270 Spencer SOW Exhaust Insulation Contract Services.doc

DOC document 52 KB Posted

Attached to
USCGC Spencer Exhaust Insulation
Solicitation number
2123403Y61A2494006
Issued by

About this file

This statement of work outlines requirements for insulation services on a Coast Guard cutter. The contractor will provide all materials and labor to insulate portions of the main diesel engine exhaust, ship service diesel generator exhaust in the engine room, and the emergency diesel generator exhaust on the USCGC 270' Spencer. This includes fabricating and installing insulation blankets and pads on the port and starboard main diesel exhaust piping and silencers, port and starboard ship service diesel generator exhaust piping and silencers, and the emergency diesel generator piping and silencer. Insulation materials should be in accordance with MIL-STD-769J or equal industry standards to maintain external surface temperatures below 130 degrees Fahrenheit for operating exhaust gas temperatures ranging from 32 to 800 degrees Fahrenheit. Insulation blankets must be fabricated and installed with proper lagging anchors and steel lacing attachments. The contractor must complete the work within three weeks starting June 27, 2024 while coordinating with the Coast Guard yard point of contact.

View the file

Other files

File Type Posted
Solicitation - 2123403Y61A2494006.docx DOCX document
Smart Matrix Acquisition.GOV.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT of WORK

For

Exhaust Insulation Blankets

Procurement Request:2123403Y61A2494006 USCGC 270’ Spencer Yard POC: LT Kevin Stachowski (410) 636-7642 Tentative Start Date: 6/27/24 Period of Performance: 3 Weeks

Provide all materials & Labor for insulating a potion of 2 (ea.) Main Diesel Engine Exhaust, complete 2 (ea.) Ship Service Diesel Generator Exhaust in engine room and 1 (ea.) Emergency Diesel Generator The exhaust insulation blankets and pads are required upon completing the installation of:

a) Port and Stbd MDE Exhaust Piping and Silencers

b) Port and Stbd SSDG Exhaust Piping and Silencers

c) Emergency Diesel Generator Piping and Silencer Please use the drawing(s) 901-WMEC-259-002, 905-WMEC-342-003 and Miratech Silencer attachment drawings provided as guidance for the manufacturing of piping insulation pads. Materials do not have to be 100% exact, they can be equal too.

General Information:

All exhaust piping, including mufflers and flexible joints, shall be insulated in accordance with MIL-STD-769J or Equal to Industry standard. For all piping, the insulation should have proper thickness for all temperature ratings for system to be insulated.

1. External surface temperature for exhaust piping shall not exceed 130 F. Operating exhaust gas temperatures range from 32 F to 800 F.

2. All insulation blankets shall be fabricated and installed with proper lagging anchors and attachments. The insulation blankets shall be attached with steel lacing.

***It is recommended to take measurements to manufacture the pads after installation of all exhaust piping, brackets, and expansion joints are completely installed. Installations may not be 100% according to the drawings detailing both of the SSDG’s and the EDG. The MDE Exhaust piping is existing and will be temporarily removed to accommodate the US Coast Guard Yards scope of work. A site survey is mandatory prior to the start of work.

All work shall be completed within a timely and efficient manner. Contractor shall communicate all work via contracting officer and ship’s superintendent (Yard POC).