270 Ft MDE Exhaust Insulation Drawings Highlighted SoW.pdf
PDF 1018 KB Posted
- Attached to
- MDE EXHAUST INSULATION REMOVAL
- Solicitation number
- 70Z04024Q61160Y00
About this file
This document is a combined synopsis/solicitation for the removal of MDE (Main Diesel Engine) exhaust insulation on the USCG Cutter Legare, WI-111. The U.S. Coast Guard, Surface Forces Logistics Center (SFLC) intends to award a Firm Fixed Price Purchase Order for this requirement. The scope of work includes the removal of approximately 40 linear feet of 20" exhaust insulation piping from the MDE flow pot assembly to the underside of the existing silencers on both the port and starboard sides. The period of performance is to start as soon as possible and be completed within 1-2 days. Quotes are due by August 19, 2024 at 12:00 PM (Eastern) and will be evaluated on a Lowest Priced Technically Acceptable basis. Payment will be made via Government Purchase Order on a Net 30 basis, and no down payments or advanced payments will be made. The place of performance is the U.S. Coast Guard Yard in Baltimore, MD.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAR Clauses.pdf | ||
| 270 Ft Legare SOW MDE Exhaust Insulation Removal Contract Services 2124404Y61A3799003.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .