AND
ESTABLISH PLANTINGS BY WATERING, WEEDING, FERTILIZING,
MULCHING, AND OTHER OPERATIONS AS REQUIRED TO
ESTABLISH HEALTHY, VIABLE PLANTINGS.
· PROTECT EXTERIOR PLANTS FROM DAMAGE DUE TO LANDSCAPE
OPERATIONS, OPERATIONS BY OTHER CONTRACTORS AND
TRADES, AND OTHERS. MAINTAIN PROTECTION DURING
INSTALLATION AND MAINTENANCE PERIODS. TREAT, REPAIR, OR
REPLACE DAMAGED PLANTINGS.
LANDSCAPE PLAN
L5.00
ALM
JMH
BUY AMERICA PROGRAM REQUIREMENTS
ALL PRODUCTS PROVIDED ON THIS PROJECT MUST BE MANUFACTURED IN
COMPLIANCE WITH THE BUY AMERICA PROGRAM FOR FEDERALLY FUNDED
TRANSPORTATION PROJECTS PER CODE OF FEDERAL REGULATIONS 49 CFR
661. THESE REQUIREMENTS ARE DISTINCT AND DIFFERENT FROM THOSE OF
THE BUY AMERICAN ACT OF 1933.
NOTE: ALL TREES TO HAVE 6' MINIMUM BRANCHING HEIGHT.
PLANT SCHEDULE
FIELD CONDITIONS:
1. PLANTING RESTRICTIONS: .
· WARM SEASON GRASSES - PLANT DURING THE FOLLOWING PERIOD:
MARCH 1st - JULY 1st OPTIMAL, NO LATER THAN AUGUST 1st
· EXTERIOR PLANTS - DO NOT PLANT DURING EITHER OF THE FOLLOWING
PERIODS WITHOUT PRIOR WRITTEN AUTHORIZATION FROM LANDSCAPE
ARCHITECT:
WINTER: MID-DECEMBER THROUGH MID-FEBRUARY
SUMMER: MID-JUNE THROUGH MID-AUGUST
2. LANDSCAPE ARCHITECT TO REVIEW AND APPROVE ONSITE TOPSOIL MATERIAL
FOR REUSE.
UNDERPLANT BIORETENTION
PLANTINGS WITH CADI AT 12"
O.C., TYP.
SYMBOL CODE QTY BOTANICAL / COMMON NAME CAL HEIGHT
TREES
ACFR 2 ACER X FREEMANII
FREEMAN MAPLE 3" MIN 12` MIN
AMCA 1 AMELANCHIER CANADENSIS
CANADIAN SERVICEBERRY - 8` MIN
CORC 3 CORNUS X 'RUTCAN'
CONSTELLATION® FLOWERING DOGWOOD 2" MIN 8` MIN
QUSH 2 QUERCUS SHUMARDII
SHUMARD OAK 3" MIN 12` MIN
SYMBOL CODE QTY BOTANICAL / COMMON NAME CONT HEIGHT SPREAD
SHRUBS
CEHP 7 CEPHALOTAXUS HARRINGTONIA 'PROSTRATA'
PROSTRATE PLUM YEW #3 12" MIN 18" MIN
CHPG 2 CHAMAECYPARIS PISIFERA 'GOLDEN MOP'
GOLDEN MOP FALSE CYPRESS #3 15" MIN 12" MIN
DISW 8 DISTYLIUM X 'PIIDIST-VI'
SWING LOW® DISTYLIUM #5 12" MIN 18" MIN
DIVI 12 DISTYLIUM X 'VINTAGE JADE'
FIRST EDITIONS® VINTAGE JADE DISTYLIUM #5 12" MIN 18" MIN
EUDU 20 EUTROCHIUM DUBIUM
DWARF JOE PYE WEED 1 GAL
ILGN 26 ILEX GLABRA 'NIGRA'
NIGRA INKBERRY HOLLY #3 18" MIN 18" MIN
ILVN 13 ILEX VOMITORIA 'NANA'
DWARF YAUPON HOLLY #3 15" MIN 15" MIN
ILVS 2 ILEX VOMITORIA 'SCHILLING'S DWARF'
SCHILLING'S DWARF YAUPON HOLLY #3 18" MIN 18" MIN
IRVI 19 IRIS VIRGINICA
BLUE FLAG IRIS 1 GAL
JUES 106 JUNCUS EFFUSUS SOLUTUS
SOFT RUSH 1 GAL
MOXS 94 MONARDA X `SNOW WHITE`
SNOW WHITE BEE BALM 1 GAL
PITT 25
PITTOSPORUM TOBIRA 'TURNER'S VARIEGATED
DWARF'
VARIEGATED DWARF PITTOSPORUM
#3 12" MIN 12" MIN
RUFS 30 RUDBECKIA FULGIDA SULLIVANTII 'GOLDSTURM'
GOLDSTURM CONEFLOWER 1 GAL
ORNAMENTAL GRASSES + SEDGES
MUCA 18 MUHLENBERGIA CAPILLARIS
PINK MUHLY GRASS #3
SYMBOL CODE QTY BOTANICAL / COMMON NAME CONT SPACING
GROUND COVERS
CADI 2,110 CAREX DIVULSA
EUROPEAN GREY SEDGE PLUG 12" o.c.
LIML 56 LIRIOPE MUSCARI 'LILAC BEAUTY'
LILAC BEAUTY LILYTURF #1 18" o.c.
SEED 5,246 SF BERMUDA TURF SEED SEED
SOD 835 SF BERMUDA TURF SOD SOD
STS 3,296 SF BERMUDA SEED - STAKED MATTING (NCDEQ) -
PERENNIALS
CODC 34 SF COTONEASTER DAMMERI 'CORAL BEAUTY'
CORAL BEAUTY COTONEASTER #3
ECPM 356 ECHINACEA PURPUREA 'MAGNUS'
MAGNUS PURPLE CONEFLOWER #1 18" o.c.
HEST 49 HEMEROCALLIS X 'STELLA DE ORO'
STELLA DE ORO DAYLILY #1 18" o.c.
Digitally signed by Dave Toms DN: C=US + CN=Dave Toms + E=toms@mcadamsco.com Date: 2025.10.01 11:10:26-04'00'
LANDSCAPE DETAILS
L5.10GRAPHIC SCALE
0 10 20 40
1 inch = 20 ft.
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com
X:
\P ro je ct s\
RA
L\
RA
L2
\0 4-
Pr od uc tio n\ En gi ne er in g\ Co ns tr uc tio n Dr aw in gs \C ur re nt D ra w in gs
\R
AL
5-
LS
2.
dw g, 0/ 1/
:5
3:
A M
, A lli so n
M ar bl e
REVISIONS
PROJECT NO. RAL22005
FILENAME
CHECKED BY
DRAWN BY
SCALE 1"=20'
DATE 09.29.2025
N0. DATE
TITLE
PLAN INFORMATION
RAL22005-LS2.DWG
CASE #: ASR-0086-2023
EA
ST
R
AL
EI
GH
P
AR
K
AN
D
RI
DE
IS
SU
ED
FO
R
BI
D
W
ILD
ER
S
GR
OV
E
LN
. A
ND
N . N
EW
H
OP
E
RD
RA
LE
IG
H, N C
CITY OF RALEIGH
ATTN: AHMED AL RUBAYE
ONE EXCHANGE PLAZA
RALEIGH, NC 27601
PHONE: 919.996.5583
EMAIL: AHMED.ALRUBAYE@RALEIGHNC.GOV
SCALE: NTS
ORNAMENTAL GRASS PLANTING
02SCALE: NTS
SHRUB INSTALLATION
01 SCALE: NTS
SOD INSTALLATION
SCALE: NTS
NCDOT MATTING INSTALLATION
BUY AMERICA PROGRAM REQUIREMENTS
ALL PRODUCTS PROVIDED ON THIS PROJECT MUST BE MANUFACTURED IN
COMPLIANCE WITH THE BUY AMERICA PROGRAM FOR FEDERALLY FUNDED
TRANSPORTATION PROJECTS PER CODE OF FEDERAL REGULATIONS 49 CFR
661. THESE REQUIREMENTS ARE DISTINCT AND DIFFERENT FROM THOSE OF
THE BUY AMERICAN ACT OF 1933.
1/4" = 1'-0"SCALE:
TREE PLANTING
NOTES:
1. SELECT TREES THAT HAVE: STRONG CENTRAL LEADER;
CROWN WITH FULL FOLIAGE; GROWN IN HEAVY CLAY SOIL
WITH DRIP IRRIGATION.
2. BEFORE INSTALLING PLANTING SOIL MIX BACKFILL AROUND
ROOT BALL, SOAK HOLE TO CONFIRM WATER FILTERS
THROUGH UNDISTURBED SOIL. DESIGN ALTERNATIVE
DRAINAGE SYSTEM IF REQUIRED.
3. A SOIL EXPERT CAN BE CONSULTED TO HELP MODIFY AND
FERTILIZE TOPSOIL TO CREATE AN ACCEPTABLE PLANTING
SOIL MIX FOR THE SITE CONDITIONS AND SPECIFIC TREE
SPECIES.
4. THOROUGHLY SOAK THE TREE ROOT BALL AND ADJACENT
PREPARED SOIL SEVERAL TIMES DURING THE FIRST MONTH
AFTER PLANTING AND DURING DRY PERIODS.
TRUNK FLARE AND TOP OF ROOT BALL SHOULD BE
2" ABOVE FINISHED GRADE AFTER SETTLING
CUT BURLAP, ROPE AND WIRE BASKET AWAY
FROM TOP AND SIDES OF ROOT BALL AND
REMOVE DURING BACKFILL PROCESS. IF USING
CONTAINER GROWN TREES, USE FINGERS OR
SMALL HAND TOOLS TO PULL ROOTS OUR OF THE
OUTER LAYER OF POTTING SOIL; CUT OR PULL
APART ANY ROOTS CIRCLING THE PERIMETER OF
THE CONTAINER.
WIDTH OF PLANTING HOLE SHALL BE 3 TIMES THE
ROOT BALL DIAMETER IN HIGHLY COMPACTED OR
CLAY SOIL; 2 TIMES THE ROOT BALL DIAMETER
MINIMUM IN ALL OTHERS
DIG WIDE PLANTING HOLE WITH TAPERED SIDES.4
TO STABILIZE, COMPACT THE PLANTING SOIL MIX
BACKFILL AROUND ROOT BALL; COMPACT SOIL BY
SOAKING WITH WATER AND OR LIGHTLY HAND
TAMPING.
SET ROOT BALL ON UNDISTURBED SOIL TO
PREVENT SETTLING.
IF STAKING IS NECESSARY, USE TWO OPPOSING
STAKES WITH SEPARATE FLEXIBLE TIES. REMOVE
STAKING AT END OF FIRST GROWING SEASON.
4" RAISED RING OF SOIL TO DIRECT WATER INTO
ROOT BALL - ESPECIALLY IMPORTANT IF TOP OF
ROOT BALL IS RAISED ABOVE GRADE
3" BARK MULCH; DO NOT PLACE MULCH WITHIN
3" OF TREE TRUNK.
FINAL GRADE10
5"-7" DEEPER THAN ROOT BALL FOR LOWERED
PLANTING HOLE AS NEEDED WITH POOR
DRAINAGE
EXTEND STAKES INTO 24" OF UNDISTURBED SOIL.12
ALM
JMH
Digitally signed by Dave Toms DN: C=US + CN=Dave Toms + E=toms@mcadamsco.com Date: 2025.10.01 11:10:50-04'00'
June 16, 2026
RE: East Raleigh Park and Ride Pre-Bid Meeting Minutes
RAL22005
CITY BID NUMBER: 274-2026-CM-PSSP-08
Note: Meeting Minutes/Discussion depicted in blue
1. Introduction
І Sign-in Sheet І Introductions
– Owner Introductions Sara Tromba-City of Raleigh Ahmed Al Rubaye – City of Raleigh Roger Warner – City of Raleigh Richard Vinson – City of Raleigh Pam Adderly – City of Raleigh
– Project Lead Introductions
◦ Nia Rodgers – Project Manager - McAdams
◦ Fred Boone – Bid Administrator – McAdams
2. Bid Documents and Distribution
І Bid documents may be obtained via Sharefile. Please contact Jess Phair at phair@mcadamsco.com to obtain a link to the bid package and any addenda that has been issued.
І Addenda will be distributed via NC eVP ( https://evp.nc.gov/ ). Mandatory acknowledgements for each addenda must be returned with the bid submission package.
3. Disadvantaged Business Enterprise (DBE) Requirements І Slide Presentation by Richard Vinson – Slides will be distributed with meeting minutes. There is no DBE Goal for this project.
І MWBE Remarks delivered by Pam Adderly with BEOP – There is no MWBE Goal for this project.
4. Critical Items for Bidders
І Time and date for receipt of bids is 2:00 pm on Tuesday, July 21, 2026 to the attention of Ahmed Al Rubaye, Construction PM/Engineer at the City of Raleigh’s Construction Management Division. The bid opening will take place at One Exchange Plaza; Suite 801; 219 Fayetteville Street Raleigh, NC 27601 on the day and time noted above.
І Bids may be mailed to Ahmed Al Rubaye up to 24-hours prior to the bid opening at the following address:
Ahmed Al Rubaye Construction PM/Engineer
RAL22005
mailto:phair@mcadamsco.com https://evp.nc.gov/
RAL22005
City of Raleigh-Engineering Services Construction Management – Public Safety & Special Projects Division One Exchange Plaza Raleigh, NC 27601 Raleigh, North Carolina 27601
І Bidding submissions will follow multi-envelope submission process:
– Place Bid Bond by itself within its own individual separate sealed opaque envelope and label ‘Bid Bond’ on envelope exterior along with Contractor’s information.
– Place the completed Bid form along with all other support documents required to be submitted with the Bid in a separate sealed opaque envelope and label ‘Bid Form’ on exterior along with Contractor’s information.
І Bid opening will occur immediately following submission of the bids received at the time, date and location noted above.
І The Bid Bond documents will be verified first prior to opening Bid envelopes. Any submissions determined to be lacking required documents will not be opened.
І The Bid opening will follow the formal bidding process for public bids with the bids opened, read aloud and recorded.
І Bids will be opened by a representative from McAdams along with Project Managers from the City’s Transit and
Engineering Services/Construction Management І Bid documents and drawings requests should be directed to Jess Phair at phair@mcadamsco.com.
І Request for substitutions/Or-Equal submittals must be submitted in writing to Jess Phair at phair@mcadamsco.com no later than 5:00 p.m. June 17, 2026. Substitution requests must show side by side comparison of specification requirements and how it is equal or better than the specified product.
І Bid bond of 5% is required with formal bid. No bid will be considered or accepted unless accompanied by this bid bond.
І Double check to make sure all required forms are included with submitted bid:
– Bid Bond
– Bid Form
– Acknowledgement of Addenda forms
– Signature Page(s)
– All required federal documentation
– Contractor Certificates
– Affidavit of Organization and Authority of Sworn Statement
– Non-Collusive Affidavit
– Additional Certifications
– Performance Policy Resolution
5. Project Overview and Overall Scope of Work
І This Construction of a parking lot including permeable pavers and drainage system, earthwork, asphalt paving, concrete flatwork, concrete curbs and stairs, lighting, electrical systems, planting and installation of site amenities. Site preparation will include building demolition, selective building demolition, clearing, earthwork and grading.
І Not In Contract
– EV Chargers + Installation (Contractor must coordinate their work with installation)
– Security Cameras + Installation (Contractor must coordinate their work with installation)
6. General Notes
І This project is being bid as a Single Price Contract. All contractors must have a valid GC license in the state of North Carolina.
І All work shall take place during normal business hours 8:00am – 5:00pm, Monday through Friday.
І Particular attention must be given to noise control and construction activities and scheduling must be considerate of adjacent businesses and operations.
І Permit reviews for the project have been completed. Tree protection and erosion control measures must be installed by the General Contractor and approved by the City Development Services prior to moving forward with remainder of work.
7. Description of project - to include the following:
І All clearing, grading, tree protection, storm drainage and erosion control measures, site demolition and associated site work.
І Utility installation (Storm Drainage + Electrical) І Parking Improvements І Sidewalk + Flat Work Improvements І Seeding and landscaping.
8. Project Schedule – Bidding and Construction
І Contractors questions received to date and minutes and questions from today will be included in an addendum.
All Addenda will be issued directly to planholders via e-mail with a sharefile link for download.
І All inquiries, questions, requests for substitution, and/or clarifications must be submitted in writing to Jess Phair at phair@mcadamsco.com no later than 5:00 p.m. on July 6, 2026.
І Bid Opening at 2:00 p.m. on Tuesday, July 21st, 2026.
І Anticipated bid award and approval by City Council: August 2026 І Anticipated issuance of Notice to Proceed: September 2026 (subject to change).
І The Contract time for construction is 300 consecutive calendar days from the Notice to Proceed (NTP) until substantial Completion. Final completion of the project shall be 345 days from NTP.
9. Expectations During Construction І Attention to noise control and working hours of construction activities І Tree protection (distinction between TPF and Sediment fence) І Attendance of GC and pertinent subs at regular project meetings as specified in the project manual І Appropriate communication channels and providing adequate notice of activities requiring additional coordination or lead time І Keep a clean and safe site І Meet all regulatory agencies’ requirements І Quality workmanship [site, paving, and landscape (establishing lawn / groundcover etc.)] І Please note the soil preparation in plans and specifications І Respectful attitude regarding working hours, work in Right of Way, considerate of neighbors etc.
10. Additional Comments
І Construction Materials Testing and Special Inspections firm is TBD.
І GC license is required to bid, evidence of current active licensed status must be provided І Reminder of two-envelope system for submitting Bid and Bond with contractor’s information and “Bid” and “Bid
Bond” written on exterior of each appropriate envelope І Follow up after bidding - Performance and payment bonds shall be required of selected bidder prior to execution of the Contract
11. Follow up
І Addendum will be issued following Pre-Bid Meeting and will include minutes and answers to all questions.
12. Conduct Site Visit / site walkthrough of project sites – Conducted by Nia Rodgers
13. Questions / Any Other Items – None Received
Disadvantaged Business Enterprise (DBE) program
City’s Transportation Department
Transit Program
DBE Program Updates USDOT issues Interim Final Rule and guidance requiring immediate changes to DBE program regulations
On Oct. 3, 2025, the United States Department of Transportation (USDOT) published an Interim Final Rule (IFR) in the Federal Register modifying the eligibility requirements for participation in the Disadvantaged Business Enterprise (DBE) program. Furthermore, the IFR mandates that all currently certified DBEs be reevaluated, and ultimately recertified, for continued program eligibility under these new requirements. 49 C.F.R. § 26.111.
The Disadvantaged Business Enterprise (DBE) and Airport Concessions Disadvantage Business Enterprise (ACDBE) modifications can be found in the Federal Register Update.
DBE Program Updates USDOT issues Interim Final Rule and guidance requiring immediate changes to DBE program regulations The IFR and the IFR Frequently Asked Questions (IFR FAQ) issued on October 24, 2025, require GoRaleigh to operate the DBE Program in a constitutionally compliant, nondiscriminatory manner. It eliminates all race- and sex-based presumptions of disadvantage and replaces them with a strictly individualized determination standard. The North Carolina Unified Certification Program (NCUCP) must reevaluate all DBE firms under the new criteria before their eligibility can be confirmed. Until the reevaluation is complete, DBE goals cannot be set on contracts, and no DBE participation may be counted toward any DBE goal.
Effective immediately, GoRaleigh, Primes and Subrecipients must operate under these new federal requirements.
DBE IFR Frequency Asked Questions https://www.transportation.gov/sites/dot.gov/files/2025-12/DBE%20IFR%20FAQ%27s%20-%20Updated%2012-1-2025_0.pdf
File details come from the government source that posted it. Updated .